2010 Minerals Yearbook



Similar documents
January Developing Copper, Zinc and Gold Deposits on the Asmara Project, Eritrea. November 2010

CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT

For personal use only

The Unparalleled Opportunity of Colluli the Colluli Potash Project presented by Danakali

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

MINERAL RESOURCES 131

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK

Sabina Gold & Silver Corp.

For personal use only

2011 Minerals Yearbook

FOR IMMEDIATE RELEASE

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA

For personal use only

TIGER RESOURCES LTD ACN

Developing a High Grade Gold Mine in Eritrea

LUPAKA GOLD ANNOUNCES JOSNITORO GOLD PROJECT OPTION WITH HOCHSCHILD MINING PLC

Savannah North Scoping Study Looking into the future 3 February 2016

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

THE REGULATORY FRAMEWORK FOR SOLID MINERALS DEVELOPMENT IN NIGERIA

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

2006 Minerals Yearbook

Fast Tracking to Production

GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5.

Highlights of selected high-grade mineralized zones exposed in drift tunnels include:

Pacifico set to commence drilling at Borroloola West Project and co-funding secured from NT Government

RIDDARHYTTAN RESOURCES PRESS RELEASE August 11, 2003

JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.

Global discovery trends : What, where and who found them

2011 Minerals Yearbook

For personal use only

PRESS RELEASE CANADIAN ZINC REPORTS RESULTS FOR THIRD QUARTER 2015

2008 Minerals Yearbook

NEWS RELEASE Nippon Mining & Metals Co., Ltd. Mitsui Mining & Smelting Co., Ltd. Pan Pacific Copper Co., Ltd.

Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back

Challenges of Investing in Junior Mining Companies and. Sotkamo Silver

The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include:

Candelaria and Ojos del Salado Chile

SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA

For personal use only

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

AIM: KEFI 6 March KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE

Ironbark Zinc Limited

Mineral Deposits and their Global Strategic Supply. Group Executive and Chief Executive Non-Ferrous 14 December 2011

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2014

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

Panoramic View on the Prospects & Investments in the Tapajós-Xingu Provinces. Elton L.S. Pereira 22/May/2012

Leapfrog : new software for faster and better 3D geological modelling

GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

Barkerville Gold Mines Investor presentation q The last great Canadian gold mining camp controlled by a junior mining company.

JUNE 2015 QUARTERLY REPORT

Gold. Grade. Infrastructure. CORPORATE PRESENTATION

Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review

INVESTOR PRESENTATION

Barkerville Gold Mines Investor presentation q Mines are found in the shadows of headframes

Corporate Presentation October 2015

Nevada Lithium. Nevada Sunrise Gold Corp. Lithium: the Energy Metal

For personal use only

FORWARD LOOKING STATEMENTS

HISTORIC INTERSECTIONS INCLUDE 19.8 G/T AU OVER 8.9 METRES AND 24.4 GT AU OVER 9 METRES

PNG Mining & Petroleum Investment Conference December Geoff Day Executive General Manager PNG and Indonesia

Chalice advances gold exploration initiatives in Australia and Canada

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia

Miocene Metals and Carube Resources Announce Start of Drilling on Bellas Gate Copper- Gold Joint Venture Project in Jamaica

Highlights. Completion of farm-out in Tanzania. Drill support contract awarded in Tanzania. Competent Person s Report commissioned

Broker Presentation. ACN

THE MINERAL INDUSTRY OF NEBRASKA

QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2015

ROME RESOURCES LTD Fraser Highway Surrey, B.C. V4N 0G2

Barkly Phosphate Project Tenement Granted

Silver Mine Project Investment Opportunity in Scandinavia

f or the P ROJECT Agreement with copper-gold Bluebird. comprises a 1.6 mineralisation are often discordant to the Proterozoic deposits found in HIG

Alecto Minerals plc / EPIC: ALO / Market: AIM / Sector: Exploration & Development 8 February 2016 Alecto Minerals plc ( Alecto or the Company )

ALCYONE REPORTS JORC SILVER RESOURCES

AngloGold Ashanti La Colosa Site Visit November, 2011

QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012

Bellhaven Expands the La Garrucha Discovery at the La Mina Project, Colombia

Core : CXO. and. Uranium Session SAREIC Conference Adelaide 13th April 2015

Pasinex Resources Limited Reports Large New Area of Surface Copper Mineralisation on its Golcuk Property in Turkey

WILLAMAX PROJECT. TSX-V: DVN Reach us at Developing B.C. mining assets to create profitable gold production.

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015

HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT

Danakali. Maiden ore reserve underpins valuation upside. Maiden 1.1Bt ore reserve at Collulli

NOVEMBER January 2013

For personal use only

Mineral MINERAL RESOURCES. Resources

Q Conference Call - Q3 financial results - Dividend declaration - Near term growth outlook - New Royalty Acquisitions

INVESTOR PRESENTATION January 2014

Thailand s Great Undeveloped Resource

News Release. n j. NovaCopper Releases Year End Results and Continues to Focus on Adding Long Term Value

Transcription:

2010 Minerals Yearbook ERITREA U.S. Department of the Interior U.S. Geological Survey August 2012

The Mineral Industry of Eritrea By Harold R. Newman and Thomas R. Yager The legal framework that governs the conduct of all mining and related operations in Eritrea is contained in the mining law that comprises Minerals Proclamation No. 68/1999, Mining Income Tax Proclamation No. 69/1995, and Regulations on Mining Operations Legal Notice No. 19/1995. All mineral resources in Eritrea are the property of the state, and licenses are required for the exploration and development of these resources (Mining Journal, 2010b). The greenstone belt of Eritrea, which hosts base and precious metals deposits and occurrences, covers about 70% of the country. The greenstone belt contains known volcanic massive sulfide (VMS) deposits, as typified by the Bisha discovery and deposits at Adi Nefas, Asmara, Debarwa, and Emba Derho. Known gold mineralization predominately occurs in quartz veins and as disseminations within shear zones (Mining Journal, 2010b). The United Nations (UN) Security Council passed a resolution to impose sanctions on Eritrea on December 23, 2009. The resolution accused Eritrea of supporting the Islamic al-shabab and Hizbul-Islam insurgents attempting to overthrow the Transitional Federal Government of Somalia and expressed concerns about Eritrea s rejection of the Djibouti Agreement. The resolution imposed an arms embargo on Eritrea and banned travel by and froze the assets of certain businesses and individuals. The Eritrean Government opposed the resolution and denied the charges made by the UN. The resolution did not target mining companies operating in Eritrea (United Nations Security Council, 2009). Minerals in the National Economy Exploration activities conducted in the past 10 years in Eritrea have identified reserves of base and precious metals. About 20 mining companies were involved in mineral exploration in different areas in 2010. Eritrea was not a globally significant producer or consumer of minerals. Production In 2010, Eritrea produced a variety of minerals and mineral products, which included basalt, cement, common clay, coral, granite, gravel, gypsum, kaolin, lime, limestone, marble, pumice, quartz, salt, sand, and silica sand. Small amounts of gold were produced in western Eritrea by artisanal miners (table 1). The country had deposits of asbestos, barite, copper, feldspar, iron ore, lead, magnesium, nickel, potash, silver, talc, and zinc that were not exploited in 2010. Refined petroleum products were imported to meet domestic needs (Mining Journal, 2010b). Structure of the Mineral Industry Table 2 is a list of the major mineral industry facilities, their locations, and their capacities. Commodity Review Metals Copper, Gold, Silver, and Zinc. Eritrea s gold mineralization is typically hosted in two types of deposits: VMS deposits, in which it is a byproduct, and quartz veins and stockworks in shear zones. Parts of both types of deposits may be weathered and contain zones of supergene enrichment. VMS deposits occur in the highlands near the capital of Asmara and include Sunridge Gold Corp. of Canada s Emba Derho prospect. Other VMS deposits, including Nevsun Resources Ltd. of Canada s Bisha and Harena projects and Sanu Resources Ltd. of Canada s Hambok project, occur in the lowlands west of Asmara (Mining Journal, 2010b). Nevsun announced that it had begun commissioning its treatment plant at the Bisha Mine and expected to start commercial production in the first quarter of 2011. Nevsun started running low-grade ore through the plant at yearend. In the first 2 years of production, the Bisha Mine was expected to produce 47,700 kilograms per year (kg/yr) of silver and 14,000 kg/yr of gold. For the next 3 years, Nevsun planned to mine 81,000 metric tons per year (t/yr) of copper, 31,500 kg/yr of silver, and 830 kg/yr of gold at Bisha. For the last 5 years of the mine s life, Nevsun planned to produce 97,500 t/yr of zinc, 17,800 t/yr of copper, 29,200 kg/yr of silver, and 500 kg/yr of gold (Nevsun Resources Ltd., 2010, 2011). In early July 2010, Chalice Gold Mines Ltd. of Australia completed a feasibility study on a new mine at the Koka gold deposit, which was part of the Zara project. Chalice planned to produce an average of about 3,200 kg/yr of gold during the 7-year life of the mine. Reserves at Koka were estimated to be 4.6 million metric tons (Mt) at a grade of 5.1 grams per metric ton (g/t) gold. Capital costs were estimated to be $122 million. Depending on when and if the Government awards a mining license to Chalice, development could start at Koka in 2011 and production could begin in 2013 (Chalice Gold Mines Ltd., 2010, p. 3, 7, 10). In October 2010, Sunridge commenced a feasibility study on a new mine at the Debarwa copper, gold, silver, and zinc deposit, which was part of the Asmara project. The feasibility study would consider a plant that would use a flotation process for the recovery of base and precious metals and would take into account various mining options over a forecasted mine life of 9 years. The feasibility study would further investigate the option of directly shipping high-grade ore (greater than 15% copper) to generate early cashflow. Resources at Debarwa were estimated to be 4.5 Mt, which included a supergene copper-enriched zone with resources of 1.3 Mt at grades of 5.36% copper, 33.9 g/t silver, and 1.54 g/t gold. The feasibility study was expected to be completed in the third quarter of 2011 (Mining Journal, 2010a; Sunridge Gold Corp., 2010a). Eritrea 2010 15.1

Sunridge also planned to start prefeasibility studies on the Adi Nefas, the Emba Derho, and the Gupo deposits, which were also part of the Asmara project, in early 2011. The studies were expected to be completed in the third quarter of 2011. Resources at Emba Derho were estimated to be 62.5 Mt, which included a copper-rich zone with resources of 38.4 Mt at grades of 1.02% copper and 0.99% zinc. At Adi Nefas, resources were estimated to be 2.7 Mt at grades of 8.38% zinc, 1.39% copper, 99.3 g/t silver, and 2.85 g/t gold. Resources at Gupo were estimated to be 4.5 Mt at a grade of 2.99 g/t gold (Mining Journal, 2010a; Sunridge Gold Corp., 2010a). Antofagasta Minerals plc of Chile and Sunridge commenced a new drilling program in 2010 at the Adi Rassi copper-gold prospect within the Asmara project as a part of their joint-venture agreement. Under the agreement, Antofagasta Minerals agreed to fund $10 million of exploration work during a 5-year period to earn a 60% interest in exploration areas of the Asmara project, excluding Adi Nefas, Debarwa, Emba Derho, and Gupo. The copper and gold mineralization at Adi Rassi was associated with quartz veins and breccia zones along a major shear zone that trends northeast and dips steeply to the west (Sunridge Gold Corp., 2010b). Sahar Minerals Ltd. of Bermuda obtained the Augaro and the Harab Suit gold and base-metal projects in February 2010; the company planned to drill at both projects. Andiamo Exploration Ltd. of the United Kingdom engaged in exploration at the Hayoka license in 2010. Gippsland Ltd. of Australia s Adobha project was composed of a 2,100-square-kilometer (km 2 ) exploration license plus three 100-km 2 prospecting licenses in the Adobha region. The project was prospective for copper, lead, and zinc. In September, Gippsland announced plans to spin off the Adobha project into a new company through an initial public offering (Gippsland Ltd., 2010; Mining Journal, 2010b). Industrial Minerals Cement. In 2010, China New Era International Engineering Corp. of China was building a new cement plant at Gedem with a capacity of 360,000 t/yr. Local resources of coral and limestone were expected to be sufficient to supply the plant for between 30 and 40 years (Ghebrehiwet, 2011; China New Era International Engineering Corp., undated). Potash. South Boulder Mines Ltd. of Australia s Colluli project is located in the Danakil Depression region about 200 kilometers (km) east of Asmara. The project, which covers an area of 906 km 2, consists of buried evaporate deposits in which two shallow potash horizons were identified. The upper horizon contains sylvinite and the lower horizon contains carnallite. South Boulder reported that mineralization at Colluli had been defined across 4.5 km 2 and was considered open in all directions; it would provide a target ranging from 300 to 500 Mt and grading from 21% to 25% potassium chloride. South Boulder stated that the quantity and grade was conceptual in nature as there had not been sufficient exploration to define a resource. A Joint Ore Reserves Committee Code-compliant resource was expected to be completed in January 2011. South Boulder also planned to complete a scoping study by the second quarter of 2011 on producing 1.5 million metric tons per year of potash at Colluli (South Boulder Mines Ltd., 2010, 2011). NGEx Resources Inc. of Canada announced that it had been granted the Bada potash exploration license located in the Danakil Depression. The license encompassed an area of more than 431 km 2 and was located 30 km inland from the Red Sea Port of Mersa Fatma and 150 km southeast of Asmara. The Bada license is situated within the northern portion of an evaporate basin that extends southward into Ethiopia. The Danakil Depression was known to extend northeast from Colluli and was believed to have the potential for potash-bearing beds on the Bada license. Exploration at Bada was scheduled to start in 2011 (NGEx Resources Inc., 2010). Mineral Fuels Petroleum. The Minister of Energy and Mines was responsible for granting petroleum rights, executing petroleum contracts, and implementing the petroleum law. Administration was carried out by the Hydrocarbon Division. Petroleum exploration and production activities were governed by the Revised Petroleum Proclamation No. 108 of 2000. Terms, most of which were negotiable, included a sliding-scale royalty; a 35% income tax rate; and land tenure for up to 8 years of exploration and 25 years of production, which could be extended for another 10 years of production (Government of Eritrea, 2000, p. 5, 13). Outlook An impending mining boom and the development of metallic deposits in the near future could have a positive effect on Eritrea s mineral industry. Exploration for gold, specifically, and copper is expected to continue. The potential for shear zone-hosted gold deposits is demonstrated from the gold discovery at Zara. Exploration for industrial minerals, particularly potash, could increase as the demand for these materials increases. Eritrea s proximity to Europe and the Middle East could offer access to export markets if mining develops. The country s relatively liberal mining laws are expected to remain in place and are likely to encourage foreign mining companies to explore in Eritrea. The UN sanctions reportedly are unlikely to have a direct effect upon mining operations; it is uncertain if mining companies could be indirectly affected (Saywell, 2010). References Cited Chalice Gold Mines Ltd., 2010, Annual report 2010: West Perth, Western Australia, Australia, Chalice Gold Mines Ltd., 83 p. China New Era International Engineering Corp., [undated], Eritrea GEDEM cement plant: China New Era International Engineering Corp. (Accessed September 19, 2011, at http://www.cnme.com.cn/en/dxxm_nei.asp?id=22.) Ghebrehiwet, Kesete, 2011, A vision beyond meeting local demand: Eritrea Profile [Asmara, Eritrea], September 7, p. 2. Gippsland Ltd., 2010, Spin off IPO of Eritrea and Tasmanian assets: Claremont, Western Australia, Australia, Gippsland Ltd. press release, September 28, 7 p. Government of Eritrea, 2000, Revised Petroleum Proclamation No. 108/2000: Asmara, Eritrea, Government of Eritrea, 20 p. Mining Journal, 2010a, Prefeasibility study announced, in Supplement to Mining Journal Eritrea: Mining Journal, August 20, p. 15. 15.2 U.S. GEOLOGICAL SURVEY MINERALS YEARBOOK 2010

Mining Journal, 2010b, Hot spot in the Arabian Nubian Shield, in Supplement to Mining Journal Eritrea: Mining Journal, August 20, p. 2 8. Nevsun Resources Ltd., 2010, Management s discussion & analysis Annual fiscal 2009: Vancouver, British Columbia, Canada, Nevsun Resources Ltd., 14 p. Nevsun Resources Ltd., 2011, Management s discussion & analysis Annual fiscal 2010: Vancouver, British Columbia, Canada, Nevsun Resources Ltd., 10 p. NGEx Resources Inc., 2010, Eritrea grants a major potash project: Vancouver, British Columbia, Canada, NGEx Resources Inc. press release, December 6, 2 p. Saywell, Trish, 2010, UN sanctions against Eritrea to impede miners?: Northern Miner, v. 95, no. 47, January 11 17, p. 1, 10. South Boulder Mines Ltd., 2010, Drilling defines additional shallow potash at Colluli: West Perth, Western Australia, Australia, South Boulder Mines Ltd. press release, December 15, 4 p. South Boulder Mines Ltd., 2011, More potash intersected and exploration target increased: West Perth, Western Australia, Australia, South Boulder Mines Ltd. press release, January 4, 4 p. Sunridge Gold Corp., 2010a, First quarter report for the three months ended November 30, 2010: Vancouver, British Columbia, Canada, Sunridge Gold Corp., 9 p. Sunridge Gold Corp., 2010b, Sunridge Gold and Antofagasta minerals exploration joint-venture update, Asmara project, Eritrea: Vancouver, British Columbia, Canada, Sunridge Gold Corp. press release, May 12, 3 p. United Nations Security Council, 2009, Resolution 1907 (2009): New York, United Nations Security Council, S/RES/1907 (2009), December 23, 6 p. Commodity 2, 3 2006 2007 2008 e 2009 e 2010 e Basalt 211,053 45,335 4 50,000 45,000 50,000 Cement e 45,000 45,000 45,000 45,000 45,000 Clays: Common 29,000 3,700 4 4,000 4,000 4,500 Kaolin 129 183 4 200 175 200 Coral 59,900 67,332 4 65,000 60,000 58,000 Gold kilograms 46 87 4 30 r 30 r 35 Granite 144,775 21,394 4 25,000 25,000 25,000 Gravel 187,826 79,913 4 80,000 78,000 80,000 Gypsum 634 874 4 800 800 800 Laterite Na Na Na Na Na Lime 164,227 165,000 165,000 165,000 170,000 Limestone e, 5 3,000 3,000 3,000 3,000 3,000 Marble: Block square meters 1,860,146 31,010 4 35,000 32,000 36,000 Chip 4,058 Na Na Na Na Pumice 1,072 55 60 60 60 Quartz 83 90 100 100 100 Salt 9,737 7,448 4 7,500 7,500 7,800 Sand thousand metric tons 2,100 e 2,309 4 2,200 2,200 2,200 Silica sand e 1,025 Na Na Na Na e Estimated; estimated data are rounded to no more than three significant digits. r revised. Na Not available. 1 table includes data available through June 30, 2011. 2 Values converted from cubic meters to metric tons. Specific gravity, in grams per cubic meter basalt, 2.8; clay, 1.09; kaolin, 1.03; gypsum, 1.60; laterite, 2.55; lime, 1.54; marble chips, 2.56; pumice, 0.64; quartz, 1.55; salt, 1.44; sand, 2.08; and silica sand, 1.44. 3 in addition to the commodities listed, feldspar and talc reportedly were produced, but information is inadequate to confirm output. 4 reported figure. 5 For other than cement. table 1 EritrEa: PrODUCtiON OF MiNEraL COMMODitiES 1 (Metric tons unless otherwise specified) Eritrea 2010 15.3

(Metric tons unless otherwise specified) Commodity Major operating companies and major equity owners Location annual capacity Cement Eritrea Cement Works Massawa 45,000 Gold kilograms Bisha Mining Share Co. (Nevsun resources Ltd., 60%, Bisha Mine near Bishia 12,800 and Eritrean National Mining Corp., 40% Granite cubic meters Margran plc Gogne 3,000 e Lime Badme Construction Co. Plants at Gogne 1 7,300 e Do. do. Plant at Barentu 3,600 e Marble Margran plc Gheleb Na Salt assab Salt Works assab 180,000 Do. Salina Salt Works Massawa 80,000 Silver kilograms Bisha Mining Share Co. Bisha Mine near Bishia 22,000 e Estimated. Do., do. Ditto. Na Not available. 1 Not producing at the end of 2010. table 2 EritrEa: StrUCtUrE OF the MiNEraL industry in 2010 15.4 U.S. GEOLOGICAL SURVEY MINERALS YEARBOOK 2010