International Space Station Carbon Dioxide Removal Assembly (ISS CDRA) Concepts and Advancements



Similar documents
Lessons Learned during the Refurbishment and Testing of an Observatory after Longterm

ISS Environmental Control and Life Support System (ECLSS) Future Development for Exploration

D Youville College July 31, 2008 New Academic Building Cannon Design Project No

SAM HOUSTON STATE UNIVERSITY

HYDRYER TYPE P Heat Regenerative Dryers ISO 9001 CERTIFIED

Element D Services Plumbing

Test Code: 8297 / Version 1

Rapid Cycle Amine (RCA 2.0) System Development

Element D Services Plumbing

The On-Board Refueling Vapor Recovery (ORVR) Evaporative Emission (EVAP) system.

Space Flight Project Work Breakdown Structure

Status of the Regenerative ECLSS Water Recovery System

A discussion of condensate removal systems for clarifier and thickener drives for water and wastewater facilities.

MEDICAL AIR STATIONS FOR MEDICAL GAS PIPING SYSTEM. Key features: NOVAIR quality and service:

Beyond LEO: Life Support Requirements and Technology Development Strategy

OPTIMIZING CONDENSER WATER FLOW RATES. W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa

How Ground/Water Source Heat Pumps Work

Running Head: An Analysis of Shuttle Crew Scheduling Violations 1. An Analysis of Shuttle Crew. Scheduling Violations.

Medical Air Systems: Scroll

TECHNICAL SPECIFICATION. StirLIN-1 Economy Liquid Nitrogen System

Element D Services Heating, Ventilating, and Air Conditioning

A Practical Guide to Free Energy Devices

A. Air-Conditioning and Refrigeration Institute: 1. ARI Commercial and Industrial Air Filter Equipment.

NATURAL GAS EXPERIENCE

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

Standard Hydraulic Piping Flushing Procedure

HR Heated HB Blower. Smart Solutions for Drying Compressed Air. Dual Tower Heat Reactivated Desiccant Air Dryer

Cartridge Filter Application Notes

EMERGENCY VAPOR SCRUBBER SYSTEMS

ESA s Data Management System for the Russian Segment of the International Space Station

Scroll Compressor Development for Air-Source Heat Pump Water Heater Applications

Hybrid Systems: Combining Technologies Leads to More Efficient Gas Conditioning

Putting a chill on global warming

MINNESOTA WEST COMMUNITY & TECHNICAL COLLEGE COURSE OUTLINE

A New Technique Provides Faster Particle Size Analysis at a Lower Cost Compared to Conventional Methods

CHAPTER 7 THE DEHYDRATION AND SWEETENING OF NATURAL GAS

DESIGN STANDARDS SECTION

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

TABLE OF CONTENT

Improving Robotic Operator Performance Using Augmented Reality James C. Maida / NASA JSC, Charles K. Bowen and John Pace / Lockheed Martin

Kompressoren. Adsorption Dryer AD

Phase Change Material Trade Study: a Comparison between Wax and Water for Manned Spacecraft

Biogas as transportation fuel

Electronic component assembly

ASE 7 - Heating, Ventilation, and Air Conditioning. Module 8 Diagnosis, Testing & Repair

HOW TO BUILD A NANORACKS PAYLOAD: NANOLABS

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion

Fiscal Measurement Natural Gas

Technical Support Services Accelerated Learning Through the Visual Presentation of Technical Information

ETC -SV. Class 0 oil-free compressed air through catalysis

1-Way Chilled Water Cassettes KCO 60, 90 & 120. Technical Brochure. TM KCO-W.1GB Date : November 2005 Supersedes : None

MTI10 Insertion and MTL10 In-line Thermal Mass Flowmeter and Temperature Transmitter

CEILING CASSETTE FAN COIL UNIT

Air Eliminators and Combination Air Eliminators Strainers

Performance Test of Solar Assisted Solid Desiccant Dryer

Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle

How Long Do You Need To Achieve Your Scientific Objectives?

Experimental Study on Super-heated Steam Drying of Lignite

Description of Thermal Oxidizers

Glossary of Heating, Ventilation and Air Conditioning Terms

Installation Instructions

Oil and Coolant Circulating Heating System. Model - OCSM

Aerospace and Defence

Auxiliary HVAC RAM ProMaster. Standard Tie-in Extreme Climate System

Automatic Self-Cleaning Strainers

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

Morrison Bros. Co. General Product Specifications

In-Line Filters and Coalescers with Automatic Drains

Full Technical Catalog For Closed-loop Sampling System

INDEPENDENT VERIFICATION AND VALIDATION OF EMBEDDED SOFTWARE

USER MANUAL WARNING! CONTENTS MODEL 1 SPECIFICATIONS READ ALL INSTRUCTIONS BEFORE PROCEEDING. Non-Programmable Single Stage Heat/Cool Thermostat

Fundamentals of Mass Flow Control

CETA Application Guide for the Exhaust System Requirements of Class II, Type B Biosafety Cabinets CAG March 24, 2010

MIDLAND COLLEGE SYLLABUS DEMR 1323 AUTOMOTIVE HEATING AND AIR CONDITIONING 2-4

AABC Specifications for Testing and Balancing HVAC Systems

New Trends in the Field of Automobile Air Conditioning

TOPO Trajectory Operations Officer

Table Z. Troubleshooting Chart for Air Conditioners. Cause

Steam Coil Installation, Operation and Maintenance

P3000 Series. Pneumatic Deadweight Testers Model P3000. Technical Data. Features

RJP CONSULTING. 823 Island Meadow Court Houston, Texas Voice/Fax: (281)

Achim Beisiegel Fouad El-Rharbaoui Michael Wich. AREVA GmbH, Technical Center, Karlstein, Seligenstädter Strasse 100, Germany

Waters Corporation. Waters 2690/5 USER & TROUBLESHOOTING GUIDE

PRELIMINARY COMPONENT INTEGRATION USING RAPID PROTOTYPING TECHNIQUES

CHAPTER 11 HEATING, VENTILATION AND AIR CONDITIONING. Section Title Page

Fossil fuel heating equipment

york air-conditioning products Residential & VRF News 2015

THE SOLAR SYSTEM - EXERCISES 1

INSTALLATION INSTRUCTIONS Fan Coil Replacement Coil Kit EBX & EBXX

Improving Data Center Efficiency with Rack or Row Cooling Devices:

Eurovacuum EV Series. Single Stage Oil Sealed Rotary Vane Pump

ThermoSorb Desiccant Dryers

SECTION HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

To: All Shipowners, Ship Managers, Ship Masters and Classification Societies

Transcription:

2005-01-2892 International Space Station Carbon Dioxide Removal Assembly (ISS CDRA) Concepts and Advancements Dina El Sherif Honeywell International, Torrance CA 90504 James C. Knox NASA Marshall Space Flight Center ABSTRACT An important aspect of air revitalization for life support in spacecraft is the removal of carbon dioxide from cabin air. Several types of carbon dioxide removal systems are in use in spacecraft life support. These systems rely on various removal techniques that employ different architectures and media for scrubbing CO,, such as permeable membranes, liquid amine, adsorbents, and absorbents. Sorbent systems have been used since the first manned missions. The current state of key technology is the existing International Space Station (ISS) Carbon Dioxide Removal Assembly (CDRA), a system that selectively removes carbon dioxide from the cabin atmosphere. The CDRA system was launched aboard UF-2 in February 2001 and resides in the U.S. Destiny Laboratory module. During the past four years, the CDRA system has operated with varying degrees of success. There have been several approaches to troubleshooting the CDRA system aimed at developing work-around solutions that would minimize the impact on astronaut time required to implement interim solutions. The paper discusses some of the short-term fixes applied to promote hardware life and restore functionality, as well as long-term plans and solutions for improving operability and reliability. The CDRA is a critical piece of life support equipment in the air revitalization system of the ISS, and is demonstrated technology that may ultimately prove wellsuited for use in lunar or Mars base, and Mars transit life support applications. INTRODUCTION The existing International Space Station (ISS) Carbon Dioxide Removal Assembly is part of the ISS air revitalization system, providing continuous COPremoval from the cabin atmosphere. CDRA is a regenerative system whose principal operation utilizes 4 beds. Each bed ORU contains a desiccant bed and a CO, sorbent be-ence desiccantladsorbent bed ORU. The system relies on one desiccant bed to condition the air prior to entry into the adsorbent bed. The adsorbent bed selectively removes the COP,and the air travels through the second desiccant adsorbent bed to replace the humidity. The CDRA system is a water-save system in contrast to the 2-bed Skylab system, which vented adsorbed water overboard. The U.S. Skylab Program successfully demonstrated the use of zeolite molecular sieves in regenerative CO, removal by using a two-bed subsystem that performed for over 4100 hours without failure. (1). While cabin air processing, one carbon dioxide removal bed is in the process of regeneration. Regeneration is accomplished using pressure/thermal swing methodology. First, the two-stage pump removes the free air from the adsorbent bed and returns it to the cabin, reducing oxygen ullage. Then Kapton heaters integrated within the adsorbent bed raise the zeolite temperature, and space vacuum creates a low, partial pressure driving the carbon dioxide gas overboard. Dayhight and continuous day power cycle is overlapped with the operating cycle. In the dayhight power cycle, the carbon dioxide adsorbent bed heaters are only allowed to be powered on during the day portion of the cycle In the current open-loop configuration, carbon dioxide is removed from the cabin and discharged overboard. The gases lost during venting must be replaced, and thus represent a consumable. By comparison, a closed-loop CDRA system could selectively remove carbon dioxide from the cabin air supply, and the concentrated CO, would be routed to a carbon dioxide reduction system, where the oxygen would be recovered, thereby reducing the consumables. This is an important aspect of long-term life support necessary to the success of lunar or Mars base or Mars Transit vehicle programs.

' The D/A bed ORU is a critical component of the CDRA system for removing cafbon dioxide. There are two D/A bed ORU's per CDRA system. Each of the ORU's was verified via system level Protoflight testing. By performing the verification at an integrated level, individual ORU's need not be tested. To support ORUlevel Acceptance testing of the D/A bed spares, the program must develop ORU-level tests to use in lieu of the existing system-level CDRA tests. Figure 2 depicts the D/A bed ORU. Two CDRA systems were produced for the ISS program. One CDRA system resides in the ISS U.S. Destiny Laboratory module. The second CDRA system is schedule for delivery for installation into Node 3. The ISS CDRA system supplements the Russian Vozdukh carbon dioxide removal system when more than three crewmembers are on board. On-board Lithium Hydroxide canisters supplement Vozdukh and CDRA CO, removal capabilities when needed. Figure 1 depicts the ISS flight CDRA. Figure 1. C '. < Carbon Dioxide Removal Assembly (CDRA) The CDRA continuously removes 6 person-equivalents of CO, when operating with both C02removal beds (dual beds) functioning. The minimum ISS carbon dioxide removal rate is based on the following equation for human equivalent unit (HEU) with the carbon dioxide partial pressure ranging from 2.0 to 3.9 mmhg: Figure 2. Eq 1 HEUs 1.723 * (pp CO, mmhg) - 0.37975 DesiccantlAdsorbent Bed ORU ISS CDRA Where 1 HEU is approximately 1 kg CO, /day During the past four years, the ISS CDRA system has operated with varying degrees of success. There have been several approaches to troubleshooting the CDRA system aimed at developing interim solutions that minimize astronaut time required to implement interim operational solutions. Failure analysis of a returned flight D/A bed ORU revealed a failure of the desiccant and sorbent containment design. This seal failure allowed some zeolite particles to be circulated with the movement of process air. While the loss of some zeolite particles does not impact CDRA system CO, removal performance, the particulates did affect operations of some downstream components resulting in malfunctions of the air save pump, D/A bed check valve and selector valve. (2) A major D/A bed redesign was implemented to alleviate the containment problem, but the modification requires an extended period of time to implement. As a Eq 2 C02removal rate (Ibhr) 2 0.158 * (pp C02, mmhg) 0.035 Each CDRA system includes 6 major orbital replacement units (ORU), including: Selector Valve ORU Desiccant / Adsorbent (D/A) Bed ORU Blower / Precooler ORU Two-Stage Pump ORU Heater Controller ORU Pump Fan Motor Controller (PFMC) ORU 3 '.

L h <.', 4.v *, result, several interim measures were adopted for on orbit operations to work through this extended redesign period.. 1 The team devised an operational mode that allows continued operation that takes advantage of the system's redundant architecture. A single-bed operation workaround allows a ground controller to isolate a bed from space vacuum during any half-cycle in which that bed is not operating properly, such as when the check valve fails open. During single-bed operation, the system provides 3 person-equivalent removal capabilities. To date, this work around has been implemented on several half-cycles during CDRA operations, however a majority of the time the CDRA has functioned with 100% capability, i.e., dual bed operation. As a. short-term hardware-based solution, the team decided to install in-line filters to capture any uncontained zeolite particulate material. In-line filters would extend the life of the selector valve ORU's and the two-stage air save pump. Combined filter testing and analysis resulted in an optimal filter design that met system specifications, i.e., flow and pressure drop(3). It also provided the program with an early system hardware protection feature. MSFC supported the development portion of the in-line filter by providing design data to Honeywell International, the manufacturer of the CDRA and filters. The filter design allowed installation without system modifications through placement of in-line filters in locations having relatively easy crew access. To date, astronauts have installed three 0.5-inch filters and three of the four 1.5-inch filters in the CDRA system while on orbit. Figure 3 presents a schematic of the CDRA. Figure 3. CDRA Schematic

OVERALL REDESIGN APPROACH In addition to operational workarounds and implementation of in-line filters to protect downstream components from sorbent particles, the long-term modification plan is to yield a solution that improves system operability and reliability. The re-design of the sorbent retainment system within the DIA bed (Figure 4) has been initiated, with plans to refurbish existing flight desiccant adsorbent bed hardware. The redesign and performance testing of the carbon dioxide removal assembly (CDRA) D/A bed ORU will be verified during Node 3 CDRA Performance Testing. BAFFLE A S S I 3 HCIJSING Desiccant Bed -\ INSERT FLANGE BhFFLE 4 S Y Figure 4. Modified DesiccantlAdsorbent Bed ORU Concept ~ Figure 5. The development of a new sorbent retainment design includes improvement of the static and dynamic seals and the addition of fixed screens beyond the dynamic seal as an added measure of redundancy for preventing particulate escape from the beds. Figure 5 illustrates the concept. Sorbent Retainment Design DesiccantlAdsorbent Bed ORU - Bed Pressure Drop Testing To determine the impact of new sorbent retainment design on packed bed pressure drop, life test 4BMS desiccant and 5A sorbent beds were used to provide comparative check on sensitivity of pressure drop to flow area. The redesign involves replacement of the current pan assemblies with new assemblies designed to incorporate an insert. The insert is required to provide a sealing surface for the baffle assembly. The baffle assembly incorporates an O-ring seal. Together with springs, it places the zeolite material under compression and retains the packing to prevent channeling. The dynamic baffle assembly allows for some travel to accommodate thermal growth and material settling. The dynamic baffle can travel a short distance until it comes to rest on the heater core within the adsorbent bed. The pan assembly will incorporate a static seal mounted directly to the hardware via braze. The static seal in the pan assembly serves as a redundant screen to the dynamic baffle. The desiccant bed dynamic baffle and insert were fabricated similar to the flight concept. Pressure drop testing results shows no increase in pressure drop within experimental error. (Figure 6) The adsorbent bed dynamic baffle and insert were installed and tested both at a fully packed condition (new) and fully settled condition (when the baffle is resting on the heater core). Pressure drop testing at the fully packed condition shows a slight decrease in pressure drop in the redesign versus the current design. At fully packed, some material must be removed to provide room for the insert. A

L L - o v ', (Figure 7) Material is removed to allow the dynamic baffle to be in the proper position representing the fully settle state. Pressure drop testing results shows a decreasing pressure drop over travel for the current design. In the redesign case, the pressure drop remains uniform over baffle travel. This can be explained by the removal of sorbent is likely offset by obstruction of flow area at end of travel. (3) Experimental and Analvtical lnvestication of Pressure Differentials for Clean and Loaded Wire Meshes Used in Zeolite Retention; Knox, James C. ICES 2004-01 -2544 (Figure 8) Incorporating the insert and baffle will O-ring will not adversely affect the pressure drop, the pressure drop testing suggests the redesign components will lower the pressure drop across the bed by a small value (5 mmh,o) at nominal flow conditions. The pressure drop results may be an indication that the CO, removal performance impact will also be small. CONCLUSION The CDRA is a critical piece of life support equipment in the air revitalization system of the ISS. This paper discussed some of the short-term fixes applied to promote hardware life and restore functionality, as well as long-term plans and solutions for improving operability and reliability. Short-term program goals include completing installation of in-line filters to protect downstream components from sorbent particles. The long-term goal is the development and implementation of a new sorbent retainment design that restores 100% functionality full-time while maintaining reliable system operability. To date, short-term solutions have restored CDRA functionality a majority of the time. The long-term solution will be to improve CDRA functionality to full capability at all times. ACKNOWLEDGEMENTS Honeywell would like to thank James C. Knox and NASA Marshall Space Flight Center's (MSFC) support in development of the intine filters and bed pressure drop testing. REFERENCES (1) 941396 Molecular Sieve CO, Removal Svstems for Future Missions: Test Results and Alternative Desians M.S. Nacheff-Benedict (2) International SDace Station ClSS) Environmental Control and Life SUDDO~~ (ECLS) Svstem Overview of Events: Februarv 2002-2004; Gentry, Gregory J. Reysa, Richard P., Williams, Dave E ICES 2004-01 -2383