Appendix C. Re-vegetation and Rehabilitation Sub-Plan



Similar documents
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

Appendix C. Municipal Planning and Site Restoration Considerations

This Chapter was compiled by GCS (2014) as part of the EMP Consolidation for MP 30/5/1/2/2/133MR and remains pertinent.

Prepared By: Tom Parker Geum Environmental Consulting, Inc.

Sagebrush steppe post-fire rehabilitation projects: Using the past to guide the future

Permeable Pavement Construction Guide

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

o d Propagation and Moon Planting Fact Sheet

City of Shelbyville Site Inspection Checklist

Seed Germination and Ecology of Western Australia

Angora Fire Restoration Activities June 24, Presented by: Judy Clot Forest Health Enhancement Program

How To Assess An Area For Erosion

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

Storm Drain Inlet Protection - IP

1.7.0 Floodplain Modification Criteria

A Developer s Guide: Watershed-Wise Development

Ecologically based weed management! Chuck Mohler! Cornell University!

Ten Easy Ways to Kill a Tree

King Fire Restoration Project, Eldorado National Forest, Placer and El Dorado Counties, Notice of intent to prepare an environmental impact statement.

Various options are discussed below.these low cost, low impact interventions can also be applied as general erosion control methods.

Introduction to Plant Propagation. Glenn T. Sako Assistant County Extension Agent CTAHR, UHM

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

Drainage A Crucial Component for Athletic Field Performance. Part Three: Sub-Surface Installed Drainage Systems

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

BMP 6.7.3: Soil Amendment & Restoration

GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Beseck Switching Station Inspection

SE-10 STORM DRAIN INLET PROTECTION. Objectives

Mud in the Water. Oklahoma Academic Standards. Objective. Background. Resources Needed. Activities

Keywords: soil and water conservation, yield increase, cost-benefit, watershed management, food security.

Chapter 11 Site Rehabilitation and Stabilization

Waterway Technote Drains

Preserving Wild Ginseng in Minnesota

Identification and Prevention of Frost or Freeze Damage By Linda Reddick, Kingman Area Master Gardener

Recovering From Wildfire A Guide for Oklahoma Forest Owners

2014 Product Catalogue

A. In this chapter, the following terms have the meanings indicated.

What Is Holistic Planned Grazing?

Prattsville Berm Removal Project. 1.0 Project Location

APPENDIX 4. Risk Tables

OSU Extension FACT SHEET

Seattle Public Utilities. Natural Drainage Systems (NDS) Maintenance Manual

agrees to replace at no charge any tree that dies and subsequent inspection shows that the wire basket was not properly removed.

2015 AVAGO 2D SEISMIC SURVEY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY

How To Plan A Buffer Zone

Tree and forest restoration following wildfire

Show me your root flare! Ellen A. Vincent Environmental Landscape Specialist Clemson University Horticulture Dept.

What Is Rehabilitation?

Soil and Vegetation Management: Keys to Water Conservation on Rangeland

IS Desertification A Reality or Myth? What is desertification?

Integrated Pest Management, Erosion and Sedimentation Control, and Landscape Management Plan

SECTION SITE PREPARATION

Scheduling Maintenance for Infiltration Basins and Trenches

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Restoring Land and Planting Trees

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

Sample Punch List. Garth Ruffner Landscape Architect (916) Page 1 of 5

Techniques and Mechanical Processes for Interseeding Alfalfa into Grasslands

FREQUENTLY ASKED QUESTIONS Biomass Harvest Guidelines

COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL

Guide to Healthy Trees

FORESTED VEGETATION. forests by restoring forests at lower. Prevent invasive plants from establishing after disturbances

Understanding Erosion. Revised Universal Soil Loss Equation

Mine Plan of Operations Reclamation Bond Checklist

It was my assignment to physically inspect the 8 trees on site near the proposed construction,

National Green Jobs Corps 2010

PREVENTING PEST DAMAGE IN HOME LAWNS

Outlet stabilization structure

Mountainous forest watershed management Governance in Greece

Oak Trees BASIC GROWING REQUIREMENTS FOR YOUR

COMPOST A USER'S GUIDE TO. The Beauty of Your Lawn & Garden Blossoms from the Soil

MULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1

Emergency Spillways (Sediment basins)

SITE VEGETATION EW POINTS GOAL CREDIT REQUIREMENTS DOCUMENTATION RELATED CREDITS SUSTAINABILITY COMPONENTS BENEFITS

Communities, Biomes, and Ecosystems

Landscape Maintenance

Chapter D9. Irrigation scheduling

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE

Ruby River Grayling - Gravel Spawning Beds Monitoring Report January 2008

Fertilizer, Weed Control, Grubs, and General Application Questions

Direct sowing versus planting

NZTA P39 Standard Specification for Highway Landscape Treatments

ZARA CHARITY TANZANIA PROJECT PROPOSAL

Fireline Rehabilitation on Donnelly Flats fire (B222) Summary: 7/1/99 R.R. Jandt

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST

Crop residue management (CRM), a cultural practice that

Create Your Own Soil Profile Ac5vity

Tall Pots in a Shallow World

Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts. Submitted to: Town of Sudbury

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

Stormwater/Wetland Pond Construction Inspection Checklist

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

Work Report for Sino-Italian Cooperation Project ( ) Application of Vallerani System Technology in Demonstration Forestation in Inner Mongolia

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

Transcription:

Appendix C Re-vegetation and Rehabilitation Sub-Plan

DRENNAN SOLAR ENERGY FACILITY REVEGETATION & REHABILITATION PLAN PRODUCED FOR ERM ON BEHALF OF SOLAIREDIRECT BY Simon.Todd@3foxes.co.za JUNE 2013

BACKGROUND & PURPOSE The purpose of the Drennan Solar Energy Facility revegetation and rehabilitation plan is to ensure that areas cleared or impacted during construction activities of the proposed Facility are rehabilitated with a plant cover that reduces the risk or erosion from these areas as well as restores some ecosystem function. The purpose the rehabilitation at the site can be summarized as follows: Achieve long-term stabilisation of all disturbed areas to minimise erosion potential; Re-vegetate all disturbed areas with suitable local plant species; Minimise visual impact of disturbed areas; and Ensure that disturbed areas are safe for future uses. It is also important to recognize that the rehabilitation plan should be closely aligned with the erosion control plan as the two factors are inextricably linked. ECOSYSTEM CONTEXT The site occurs within a semi-arid environment and a fundamentally different approach to rehabilitation efforts in such areas is required as compared to traditional rehabilitation approaches within more mesic areas. In addition, rehabilitation techniques which rely on agricultural techniques such as the application of fertilizer and the planting of annual grasses or other alien species are not appropriate. The major implication of the semi-arid nature of the site is that the use of appropriate species and techniques is key in order to achieve long-term success. REHABILITATION MANAGEMENT PRINCIPLES Topsoil management Effective topsoil management is a critical element of rehabilitation, particularly in arid and semi-arid areas where soil properties are a fundamental determinant of vegetation composition and abundance. Although some parts of the site consist of exposed bedrock, most parts of the site have at least some topsoil. Where any excavation or topsoil clearing is required, the topsoil should stockpiled and later used to cover cleared and disturbed areas once construction activity has ceased. Topsoil is the top-most layer (0-25cm) of the soil in undisturbed areas. This soil layer is important as it contains nutrients, organic matter, seeds, micro-organisms fungi and soil fauna. All these elements are necessary for soil processes such as nutrient cycling and the growth of new plants. The biologically active upper layer of the soil is fundamental in the maintenance of the entire ecosystem. Drennan Solar Energy Facility Rehabilitation Plan Page 2

Topsoil should be retained on site in order to be used for site rehabilitation. The correct handling of the topsoil is a key element to rehabilitation success. Firstly it is important that the correct depth of topsoil is excavated. If the excavation is too deep, the topsoil will be mixed with sterile deeper soil, leading to reduction in nutrient levels and a decline in plant performance on the soil. Wherever possible, stripped topsoil should be placed directly onto an area being rehabilitated. This avoids stockpiling and double handling of the soil. Topsoil placed directly onto rehabilitation areas contains viable seed, nutrients and microbes that allow it to revegetate more rapidly than topsoil that has been in stockpile for long periods. If direct transfer is not possible, the topsoil should be stored separately from other soil heaps until construction in an area is complete. The soil should not be stored for a long time and should be used as soon as possible. The longer the topsoil is stored, the more seeds, microorganisms and soil biota are killed. Ideally stored topsoil should be used within a month and should not be stored for longer than three months. In addition, topsoil stores should not be too deep, a maximum depth of 1m is recommended to avoid compaction and the development of anaerobic conditions within the soil. If topsoil is stored on a slope then sediment fencing should be used downslope of the stockpile in order to intercept any sediment and runoff should be directed away from the stockpiles upslope. MULCHING Mulching is the covering of the soil with a layer of organic matter of leaves, twigs bark or wood chips, usually chopped quite finely. The main purpose of mulching is to protect and cover the soil surface as well as serve as a source of seed for revegetation purposes. During site clearing the standing vegetation should not be cleared and mixed with the soil, but should be cleared separately, either mechanically or by hand using a brush-cutter. The cleared vegetation should be stockpiled and used whole or shredded by hand or machine to protect the soil in disturbed areas and promote the return of indigenous species. Mulch should be harvested from areas that are to be denuded of vegetation during construction activities, provided that they are free of seed-bearing alien invasive plants; No harvesting of vegetation may be done outside the area to be disturbed by construction activities; Brush-cut mulch should be stored for as short a period as possible, and seed released from stockpiles can also be collected for use in the rehabilitation process. Drennan Solar Energy Facility Rehabilitation Plan Page 3

SEEDING In some areas the natural regeneration of the vegetation may be poor and the application of seed to enhance vegetation recovery may be required. Seed should be collected from plants present at the site and should be used immediately or stored appropriately and used at the start of the following wet season. Seed can be broadcast onto the soil, but should preferably be applied in conjunction with measures to improve seedling survival such as scarification of the soil surface or simultaneous application of mulch. Indigenous seeds may be harvested for purposes of re-vegetation in areas that are free of alien or invasive vegetation, either at the site prior to clearance or from suitable neighbouring sites; Seed may be harvested by hand and if necessary dried or treated appropriately Seed gathered by vacuum harvester, or other approved mass collection method, from suitable shrubs or from the plant litter surrounding the shrubs must be kept apart from individually harvested seed; No seed of alien or foreign species should be used or brought onto the site. Within the context of the site seed of perennial grasses such as Eragrostis lehmanniana and shrubs such as Pentzia incana would be suitable species for collection. TRANSPLANTS Where succulent plants are available or other species which may survive translocation are present, individual plants can be dug out from areas about to be cleared and planted into areas which require revegetation. This can be an effective means of establishing indigenous species quickly. Plants for transplant should only be removed from areas that are going to be cleared. Perennial grasses, shrubs, succulents and geophytes are all potentially suitable candidates for transplant. Transplants should be placed within a similar environment from where they came in terms of aspect, slope and soil depth. Transplants must remain within the site and may not be transported off the site. Some species can also grow from cuttings and branches of many succulent species can be rooted in the field. Some species such as Pentzia incana can also be grown from cuttings but would need to be rooted in pots under irrigation first. Drennan Solar Energy Facility Rehabilitation Plan Page 4

USE OF SOIL SAVERS On steep slopes and areas where seed and organic matter retention is low, it is recommended that soil savers are used to stabilise the soil surface. Soil savers are man-made materials, usually constructed of organic material such as hemp or jute and are usually applied in areas where traditional rehabilitation techniques are not likely to succeed. In areas where soil saver is used, it should be pegged down to ensure that is captures soil and organic matter flowing over the surface. Soil saver may be seeded directly once applied as the holes in the material catch seeds and provide suitable microsites for germination. Alternatively, fresh mulch containing seed can be applied to the soil saver. GENERAL RECOMMENDATIONS Progressive rehabilitation is an important element of the rehabilitation strategy and should be implemented where feasible. Once revegetated, areas should be protected to prevent trampling and erosion. No construction equipment, vehicles or unauthorised personnel should be allowed onto areas that have been vegetated. Where rehabilitation sites are located within actively grazed areas, they should be fenced. Fencing should be removed once a sound vegetative cover has been achieved. Any runnels, erosion channels or wash aways developing after revegetation should be backfilled and consolidated and the areas restored to a proper stable condition. MONITORING REQUIREMENTS As rehabilitation success, particularly in arid areas is unpredictable, monitoring and follow-up actions are important to achieve the desired cover and soil protection. Re-vegetated areas should be monitored every 4 months for the first 12 months following construction. Re-vegetated areas showing inadequate surface coverage (less than 30% within 12 months after re-vegetation) should be prepared and re-vegetated; Any areas showing erosion, should be re-contoured and seeded with indigenous grasses or other locally occurring species which grow quickly. Drennan Solar Energy Facility Rehabilitation Plan Page 5

CONCLUSIONS AND RECOMMENDATIONS The most cost-effective way to reduce the cost and effort for rehabilitation is to reduce and minimize the disturbance footprint. If the panel arrays can be constructed without clearing the site, then the amount of rehabilitation required would be low and any cleared areas would quickly become revegetated. The solar panels and roads within the development represent hard surfaces that will generate a lot of runoff. As a result, effective runoff management is essential as is an effective vegetation cover to prevent widespread erosion across the site. As the majority of the site is sloping, the risk of erosion is high and retaining vegetation cover between the rows of panels during construction is strongly recommended. The dominant species at the site are quick growing and would also be suitable candidates for rehabilitation. This includes the woody shrub Pentzia incana, succulent shrub Ruschia ferox and perennial grass Eragrostis lehmanniana. Drennan Solar Energy Facility Rehabilitation Plan Page 6