Development of a new improved model of the ITIL V3 framework for the information system of Telecom operator



Similar documents
Advantages of the new ITIL V3 model in the implementation of the IMS system

Proposal of a new model for ITIL framework based on comparison with ISO/IEC standard

Recent Advances in Automatic Control, Information and Communications

Improvement of the Etom Standard Throught the Comparison with Itil V3 Best Practices

Advantage of using Service Desk Management Systems in real organizations

Design and implementation of new ITIL Service Desk for insurance companies

Advantages of the implementation of Service Desk based on ITIL framework in telecommunication industry

AN APPROACH TO DESIGN SERVICES KEY PERFORMANCE INDICATOR USING COBIT5 AND ITIL V3

ITIL Service Lifecycle Stream

IT Service Management and Normatively Regulated Activities

The ITIL Foundation Examination

The ITIL v.3 Foundation Examination

Project Management and ITIL Transitions

Implementation of the Information System of the Telecom Operators Using the ITIL V3 Methodology for the Service Design Phase

Preparation Guide. IT Service Management Foundation Bridge based on ISO/IEC 20000

The ITIL Foundation Examination

The ITIL Foundation Examination

The most applicable KPIs of Problem Management Process in Organizations

Free ITIL v.3. Foundation. Exam Sample Paper 4. You have 1 hour to complete all 40 Questions. You must get 26 or more correct to pass

1 Why should monitoring and measuring be used when trying to improve services?

Service Management. A framework for providing worlds class IT services

Tutorial: Towards better managed Grids. IT Service Management best practices based on ITIL

ITSM Reporting Services. Enterprise Service Management. Monthly Metric Report

SD0-302 Service Desk Manager Qualification

1. Verzeichnis der ITIL V3 Service Strategy Prozesse

ITIL: What is it? How does ITIL link to COBIT and ISO 17799?

EXIN Foundation in IT Service Management based on ISO/IEC 20000

ITIL v3 Incident Management Process

Roles within ITIL V3. Contents

EXIN IT Service Management Foundation based on ISO/IEC 20000

Foundation. Summary. ITIL and Services. Services - Delivering value to customers in the form of goods and services - End-to-end Service

: SDI SD0-302 : SDI - SERVICE DESK MANAGER QUALIFICATION. Version : R6.1

1 What does the 'Service V model' represent? a) A strategy for the successful completion of all service management projects

Which statement about Emergency Change Advisory Board (ECAB) is CORRECT?

Contract management roles and responsibilities

Free ITIL v.3. Foundation. Exam Sample Paper 1. You have 1 hour to complete all 40 Questions. You must get 26 or more correct to pass

iso20000templates.com

Version 1.0. IT Service Management & IT Asset Management Services (ITSM & ITAM Services) Governance Process

ITIL Roles Descriptions

The ITIL v.3. Foundation Examination

Integrating Project Management and Service Management

Benchmark of controls over IT activities Report. ABC Ltd

Information Technology Engineers Examination. Information Technology Service Manager Examination. (Level 4) Syllabus

4net Technologies. Managed Services and Cloud Solutions

Trainning Education Services Av. Paulista, º andar SP Tel/Fax: 55+ (11)

Information and Communication Technology. Helpdesk Support Procedure

Benefits to the Quality Management System in implementing an IT Service Management Standard ISO/IEC

ICTEC. IT Services Issues HELSINKI UNIVERSITY OF TECHNOLOGY 2007 Kari Hiekkanen

ISEB MANAGER S CERTIFICATE IN ITIL INFRASTRUCTURE MANAGEMENT. Guidelines for candidates who are taking the ICT Infrastructure Examination

ITIL by Test-king. Exam code: ITIL-F. Exam name: ITIL Foundation. Version 15.0

2005 Kasse Initiatives, LLC version 1.2. ITIL Overview - 1

INTERVIEW QUESTIONS. Que: Which process is responsible for ensuring that the CMDB has been updated correctly?

Service Management ITIL Service Design

Preparation Guide. EXIN IT Service Management Associate Bridge based on ISO/IEC 20000

Overview of Service Support & Service

Digital Asset Manager, Digital Curator. Cultural Informatics, Cultural/ Art ICT Manager

Preparation Guide. EXIN IT Service Management Associate based on ISO/IEC 20000

ICT Category Sub Category Description Architecture and Design

MSM HIGH-SPEED, WEB-BASED INTEGRATED SERVICE MANAGEMENT SOFTWARE

The ITIL v.3 Foundation Examination

ITIL 2011 Lifecycle Roles and Responsibilities UXC Consulting

The ITIL Foundation Examination

The Value of ITIL to IT Audit

ITSM Maturity Model. 1- Ad Hoc 2 - Repeatable 3 - Defined 4 - Managed 5 - Optimizing No standardized incident management process exists

ITIL: What it is What it Can Do For You V2.1

Service Catalogue. 0984v1

pavassure Resolve Service desk Onsite diagnosis and recovery Enhanced hours support Monitor Event monitoring & alerting Reporting Services

Determining Best Fit. for ITIL Implementations

ITIL V3 AND THE SERVICE LIFECYCLE PART I THE MISSING COMPONENT

The Service Desk Manager is responsible for the performance of the Service Desk down to the individual level.

Information Technology Services Core Services SLA

ITIL's IT Service Lifecycle - The Five New Silos of IT

Information Technology Auditing for Non-IT Specialist

ITIL Essentials Study Guide

MSM HIGH-SPEED, WEB-BASED INTEGRATED SERVICE MANAGEMENT SOFTWARE

ICT Indicators. The scope of the ICT function covers all aspects of infrastructure, systems, processes and disciplines required to support:

Service assurance for communications service providers White paper. Improve service quality and enhance the customer experience.

The ITIL Foundation Examination

White Paper: AlfaPeople ITSM This whitepaper discusses how ITIL 3.0 can benefit your business.

Service Improvement. Part 3 The Strategic View. Robert.Gormley@ed.ac.uk

ISO/IEC ITIL Service Management V.2 V s V.3 Project ACE Andy Evans Programme Director and Strategic Programme Advisor

APPLICATION OF INFORMATION TECHNOLOGY SERVICE MANAGEMENT WITHIN SELECTED LOGISTICS AND TRANSPORT SERVICES

Job Description. Job Title: Network Services Manager. Department: INFORMATION TECHNOLOGY MAIN PURPOSE OF JOB: MAIN DUTIES AND RESPONSIBILITIES:

Combine ITIL and COBIT to Meet Business Challenges

Roles & Grades Rate Cards and Applicable SFIA Skills

The ITIL Foundation Examination Sample Paper A, version 5.1

Service Strategy. Process orientation Terminology Inputs and outputs Activities Process flow / diagram Process Roles Challenges KPIs

The ITIL Foundation Examination

ITIL V3 Foundation Certification - Sample Exam 1

Sample Exam. IT Service Management Foundation based on ISO/IEC 20000

Release and Deployment Management using ITIL

REPORT 2014/001 INTERNAL AUDIT DIVISION. Audit of information and communications technology help desk operations at United Nations Headquarters

Location of the job: CFO Revenue Assurance

IT service management

Telstra Service Management Framework. Your assurance of first-class network support

Transcription:

Development of a new improved model of the ITIL V3 framework for the information system of Telecom operator A. Tanovic*, F. Orucevic**, I. Androulidakis*** *Department for IT development of muldia services, BH Telecom d.d. Sarajevo Obala Kulina Bana 8, Sarajevo 71000, Bosnia and Herzegovina ** Department of Computer Science and Informatics University of Sarajevo, Faculty of Electrical Engineering Zmaja od Bosne bb, Sarajevo 71000, Bosnia and Herzegovina ***Jožef Stefan International Postgraduate School Jamova 39, Ljubljana SI-1000, Slovenia anel.tanovic@bhtelecom.ba, forucevic@etf.unsa.ba, sandro@noc.uoi.gr Abstract: - Management of IT services is of particular importance for every organisation. ITIL is the most populary framework for the management of IT services. Previous researches showed that are needed some improvements of this framework. This paper describes improved model for ITIL V3 framework which is a result of integration of this framework with CobiT framework. Measurements are done in the information system in one Telecom operator in Bosnia and Herzegovina. improved model for ITIL V3 framework is better in its performances than the old model. This paper has a scientific value because it introduces one new model for ITIL V3 framework. Key-Words: ITIL, CobiT, Provisioning system, Third-party services Management, Performance and Capacity Management, Continuous Service Management, Systems Security Management, Costs Management. 1 Introduction Information Technology Infrastructure Library (ITIL) is the most popular framework for the management of IT services [3], [4], [5]. In version ITIL 2011, it has 3 new processes which are respectivelly added into these phases: Strategy Management for IT Services (Service Strategy) [1], Business Relationship Management (Service Strategy) [1] and Design Coordination (Service Design) [2]. Also, some old processes are improved: Financial Management for IT Services (Service Strategy) [1], Demand Management (Service Strategy) [1], Service Level Management (Service Design) [2], Service Asset and Configuration Management (Service Transition) [3], Change Evaluation (Service Transition) [3], Problem Management (Service Operation) [4] and 7-Step Improvement Process (Continual Service Improvement) [5]. This is a model which is signed as the old ITIL model in the rest of the paper. Control Objectives for Information and related Technology (CobiT) is the most popular framework for the management of IT Governance [8]. CobiT 5.0 has these 4 phases in which are placed 34 processes: plan and organise, acquire and implement, deliver and support and monitor and evaluate [7]. Some last researches showed that CobiT is very similar to ITIL in some phases or processes [6], [10]. The aim of this framework is to produce information which has to satisfy business objectives and governance objectives. Some other researches for CobiT include: [11], [12], [13], [14] and [16]. These researches produced quantified models of CobiT for corporate IT governance. These models are implemented in many organizations and this kind of IT governance is in the strong relationship with SOA governance. Internal audits showed the high level of CobiT implementation in these organizations. Section II of the paper describes Provisioning system of the Telecom operator which is the test environment for the research in this paper. Section III of the paper describes measurements for Incident Management and Problem Management after the releasing of Provisioning system into production by using the old model for ITIL V3 framework. Section IV of the paper describes comparative analysis between 2 implementation phases from ITIL V3 and CobiT and based on this we proposed a new model for ITIL V3 which has now some processes which are added from CobiT framework. Section V of the paper describes measurements for Incident Management and Problem Management by using a new model for ITIL V3 framework. Section VI, ISBN: 978-1-61804-118-0 208

which is the conclusion of the paper, describes differences between results from sections III and V. Previous research of authors is the paper is [15] in which is described one model for ITIL V3 framework which is a result of integration with PRINCE 2 framework. It is added only one new process into a new model for ITIL V3 framework. The second previous research of authors is the paper [17] in which is described the development of a new model for IMS system. This paper only describes schedule of processes for IMS system. In paper [18] is described the difference between ITIL 2007 and ITIL 2011. The last researches which connect ITIL and CobiT are: [6] and [10] and these researches are based on theoretical hypothesis [8], [9]. The result of these researches is a new model for ITIL framework which has positive elements of the implementation from CobiT framework and ISO/IEC 27000 standard. This new model of ITIL framework is performed in some processes of ITIL Service Strategy and ITIL Service Design phase especially in Information Security Management process. Other researchers that have examined issues regarding the social acceptance of IT governance in the broader sense [19], [20]. 2 Test environment We have chosen a Provisioning system of Telecom operator as the test environment [17]. Provisioning system is the central information system system of the Telecom operator which connects central information system application and other 7 different systems: fixed telephony system, mobile telephony system, IPTV system, VoIP system, Hosting system, ADSL system and IMS system [17]. Figure 1. presents this system. This system is developed by using ASAP tool. This is a tool which significantly reduces -consuming work and it connects different software systems into one new system. Figure 1. Provisioning system Table I shows all functions of the Provisioning system. These functions are responsible for actions with users, packages, devices and numbers. All actions are described in table I. Central information system application is connected with other seven systems by using web services. TABLE I: FUNCTIONS OF THE PROVISIONING SYSTEM Provisioning system function name Meaning of the Provisioning function This function is responsible for the adding a new type of terminal equipment into central adddevice information system like: modems, set top boxes, voip adapters, mobile telephones and fixed telephones. This function is responsible for deletedevice deleting one specific device addsubscriberanditsdefault User deletesubscriber setsubscriber connectdeviceforsubsciber disconnectdevicefromsubs criber addsubscriberchpackage addsubscribermobilephone addsubscriberfixedphone addsubscribervoipphone deletesubscriberchpackage deletesubscribermobilephon e deletesubscriberfixedphone deletesubscribervoipphone addpackage from the central database. This function adds new mobile telephony users, fixed telephony users, IPTV users, VoIP users, Hosting users, ADSL users and IMS users into central information system. This function deletes one subscriber from one Telecom operator s service. This function is responsible for changing some parameters for subscribers like: package, phone number, mobile number, address, region etc. This function connects some type of terminal equipment to the specific user. This function disconnects some terminal equipment from one specific user. This function is responsible for the assigning one specific channel package to one user. This function assigns a mobile phone number to one specific user. This function assigns a fixed phone number to one specific user. This function assigns a VoIP phone number to one specific user. This function deletes one specific channel package from one user. This function deletes a mobile phone number from one specific user. This function deletes a fixed phone number from one specific user. This function deletes a VoIP phone number from one specific user. This function adds one new package to one of the following systems: fixed telephony, mobile telephony, IPTV, VoIP, ADSL, Hosting and IMS system. This function deletes one ISBN: 978-1-61804-118-0 209

deletepackage package from one of the following systems: fixed telephony, mobile telephony, IPTV, VoIP, ADSL, Hosting and IMS system. 3 Measurement of performances of the implemented Provisioning system by using the old model for ITIL V3 framework For the testing of implemented Provisioning system, we have chosen 2 processes from Service Operation phase: Incident Management and Problem Management [10]. The reason for this is because these 2 processes are the best processes for the measurement of the implementation of some system. This is because every software or hardware incident or has to be solved in these 2 processes by using ITIL framework. Key Performance Indicators (KPIs) are chosen for the implementation of these 2 processes [10]. Table II describes the realisation of the key performance indicators for the old model of ITIL V3 framework. Test conditions between the measurement of the old model and a new model were the same. All these results are collected from all departments from Telecom operator. Key Performance Indicator TABLE II: REALISATION OF THE KEY PERFORMANCE INDICATORS FOR THE OLD MODEL OF ITIL V3 FRAMEWORK The implementation of the key performance indicator repeated Remotely resolved escalations number of repeated is 14. These s are mostly connected to setsubsciber function which is responsible for changing packages for each subscriber or for changing personal data for each subscriber. number of remotely resolved is only 2. These are resolved remotely by the Service Desk. Employees from Service Desk solved only s with changing address of subscriber and with changing one mobile package with another mobile package. number of escalations for that are not resolved in the agreed is only 1. This escalation started when 50 subscribers cancelled IPTV service because the Provisioning system could not change them from one IPTV The percentage of the implementation of each key performance indicator 40% 15% Incident First Resolution with SLA Incident effort s Problem package to another IPTV package. total number of which are registered by Service Desk is 60. Some of showed that some additional functions of the system are not good implemented. For example, the function of assigning HD channels to IPTV subscribers is not working. Incident, or average for resolving an incident, is 2 days (48 hours). Based on SLA, this should be only 12 hours. number of that are resolved at the Service Desk during the first call is only 12, and the total number of is 60. Employees from Service Desk known only to solve some simply like assigning terminal equipment to users, for example modems for ADSL service. Rate of resolved during solution s agreed in SLA is 60 %. The result for fixed telephony system is 90%, for mobile telephony system result is 40%, for IPTV service 60%, for VoIP service result is 70%, for ADSL service result is 60%, for Hosting system result is 40% and for IMS system result is 80%. The average result is 60%. average work effort for resolving is 3 days (72 hours). This is 3 s less than the allowed which is 24 hours. The reason for this is that Service Desk couldn t solve some big issues like the for changing from one to another mobile package and because of this system developers have to solve this s and they are working on the 3 rd level of support. total number of s is 2. The 1 st one is the with setsubscriber function and the 2 nd one is the with assigning some additional TV channels to IPTV subscriber. This parameter is average for resolving a. Both s that are described are not solved by using the old model for ITIL V3 framework so the final result of the implementation of this KPI is 0%. average number of per each is 7 (7 20% 25% 20% 60% 30% 50% 0% ISBN: 978-1-61804-118-0 210

per per known Time until identification Problem effort for the 1 st and 7 for the 2 nd ). This number is 2 s bigger than the allowed number which should be 3. The average number of linked to the same after identification is also 7. All are connected to the 2 known s so this KPI is fully implemented. This parameter is the average between the first occurance of an incident and identification of the underlying root cause. The needed for the identification is 5 days for this model (10 days is the result for the critical success factor), so the result for this KPI is very good. This is basically average work effort for resolving s. This parameter is not measured because all 2 known s in this model are not solved so the final result of the implementation of this KPI is 0%. 50% The result of the successfully implemented KPIs for the old model for ITIL V3 is 44%, and for unsuccessfully implemented KPIs result is 56%. Figure 2. represents the ratio between successful and unsuccessful implemented key performance indicators for the old model for ITIL V3. It is evident that are results bad, and as we can see for many KPIs result is 0%. Figure 2. The result of the implementation of KPIs for the old model for ITIL V3 4 The proposal for a new model for ITIL V3 framework Figure 3. presents processes for the old model for ITIL V3 framework (it is included only implementation phase which is Service Transition). This model has 6 processes which are presented on this figure. 0% Figure 3. Processes for the old model for ITIL V3 framework The result of the implementation of KPIs for the old model for ITIL V3 is 44%, and it is pretty bad result. So based on this we did a comparative analysis between ITIL V3 and CobiT implementation phases. The implementation phase for ITIL V3 is Service Transition and for CobiT is Deliver and Support [6]. We used some previous researches for this [9] and [10]. The comparative analysis shows that CobiT processes between DS7 and DS13 are presented in an old model for ITIL V3 framework: DS7 Educate and train users (ITIL V3: Knowledge Management), DS8 Manage Service Desk and Incidents (ITIL V3: Incident Management), DS9 Manage the configuration (ITIL V3: Release and Deployment Management), DS10 Manage s (ITIL V3: Problem Management), DS11 Manage data (ITIL V3: Service Asset and Configuration Management), DS12 Manage the physical environment (ITIL V3: Access Management) and DS13 Manage operations (ITIL V3: Event Management) [9], [10]. The comparative analysis shows that CobiT processes between DS1 and DS6 are not presented in an old model for ITIL V3 framework [8]: DS1 Define and manage service levels (we proposed a new process which is called Service Levels Management), DS2 Manage third-party services (we proposed a new process which is called Thirdparty services Management), DS3 Manage performance and capacity (we proposed a new process which is called Performance and Capacity Management), DS4 Ensure continuous service (we proposed a new process which is called Continuous Service Management), DS5 Ensure systems security (we proposed a new process which is called Systems Security Management) and DS6 Identity and allocate costs (we proposed a new process which is called Costs Management). Figure 4. presents processes for the new model for ITIL V3 framework. This model has now 13 ISBN: 978-1-61804-118-0 211

processes (7 old processes and 6 new processes) which are presented on figure 4. Figure 4. Processes for the new model for ITIL V3 framework The new model for ITIL V3 framework has these 6 new processes: Service Levels Management, Third-party services Management, Performance and Capacity Management, Continuous Service Management, Systems Security Management and Costs Management. Bellow is a brief description of activities for each new process. Service Levels Management is responsible for these activities [7]: Create a framework for defining IT services. Build an IT Service Catalogue. Define service level agreements (SLAs) for critical IT services. Define operating level agreements (OLAs) for meeting SLAs. Monitor and report end-to-end service level performance. Review SLAs and underpinning contracts. Review and update IT service catalogue. Create service improvement plan. Third-party services Management process is responsible for these activities [7]: Identify and categorise third-party service relationships. Define and document supplier management processes. Establish supplier evaluation and selection policies and procedures. Identify, assess and mitigate supplier risks. Monitor supplier service delivery. Evaluate long-term goals of the service relationship for all stakeholders. Performance and Capacity Management is responsible for these process activities [7]: Establish a planning process for the review of performance and capacity of IT resources. Review current IT resources performance and capacity. Conduct IT resources performance and capacity forecasting. Conduct gap analysis to identify IT resources mismatch. Conduct contingency planning for potential IT resources unavailability. Continuously monitor and report the availability, performance and capacity of IT resources. Continuous Service Management process is responsible for these activities [7]: Develop IT continuity framework. Conduct business impact analysis and risk assessment. Develop and maintain IT continuity plans. Identify and categorise IT resources based on recovery objectives. Define and execute change control procedures to ensure IT continuity plan is current. Regularly test IT continuity plan. Develop follow-on action plan from test results. Plan and conduct IT continuity training. Plan IT services recovery and resumption. Plan and implement backup storage and protection. Establish procedures for conducting postresumption reviews. Systems Security Management is responsible for the following process activities [7]: Define and maintain an IT security plan. Define, establish and operate an identity management process. Monitor potential and actual security. Periodically review and validate user access rights and privileges. Establish and maintain procedures for maintaining and safeguarding cryptographic keys. Implement and maintain technical and procedural controls to protect information flows across networks. Conduct regular vulnerability assessments. Costs Management process is responsible for these activities [7]: ISBN: 978-1-61804-118-0 212

Map IT infrastructure to services provided/business processes supported. Identify all IT costs and map them to IT services on a unit cost basis. Establish and maintain an IT accounting and cost control process. Establish and maintain charging policies and procedures. 5 Measurement of performances of the implemented Provisioning system by using the new model for ITIL V3 framework Table III presents the realisation of the KPIs for the new model of ITIL V3 framework [9]. Results show that the new model is better than the old model for all 14 KPIs. Key Performance Indicator TABLE III: REALISATION OF THE KEY PERFORMANCE INDICATORS FOR THE NEW MODEL OF ITIL V3 FRAMEWORK The implementation of the key performance indicator repeated Remotely resolved escalations number of repeated now is 6. These s are mostly connected to SetSubsciber function but now only for packages for fixed telephony system. Problems with other systems don t exist any more. number of remotely resolved is now 10. These are resolved remotely by the Service Desk. Employees from Service Desk solved every s except s with changing packages of fixed telephony system and some small s with supplements to the user account for example adding an old mobile phone number to the IPTV account. Measurements showed that there is no escalations for that are not resolved in the agreed. There are no escalations and because of this users didn t have to cancel one of Telecom operator s services. total number of which are registered by Service Desk is now 20. There are now only 2 kinds of : the 1 st one is the function of adding some supplements to the user account and the 2 nd one is The percentage of the implementation of each key performance indicator 80% 70% 80% Incident First Resolution with SLA Incident effort s Problem per per known function of showing a phone number on the fixed telephony device which is one function that is connected only to the fixed telephony system. The average for resolving an incident is now 16 hours so this result is better for 32 hours than the old result. number of that are resolved at the Service Desk during the first call is 50, and the total number of is 60. Employees from Service Desk known to solve any except connected to the changing packages for fixed telephony system. Rate of resolved during solution s agreed in SLA is 95%. The result for fixed telephony system is 50%, for mobile telephony system result is, for IPTV service, for VoIP service result is, for ADSL service result is, for Hosting system result is and for IMS system result is. The average result is 95%. average work effort for resolving is 48 hours. The allowed is 24 hours. The reason for this not very good result is that was needed some for resolving connected to the fixed telephony system. Service Desk workers didn t know how to solve these s so systems architects had to come to solve these s. total number of s is 1. The is now connected to the setsubscriber function but only for the fixed telephony system. This parameter is average for resolving a. Both s that are described in table I are solved and the average for solving these s was 5 days. The agreed defined in SLA is 3 days so this parameter is 60% implemented. average number of per each is now 4. Allowed number of should be 3 so this parameter could be performed in one of the the future researches. The average number of linked to the same after identification is also 4. All are connected to the known. 80% 85% 95% 50% 90% 60% 85% ISBN: 978-1-61804-118-0 213

Time until identification Problem effort The needed for the identification of this was 1 day so this result is 10 s better than the value defines for critical success factor. The for the function SetSubscriber for the fixed telephony system was identificated on the 2 nd day after a releasing into a production of the new system. average work effort for the solving of s from the old model for ITIL V3 framework is 2 days which is the same result as for the value which is assigned to the critical success factor for this parameter. The result of the successfully implemented KPIs for the new model for ITIL V3 is 84%, and for unsuccessfully implemented KPIs result is 16%. Figure 5. represents the ratio between successful and unsuccessful implemented key performance indicators for the new model for ITIL V3. processes, Performance and Capacity Management which manages with establishing a planning process for the review of performance and capacity of IT resources, Continuous Service Management process which develops IT continuity framework, Systems Security Management which defines and maintains an IT security plan and Costs Management which is responsible for identifing all IT costs and mapping them to IT services on a unit cost basis. Future research of authors in this area is connected to the testing of this developed model in some other services, for example in IPTV or VoIP service of Telecom operator [17], [18]. The aim is to improve even this model and to prove that this model is better in every environment than the old model. This is very important because in this way a new model replace the old model for ITIL V3 framework. The new model will reduce a for introducing a new service, the number of and s on service desk and a for a development of a new service. Figure 5. The result of the implementation of KPIs for the new model for ITIL V3 6 Conclusion percentage of the successfully implemented key performance indicators for the old model for ITIL V3 is only 44%. For the new model, the result is pretty better and it is 84%. So new model is 91% better than the old model. The new model is equal or better in all 14 key performance indicators for Incident and Problem Management than the old model. Incident Management and Problem Management are 2 processes from Service Operation phase in which is shown the quality of the implemented Service Transition phase. The new model for ITIL V3 framework has 6 new processes which are all added into Service Transition phase. These new processes are [7], [9]: Service Levels Management which is responsible for the building of IT Service Catalogue, Thirdparty services Management which is responsible for the defining and documenting supplier management References: [1] S. Taylor, M. Iqbal, and M. Nieves, ITIL Version 3 Service Strategy, The Office of Government Commerce, July 2011. [2] S. Taylor, V. Lloyd, and C. Rudd, ITIL Version 3 Service Design, The Office of Government Commerce, July 2011. [3] S. Taylor, S. Lacy, and I. Macfarlane, ITIL Version 3 Service Transition, The Office of Government Commerce, July 2011. [4] S. Taylor, D. Cannon, and D. Wheeldon, ITIL Version 3 Service Operation, The Office of Government Commerce, July 2011. [5] S. Taylor, G.Case, and G.Spalding, ITIL Version 3 Continual Service Improvement, The Office of Government Commerce, July 2011. [6] ITGI and OGC, Aligning CobiT 4.1, ITIL V3 and ISO/IEC for Business Benefit A Management Briefing From ITGI and OGC, August 2008. [7] IT Governance Institute, CobiT Control Practices: Guidance to Achieve Control Objectives for Successful IT Governance, 2 nd Edition, May 2007. [8] IT Governance Institute, CobiT User Guide for Service Managers, 1 st Edition, April 2009. [9] ITGI, CobiT Mapping: Mapping of ITIL V3 With CobiT 4.1, August 2008. [10] S. Sahibudin, M. Sharifi, and M. Ayat, Combining ITIL, CobiT and ISO/IEC 27002 in Order to Design a Comprehensive IT ISBN: 978-1-61804-118-0 214

Framework in Organizations, 2 nd Asia International Conference on Modeling & Simulation (AICMS 2008), pp. 749-753, May 2008. [11] D. Radovanovic, T. Radojevic, D. Lucic, and M. Sarac, IT audit in accordance with CobiT standard, 33 rd International Convention MIPRO, pp. 1137-1141, May 2010. [12] G. Ridley, J. Young, and P. Caroll, CobiT and its utilization: a framework from the literature, 37 th Annual Hawaii International Conference on System Sciences, pp. 1-8, January 2004. [13] S.J. Hussain and M.S. Siddiqui, Quantified Model of CobiT for Corporate IT Governance, 1 st International Conference on Information and Communication Technologies (ICICT 2005), pp. 158-163, August 2005. [14] F. Hojaji and M.R.A. Shirazi, A Comprenhensive SOA Governance Framework Based on CobiT, 6 th World Congress on Services (SERVICES-1), pp. 407-414, July 2010. [15] A. Tanovic and F. Orucevic, Integration of PRINCE 2 model into ITIL V3 model, 19 th Telecommunications Forum (TELFOR 2011), pp. 102 105, November 2011. [16] T. Goldschmidth, A. Dittrich, and M. Malek, Quantifying Criticality of Dependability-Related IT Organization Processes in CobiT, 15 th IEEE Pacific Rim International Symposium on Dependable Computing, pp. 336-341, November 2009. [17] A. Tanovic, I. Androulidakis, and F. Orucevic, Design and implementation of the IP Muldia Subsystem by using ITIL V3 recommendations, 6 th WSEAS International Conference on Communications and Information Technology (CIT 12), pp. 39-48, March 2012. [18] A. Tanovic and F. Orucevic, Advantages of the new ITIL V3 model in the implementation of the IMS system, 6 th WSEAS International Conference on Communications and Information Technology (CIT 12), pp. 183-191, March 2012. [19] Nikolaos Bardis, Nikolaos Doukas, Oleksandr P. Markovskyi, Fast subscriber identification based on the zero knowledge principle for muldia content distribution, International Journal of Muldia Intelligence and Security, Volume 1, Number 4, pp. 363 377, 2010. [20] N.G. Bardis, A. Drigas, N. Doukas, N.V Karadimas. Optimised Information System Reliability Techniques for Knowledge Society Acceptance. International Journal of Knowledge and Learning, Volume 5, Number 3-4/2009, pp 207-221. ISBN: 978-1-61804-118-0 215