Gas Legislation Guidance IGE/GL/9 Communication 1724 Guidance for large gas consumers in dealing with Natural Gas supply emergencies



Similar documents
Planning of gas distribution systems of MOP not exceeding 16 bar

IGEM/UP/16 Communication 1756

A guide to landlords duties: Gas Safety (Installation and Use) Regulations What type of property is covered?

IGEM/UP/11 Edition 2 Communication 1744 Gas installations for educational establishments

UNDERSTANDING WINTER GAS SUPPLY. Answers to frequently asked questions from business

Defining the end of the Network, a meter installation and installation pipework

MANAGEMENT AND USE OF WORK EQUIPMENT: PRESSURE SYSTEMS

Emergency Plan. This emergency plan provides a format of data essential in an emergency situation.

Operating instructions

Operating instructions

Online Fixed Energy A Guaranteed Deal

PE and steel gas services and service pipework

CODE OF PRACTICE FOR GAS METER ASSET MANAGERS

Online Fixed Energy A Guaranteed Deal

Online Fixed Energy A Guaranteed Deal

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

GAS INDUSTRY GUIDANCE ON WORK ON METER INSTALLATIONS (v5)

Western Australia Kalbarri Vision Reticulated LPG. Terms and Conditions


A guide to the Gas Safety (Management) Regulations 1996

G11. Acceptable Solutions and Verification Methods. For New Zealand Building Code Clause G11 Gas as an Energy Source

Bradlee Boilers Ltd. Instruction Manual for starting up Bradlee Hire Boiler from Cold

TOWNSVILLE WATER Customer Service Standards

Our Customer Charter.

GAS SUPPLY CODE. Energy Market Authority Of Singapore

ecomax Instructions for use Wall hung room sealed fan assisted condensing boilers For the user

Electric Gas Reliability Workshop April 2012

EMERGENCY RESPONSE PLAN FOR AZU SMALL WATERWORKS SYSTEM

DEALING WITH PLUMBING AND HEATING EMERGENCIES

Risk Management Guidelines

Duo-tec Combi HE A Range. User s Operating Instructions & Important Warranty Information. Gas Fired Wall Mounted Condensing Combination Boiler

P. Locker, Photo Graphic Design, Bolton

C3306 LOCKOUT/TAGOUT FOR AUTHORIZED EMPLOYEES. Leader s Guide. 2005, CLMI Training

Syston Dry Cleaners and Laundry Schedule 1 CHARNWOOD BOROUGH COUNCIL POLLUTION PREVENTION AND CONTROL ACT 1999

BUSINESS CONTINUITY ASSESSMENT CHECKLIST

For installation guide see reverse of book

NETWORK OPERATIONS. Siteworks Charging. From May

Liberty Mutual Insurance RISK ENGINEERING PROCEDURE. REP 07 Incident Planning For external use

YOUR CONTACT WITH ELECTRICITY COMPANIES

Best Practice Guide BPGCS007

ISO27001 Controls and Objectives

Response: The combi boiler. Response: The fit anywhere combi

USERS GUIDE. LOGIC Combi 24, 30, 35. For installation guide see reverse of book

Take care with oxygen Fire and explosion hazards in the use of oxygen

Your connection with Contact

Policy for the Management of Asbestos in Buildings

FIXED CHARGE: This is a cost that goes towards making the service available, including

User Guide and Important Warranty Information. Heatmax Combi HE Range. Condensing Combination Boiler

Standard conditions of electricity supply licence

Control of legionella bacteria in water systems

Petroleum (Consolidation) Regulations 2014

Your. connection. with. Contact. Contact Energy terms and conditions for residential and business customers. Effective 26 December 2013.

USERS GUIDE. LOGIC Heat 12, 15, 18, 24, 30. For installation guide see reverse of book

UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN

Guidance on how to comply with the 2013 Building Regulations Part L

BGE/BE/TAC/0710. NQH Business electricity Terms and conditions

LOCK-OUT/TAG-OUT PROGRAM I. Purpose

Business Continuity Policy

Abnormal Operating Conditions Emergency Plans and Public Awareness Plans for Natural Gas Systems

Code of Practice EST 01 Decommissioning arrangements prior to site hand over Oct 2004

The client organisation that was best at meeting residents needs in the provision of a maintenance service

GAS HEATING IN COMMERCIAL PREMISES

Monitoring your Energy Bills in Your Business

Co-operative Energy, Co-operative House Warwick Technology Park, Warwick CV34 6DA.

Online Fixed Energy A Guaranteed Deal

User's Instructions. Alpha HE CB25/33 and HE SY25

Commercial Heating and Ventilation

Your. connection. with. Contact. Contact Energy terms and conditions for residential and business customers. Effective 1 October 2012.

Contract for the supply of electricity to business premises

Gas Emergencies. You re in safe hands. Main title

service breakdown emergency 3in1 Plan What the SGS Service Plan provides What happens if you have a breakdown Cover provided by the Plan Dear

Baxi Combi 80e & 105e

NATURAL GAS EMERGENCY PROCEDURES AND ACCIDENT PREVENTION

Customer Code of Practice & Security of Supply. Standard Distribution Licence Conditions 8, 9 and 10

Business Continuity Plan

Controlling fire and explosion risks in the workplace

POLICY AND PROCEDURE. Business Continuity Plan. SoLO Life Opportunities

UCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS

How To Understand The Gusp

Load Response Program Agreement Real-Time Demand Response Program 30 Minute Notice

Guidance on Safe Operation of Boilers

Owner-User Pressure Equipment Integrity Management Requirements

Welcome to natural gas for your home

Metering, Billing & Remote Surveillance. Solutions for Communal Heating Systems - Including SmartTalk Two-Way Communication

For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems

Gas Network Security Provisions. Peter Boreham UKT Gas Operations Manager and National Emergency Coordinator

Asbestos Management Policy

Operating instructions

Section 1 Bills Bills Bills All copies of bills and information obtained from company websites

INDEX 1.0 HEALTH, SAFETY & ENVIRONMENT 1.1 INTRODUCTION 1.2 OBJECTIVES 1.3 HEALTH, SAFETY & ENVIRONMENT STATEMENT 1.4 ENVIRONMENTAL STATEMENT

DISTRIBUTION CONNECTION

Terms of Reference Annex: Energy Sector

Clients in Construction Best Practice Guidance

ISO Controls and Objectives

Practical Skills Sign Off Instrument

Technical Bulletin 140 Developed in conjunction with the Institution of Gas Engineers and Managers (IGEM)

ROTTNEST ISLAND AUTHORITY OPERATION OF ELECTRICAL SERVICES CUSTOMER SERVICE CHARTER Electrical Customer Service Charter 2009 Version 2 1

This leaflet provides information on

Fixed Price Energy A Guaranteed Deal

Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR

Transcription:

Gas Legislation Guidance IGE/GL/9 Communication 1724 Guidance for large gas consumers in dealing with Natural Gas supply emergencies Founded 1863 Royal Charter 1929 Patron: Her Majesty the Queen

Gas Legislation Guidance IGE/GL/9 Communication 1724 Guidance for large gas consumers in dealing with Natural Gas supply emergencies Price Code: TO The Institution of Gas Engineers and Managers Charnwood Wing Holywell Park Ashby Road Loughborough, Leics, LE11 3GH Tel: 01509 282728 Fax: 01509 283110 Email: general@igem.org.uk

CONTENTS SECTION PAGE 1 Introduction 1 2 Scope 1 3 Planning for cessation of gas supply 2 3.1 Causes of cessation of gas supply 2 3.2 Planning for cessation of gas supply 2 4 Shutting down plant and equipment 3 5 Re-starting equipment upon restoration of gas supply 3 5.1 Gas supply locally isolated at appliances 3 5.2 Gas supply isolated at the emergency control valve or section isolation valves 3 6 Further Help 4

SECTION 1 : INTRODUCTION 1.1 This Guidance provides advice on the potential reasons for cessation of supplies to commercial and, in particular, industrial gas users and the actions necessary to be taken in a Natural Gas supply emergency. 1.2 IGE/GL/9 aims to give simple advice to Natural Gas consumers on the consequences of the loss of their gas supply, their legal obligations, and technical requirements to ensure continued safe operation of consumers plant. 1.3 With appropriate contingency planning, gas consumers may avoid being exposed to greater costs and commercial risks than would otherwise be expected. 1.4 Minimising the impacts of potential Natural Gas supply emergencies requires the co-operation of everyone in the industry. Only by working together can the quality of contact information be improved. This is a vital part of the industry emergency process for reducing demand on the gas network quickly and safely. 1.5 The Gas Safety (Management) Regulations allow gas transporter(s) (as gas conveyors) to direct any consumer to stop using gas when necessary, to prevent a Natural Gas supply emergency. In the event of such an emergency, it is vital that Large End Users stop using gas as soon as can be safely achieved, to limit the disruption to smaller consumers and to safeguard the Network. Site occupiers will also have safety responsibilities under other safety legislation such as the Health and Safety at Work Act and the Provision and Use of Work Equipment Regulations. This publication does not cover all the safety issues arising from such legislation. However, the need for competent persons, planning and safe procedures is of paramount importance. 1.6 This Guidance does not address any issues that are associated with any contractual arrangements (between users and the gas transporter/shipper) for interruptible supply except that some or all of the technical guidance will be applicable. SECTION 2 : SCOPE 2.1 This Guidance provides advice for those Large End Users of Natural Gas who may be directed to cease the use of Natural Gas in the event of a gas supply emergency. In this respect, Large End Users are those consuming 732,000 KWh (25,000 therms) per annum at an individual supply point. 2.2 This Guidance is not specific to loss of gas affecting any particular premises but the general information given has general relevance and may be used to formulate site-specific plans. 1

SECTION 3 : PLANNING FOR CESSATION OF GAS SUPPLY 3.1 CAUSES OF CESSATION OF GAS SUPPLY The cessation of supplies to users of Natural Gas may be caused by: damage to, or failure of, the local gas supply network failure of part of the national transmission system insufficient supplies to meet gas demand. In such cases, Large End Users may be required to implement immediate or phased cessation of their gas supply. Large users will be directed to cease using gas ahead of priority users and domestic users. The proximity of a premises supply to a network terminal does not imply that gas supply will be secure under emergency conditions. Under any of the above circumstances, the user may be contacted by the gas transporter, or shipper or supplier acting on the transporter's behalf, and directed to cease using gas. Users are required by law to comply with this direction. If a user fails to comply with the direction to cease consumption of gas and the gas transporter attends to isolate the user s supply, this will normally be done at the Emergency Control Valve (at the primary meter). The user s co-operation with the gas transporter in an emergency is vital if the safety of the gas supply network is to be assured. 3.2 PLANNING FOR CESSATION OF GAS SUPPLY There are a number of important steps which the user should take in planning for a cessation of supply: assess the risks to site and business operations due to the cessation of gas supplies. This may include business continuity issues. establish who is the gas transporter, gas shipper and gas supplier and adopt a rigorous procedure to ensure their details are kept up-to-date. Details of the gas transporter and supplier are shown on the gas supply invoice. The gas supplier will have details of the relevant gas shipper. prepare an operating plan for when no gas is available, including the availability/operability of existing alternative site energy sources, and potential damage to plant or processes e.g. caused by freezing of water systems. identify the key contact points within the user s company to respond to the direction to curtail supplies. It is vital that up-to-date details of these contacts are supplied to the gas supplier, including out of hours details [24 hours/365 days] ensure that competent resources are available to cease the use of gas as directed ensure competent resources are available for the restoration of gas systems and the start-up of associated plant and equipment when the gas supply emergency has finished. Other Large End Users may be similarly affected and, therefore, if the required competency to restore gas supplies is not available in-house, it is worth bearing in mind that the services of specialised contractors may be stretched at this time. on a regular basis, establish and test the procedures for the controlled shutdown and start-up (re-commissioning) of plant and equipment. Refer to Section 4 for details of important considerations when establishing these procedures if the risk assessment indicates that significant health and safety implications may exist due to cessation of supply, the user may contact the gas supplier ensure it is known who will provide the information that the gas supply emergency has finished i.e. will it be the transporter, the shipper, the supplier or another party? 2

SECTION 4 : SHUTTING DOWN PLANT AND EQUIPMENT 4.1 When a direction to cease consumption is received then the user should try to do this by shutting down gas appliances rather than turning off the gas at the Emergency Control Valve (at the primary meter) or at other section isolation valves. The primary consideration is to ensure continuing safety while, if reasonably practicable, maintaining a positive gas pressure i.e. greater than atmospheric pressure, within the pipework system. Turning off the supply at the Emergency Control Valve or at any other section isolation valve may lead to the complete loss of pressure within the installation pipework downstream of that valve. This may also lead to the inability to ignite alternative fuels (see Note 1 of 4.2) and require purging, testing and commissioning upon resumption of supply. These activities could involve considerable expense and delay. Furthermore, in some cases, the steps to recommission will require a written methodology and the use of appropriate purge gas. There will also be a need for staff with the appropriate level of competence to test and purge the system. There may occasions where the user suspects a failure of the gas supply network before being contacted by the gas transporter, or shipper or supplier. In such cases, each appliance should immediately be turned off and the Emergency Service Provider contacted via 0800 111 999. 4.2 If the user has the ability to use alternative fuels, it is important to ensure that all associated equipment can be readily switched to the alternative fuel at short notice. Note 1: It may be necessary to have either a standby LPG or bottled Natural Gas supply for the ignition system. Note 2: In a gas supply emergency, little or no advance notice may be given of the cessation of gas supply, so it is important to remember that adequate standby fuel storage or heated oil systems may be needed to permit rapid changeover to oil firing at any time and not just under peak winter conditions. SECTION 5 : RE-STARTING EQUIPMENT UPON RESTORATION OF GAS SUPPLY When the gas supply emergency is finished, you will be notified by the gas transporter, shipper or supplier. 5.1 GAS SUPPLY LOCALLY ISOLATED AT APPLIANCES If appliances are isolated at their local isolation valve, it should be possible to light the appliances one at a time. Check in each case that they appear to be operating correctly. Site staff should understand and be sufficiently competent to attempt to relight appliances. They should also have the operating and fault finding instructions to hand. If there is any doubt about the staff competency or if appliances do not appear to be operating correctly, seek assistance from a competent person such as the manufacturer/servicing agent. 5.2 GAS SUPPLY ISOLATED AT THE EMERGENCY CONTROL VALVE OR SECTION ISOLATION VALVES In this instance, it is essential to first apply a test for gas tightness of the existing pipework system in accordance with IGE/UP/1 or IGE/UP/1A before purging takes place. 3

This must be performed by persons holding the appropriate competency and, for commercial premises, those who are registered as a Member of a Class of Persons (currently CORGI). SECTION 6 : FURTHER HELP For information on competency, see HSE COP 20 Standards of Training in Safe Gas Installation. IGEM has a wide range of Utilization Procedures that may be of assistance. For more information visit the web site on www.igem.org.uk. IGEM also has available a list of Consultants with expertise in most fields of gas supply and utilization, to assist consumers of gas in meeting their obligations and ensuring the safety of their systems. For more information visit the website on www.igem.org.uk. 4

Communication 1724 ISBN 0-7177-0104-2 Price Code: TO ISSN 0367-7850 This copyright publication forms part of a series of Gas Legislation Guidance published by the Institution of Gas Engineers and Managers, Charnwood Wing, Ashby Road, Loughborough, Leicestershire, LE11 3GH. The latest titles that are currently available in this series are the following: Item No. Title Date of Comm Current Edition No IGE/GL/1 Planning of gas distribution systems of MOP not exceeding 16 bar 2005 1718 Edition 2 IGE/GL/2 Planning of transmission and storage systems operating at 1996 1627 pressures exceeding 7 bar IGE/GL/3 Network emergency procedures 1996 1628 IGE/GL/4 Management and audit procedures 1996 1629 IGE/GL/5 Procedures for managing new works, modifications and repairs 2005 1715 Edition 2 IGE/GL/6 Non-routine operations 1996 1631 IGE/GL/8 Reporting and investigation of gas related incidents 1996 1633 IGE/GL/9 Dealing with Natural Gas supply emergencies for large 2006 1724 gas consumers The Institution of Gas Engineers and Managers, 2006 (Registered Charity 214011)