Kurt Wilson Louisiana Dept. of Environmental Quality Business & Community Outreach Division Small Business/Small Community Assistance Program



Similar documents
Spill Prevention, Control, and Countermeasures (SPCC) Regulations Update

ABOVE-GROUND STORAGE TANKS

The Federal Spill Prevention, Control & Countermeasures (SPCC) Rule Overview

ACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas

Spill Prevention, Control and Countermeasure (SPCC) Rule

Section 5. Secondary Containment and Impracticability. (as applicable to APSA tank facilities)

Spill Prevention, Control and Countermeasure (SPCC)

Spill Prevention, Control and Countermeasure (SPCC) Training

SPCC for Food Services

U.S. ENVIRONMENTAL PROTECTION AGENCY TIER I QUALIFIED FACILITY SPCC PLAN TEMPLATE

TRAINING SPCC/SWPP Training UGA. Automotive Center. Campus Transit

Appendix E: Spills. Spill Prevention, Control, and Countermeasure Plans Your Role in Spill Response: What to Do if You Have a Spill...

History of the SPCC Rule

Spill Prevention Control and Countermeasure (SPCC) Regulations Fact Sheet

Spill Prevention, Control and Countermeasure Plan Checklist

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

OIL POLLUTION PREVENTION REGULATIONS

Safety Manual Title: Spill Prevention & Response Review Date: 6/1/2014

MODULE IV Secondary Containment, Oil Spill Control & Spill Prediction

Good Housekeeping Practices for DPW/Fleet Maintenance Facilities

TULANE UNIVERSITY SPILL PREVENTION CONTROL & COUNTERMEASURE (SPCC) PLAN FOR OIL STORAGE AREAS

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

Critical Regulations SUMMARY OF. Stormwater Management Regulations (National Pollutant Discharge Elimination System or "NPDES ) 40 CFR 122.

Safety, Health and Environmental Quality Conference

Spill Control Prevention Plan (SCPP)

W250. The Agricultural Producers Comprehensive Guide to Federal Oil Pollution Prevention Regulations

Spill Prevention, Control and Countermeasures (SPCC) 40 CFR 112. For Bulk Facilities

OIL STORAGE REQUIREMENTS OF THE SPCC REGULATIONS. Christopher J. Ecsedy, P.E. Fuss & O'Neill, Inc. 146 Hartford Road Manchester, CT 06040

Spill Prevention, Control, and Countermeasures (SPCC) Course Material

Facility Scenario - Example Tier I Qualified Facility SPCC Plan

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN. for the PIÑON RIDGE MILL HIGHWAY 90 BEDROCK, COLORADO Prepared by:

Appendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans

U.S. ENVIRONMENTAL PROTECTION AGENCY TIER I QUALIFIED FACILITY SPCC PLAN TEMPLATE

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

SPILL CONTAINMENT AND CONTROL PLAN

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

Spill Prevention Control & Countermeasure (SPCC) for Farms

FACILITY ENVIRONMENTAL COMPLIANCE

SPCC Rule Review. Spill Prevention Control & Countermeasures NON-TRANSPORTATION RELATED ONSHORE AND OFFSHORE FACILITIES

UNIVERSITY OF WISCONSIN MADISON

SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN

FUELING AND FUEL STORAGE

CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA

DISCLAIMER - APPENDIX D

If your campus has. Oil Pollution Prevention Rules (con.) Oil Pollution Prevention Rules (con.)

Spill Prevention, Control & Cleanup SC-11

Spill Prevention, Control & Countermeasure

Outdoor Liquid Container Storage

Chapter 4 Secondary Containment and Impracticability

for Gary Hughes GARY HUGHES SELF SERVICE LLC State of Missouri ID: ST

BEST MANAGEMENT PRACTICES FOR LEAK AND SPILL CONTROL

The Federal Spill Prevention, Control & Countermeasures (SPCC) Rule Overview

SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN PREPARED FOR: ARKANSAS STATE UNIVERSITY JONESBORO, ARKANSAS ORIGINAL DATE OF PLAN: APRIL 2005

SPILL PREVENTION, CONTROL AND COUNTERMEASURES (SPCC) PLAN

Annual Storm Water Pollution Prevention Plan and Spill Prevention, Control and Countermeasures Plan Compliance Inspection

UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES

MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION

SPCC Plan. Spill Prevention Control and Countermeasure Plan. Southwestern University

Spill Prevention, Control. and. Countermeasures Plan

SPILL PREVENTION, CONTROL AND COUNTERMEASURE (SPCC) PLAN

Spill Prevention, Control, and Countermeasure Plan Daneros Mine

Management Approval/Certification Statement

Spill Plan Reviewer s Guidance

SPCC. Created by EPA in 1973 under the Clean Water Act. 10/22/2014. Spill Prevention Control & Countermeasure Plan

Natural Resources Conservation Authority Guidelines for Secondary Containment of Hazardous Liquids stored Above-ground

DOES YOUR COMPANY NEED AN SPCC PLAN? Larry Seabolt Remtech Engineers Remediation Specialists

How To Safely Handle A Spill

SOP 4: Spill Response and Cleanup Procedures SOP 4: SPILL RESPONSE AND CLEANUP PROCEDURES

Environmental Health & Safety

Secondary Containment. Beth Powell VP & General Manager 855-PIG-LINER ( )

Draft. ATLANTIC COAST PIPELINE, LLC ATLANTIC COAST PIPELINEINE Docket No. PF and

A Guide for Used Oil Transporter Training Programs. Following are excerpts from laws and rules pertaining to Used Oil Transporter Certification

SPILL PREVENTION, CONTROL AND COUNTERMEASURE (SPCC) PLAN

Pollution Prevention And Best Management Practices For Dry Cleaners Operating In Broward County

Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702

Petroleum Storage Tank Compliance 101

Suffolk County Department of Health Services. Division of Environmental Quality

CHAPTER PETROLEUM CONTACT WATER

SPILL PREVENTION, CONTROL, AND COUNTER MEASURES PLAN (SPCC)

Environmental Standard Operating Procedures (ESOP) TITLE: ESOP 9.7 BULK STORAGE AND MANAGEMENT OF HAZARDOUS MATERIALS (HM)

Fuel Storage Who to ask: tank farm owners/operators

Port of Portland Terminal 2

Steel Tank Institute AST Inspections. Dana Schmidt, PE STI/SPFA

~CSRMA ALERT~ REVISED SPCC RULE WILL IMPACT MOST POTW S

SPILL RESPONSE PLAN. What is the Issue? Regulatory Requirements. General Information

Improper storage of potential pollutants will increase the risk of water pollution that may occur because of spills.

Outdoor Storage of Raw Materials SC-33

(d) Properly maintain and operate equipment that uses or contains OHS to prevent spills.


Civil Engineering Sector Labour-Management Health and Safety Committee

APPENDIX 4A SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN

PREVENTING GROUNDWATER POLLUTION: SECONDARY CONTAINMENT

SPILL PREVENTION CONTROL AND COUNTERMEASURES PLAN

SILICON VALLEY CLEAN WATER. May 2015

SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN Community College of Rhode Island Warwick, Rhode Island

APPENDIX G Materials Storage and Handling Guidelines

Contingency Plan Template. Hazardous Materials and Waste Management Division (303)

The following definitions apply with regard to requirements specified in this document:

Transcription:

Kurt Wilson Louisiana Dept. of Environmental Quality Business & Community Outreach Division Small Business/Small Community Assistance Program

LDEQ Water Regulations Spill Prevention and Control (SPC) Authorized Pursuant to LAC 33:IX.Chapter 9 U.S. EPA Code of Federal Regulations Spill Prevention, Control, and Countermeasure (SPCC) Authorized Pursuant to 40 CFR Part 112; Oil Pollution Prevention

Establish Contingency Planning Implement Operating Procedures Require Best Management Practices (BMPs) Outline Response Actions To prevent and control the discharge of pollutants resulting from spill events.

LAC 33:IX. Chapter 9 applies to: Oil of any kind and in any form (i.e. petroleum, fuel oil, sludge, oil refuse, etc) All substances listed in LAC 33:I.3931 of the LDEQ Notification Regulations that are in liquid form. Minimum above ground storage capacity is 1320 US gallons for 2 or more individual containers in aggregate within common storage area. 660 gallons for an individual container.

Plan must be prepared within 180 days of the facility beginning operations Fully implemented no later than 1 year after facility operations begin A final permit may contain a tighter schedule Plan is to be kept and maintained on site and not submitted to LDEQ unless requested Plan is to be reviewed and revised as necessary every three years

Name of facility and operator of facility Mailing address and location of the facility Date and year of initial facility operation Description of facility with identity, amount, and location of applicable substances Corrective action (countermeasure) procedures A description and map showing direction of flow and location of nearest receiving waters

Dikes, berms, retaining walls Curbing, drip pans Culverts, gutters, sumps, other collection or drainage systems Weirs, booms, other barriers Spill diversion and retention ponds Sorbent and other response materials

All storage tanks installations should be constructed so that a secondary means of containment is provided for the entire contents of the largest single tank and sufficient freeboard to allow for precipitation Diked areas should be sufficiently impervious to contain spills Drainage from area should be restrained by valves or other positive means to prevent spills or leakage.

The remainder of Chapter 9 is a discussion of conformance Personnel training, designated contact person, operator meetings Inspections and record keeping in writing as part of the working document And, what was once a minor discussion but a very important component; security in the form of restricting unauthorized entry: gates, fences, locks and lighting.

Authorized Pursuant to 40 CFR Part 112; Oil Pollution Prevention Administered by the United States Environmental Protection Agency (EPA) Several subtle differences from State (SPC) Regulations

Minimum applicable capacity for single tank is 1320 gallons Total Capacity applies to containers down to 55 gallons or more If total capacity is over 10,000 gallons (or if other stipulations apply), SPCC Plan must be certified by a Professional Engineer Required content of SPCC Plan is slightly different from SPC Plan New SPCC Rule amendments have altered compliance dates

The SPCC Plan must clearly address the following: Operating procedures to prevent oil spills Control measures to prevent a spill from reaching navigable waters Countermeasures to contain, clean up, and mitigate the effects of an oil spill that reaches navigable waters

Discussion of facility s conformance with applicable SPCC requirements Explanation of regulatory applicability Description of the facility s physical layout and a facility diagram that indicates locations of oil storage and handling General facility description including name, function, and drainage patterns Description of oil storage and handling areas Discharge prevention measures including procedures for routine handling of products Designation of SPCC responsibilities, including a Spill Coordinator Description of spill events in the previous 12 months

Analysis of potential spill scenarios, including prediction of directions, rate of flow, and total quantities that could be released Description of spill containment and drainage control structures and equipment for oil storage and handling facilities Description of spill emergency response equipment Description of spill notification procedures Oil Spill Contingency Plan describing spill response and cleanup procedures, including coordination with local authorities and spill response contractors

Spill Prevention Plan, including inspection and monitoring program, tank integrity testing procedures, engineering controls to prevent overfills, preventative maintenance and housekeeping procedures, formal spill response training and exercises, and security measures Documented review and update of procedures every five years Professional Engineer (PE) certification, or selfcertification if the facility qualifies Management approval

Amendments were made to the SPCC Rule over the last few years for several reasons: Address a number of issues raised by the regulated community Increase clarity Tailor and streamline certain requirements Facilitate compliance by owners and operators of a facility

A facility starting operation On or before August 16, 2002 Must Maintain its existing SPCC Plan Amend and implement the SPCC Plan no later than Nov. 10, 2010. After August 16, 2002 through Nov. 10, 2010 Prepare and implement the SPCC Plan no later than Nov. 10, 2010. After Nov. 10, 2010 Prepare and implement a SPCC Plan before beginning operations.* * Owners or operators of new oil production facilities must prepare and implement an SPCC Plan six months after the start of operations.

Tank containment may be made of concrete, concrete blocks, impervious clay, steel, or any impervious material that will not react with the fuel or oil. (Asphalt will dissolve if diesel is spilled on it making an oily sheen.) Before the rainwater that accumulates in the containment area can be discharged, it must be inspected for a visible sheen (the rainbow appearance oil makes on water) or free product. If the rainwater looks clean, document the date, time, that it did not have a sheen or free product floating on it and discharge it. Keep that log book for state (LDEQ) and federal inspectors (EPA).

If the containment has a drain valve or bung for draining the storm water, it must be kept in the closed position at all times except when the storm water is being drained off. The draining of the storm water must be supervised at all times. Once the water is drained off, close and secure the valve or bung. The tanks should be fenced or secured in someway to prevent vandals. The containment area should be well lit so as to discourage vandals, and allow responders to be able to see a leak and not be standing in gasoline or other oil product.

Any spills or leaks from fueling or maintenance of equipment exposed to storm water must be cleaned up. Dry methods (kitty litter, absorbent pads, etc.) shall be used. The spilled material shall be properly disposed of after cleanup (usually goes to a drum or dumpster for disposal in an approved landfarm, or sanitary or industrial landfill). Employees must be trained at least once a year on spill control methods and the content of the SPC/SPCC plan. The training should include who to call if a spill occurs and what steps to take to stop and mitigate (cleanup) the spill. Records of the training and who attended is important.

LDEQ Small Business/Small Community Assistance Program Provide small business owners and small communities with FREE technical assistance in understanding and complying with environmental regulations. Regional, Multi-media, and Non-Enforcement Assist with developing and implementing SPC/SPCC Plans, as well as understanding regulatory applicability

HOTLINE: 1-800-259-2890 EMAIL: SBAP@la.gov WEBSITE: http://www.deq.louisiana.gov/

Kurt Wilson Office of the Secretary Business & Community Outreach Division Email: Kurt.Wilson@la.gov Phone: (504)736-7767

40 CFR Part 112: http://ecfr.gpoaccess.gov/cgi/t/text/textidx?c=ecfr&sid=22c1727100b482e3a5a3838622642afd &rgn=div5&view=text&node=40:21.0.1.1.7&idno=40 EPA Oil Program: http://www.epa.gov/oilspill/ Region 6 Outreach Guides: http://www.epa.gov/earth1r6/6sf/sfsites/oil/ Tier I Qualified Facility SPCC Plan Templates: http://www.epa.gov/emergencies/content/spcc/tier1tem p.htm