Repair of Fences Damaged by Bushfire and Fire Control Line Rehabilitation Policy



Similar documents
Living with Electricity Easements

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE

Note on Draft Progress Report Template

King Fire Restoration Project, Eldorado National Forest, Placer and El Dorado Counties, Notice of intent to prepare an environmental impact statement.

Volume I: The Fires and the Fire-Related Deaths

SFPUC Experience with Rim Fire

Community Emergency Planning Guide

FENCING LAW IN VICTORIA: WHAT ARE MY RESPONSIBILITIES?

The Emissions Reduction Fund what it means for you. How Australian businesses and the community can benefit from the Emissions Reduction Fund

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

AS 4708:2013. Interpretation of Requirements relating to the Recovery of Forest Products from a Water Body

Fire Management needs assessment and priority actions

Fireline Rehabilitation on Donnelly Flats fire (B222) Summary: 7/1/99 R.R. Jandt

The. Recovery Story. The 2003 Alpine Fires. The Recovery Story - The 2003 Alpine Fires

Chapter 813 TREES. [HISTORY: Adopted by the Council of the City of Toronto as indicated in article histories. Amendments noted where applicable.

PART C10 TRANSITION OF COORDINATION FROM RESPONSE TO RECOVERY

Queensland Parks and Wildlife Service PEST MANAGEMENT PLAN

WORKPLACES (PROTECTION FROM PROTESTERS) BILL 2014

Wilderness Management and Environmentally Manageable Wildlife Refuge Facilities in Kansas

Primary Industries Certificate III in Rural Operations (AHC32810)

EHP Financial Assurance Calculator. User guide

OWNER BUILDER AS AN WHAT ARE MY RESPONSIBILITIES UNDER THE DEVELOPMENT ACT 1993

Farm Tax Record Book SAMPLE

Native Vegetation Council. Strategic Plan

Angora Fire Restoration Activities June 24, Presented by: Judy Clot Forest Health Enhancement Program

INCOME FROM FARMING OPERATIONS (INCLUDING PARTNERSHIP FARMING OPERATIONS)

Impacts of air pollution on human health, ecosystems and cultural heritage

DISASTER RECOVERY PROGRAM HANDBOOK AGRICULTURAL OPERATIONS

Approved Natural Disaster Recovery Round Green Army projects

Disaster Assistance Programs for Agriculture. Small Business Association SBA USDA Programs FEMA Programs

Rural Flooding: The Potential Role of Forestry

Post-fire Site Rehabilitation Special Investigation: Interim Report. Special Investigation

Guide to agrichemical use in Resource Management Plans Northland Region as at October 2011

Scope of Capital Measurement and Classifications

UNDERGROUND TELECOMMUNICATIONS CABLES ACROSS PRIVATE LAND

2015 AVAGO 2D SEISMIC SURVEY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY

APPLICATION FOR CLASSIFICATION OF FOREST LAND

Rural dwellings including bed and breakfast accommodation

Alignment of Social and Environmental Resilience

Foundations of Emergency Management Class 1 Emergencies. Working in conjunction with Communities, Government, Agencies and Business

URGENT FENCING NOTICE

Environment Management Plan

APPENDIX 4. Risk Tables

ENERGY, MINES AND RESOURCES (EMR) ASSESSMENT REGULATORY GUIDE:

Course: AG 460-Agribusiness Management and Marketing

Forest Management Plan Templates

SOUTH AUSTRALIAN FIREBREAKS, FIRE ACCESS TRACK AND SIGN STANDARDS GUIDELINES

Agland Decision Tool: A Multicriteria Decision Support System for Agricultural Property

Do we know the cost of fires? An example from California, USA

Practice Note

QUALITY MANUAL 1. SCOPE, COVERAGE AND BASIS OF QUALITY MANAGEMENT SYSTEM AT APSSDC

66 REFERRAL AND NOTICE PROVISIONS. Scope

Landslides & Mudslides

Planning requirements for heliports and helicopter landing sites

Flood Damage Detailed Project Report

Animals in Disasters

How To Know If A Forest Service And Bmd Plan Postfire Rehabilitation And Restoration

Municipal Emergency Management Planning Arrangements Guidelines for Committees Part 6: Emergency Management Manual Victoria

COM PREHENSIVE GUIDE TO FARM FINANCIAL MANAGEM ENT AGRICULTURE. Module 7: Cash Flow Statement Analysis

NPS Burned Area Emergency Response (BAER) and Burned Area Rehabilitation (BAR) in the Southern California Landscape

2009 Bushfire. Public Land. Recovery Program Update

Waldo Canyon Fire. Mark Shea Watershed Planning Supervisor August 23, 2012

PIRU FIRE BURNED AREA EMERGENCY RESPONSE PLAN

Here s a cheque for five grand. All you have to do is grab it!

Audit summary of The Department of Human Services Role in Emergency Recovery

Crown Land Management

Development plan template. Development plan Stage 1. Part 1: Applicant s information. Part 2: Vegetation clearing particulars

Single Emergency Incident Management Functional Unit Date Ratified Next Review SOP EMG Sept 2013 Sept

Dysart Road and Associated Services Infrastructure Project Compliance Report Environment Protection and Biodiversity Conservation Act 1999

Please describe the proposal accurately and concisely. State the number of storeys proposed and the position of any extensions.

Property Acquisition. A guide to DPTI s acquisition process under the Land Acquisition Act 1969

CONSERVING OUR RURAL ENVIRONMENT

CHANDAM7AIL,P SAND DEPOSIT

SECTION SITE PREPARATION

OSU Extension FACT SHEET

first choice home insurance information

Farm Household Allowance Farm Financial Assessment

The State of the Sierra Nevada s Forests

Fiskville Training College

Environmental Law Enforcement in Zimbabwe. Farai Michael Nyahwa

FORESTED VEGETATION. forests by restoring forests at lower. Prevent invasive plants from establishing after disturbances

RIGHT OF ENTRY PERMIT (For providing Debris Removal on Private Property)

Ecological Restoration on Barren lands, degraded arable lands, harvested sites and sloped farmland: A Market-based Approach

Available FSA and NRCS Disaster Assistance Programs Crop Insurance: Prevented Planting and Failed Acreage Considerations Click on title for video

Practical Applications of Adaptive Management Lori Gould GA ACT & SE NSW. Case Study Bidgee Banks

Format for scrutinising the Hill Station Building Applications ( Current File No /2001-HSBA) The application shall be accompanied by

Managing Fire Dependent Wildlife Habitat without Fire. A Land Management Practice That: 100 Years of Fire Suppression in Ponderosa pine ecosystems

Nevada Pinyon-Juniper Partnership Proposed Demonstration Area A Brief Introduction. Presented by Jeremy Drew Project Manager Resource Concepts, Inc.

Fire Technology Transfer Note

Environment Management Plan

Finding a Farm to Buy or Lease Resource Kit for Nova Scotia Farmers

Charcoal Production in Ghana

Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements

Exploration for natural gas

LAND ACCESS ARRANGEMENT FOR MINERAL EXPLORATION Template published in accordance with Section 141(1A) of the Mining Act 1992

Householder Applications: Supplementary Planning Guidance GENERAL POINTS

Operating Expenses and Carrying Charges

TRAFFIC MANAGEMENT PLAN

Provision of Personal Protective Clothing (PPC)

municipal power be exercised by by-law; to a municipality the authority to pass by-laws respecting the health, safety and wellbeing

Transcription:

Repair of Fences Damaged by Bushfire and Fire Control Line Rehabilitation Policy

Contents Contents 1 1.0 Purpose 2 1.1 Background 2 1.2 Purpose 2 2.0 Scope 2 3.0 Principles / Policy 3 3.1 Damage to private fences (internal and boundary) by fire agency staff or machinery during bushfire emergencies 3 3.2 Repair of fences damaged by bushfire on the boundary of private land and public land 3 3.3 Rehabilitation of fire control lines constructed by fire agencies during bushfire emergencies 3 3.4 DELWP Planned Burns that escape from public land and damage private land 3 4.0 Examples of different scenarios where this policy may be applied 4 5.0 Glossary of definitions 5 1

1.0 Purpose 1.1 Background In Victoria there is approximately 60 000 km of boundary fencing constructed by private landholders along the boundary of public (Crown land) and private land (not including Crown land river frontage). The policy is based on shared responsibility and government encourages landholders to assess and manage their risks with regard to fire by taking up adequate insurance where available. Landholders are expected to manage risks to their assets from the potential impact of bushfire. All landholders are expected to have appropriate levels of insurance cover for boundary and internal fences, in the same way any business venture or private householder should protect and insure their assets. In line with the Fences Act 1968, the State Government of Victoria does not have any ownership or financial stake in fences along the boundary of private and public land except in cases where specific fencing agreements have been entered into with landholder. It is the responsibility of the owner of private land to fence their property and secure stock within their boundary. 1.2 Purpose This document establishes a clear and consistent approach to repair of damage to fences caused by bushfires and prescribed burns. It also covers the rehabilitation of land used as fire control lines in the suppression of bushfires. The policy outlines the responsibilities of Lead Agencies and the landholders to ensure a smooth and prompt implementation of the policy and to support landholders and communities recover from a bushfire incident. 2.0 Scope The policy includes fences that adjoin National Park, State Park and State Forest damaged by bushfires fences damaged as a result of bushfire suppression activities fences damaged as a result of planned burning activities fire control lines constructed by fire agencies during bushfire emergencies fences covered by an agreement between the Victorian Government and the private landholder The policy excludes internal fences damaged by bushfire repair or replacement of any losses, other than fencing or other fencing assets replanting of trees, re-establishment of pasture, or any other agricultural crop 2

3.0 Principles / Policy 3.1 Damage to private fences (internal and boundary) by fire agency staff or machinery during bushfire emergencies The Victorian Government will pay 100% of the restoration costs of fences damaged on private land as a result of machinery used by fire agencies to control bushfires, or fire agency staff cutting through fences to allow access for suppression efforts. This includes damage to fences by machinery such as bulldozers entering the property and/or constructing fire control lines, and other fire emergency vehicles obtaining access. 3.2 Repair of fences damaged by bushfire on the boundary of private land and public land Government will meet half the cost of materials to replace or repair fencing between private land and all national parks, state parks and state forests destroyed or damaged by bushfires. The Lead Agency is not responsible for the repair or replacement of internal fences that have been impacted by bushfire, unless damaged by machinery during fire suppression activities. Assets damaged by bushfire are the responsibility of the land holder and may be able to be claimed through the land holder s insurance. 3.3 Rehabilitation of fire control lines constructed by fire agencies during bushfire emergencies Government will assist private landholders with the rehabilitation of fire control lines, established by fire agencies, during the suppression of bushfires. In the event of fire that starts on private land and is under the control of the Country Fire Authority (CFA), the CFA will provide some limited assistance for the rehabilitation of fire control lines and repair to fences damaged by machinery. The Department of Environment, Land, Water and Planning (DELWP) will assist the CFA with fencing and control line rehabilitation works when requested to. 3.4 DELWP Planned Burns that escape from public land and damage private land Government will pay the cost of restoration if fences or other fencing assets are destroyed or damaged by planned burns on public land escaping onto private land. Note - DELWP planned burns are burns undertaken as part of the yearly planned burning program and do not include fire suppression back-burns undertaken by the fire agencies during a bushfire emergency in order to try to control a bushfire. The land holder must contact the Lead Agency as soon as possible after the fire event. Claims for assistance MUST be lodged withing 12 months of the incident. 3

4.0 Examples of different scenarios where this policy may be applied 4

5.0 Glossary of definitions Statement Damage to private fences Rehabilitation of fire control lines Restoration Other fencing assets Specific fencing agreements Definition Any direct impacts to private fences from bushfire or fire agency suppression activities. Fire control line rehabilitation involves pushing back top soil and undertaking erosion control measures to protect the land from soil erosion and protect water quality. Government may also provide seed for use by the landholder to control erosion and prevent soil movement. The repair or replacement of damaged fences or fence parts. Other fence parts such as end assemblies, gates and grids. Where DELWP or Parks Victoria have an operational requirement for the public land / private land boundary fence (e.g. for environmental protection works), the agencies may at times enter into individual agreements with landholders regarding the sharing of costs of installation and/or ongoing maintenance of a boundary fence. The most common agreement is where DELWP pays for the installation, on the condition the landholder maintains the fence and takes up adequate levels of insurance on an ongoing basis for that fence. 5