Basements and Deep Building Construction Policy 2014



Similar documents
FLOOD PLAIN DESIGNATION AND PROTECTION

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

Downspout Disconnection Program FAQs

Guidance on applying for approval of installation of a commercial onsite wastewater system

3. Given the geographic extent of the area, amendments have been made to the following regional planning documents

Council Policy. This Policy assists in the implementation of the Council Plan Revised 2010, in particular Strategy 3.1.

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES

Rainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation

rescue and relief efforts in the aftermath of flooding, (iii) repair of flood damaged public facilities and utilities, and

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE

WITHOUT PREJUDICE. City of Port Phillip Planning Permit Application No. P0039/2015

The site is Lot 1 DP Survey of this lot and Willarong Road and Koonya Circuit is given in Figure 2.

Melbourne, Australia. Melbourne: The city as a catchment approach. The importance of holistic urban water management

September September Consulting Structural and Civil Engineers. 100 St John Street London EC1M 4EH. akt-uk.com

Recommendations for future developments

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Town of Ware Board of Health. Regulations for Percolation Tests, Soil Evaluations, Design, and Technical Review of Subsurface Sewage Disposal Systems

Floodplain Development Land Use Review

BASEMENT FLOODING. Prevention Guide for. Homeowners

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding.

A guide to preventing structural damage

The Guide To Waterproofing An Existing Basement

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

CONTACTS: Mitchell Shire Council M.S.C. Building Department M.S.C. Health Department

FLOOD DAMAGE PREVENTION ORDINANCE

Environmental guidelines for preparation of an Environment Management Plan

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

Outdoor Storage of Raw Materials SC-33

Home Drainage & Causes of Basement Flooding. Water

How To Amend A Stormwater Ordinance

Summary: Introduction

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

Guidelines for Dewatering Management Plan

Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region

16. Storm water drainage

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

Protect Your Home From Flooding. A guide for Lethbridge Residents

SUMP PUMP DISCHARGES INFORMATIONAL PACKET

A Developer s Guide: Watershed-Wise Development

NSW Housing Code A guide to complying development

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

BUILDING OR RENOVATING

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

STAFF REPORT TO COMMITTEE OF THE WHOLE

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects

Tree Management Policy

CHAPTER 17. Sewers and Sewage

Civil Engineering Sector Labour-Management Health and Safety Committee

GOALS, OBJECTIVES AND POLICIES

CITY UTILITIES DESIGN STANDARDS MANUAL

Carlton Fields Memorandum

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

Appendix B. Property Owner Questionnaire

Preventing Basement Flooding Through Early Site Evaluation

HYDROCARBON SPILLS PROCEDURE SIG-ENV-PR003

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission

Development at 2 St Albans Road, Kingston, London, KT25HQ

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

The application site is on the edge of flood zones 1 and 2 with flood zone boundary cutting across part of the southern boundary of the site.

Objective 4: Enhanced community education, flood awareness and preparedness

Florida Department of Environmental Protection

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

SANITARY SEWER BACKUP. Causes & Prevention

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

90 Brighton Road, Surbiton, Surrey

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Lisgar District Basement Water Infiltration Investigation Answers to Residents Written Questions Received by Councillors Ward 10 Office

HUNTER WATER CORPORATION Review of Environmental Factors Guidance Notes EG0041

Basement Waterproofing in Existing Buildings

6 Chemicals from human settlements

Environmental Guidelines for Preparation of an Environmental Management Plan

Improper storage of potential pollutants will increase the risk of water pollution that may occur because of spills.

Excavation & Trenching Procedure

Lars-Göran Gustafsson, DHI Water and Environment, Box 3287, S Växjö, Sweden

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

KAWERAU DISTRICT COUNCIL General Bylaw Part 9: On-site Wastewater Disposal Systems (2010)

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

Federal Triangle Stormwater Working Group Federal Triangle Floodproofing Seminar BUILDING STRONG SM

minimum deductible may be increased significantly.

Improving on-site domestic wastewater treatment systems - West Coast Lagoons Project

Preventing Basement Flooding

SUBDIVISION AND DEVELOPMENT REGULATION

Implementing a Coastal Settlement Boundary

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

GUIDELINES FOR DESIGNERS BUILDING AND CONSTRUCTION WORKS WITHIN PROXIMITY TO CORPORATION SERVICES

PREVENTION. City of Orem FLOOD DAMAGE PREVENTION

FLOOD INFORMATION SERVICE EXPLANATORY NOTES

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

Practice Note

ASSET MANAGEMENT STRATEGY

Transcription:

Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets and Environment POLICY OWNER Manager Infrastructure The electronic version of this document is the controlled version. Printed copies are considered uncontrolled. Before using a printed copy, verify that it is the current.

Contents 1. Purpose of the Policy... 3 2. Scope... 3 3. Definitions... 3 4. Responsible Executive... 3 5. Policy owner... 3 6. Related Documents... 3 7. Delegation Authority... 4 8. Policy Statement... 4 9. Objectives... 4 10. Basement Design and Construction Principles... 5 11. Underground Construction Structure Types... 5 12. Control of Groundwater and Stormwater... 6 13. Requirements for Developers... 6 14. Specific Wording... 7 15. Decision Guidelines... 7 16. Transition/Translation arrangements... 7 17. Review... 7 Page 2

1. Purpose of the Policy The purpose of the Kingston Basements and Deep Building Construction Policy (2014) (Policy) is to assist Kingston City Council manage the construction of buildings and other structures with below ground level elements for the benefit of the whole community. The Policy states the approach, methods, principles and procedures that Council will follow in order to manage the construction of underground structures to ensure consistent, equitable and transparent outcomes are achieved. 2. Scope This policy is applicable to all properties in the City of Kingston. This includes all private, Council and Government owned properties involving significant excavation for structures below native surface levels. Examples include, but are not limited to, basements, underground car parks, dwellings, tanks, swimming pools and retaining walls. 3. Definitions a. Acid Sulfate Soils means naturally occurring soils, sediments or organic substrates that are formed under water logged conditions which contain iron sulphide minerals or related oxides. These soils commonly occur within Kingston. b. Aquifer means a geological structure or formation or an artificial land fill permeated or capable of being permeated permanently or intermittently with water. c. Stormwater refers to water that runs off all urban surfaces such as roofs, foot paths, car parks, roads, gardens and vegetated open spaces and is captured in constructed storages and drainage systems. This excludes roof water captured directly by rainwater tanks, water captured in natural rivers, creeks, streams and lakes, and water sourced from private dams for primary production purposes. d. Groundwater refers to any water occurring in or obtained from an aquifer and includes any matter dissolved or suspended in any such water. 4. Responsible Executive The General Manager City Assets and Environment has responsibility for this policy. 5. Policy owner The position responsible for writing and / or reviewing the policy and ensuring it is kept up-to-date with any legislative or operational changes is the Manager Infrastructure. This position can be contacted for assistance and information about this Policy. 6. Related Documents This policy refers to the following State legislation, local laws and standards a) Local Government Act 1989 Page 3

b) Water Act 1989 c) Environment Protection Act 1970 d) Building Regulations 2006 e) Kingston Local Law 2 f) AS/NZS 2890.1 Off Street Car Parking This policy refers to the following internal plans and strategies: a) Kingston One Vision, Council Plan 2013-2017 b) Kingston Council Civil Design Standards i. Civil Design Requirements for Developers - Part A: Integrated Stormwater Management ii. Civil Design Requirements for Developers - Part B: Road Works & Construction Plans c) Kingston Flood Mitigation Strategy d) Kingston Integrated Water Cycle Strategy e) Kingston Basements and Deep Building Construction Guidelines 2014 7. Delegation Authority Delegations under the following Acts and Regulations that apply to this Policy: Local Government Act 1989 8. Policy Statement Developers of projects within the City of Kingston shall be required to design and construct underground structures in a manner which is consistent with the Kingston Basements and Deep Building Construction Guidelines and Kingston Civil Design Standards. Council s goal is to promote sustainable design principles, protect natural resources and ensure a safe environment. 9. Objectives The objectives of this Policy are to: Promote sustainable designs for underground structures; Protect natural groundwater resources; Prevent inundation of underground structures due to poor design and construction techniques; Reduce potential for damage to properties, adjacent properties and council infrastructure due to consolidation or subsidence of soil; Ensure a safe, accessible and sustainable road environment for all users near underground car parks; Page 4

Ensure the design of vehicle crossings and footpaths adhere to relevant design standards; 10. Basement Design and Construction Principles 10.1. Protection of Natural Resources Groundwater is a valuable natural resource that should be protected. Underground structures should minimise their impact on the natural state of groundwater equilibrium. 10.2. Sustainable Development Council encourages the adoption of sustainable development principles, including minimising energy consumption by developments. Underground structures should use sustainable groundwater management practices. 10.3. Safety Council has a responsibility to ensure the safety of all residents. Vehicle crossings and driveways associated with underground structures must not create hazards to pedestrians and other road users. Vehicle crossings into underground structures must comply with design standards. The relevant conditions are given in AS/NZS 2890.1 - Off street car parking. 10.4. Minimise Flood Risks Entrances into basement car parks shall be designed to minimise the risk of inundation from overland flows from the stormwater network 11. Underground Construction Techniques There are several different methods of basement construction; however, most will fall into the category of wet or dry (tanked). 11.1. Wet Basement Wet basements typically have a slotted subsurface drainage collection system on the outside of the wall to collect groundwater and relieve hydrostatic pressures. This is usually collected into pits that are pumped out. Since the water in this type of system is groundwater, Council has no obligation to accept this to the legal point of stormwater discharge. Risks associated with this type of construction include the potential for large amounts of groundwater being collected in the drainage system. If discharged to the street network, this will overload the system. This water is not stormwater and must be disposed of on site or via a trade waste agreement reached with the local sewer authority. Other risks are those associated with changes to the local water table level. This may cause subsidence in adjacent properties. Closed systems to re-inject the groundwater back into the water table are acceptable however Kingston has many areas of ground water with high levels of organic fines which may not make this method practical. 11.2. Dry (Tanked) Basement A tanked basement is considered waterproof and is designed to withstand the hydrostatic pressures of a saturated soil. Waterproofing agents are applied to the Page 5

concrete during construction to prevent ingress of water. This type of construction requires no groundwater collection and is the preferred method of construction by Council. 11.3. Retaining Walls Retaining walls are an engineered method of holding soil at unstable angles to create or protect usable spaces. Most retaining walls rely on the soil behind the wall being drained in a similar way to a wet basement. Kingston allows the drainage of some retaining walls to be connected to the Legal Point of discharge if simple requirements are met. Alternatively retaining walls should be designed to withstand hydrostatic pressures and constructed using appropriate materials. 11.4. Soil Management Stockpiling of excavated materials must be conducted to best practice guidelines, especially in areas of Coastal Acid Sulphate Soils. Leachates must be prevented from contaminating the environment. Details of the requirements for Underground Construction Techniques can be found in the Basement and Deep Building Construction Guidelines (2014). 12. Control of Groundwater and Stormwater Legal advice provided to Council is that stormwater and groundwater are separate entities. The Victorian Water Act 1989 recognizes that the Crown has control over groundwater, while the Responsible Drainage Authority (either Kingston City Council or Melbourne Water) have control over stormwater drainage. Within the municipality, Southern Rural Water is the Responsible Authority for groundwater. Kingston City Council, acting as the drainage authority, is not legally required to accept any groundwater into the stormwater drainage network. It may do so on a case by case basis under delegation. It should also be noted that the Building Code of Australia relates specifically to stormwater, not groundwater. 13. Requirements for Developers All areas of Kingston have potential issues with groundwater for deep constructions as the predicted water table varies between 0 and -5 metres from natural ground surface. Some areas are known to be very high risk with respect to high water table and related issues such as prevalence of Acid Sulfate Soils. Prior to application for a building permit, developers must conduct a site investigation to assess the local hydrology. The results of the site investigation must be presented to Council in the form of a Groundwater Assessment Report (GAR). Pending the results of the GAR, Council will assess whether the site is likely to experience issues associated with groundwater management. Developers may be required to submit a Groundwater Management Plan (GMP) at the discretion of Council s Development Approvals Engineer. Details of the requirements for the GAR and GMP can be found in the Basements and Deep Building Construction Guidelines (2014). Page 6

13.1. Design Phase Prior to detail design stage, site limitations should be fully explored. This may include a GAR where natural surface levels on the site are low (below 10.000 AHD) or groundwater is known to be close to the surface. Basement and floor levels shall set to a safe level above the water table. 13.2. Construction Phase Site limitations with respect to groundwater that have been identified in the initial design phase should be considered prior to the commencement of construction. Any excavation within 1.00 metre of the groundwater table will require a documented management plan to be submitted as part of or in conjunction with a Construction Management Plan. All necessary permits for the drainage of or de-watering of the site shall be in-place prior to construction commencing. 14. Specific Wording For wording specific to legal documents (i.e. legal point of discharge and planning permits), refer to the Basements and Deep Building Construction Guidelines (2014). 15. Decision Guidelines There are no exemptions to this policy except where noted below: i. Groundwater Assessment Report (GAR). The proposed construction of underground services, stormwater drains, sewers, strip footings and swimming pools do not require the submission of a GAR unless otherwise determined by the Manager Infrastructure. ii. Groundwater Management Plan (GMP). A GMP is not required where the geotechnical assessment indicates that the groundwater table is more than 2.0 metres below the proposed structure at its lowest level surveyed relative to the Australian Height Datum unless otherwise determined by the Manager Infrastructure An exemption based on geotechnical advice obtained prior to construction does not remove a developer s obligation to submit a GMP should groundwater be encountered during construction. 16. Enforcement Where a property owner or developer contravenes the conditions of an Infrastructure permit or the planning permit, enforcement action will be pursued. 17. Transition/Translation arrangements Policy commencement date is 30 November 2014. All new constructions commencing after this date will be subject to the Policy. 18. Review The Policy shall be reviewed before 30 October 2019. Page 7