Before applying for a Road Opening Licence, please read and understand the following information.

Similar documents
ROAD OPENING LICENCE APPLICATION FORM PLEASE READ ALL PARTS AND SECTIONS OF THIS FORM IN ADVANCE OF COMPLETING THE APPLICATION

DESCRIPTION OF WORK:

HIGHWAYS ACT 1980 SECTION 171 : LICENCE APPLICATION PACK. Consent to deposit building materials and making of excavations in the Public Highway

3. QUALITY ASSURANCE REQUIREMENTS

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

GUIDELINES FOR OUTDOOR EATING FACILITY

Application for Erection of Crane - Section 169 Highways Act 1980-

GUIDELINES FOR WORKING ON ROADS

Permit No. Permit Fee: $ Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: Address:

Prequalification of Roading Contractors

Permit Number: Date Issued: Permit Fee: Invoice Number:

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13

FIBER-OPTIC CABLE PLAN CHECK

HIGHWAYS ASSET MANAGEMENT STRUCTURES TEAM GUIDANCE NOTE SMT/GN/03/10 TECHNICAL APPROVAL

WHS Contractor Management Procedure

Factored properties include Owners and Sharing Owners who receive services from the Association.

Federation of Piling Specialists

CONSTRUCTION PERMIT REQUIREMENTS

GENERAL CONDITIONS OF CONTRACT MINOR WORKS AND SERVICES

VEHICLE CROSSOVER INFORMATION PACK

ITS specification Jointing chambers and pull pits (ITS-02-02)

Taking In Charge Policy

WHS CONTRACTOR MANAGEMENT PROCEDURE

Building over or close to a public sewer

MANAGING THE ROADS AND THE ROLE OF THE ROAD MANAGEMENT OFFICE. Stephen Flynn Chartered Engineer Road Management Office

LONDON BOROUGH OF BARNET ENVIRONMENT, PLANNING & REGENERATION DIRECTORATE

APPLICATION KIT AND GUIDELINES FOR ORGANISATIONS SEEKING TO UNDERTAKE WORKS WITHIN ROAD RESERVE LOW COMPLEXITY WORKS.

How To Increase Vehicle Height Of A Tunnel In Daugherd Port

CHAPTER 10 - PERMIT PROCEDURES AND BONDING REQUIREMENTS

Approval Services Unit

PLEASE PRINT. Job Name: Job # City File No. SIDEWALK; DRIVEWAY APPROACH; CURB & GUTTER; PEDESTRIAN RAMP; STREET LIGHT; PLANTER STRIP;

Tree Management Policy

How To Get A Job Done

Republic of Zambia Ministry of Works and Supply Roads Department Labor-based Routine Maintenance Contract Agreement. C. Kalangwa - Box 33545, Lusaka

Construction Management Plan (CMP) Application

Asphaltic Wedge Paving

Ipswich City Council Subordinate Local Law 5.1 (Parking) 2013

Leasing Commercial Premises

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

Principles of Traffic Management on sites / road network

Consultant Warranty of [Specify discipline of Consultant]

CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING Subdivision Improvement Performance Bond Requirements

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

Delineation. Section 4 Longitudinal markings

ULSTER UNIVERSITY TUITION FEES PAYMENT POLICY ACADEMIC YEAR 2015/16

CHAPTER 53 CARE & PROTECTION OF HIGHWAYS

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

Series 600: Earthworks

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

Waste Management. GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012)

Building Work Contractors Act 1995

Underground Service Requirements and Instructions

HIGHWAY ENGINEERING BY DISTANCE/ONLINE LEARNING. HIGHWAYS OPEN TECH

Clubs / Organisations are NOT permitted to use Council Reserves or Pavilions without first having WRITTEN approval from Hume City Council.

Environment Committee 11 January 2016

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

Permeable Pavement Construction Guide

Reference Guide for Obtaining Permits and Utility Services For New Construction

Acceptance on the Approved List of contractors cannot however guarantee that any work orders will be issued to that contractor.

Terms of Business. Murray & Spelman Ltd. Name: T/A Murray # Spelman Insurance & Finance. Name & Contact Details:

Children s Savings Account Terms And Conditions

JEFFERSON COUNTY ROAD DEPARTMENT HIGHWAY PERMIT USE OF ROADS FOR HAUL ROUTE / EVENT ROUTE. Hereinafter referred to as County/Owner and Name

GENERAL SPECIFICATION

Asset Protection Agreement Templates - Customer Explanatory Notes. Explanatory Notes on Asset Protection Agreement

THE CORPORATION OF THE TOWNSHIP OF SEVERN BY-LAW NO

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

1.1 The contract shall be deemed to have been entered into upon receipt of supplier s written acknowledgement stating its acceptance of the order.

Building and Construction Industry Security of Payment Amendment (Retention Money Trust Account) Regulation 2015

Guidelines for Excavations

Heavy Loads on Roads By-law

CAIRNS CRUISE LINER TERMINAL VENUE HIRE DEED

ELIZABETHAE SECUNDAE REGINAE

asphalt applications Construction and surfacing of footways and cycleways using asphalt mpa asphalt Asphalt Information Service

INDIVIDUAL CLIENT AGREEMENT AGILITY FOREX LTD INDIVIDUAL CLIENT AGREEMENT

House Purchase Loan Application Form. Housing and Residential Services

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage

PUBLIC POWER CORPORATION S.A. DISTRIBUTION

For ease of reference the clauses are arranged in 12 sections as follows:-

Township of Enniskillen. Asset Management Plan

Licence to Trail or Drag Hunt on Ministry of Defence Land

Thames Water Utilities Limited. Settlement deed

Transcription:

Sept 2012 Before applying for a Road Opening Licence, please read and understand the following information. What is a Road Opening Licence? A Road Opening Licence (ROL) is a licence that allows the holder to excavate a specified section of the public road, (the public road includes carriageway/footway and associated grass verge), and carry out reinstatement (which may be permanent or temporary). A ROL may be issued for the purposes of installing service connections to a new development, reconstructing a portion of the public road if damaged over the course of a development, or as required by Planning Permission. A Road Opening Licence normally takes approx one (1) week to process, if the application is complete. Incomplete applications will result in delays. The applicant must familiarise themselves with Directions for the Control and Management of Roadworks in Dublin City (June 2010 edition) before proposing any works in the public road. This document is available from DCC Roadworks Control Unit (01 222 2246), or from www.dublincity.ie/sitecollectiondoucments/roadworks_control_directive.pdf No excavation may be made in a public road without a Road Opening Licence. Under Section 13 of the Roads Act (1993), any person to do so, shall be guilty of an offence. No work can commence on the public road/footpath until the applicant applies for and is granted a T2 Permit by the Roadworks Control Unit of Dublin City Council. (Block 2, Floor 6, Civic Offices, Ph: 222-2246). Road Maintenance Services 1 Information on Road Opening Licences Sept 2012

Who May Apply For A Road Opening Licence? Utility Companies Main Contractors The Main Contractor is the company who has contractual relationship with the Developer/Client, and has overall control of the site in question. They must also hold Public Liability Insurance with a minimum indemnity of 6.5 million. Main Contractors must be registered with the Roadworks Control Online System (RCOS) before they can be granted a T2 permit. No works may be carried out in the public road without a Road Opening Licence and a T2 traffic permit. A T2 permit will not be issued until a Road Opening Licence is issued first. (Contract Roadworks Control ph. 222 2246 re: RCOS & T2s) Who May Not Apply For A Road Opening Licence? Private Individuals Sub-Contractors Where the application relates to a development with a Main Contractor. Those not registered on the Roadworks Control Online System To register, contact Roadworks Control at 222 2246. Those proposing works on behalf of a Utility Company Where it is proposed to excavate, the Utility/Utilities in question are to carry out these works directly. What Works May Be Carried Out Under A Road Opening Licence? Service connections to developments. Reconstructing a portion of the public road if damaged over the course of a development. The applicant may only carry out permanent reinstatement, provided that the damaged section is to be reconstructed in in-situ concrete or asphalt. The material of permanent reinstatement shall match the existing, unless otherwise directed by Road Maintenance Services. Under no circumstances shall a modular stone or modular concrete footpath/carriageway be excavated and permanently reinstated by the applicant. All modular stone or concrete (i.e. cobblestones, stone setts, stone flags, stone kerbs, concrete flags, concrete brick/pavers/setts etc.) reinstatements shall be carried out by Dublin City Council, or their agents, the licence fee being non-refundable in this case. Reconstructing a section of the public road if required to do so by Planning Permission. Same conditions as above apply Trial Pits / Slit Trenches Road Maintenance Services 2 Information on Road Opening Licences Sept 2012

What Works May Not Be Carried Out Under A Road Opening Licence Works greater than 20 lin.m or 20m 2 Unless directed to do so by Road Maintenance, or in order to satisfy a Condition of a Planning Permission. Works carried out on behalf of a Utility Where a connection is made to a Utility, these works are deemed to be on behalf of a utility, rather than a service connection. Such works are to be carried out by the Utility. In such a case, the developer/applicant is to make arrangement with the Utility concerned to for the Utility to complete these works. Works by Sub-Contractors Works in the public road are to be carried out by Main Contractors or Utility companies only. Works by private individuals Works are to be carried out by Main Contractors or Utility companies only Works requiring a T1 permit application Works requiring a T1 include works greater than 100m in length, works at junctions with traffic lights, works on bridges, and several other categories of work. See Directions for the Control and Management of Roadworks in Dublin City (June 2010 edition) for details of such works. This document is available from DCC Roadworks Control Unit (01 222 2246), or from www.dublincity.ie A Road Opening Licence will only be issued after the T1 has been granted. Road Maintenance Services 3 Information on Road Opening Licences Sept 2012

What Is The Cost Of A Road Opening Licence? In order to be granted a Road Opening Licence, the applicant must pay a fee. Dublin City Council holds this fee for a period of two years (the Maintenance Period) as a deposit, after written notification of completion of the works is received and certificate of completion issued. If the works are found to be satisfactory at the end of the Maintenance Period, the deposit amount will be refunded, less an amount for Long-Term Damages (if applicable). If the reinstatement is not satisfactory, whatever repairs are necessary must be carried out by the contractor/developer, and prior to DCC taking back in charge. If however, DCC have to carry out any repairs, the cost of these will be deducted from the deposit, and the balance refunded. The amount payable depends on the area of the proposed opening and the Pavement Type. The Reinstatement Rates ( /m 2 ) are included within the ROL application form. In addition to the Pavement Type, the Reinstatement Rate applicable depends upon the area i.e. openings less than 2m 2, from 2-10m 2, and greater than 10m 2. The Reinstatement Rate also depends on the Impact Number of the road, which is determined by its strategic importance for traffic flows. The Impact Numbers of roads is given in Directions for the Control and Management of Roadworks in Dublin City"( June 2010 edition). To account for edge ravelling, 0.3m is to be added to the length and width of the opening, before calculating the area, and consequently, the amount payable. Pavement Type refers to the type of paving material at the location at present, e.g. concrete flag footpath, in-situ concrete carriageway, asphalt carriageway etc. There is an additional charge for specialist surfaces such as anti-skid, cycle lanes, etc. Modular paving (stone flags/cobbles/setts or concrete flags/paving blocks) are only to be reinstated by DCC, or their agents, the licence fee is non refundable in this case. Specialist surfaces, such as anti-skid, cycle lanes, or asphalt ramps are to be reinstated permanently. The amount is to include for the area surrounding any proposed manholes. Long Term Damages are charges, which are already included in the Reinstatement Rates, due to the damage caused by excavating trenches in roads paths. Such excavations, no matter how well constructed, will always reduce the life of a pavement. It is considered reasonable that the applicant should bear a portion of the cost of resurfacing/reconstruction the pavement at some future point. The current rates for Long-Term Damages are shown on the application form. If the reinstatement passes the inspection at the end of the Maintenance Period, DCC taking in charge letter will be issued, and it will revert to the charge of Dublin City Council. Road Maintenance Services 4 Information on Road Opening Licences Sept 2012

The Road Opening Licence fee is to be by cheque, made payable to Dublin City Council. Measuring the Area Of Reinstatement? The requirements of DCC are given, in full, in Directions for the Control and Management of Roadworks in Dublin City" (June 2010 edition), the guidance given here is preliminary, and for information only. Where the opening is within 1.0m of a joint in footway/carriageway, any existing ironwork, or the kerb/back of path, the reinstatement is to extend to same. The area of the opening is to be calculated to take account of any such features, and the amount payable is to be calculated accordingly. All trenches/reinstatements across public roads/footpaths shall be perpendicular to the road centreline. In general, the material of reinstatement shall match the existing, but in all cases, this to be agreed in advance with Road Maintenance Services. Where it is proposed to lay a service diagonally across a road, the reinstatement shall be a rectangular section, extending from kerb to centreline, or kerb to kerb. Diagonal reinstatements to trenches are not permitted. Likewise, where it is proposed to lay services diagonally across footpaths, the full width of the path shall be reinstated. Footpaths may only have one longitudinal joint, reinstatement is to be from trench to kerb, or trench to back of path, to be agreed in advance with Road Maintenance Services. Where it is proposed to carry out works in a public path that already has an existing trench/reinstatement, the extent of the new reinstatement shall be increased to include the old one. Likewise, a proposed reinstatement in a public road shall include any existing trench/reinstatement/construction joint within 1.0m, to be agreed in advance with Road Maintenance Services. Special conditions apply to roads reconstructed within the last five (5) years, or footpaths improved within the last ten (10) years. For details, please see Directions for the Control and Management of Roadworks in Dublin City (June 2010 edition). This document is available from DCC Roadworks Control Unit (01 222 2246), or from www.dublincity.ie Details of such works are to be agreed in advance with Road Maintenance Services. All road markings are to be reinstated to the satisfaction of the Traffic Dept. The above list is not intended to be exhaustive, and the details of every reinstatement are to be agreed in advance of works commencing with Road Maintenance Services Area Engineer, or Area Inspector. Road Maintenance Services 5 Information on Road Opening Licences Sept 2012

What Is The Maintenance Period? By signing the Road Opening Licence Application Form, the applicant agrees to enter into a Maintenance Period. This Maintenance Period lasts for a minimum period of 24 months from the date of issue of the certificate of completion of permanent reinstatement. During the Maintenance Period, the applicant is responsible to the maintenance and upkeep of the reinstatement. During the Maintenance Period, the applicant shall be liable for any accident claims arising from the reinstatement. This also includes claims made after the reinstatement is taken back into the charge of Dublin City Council, where the claim relates to an incident that occurred during this Maintenance Period. After 24 months have expired, and once the licence holder applies in writing to Dublin City Council, the reinstatement will be inspected. If found to be satisfactory, DCC taking in charge letter will be issued and the reinstatement will revert to the charge of Dublin City Council, and the deposit refunded, less Long Term Damages (if applicable). If written notification of completion of the works is not received by Road Maintenance Services, the certificate of completion cannot be issued, and the Maintenance Period will be deemed not to have started. In this case, the applicant will continue to carry liability for the reinstatement, until such written notification is received, and the certificate of completion issued to the applicant. The applicant carries liability for the reinstatement until such time as it is formally taken back into the charge of DCC Road Maintenance, (i.e. taking in charge letter has been issued by the department). Road Maintenance Services 6 Information on Road Opening Licences Sept 2012

What Must Be Submitted With A Road Opening Licence Application? The completed Road Opening Licence Application Form. (All fields are to be completed. An incomplete submission will result in delays in issuing the Road Opening Licence) The form is to be completed by the contractor carrying out the work, not their employer. Drawing(s) (2no. copies) This is to be drawn accurately to scale, not to be diagrammatic. Location of opening is to be clearly shown relative to existing addresses/features. Proposed opening is to be clearly shown and dimensioned. Proposed manholes/boxes are to be clearly shown and dimensioned Programme. Start and completion dates of the proposed works included Letter From Applicant Confirming Safety Statement. Confirms that the applicant has a valid safety statement in place, which complies with all relevant Health and Safety Legislation. Identifies the company, and their registered offices Signed by an authorised person, with their name and position within the company identified Letter From Insurer Confirming Public Liability Insurance. Confirms that the applicant holds P.L. Insurance with a minimum indemnity of 6.5 million. P.L. insurance has a specific indemnity to Dublin City Council. Licence Fee By cheque, made payable to Dublin City Council. Letter Of Approval / Drainage Licence From Drainage Dept. (For Sewer Connections Only) Completed Road Opening Licence applications to be sent to: Road Maintenance Services, Floor 4, Block 2, Civic Offices, Wood Quay, Dublin 8. Dublin City Council will not be held liable for applications lost/damaged in post/transit. Road Maintenance Services 7 Information on Road Opening Licences Sept 2012

Dublin City Council Road Maintenance Services What Happens After The Road Opening Licence Is Issued? May be Required Depends on nature of work Drainage Licence (for sewer works) Drainage Dept. p.222 2155 Traffic Agreement (for works that change the physical layout of roads/paths, or involving pedestrian crossings etc.) 2795 T1 Application Traffic Dept. p.222 (see The Directive for specifics typically for work greater than 100m in length, on a number of roads, at traffic light junctions, bridges, etc) Utility 222 2246 Agreement Roadworks Control. p. (for ducting / service connections) Road Opening Licence Road Maintenance Services ph. 222 2255 Required: Approval form other DCC Depts, as applicable ROL Form Drawings Safety Statement Letter Public Liability Insurance Details Licence Fee (Deposit) Programme T2 (Traffic Permit) Roadworks Control p. 222 2246 See Directions For The Control and Management of Roadworks in Dublin City (June 2010 edition) available from RWC. After Work on Site is Finished Required: Register with the Roadworks Control Written Notification of completed works to Online System Road Maintenance Dept. Public Liability Insurance Details Reinstatement inspected and snags agreed. Legal Agreement to follow the Directions Cert of Completion issued which starts the Complete Online form maintenance period (minimum of 2 years). 2 Years after Cert Of Completion Written request to RM to inspect site. Site Inspected, TIC letter issued. If acceptable, deposit is returned, less Long Term Damages (if applicable). Before Work on Site Starts CARRY OUT WORKS ON SITE Contact local Road Maintenance Inspector DCC may inspect works at any time Contact Individuals named on T2 permit. Construct sample panel for inspection, (if required to do so) Road Maintenance Services 8 Information on Road Opening Licences Mar 2011