Report from Italian ROC



Similar documents
OPERATIONS STRUCTURE FOR THE MANAGEMENT, CONTROL AND SUPPORT OF THE INFN GRID/GRID.IT PRODUCTION INFRASTRUCTURE

The Grid-it: the Italian Grid Production infrastructure

The Italian Grid Infrastructure (IGI) CGW08 Cracow. Mirco Mazzucato Italian Grid Infrastructure Coordinator INFN CNAF Director

Support Model for SC4 Pilot WLCG Service

Internal ROC DECH Report

GridICE: monitoring the user/application activities on the grid

Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft. Support in EGEE. (SA1 View) Torsten Antoni GGUS, FZK

The Italian Regional Helpdesk System

Global Grid User Support - GGUS - in the LCG & EGEE environment

Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft. Global Grid User Support - GGUS - within the LCG & EGEE environment

SPACI & EGEE LCG on IA64

Large Hadron Collider:

CY-01-KIMON operational issues

Global Grid User Support - GGUS - start up schedule

Ticketing System Configuration and Accounting Network

Regional Dashboard. Cyril L Orphelin - CNRS/IN2P3 Abingdon, England. EGEE and glite are registered trademarks

Welcome to the User Support for EGEE Task Force Meeting

The ENEA-EGEE site: Access to non-standard platforms

The PON RECAS Infrastructure: present and future of grid/cloud computing and connectivity Guido Russo Università di Napoli Federico II & INFN Napoli

File Transfer Software and Service SC3

CMS Dashboard of Grid Activity

The glite File Transfer Service

The GILDA Testbed Valeria Ardizzone INFN Catania

Focus on Emergency and Essential Care (EEC) at District Hospital

HAMBURG ZEUTHEN. DESY Tier 2 and NAF. Peter Wegner, Birgit Lewendel for DESY-IT/DV. Tier 2: Status and News NAF: Status, Plans and Questions

Sustainable Grid User Support

The GENIUS Grid Portal

EGEE a worldwide Grid infrastructure

Status of Grid Activities in Pakistan. FAWAD SAEED National Centre For Physics, Pakistan

John Walsh and Brian Coghlan Grid Ireland /e INIS/EGEE

DSA1.5 U SER SUPPORT SYSTEM

PoS(ISGC 2013)024. Porting workflows based on small and medium parallelism applications to the Italian Grid Infrastructure.

The dashboard Grid monitoring framework

Alternative models to distribute VO specific software to WLCG sites: a prototype set up at PIC

D4A - DOCTORS FOR AFRICA. Objectives of the MA Program

GRIDSEED: A Virtual Training Grid Infrastructure

The ENEA gateway approach providing EGEE/gLite access to unsupported platforms and operating systems

Analisi di un servizio SRM: StoRM

ARDA Experiment Dashboard

DSA1.4 R EPORT ON IMPLEMENTATION OF MONITORING AND OPERATIONAL SUPPORT SYSTEM. Activity: SA1. Partner(s): EENet, NICPB. Lead Partner: EENet

IT-INFN-CNAF Status Update

GRIDSEED: A Virtual Training Grid Infrastructure

APPLEPIES May, International Conference on Electronic Applications. hosted by.

DCMS Tier 2/3 prototype infrastructure

Report from SARA/NIKHEF T1 and associated T2s

The dcache Storage Element

DAME Astrophysical DAta Mining Mining & & Exploration Exploration GRID

Auto-administration of glite-based

Widening the number of e- Infrastructure users with Science Gateways and Identity Federations (access for success)

Virtualization of Grid Infrastructure

Tier-1 Services for Tier-2 Regional Centres

Virtualization, Grid, Cloud: Integration Paths for Scientific Computing

Document: 8600 FAQ FOR TPM TPM. Version Authors Date Comments

Status and Integration of AP2 Monitoring and Online Steering

Sun Grid Engine, a new scheduler for EGEE

Global Grid User Support Building a worldwide distributed user support infrastructure

Analyses on functional capabilities of BizTalk Server, Oracle BPEL Process Manger and WebSphere Process Server for applications in Grid middleware

EGEE is a project funded by the European Union under contract IST

Mediterranean School of Oncology

ITALY S EXTERNAL COMPETITIVENESS

INFN Testbed status report

A Uniform Job Monitoring Service in Multiple Job Universes

Management and Control Bodies, Points of Contact, Addresses

Plateforme de Calcul pour les Sciences du Vivant. SRB & glite. V. Breton.

Walk Ludovico: Piano and Celesta

See-GRID Project and Business Model

REPORT ON INTEGRATED RESEARCH ACTIVITIES OF RT4 (RG6)

A Web-based Portal to Access and Manage WNoDeS Virtualized Cloud Resources

perfsonar deployment over Spanish LHC Tier 2 sites

CNR-INFM DEMOCRITOS and SISSA elab Trieste

LHC schedule: what does it imply for SRM deployment? CERN, July 2007

Efficient and Scalable Climate Metadata Management with the GRelC DAIS

Document: Recommended regional helpdesk approach for interfacing with GGUS system

Experiences with the GLUE information schema in the LCG/EGEE production Grid

Report on WorkLoad Management activities

NOME ROLE DEGREE TEACHING AREA INSTITUTION. Chiara Tonelli Faculty Advisor Aggregate Professor Environmental Design Architecture Department Roma Tre

TRANSLATION OF ANNOUNCEMENT FOR 9 RESEARCH POSITIONS (Decree no.89 dated )

glibrary: Digital Asset Management System for the Grid

How To Contact Cognome Nome

Forschungszentrum Karlsruhe: GridKa and GGUS

Sun Grid Engine, a new scheduler for EGEE middleware

present a film by Andrea Biglione starring release date 12 August 2011 distributed by

CERN local High Availability solutions and experiences. Thorsten Kleinwort CERN IT/FIO WLCG Tier 2 workshop CERN

SESSION 1: INFRASTRUCTURE SESSIONS

INFN CC - A Work at Home infrastructure and Customer Profile

October 13 th Program

CREA International company profile & project credentials

INTELLIGENT ELECTRICAL NETWORKS: A KEY ELEMENT IN THE DEVELOPMENT OF NEW MODELS OF GROWTH

Agenda. Morning GAS MARKET MONDAY 28 SEPTEMBER INAUGURAL CONFERENCE GEOPOLITICS OF ENERGY: TOWARDS THE EUROPEAN SINGLE MARKET

Update on Network Performance Monitoring

AMGA - Official Metadata Service for EGEE

IIR Proceedings of the Fourth Italian Information Retrieval Workshop. Roberto Basili, Fabrizio Sebastiani, Giovanni Semeraro (Eds.

D.Cesini (IGI/INFN- CNAF) E.Giorgio (IGI/INFN- CT) (On behalf of the IGI- FUS group)

I DAY. OPENING PLENARY SESSION MORNING (09:30 10:30 a.m.) Opening remarks: Giovanni Sabatini, General Manager ABI

DRAFT AGENDA. OPENING PLENARY SESSION Environmental, social and economic sustainability for Europe: the 2020 outlook

Chairman - Casagli Nicola Convenor - Bertolini Giovanni Convenor - Gonzalez Marta Convenor - Karl Mayer

WM Technical Evolution Group Report

Representation of the European Commission in Italy - Rome, Via IV Novembre, 149 LOCATION: Spazio Europa (ground floor) II FORUM

UNIVERSITÀ DEGLI STUDI DELLA TUSCIA

Towards a Comprehensive Accounting Solution in the Multi-Middleware Environment of the D-Grid Initiative

Transcription:

Report from Italian ROC Paolo Veronesi for ROC It www.eu-egee.org ARM-7, ROC(111) 15th - 17th May 2006 - Krakow,

Outline Changes in ROC structure over the last 3 months (people/institutes involved) People directly involved in running the ROC (names, roles) Regional trouble ticketing system status List of VOs supported in the region Levels of computer resources in the region INFNGRID customizations for glite 3.0 and deployment plans 2

Any changes in ROC structure over the last 3 months (people/institutes involved) Enabling Grids for E-sciencE No changes in institutes involved: INFN, ENEA, SPACI Consortium Universities ROC manager Luciano Gaido, Paolo Veronesi, Cristina Vistoli Regional Deployment manager Alessandro Paolini Support coordination Marco Verlato, Federico Nebiolo PPS and Certification testebed Daniele Cesini Grid Operation on Duty Alessandro Cavalli, Alfredo Pagano, Paolo Veronesi SC Coordination Tiziana Ferrari 3

People involved (1/7) Task TSA1.1: Operate a production and preproduction service It Partner INFN ENEA SPACI-UNICAL SPACI-UNILE SPACI-UNINA IT Total TSA1.1.1: ROC management Paolo Veronesi TSA1.1.2: Pre-production service site 60 60 Daniele Cesini Marco Verlato Stefano Dal Pra Riccardo Veraldi Guido Negri TSA1.2: Middleware deployment and support TSA1.2.1: Coordination and support for middleware deployment Simone Dalla Fina Guido Cuscela Federico Nebiolo Giuseppe Lo Re Luciana Carota Giacinto Donvito 72 72 4

People involved (2/7) Task TSA1.3: Grid Operations and support TSA1.3.1: 1st line support for operational problems in region Alessandro Barchiesi Sergio Fantinel Riccardo Zappi It Partner INFN ENEA SPACI-UNICAL SPACI-UNILE SPACI-UNINA IT Total 72 Stefano Zani Alessandra Doria 7,2 Paolo Mastroserio tbd Giovanni Bracco Andrea Quintiliani Sandro Fiore Osvaldo Marra Antonio Morrone Andrea Attanasio 4,8 9 10 8 1 6 4 20 111 8 5

People involved (3/7) Task TSA1.3.2: Oversight and management of operational problems Alessandro Paolini Marco Verlato It Partner INFN ENEA SPACI-UNICAL SPACI-UNILE SPACI-UNINA IT Total 72 72 Luca Vaccarossa Leonardo Merola 6 Giorgio Maggi 6 6 6 Michele Michelotto Cristina Vistoli Enrico Mazzoni TSA1.3.3: Run essential regional grid services Daniele Cesini Alfredo Pagano Luca Magnoni Alessandro Italiano 48 48 6

People involved (4/7) Task TSA1.3.4: Weekly operator on duty support Paolo Veronesi Alessandro Cavalli Alfredo Pagano Massimo Donatelli Maria D'Amato Alberto Ciampa TSA1.3.5: Grid services for infrastructure or VOs Alessandro Cavalli Riccardo Zappi Sergio Fantinel Stefano Dal Pra Tiziana Ferrari Fabio Martinelli tbd It Partner INFN ENEA SPACE-UNICAL SPACI-UNILE SPACI-UNINA IT Total 72 72 72 72 7,2 4,8 7

People involved (5/7) Task TSA1.4: Grid security and incident response TSA1.4.1: Grid incident response coord in region Riccardo Brunetti Luca Dell'agnello TSA1.5: VO, application, and user support TSA1.5.2: Call centre, helpdesk for ROC Simone Dalla Fina Luca Magnoni Daniele Bonacorsi Nicola De Filippis It Partner INFN ENEA SPACE-UNICAL SPACI-UNILE SPACI-UNINA IT Total 24 24 tbd Angelo Carbone TSA1.5.3: VO support, integration support Luca Vaccarossa Alessandro Barchiesi Salvatore Podda Silvio Migliori Marco Lapegna Vito Patruno Osvaldo Marra Sandro Fiore 72 72 24 8 4 20 10 0 66 8 4 6 8

People involved (6/7) Task It SPACE- SPACI- SPACI- Partner INFN ENEA UNICAL UNILE UNINA IT Total TSA1.5.4: User training in region 24 24 Gennaro Tortone Simone Campana Francesca Galluccio TSA1.5.5: Site admin training in region 7,2 4,8 24 24 Federico Nebiolo Davide Salomoni TSA1.6: Grid Management TSA1.6.2: Accounting coordination in region Riccardo Brunetti Giuseppe Patania 24 24 9

People involved (7/7) Task It Partner INFN ENEA SPACE-UNICAL SPACI-UNILE SPACI-UNINA IT Total TSA1.7: Interoperation TSA1.7.1: National and regional grid project coordination Luciano Gaido TSA1.8: Application<- >resource provider coordination TSA1.8.1: ROC management of resources/slas Alessandro Paolini TSA1.8.2: OAG management TSA1.9: Application/resource provider/mw provider coord TSA1.9.1: ROC representation in coordination tbd 10

GGUS-Xoops/xhelp interface 11

GGUS-ROC interface improvements Enabling Grids for E-sciencE Replace XML ticket mail exchange with web-services technology for GGUS ROC communication SOAP Server on top of the local helpdesk ROC_SW developed it for OneOrZero ROC_Italy developed it for Xoops/Xhelp From test to production systems soon Multiple attachements handling Mail to submitter (DONE) Full ticket history

LCG VOs ALICE ATLAS CMS LHCB Enabling Grids for E-sciencE List of VOs supported in the region EGEE VOs BIOMED COMPCHEM EGRID ESR GEANT4 MAGIC PLANCK REGIONAL ARGO BIO ENEA GRIDIT INAF INGV THEOPHYS Certification VOs DTEAM INFNGRID OPS GLOBAL BaBar CDF SIXT VIRGO ZEUS OTHER EUMED EUCHINA GILDA GEAR LIBI NA48 PAMELA 13

Levels of computer resources in the region Enabling Grids for E-sciencE 14

INFN-GRID Customizations Additional VOs (~20) GridICE on WN Preconfigured support for MPI WN without home shared but with ssh hostbased authentication DGAS: accounting New profile (HLR server) + additional packages on CE and WN NME (Network Monitor Element) Collaboration with CNAF-T1 for Quattor UI PnP UI installable without administrator privilegies NTP AFS (read-only) on WN (only for sites supporting CDF) 15

Plans Changed plans: First install on T1 (quattor based), then other sites (In the past it was the opposite because of complexity of T1 setup) Reduce tests of standard functionalities Focus on the local customizations + Quattor based deployment As soon as T1 is up and the customizations are tested: Update documentation for other sites installing with plain yaim Provide 1 st line support for the ROC Timescale: May 11 th : release ready for T1 install May 18 th : release available for other sites 16