ESTIMATION OF PROJECT COSTS AND BENEFITS



Similar documents
Economics Training Series Introductory Course. Cost Estimation

Examples of Good Practice

FINANCIAL AND ECONOMIC ANALYSES

Session 2.3 Financial / Economic Analysis and Shadow Pricing. Introductory Course on Economic Analysis of Investment Projects

ECONOMIC GROWTH* Chapter. Key Concepts

The Town of Fort Frances POLICY SECTION ACCOUNTING FOR TANGIBLE CAPITAL ASSETS. ADMINISTRATION AND FINANCE NEW: May PURPOSE: 2.

Chapter 5 Revenue & Cost Analysis

CAPITALIZATION OF PROPERTY, PLANT, AND EQUIPMENT P ACCOUNTING MANUAL Page 1 CAPITALIZATION OF PROPERTY, PLANT, AND EQUIPMENT.

Financial Statement Guide. A Guide to Local Government Financial Statements

The National Accounts and the Public Sector by Casey B. Mulligan Fall 2010

Consolidated Financial Statements (For the fiscal year ended March 31, 2013)

PROGRAM EXPENDITURE AND FINANCING ASSESSMENT

How To Calculate Discounted Cash Flow

Consolidated Financial Statements

GUIDANCE FOR TRANSIT FINANCIAL PLANS

CONSOLIDATED STATEMENT OF INCOME

Notes to Consolidated Financial Statements Notes to Non-consolidated Financial Statements

Project Profile on the Establishment of Electric Water Heater Making Plant

The Kansai Electric Power Company, Incorporated and Subsidiaries

INDUSTRIAL-ALLIANCE LIFE INSURANCE COMPANY. FIRST QUARTER 2000 Consolidated Financial Statements (Non audited)

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance

EXPLANATORY NOTES. 1. Summary of accounting policies

MEASURING GDP AND ECONOMIC GROWTH CHAPTER

Course 3: Capital Budgeting Analysis

Financial Statements

SIGNIFICANT ACCOUNTING POLICIES

Compiling the Gross Domestic Product: The Myanmar Experience

The CAO s Experience in Auditing Public Debt

Notes to Consolidated Financial Statements Year ended March 31, 2014

3. CONSOLIDATED QUARTERLY FINANCIAL STATEMENTS

GUIDELINES FOR RESPONDING TO THE GFSM 2014 ANNUAL GFS QUESTIONNAIRE

Closing Announcement of First Quarter of the Fiscal Year Ending March 31, 2009

A Quick Guide to Municipal Financial Statements MUNICIPAL AFFAIRS

PSAB AT A GLANCE Section PS 1201 Financial Statement Presentation

DISTRICT OF NORTH VANCOUVER GUIDE TO FINANCIAL STATEMENTS

Notes to Consolidated Financial Statements Notes to Non-Consolidated Financial Statements

6. Significant Accounting Policies for Preparing Consolidated Financial Statements

1. Basis of Preparation. 2. Summary of Significant Accounting Policies. Principles of consolidation. (a) Foreign currency translation.

Residual carrying amounts and expected useful lives are reviewed at each reporting date and adjusted if necessary.

ZAMIL INDUSTRIAL INVESTMENT COMPANY (SAUDI JOINT STOCK COMPANY)

A Guide to for Financial Instruments in the Public Sector

Notes to Consolidated Financial Statements Kikkoman Corporation and Consolidated Subsidiaries Years ended March 31, 2009 and 2008

Consolidated Financial Results

Outline feasibility study for ORET application in the health care sector

VANCOUVER COMMUNITY COLLEGE

Consolidated Financial Statements 2009

IFRS IN PRACTICE. IAS 7 Statement of Cash Flows

ICC PROJECT EVALUATION PROCEDURES AND GUIDELINES

1 CONSOLIDATED FINANCIAL STATEMENTS (1) Consolidated Balance Sheets

The Application of International Accounting Standards in the Financial Statements of Tearfund Partners

STATEMENT OF COMPLIANCE AND BASIS OF MEASUREMENT

Flow of Funds Data Dictionary

Walmart reports Q1 FY 16 EPS of $1.03

CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS

CHAPTER 5: MEASURING GDP AND ECONOMIC GROWTH

Province of Newfoundland and Labrador. Public Accounts Volume I Consolidated Summary Financial Statements

Investments and advances ,669

November 4, 2015 Consolidated Financial Results for the Second Quarter of Fiscal Year 2015 (From April 1, 2015 to September 30, 2015) [Japan GAAP]

PROJECT PROFILE ON THE ESTABLISHMENT OF ALUMINIUM FRAMES PRODUCING PLANT

In 2012, GNP in constant prices increased by 1.8% compared with 2011.

UK debt and the Scotland independence referendum

Consolidated and Non-Consolidated Financial Statements

2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation

Items Disclosed via the Internet Concerning the Notice of. Convocation of the 117th Annual General Meeting of Shareholders

WATER UTILITY REFERENCE MANUAL

GOLDMAN SACHS EXECUTION & CLEARING, L.P. and SUBSIDIARIES

Summary of Financial Results for the Third Quarter of Fiscal Year Ending March 31, 2009 (Nine Months Ended December 31, 2008)

COST & BREAKEVEN ANALYSIS

Online Disclosures Relating to Notice of the 101st Annual Shareholders Meeting

INTERNATIONAL ACCOUNTING STANDARDS. CIE Guidance for teachers of Principles of Accounts and Accounting

What is Cost of Service Regulation? Basic Issues in Rate Proceedings. Basic COS Component: Operating Expenses

Fund Balance With Treasury Debit Fund Balance With Treasury Under a Continuing Resolution Debit

Consolidated Financial Results for the nine months of Fiscal Year 2010

National Income Accounting

Financial Results for the First Quarter Ended June 30, 2014

Intermediate Accounting

Japan Vilene Company, Ltd. and Subsidiaries

ECONOMIC ANALYSIS (Republic of the Marshall Islands: Public Sector Program)

Data Compilation Financial Data

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

CASH FLOW STATEMENT & BALANCE SHEET GUIDE

Chapter 3 Unit 1. IET Engineering Economics. Learning Objectives Chapter 3. Learning Objectives Unit 1

Office of the Minister of Transport. Chair Cabinet NATIONAL LAND TRANSPORT FUND: FUTURE FUNDING. Proposal

Investments and advances ,499

Management Discussion and Analysis of Financial Position and Operating Results

Summary of Significant Differences between Japanese GAAP and U.S. GAAP

184. PROFILE ON MICRO FINANCE SERVICE

College Accounting Chapter 10 Plant Assets, Natural Resources, and Intangibles

Summary of Consolidated Financial Statements for the Second Quarter of Fiscal Year Ending March 31, 2012 (Japanese GAAP)

85. PROFILE ON ENVELOPS, LABELS AND BADGES OF PAPER

GOVERNMENT OF YUKON. Financial Statement Discussion and Analysis for the year ended March 31, 2007

Chapter Copyright 2012 Pearson Education, Inc. Publishing as Prentice Hall.

Condensed Consolidated Interim Financial Statements (In U.S. dollars) (Unaudited) GALANE GOLD LTD.

Transcription:

SESSION 2.1 ESTIMATION OF PROJECT COSTS AND BENEFITS Introductory Course on Economic Analysis of Investment Projects Economics and Research Department (ERD)

2 Project Statements Comparison of costs and benefits Typically investment costs (equipment, land, buildings etc) in early years with benefits arising after one or two years Start year when funds are committed to project (eg year 1, sometimes year 0 if starts immediately) Working capital for running project eg stocks

3 Project Life Needs to be identified Can be based on technical life of main equipment or estimated economic working life Economic working life ends in year where running cost > additional revenue Where economic life < technical life need to add Terminal Value for resale of assets in final year

4 Constant Prices Inflation usually ignored on assumption that all items rise at same rate Constant base year prices Not strictly correct as fixed costs or revenues will be reduced in real terms Eg tax allowances or fixed interest debt Also relative price changes eg oil price

5 Relative Price Change Formula RP = ((1 + p)/(1 + i))-1 where p is price rise for specific commodity and i is general inflation Approximately equal to p i So if oil price rises by 10% in 2011 and inflation is 2% relative price change for oil is approximately 8% Also applies to exchange rate

Project Cost Estimate: Feasibility/Detailed Design Identify project. Identify individual project components. Classify individual project components. Schedule construction and operation and maintenance of individual components within the project design. Engage project cost estimator to begin estimating costs in financial terms. Engage financial analyst to provide cost estimator with the level of detail required for financial analysis. Engage economist to provide cost estimator with the level of detail required for economic analysis. 6

7 Project Cost Estimates Choice of currency domestic currency (e.g., Som, Tenge, Tugrik) foreign currency (e.g., US$) Categories of costs domestic currency costs (e.g., unskilled labor) foreign currency costs (e.g., imported equipment) tradables nontradables

Project Cost Estimates: Types of Costs 8 a) Investment Costs civil works electrical works mechanical works engineering and other professional services start-up costs vehicles and equipment labor other taxes and duties b) Recurrent Costs salaries operation and maintenance costs salaries fuel consumables other c) Salvage values d) Financial charges interest during construction

Identifying Cost Items System Costs if project is part of a larger system, include all other system investments needed to achieve project benefits. Power generation project may or may not need investment in transmission and distribution A highway section may or may not need investment in preceding or following sections Sunk Costs - costs that would exist without or with the project; should be excluded Working capital In financial analysis, includes net current assets (inventories, securities, cash, etc.) In economic analysis, include only inventories Changes in working capital are what matter Transfer payments taxes, duties, subsidies Included as cost in financial analysis, but not in economic analysis 9

10 Identifying Cost Items Depreciation and amortization Accounting convention allows entry as expenses, for computing tax liabilities In financial and economic analysis, such costs amount to doublecounting if already counted at time of disbursement External costs Some costs may not be charged against the project, e.g., air or water pollution Such costs may be internalized, e.g., when pollution charges are imposed, or anti-pollution devices are installed

11 Base Costs Base Costs - best estimates of project costs at a specified date, assuming: Quantities of works, goods and services and relevant prices are accurately known. Quantities and prices will not change during implementation. The project will be implemented exactly as planned.

Contingency Allowances 12 Allowance for adverse conditions which will be in addition to the base cost estimate. Physical contingencies to cover physical uncertainties beyond the base case to complete the project. Often calculated and expressed as percentages of base costs. Price contingencies to cover inflation and price uncertainties Some typical levels of Physical Contingencies: 5% - standard equipment designs/definable civil works, e.g., road surfacing, canal lining. 10% - general civil works with routine and predictable uncertainties e.g, roads, buildings, pipelines, transmission lines 15% - plant and civil works in difficult terrain.

13 Cost Scheduling - 1 Various methodologies Project engineers/designers advise cost estimator on the distribution of costs over the project life. For example, major civil works on a hydroelectric project costing $200 million may be disbursed over a 4-5 year period, as follows: Year % $ million 1 15 30 2 25 50 3 40 80 4 20 40 TOTAL: 200

14 Cost Scheduling-2 Built-up for each project component in the base cost. Identify foreign and local currency costs separately Physical contingencies allotted. Price contingencies allotted. Taxes, duties, and other transfer payments quantified. Interest during construction calculated. Project cost estimate aggregated to derive total cost estimate (i.e., base costs + taxes/duties + contingencies) Consolidated annual cost estimate prepared (e.g., capital and O & M costs).

Project Cost Estimates ($ million) 15 Base Cost a Physical Price Contingency c Total Contingency b FC LC Total FC LC Total FC LC Total FC LC Total A. Preliminary Works 0 4.7 4.7 0 0.2 0.2 0 0.1 0.1 0 5.0 5.0 B. Civil Works Lot C1 (Dam and Desanders) 75.7 12.6 88.3 7.6 1.3 8.8 5.7 1.0 6.7 89.0 14.9 103.8 Lot C2 (Tunnel) 54.6 6.4 61.0 5.5 0.6 6.1 2.8 1.9 4.7 62.9 8.9 71.8 Lot C3 (Powerhouse) 36.2 11.6 47.8 6.5 2.1 8.6 2.9 0.9 3.8 45.6 14.6 60.2 C. Electromechanical Lot 4 (Hydraulic Steel Work) 21.6 0.9 22.5 1.2 0.1 1.3 1.4 0.4 1.8 24.2 1.4 25.6 Lot 5 (Electrical Equipment) 31.1 1.0 32.1 1.7 0.1 1.8 2.2 0.5 2.7 35.0 1.6 36.6 Lot 6 (Mechanical Equipment) 19.5 0.8 20.3 1.1 0 1.1 1.1 0.3 1.4 21.7 1.1 22.8 Lot 7 (Transmission System) 10.5 2.9 13.4 0.6 0.2 0.8 0.7 1.3 2.0 11.8 4.4 16.2 D. Other Project Costs Construction Engineering 13.0 2.1 15.1 0.7 0.1 0.8 0.9 0.1 1.0 14.6 2.3 16.9 Project Management 2.1 6.1 8.2 0.1 0.3 0.5 0.2 0.4 0.6 2.4 6.8 9.3 Environmental Mitigation 2.3 3.0 5.3 0.1 0.2 0.3 0.2 0.2 0.4 2.6 3.4 6.0 Loss Reduction Component 2.3 0.9 3.2 0.1 0.1 0.2 0.2 0.1 0.3 2.6 1.1 3.7 Total (A+B+C+D) 268.9 53.0 321.9 25.3 5.2 30.5 18.3 7.2 25.5 312.5 65.4 377.9 E. Taxes and Duties Contract Tax 0 16.8 16.8 Customs Duties 0 1.5 1.5 F. Interest during Construction 7.9 1.6 9.5 Total 320.4 85.3 405.7 a Base cost is based on January 1996 prices. b Physical contingency: Lot C1 10%; Lot C2 10%; Lot C3 18%; Preliminary works 4%; other items 5.6%. c Price contingency: 2.7% for foreign exchange costs (FC) and 6% for local currency costs (LC).

Annual Project Cost Estimates ($ million) Operation & Fiscal Capital Maintenance Salvage Total Year Costs Costs Value Costs 1999 1.45 1.45 2000 64.91 64.91 2001 93.38 93.38 2002 165.39 165.39 2003 57.83 57.83 2004 22.74 3.46 26.2 16 2012 3.46 3.46 2013 15 15 2014 3.46 3.46 2022 3.46 3.46 2023 3.46-81.14-77.68 Total 405.70 80.74-81.14 405.30 Construction Period: 5 years (overlap in years 1 and 6) Project Operating Life: 20 years Salvage Value: 20% of Investment Cost

17 Item A. Base Cost a Zhengzhou Xi an Railway Project COST ESTIMATES AND FINANCING PLAN ($ million) Cost Estimates Financing Plan FX LC TC ADB MOR, HPG,SPG, CDB 1. Civil Works 604.54 1,410.60 2,015.14 0.00 2,015.14 2. Railway Track Work b 120.79 134.47 255.26 105.85 149.41 3. Buildings and Facilities 3.78 66.16 69.64 0.00 69.64 4. Signaling and Communications 190.84 138.71 329.55 156.17 173.38 5. Electric Power and Traction 76.47 106.32 182.79 49.89 132.90 6. Safety Component 26.29 23.29 49.58 20.47 29.11 7. E-Governance and MIS 41.89 37.09 78.98 32.61 46.37 8. Land Acquisition and Resettlement 0.00 181.43 181.43 0.00 181.43 9. Other Equipment and Facilities 16.23 14.38 30.61 12.64 17.97 10. Administration, Consulting 32.28 178.41 210.69 0.80 209.89 Services, and Miscellaneous 11. Environmental Protection 0.0 31.97 31.97 0.00 31.97 Mitigation and Monitoring 12. Temporary Facilities and 0.0 56.11 56.11 0.00 56.11 Transitional Works Subtotal (A) 1,112.81 2,378.94 3,491.75 378.43 3,13.32 B. Contingencies 1. Physical Contingency c 144.30 96.20 240.50 0.00 240.50 2. Price Contingency d 58.50 87.75 146.25 21.57 124.68 Subtotal (B) 202.80 183.95 386.75 21.57 365.18 C. Interest e 49.00 204.43 253.43 0.00 25343 Total 1,364.61 2,767.32 4,131.93 400.00 3,731.93 ADB= Asian Development Bank, CDB = China Development Bank, HPG=Henan Provincial Government, MOR = Ministry of Railways, SPG= Shaanxi Provincial Government a At 2005 prices. Import taxes and duties are waived b Including rails, sleepers, ballast, bridge beams, track laying and bridge construction c At 8% of civil works cost, including land acquisition d At 3% per annum of local currency costs and 2% per annum for foreign exchange cost during 2006-2011 e This is based on the prevailing US$ 5-year swap rate plus a spread for the ADB loan and the prevailing interest rate for the China Development Bank

18 Economic Cost Estimate Economist advises cost estimator on the breakdown of costs required for the economic analysis. Level of detail contingent upon availability of conversion factors and choice of numeraire. Include base cost. Include physical contingencies. Exclude price contingencies Exclude relevant taxes, duties, subsidies, and other transfer payments. Classify project components as tradable or non-tradable.

19 Economic Cost Estimate Tradable inputs and outputs -- goods and services where production or consumption affects a country s level of imports or exports. Nontradable inputs and outputs -- goods and services that are not imported or exported by the country in which the project is located, because by their nature, they must be produced or sold within the domestic economy, e.g., products with no international market due to their quality and/or cost.

Economic Cost Estimate 20 Apply shadow pricing For example, $200 million civil works on a hydroelectric project including physical contingencies (10%) using world price numeraire; standard conversion factor of 0.90 and no other conversion factors. Total Traded Nontraded Total Economic Year Civil Works (35%) 65% SCF Economic Cost Cost 1 33 11.6 21.4 0.9 19.3 30.9 2 55 19.2 35.8 0.9 32.2 51.4 3 88 30.8 57.2 0.9 51.5 82.3 4 44 15.4 28.6 0.9 25.7 41.1 Total 220 77.0 143.0 128.7 205.7 In the above example, non-traded goods and services were adjusted by the standard conversion factor. Step repeated for each project component and then presented in the economic resource statement.

Economic Cost Estimate 21 If domestic price numeraire used for project, result is as follows. Shadow Exchange Rate Factor = 1.11 (i.e. 1/SCF = 1/0.9) Total Traded Nontraded Total Economic Year Civil Works (35%) SERF Economic Cost 65% Cost 1 33 11.6 1.11 12.9 21.4 34.3 2 55 19.2 1.11 21.3 35.8 57.1 3 88 30.8 1.11 34.2 57.2 91.4 4 44 15.4 1.11 17.1 28.6 45.7 Total 220 77.0 85.5 143.0 228.5 Economic costs are different with different numeraire. Shows importance of ensuring numeraire is defined clearly and used consistently. If numeraire is used consistently for costs and benefits, eventual decision on project, will not be affected by choice of numeraire.

Benefit Identification: The Project Framework and Economic Analysis Define Targets (from Project Framework) Target Goal Purpose Outputs Activities Risks/Assumptions Specify Outputs-to-Benefits Linkage Benefits Outputs 22 Value Benefits, use in EIRR calculation and distributional analysis Benefits Economic analysis procedure over time

Specifying the Output-to-Benefit Linkage 23 Output-to- Benefit Characteristic Type of output-tobenefit linkage mechanism Basis of output valuation Types of beneficiaries Characteristic Direct (e.g., the project produces intermediate or final goods for participants) Project output is sold in domestic and/or international markets Existing participants (e.g., farmers, smallholders) Alternate characteristic Indirect (e.g., the project strengthens institutions or services to participants) Project output is not sold in markets (domestic or international) New, or new and existing participants

Benefit Identification: Incremental and Nonincremental Economic valuation of project outputs depends upon whether they are incremental or not to existing national output or usage: 24 Project Output Incremental the project output is additional to the case without the project Nonincremental the output of the project substitutes for alternative sources of supply in the economy (or imports)

Measuring Benefits in an Efficient Market with No Price Effects Price 25 S S + q p 0 a b D e d 0 q 0 q 1 Quantity Revenues = Benefits

26 Measuring Benefits in an Efficient Market with Price Effects P f S Po P 1 a c b S + q e d D 0 qo q1 Q

Measuring Benefits in a Distorted Market: Non-incremental Benefits 27 price a b P* c p 0 Q0 Q* Q1 D quantity

Measuring Benefits in a Distorted Market: price Incremental Benefits 28 P* b P 1 c 0 Q* Q 1 D quantity

29 Benefit Valuation Methodology Non-incremental Benefits Incremental Benefits Resource Cost Savings Willingness-to-Pay Supply Price Demand Price

Incremental to present production Valuing Project Outputs Non-incremental to present production 30 DEMAND PRICE SUPPLY PRICE Tradable Non-tradable Tradable Non-tradable World Market Price (FOB) Domestic Market Price World Supply Price (CIF) Domestic cost of supply NB> Note that the domestic market demand price includes net taxes (i.e., it is a measure of what consumers are willing to pay for it), but that the domestic market supply price is only the cost of production (i.e., it should exclude any production taxes or surplus profits).

31 Benefit Identification: Urban Infrastructure Projects Type of Project a) Piped Water Supply Potential Nonincremental Benefits i) Alternative sources of supply displaced ii) Improved quality displacing adverse health impacts iii) Improved quality resulting in efficiency gains Potential Incremental Benefits Improved quality Induced demand b) Wastewater Treatment i) Alternative sources of wastewater treatment displaced ii) Improved health through cost of illness displacement Induced demand

32 Benefit Identification: Energy Projects Type of Project Potential Nonincremental Benefits a) Power Generation Displaced alternative forms of electricity/ energy generation in various sectors all size generators b) Electricity Transmission i) Augmentation i) Transmission loss reduction i) Reliability Improvement ii) Alternative supply displacement ii) Interconnection Alternative sources of fuel displaced Potential Incremental Benefits Additional or induced energy consumption valued at willingness-topay Induced demand Induced demand

Benefit Identification: Transportation Sector 33 Type of Project a) Road Improvement/ Rehabilitation b) Expressway Construction Potential Nonincremental Benefits i) Reduced operating costs for existing traffic ii) Reduced operating costs for traffic diverting from alternative route iii) Travel time savings iv) Reduced road maintenance expenditures i) Resource cost savings for traffic diverting from existing roads/railways ii) Resource cost savings for traffic remaining on existing roads (reduced congestion) Potential Incremental Benefits Willingness-to-pay of new traffic generated by improved conditions of road. Willingness-to-pay of new traffic generated by new road.

34 Transport Projects Benefits = Vehicle Operating cost savings for Normal Traffic Benefits = 0.5* Vehicle Operating cost savings for Generated Traffic Benefits can be estimated initially in financial prices (eg via HDM model) then converted to economic prices

35 Non-Quantifiable Economic Benefits non-tangible (social / political, knowledge / information / business skills) tangible (inputs for processing industry, new businesses) exclude from economic analysis but describe textually (quantity and quality)

Thank you. 36