LTES Environmental Management System (EMS) Programmes



Similar documents
Module 5: Objectives And Targets

LTES Environmental Management System (EMS) Compliance

Implementing an Environmental Management System

Environmental Management Systems in Hotels. 15 Steps to the Successful Implementation of an Environmental Management System in a Hotel

ISO A Standard for the Environment... Today and Tomorrow

Sierra Army Depot ISO Environmental Management System (EMS) Awareness Training. ~ protecting our environment is. everyone s responsibility ~

Moving toward sustainable in-plant printing. Together, we re working to protect our environment.

Successful Pollution Prevention Strategies in a Zinc Die-Casting Plant

Waste and Cost Reduction Techniques for Small Parts Cleaners

2013 CONSTRUCTION CONTRACTOR CATALOGUE ECATTS. Copyright ECATTS. All Rights Reserved.

BUILDING PRODUCT DECLARATION BPD 3 in compliance with the guidelines of the Ecocycle Council, June 2007

Data and Trends. Environmental protection and Safety

Monitoring Water Use

Green Seal Best Practices Guide for Fleet Vehicle Maintenance Operations

Hong Kong Green Label Scheme Product Environmental Criteria for Copying Machines, Printers, Fax Machines and Multifunctional Devices (GL )

About this document. UPS Attention: Sustainability Report Editor 55 Glenlake Parkway N.E. Atlanta, Georgia 30328

Environmental Product Declaration

Florida Department of Environmental Protection

Low Carbon Data Centres without compromise

CRITERIA DOCUMENTATION VERIFICATION PRINTED PAPER (Commission Decision 2012/481/EU)

Information Technology Solutions

Dukes of Hazard Activity Time:

BOS Dairy Farms Farm Project Tulare, California, USA

Product Environmental Assessment Activities in Taiwan

Risk Assessment Based Environmental Management Systems for Petroleum Retail Stores

Energy consumption. Environmental indicators

APHA 2016 Annual Meeting and Expo Hotel Environmental Survey Denver, CO

State of the art sustainability marketing tools

Environmental Product Declaration

UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES

2. Environmental indicators

ALLIED PRINTING SERVICES, INC. CORPORATE SUSTAINABILITY AND ENVIRONMENTAL MANAGEMENT PROGRAM REPORT

ENVIRONMENTAL POLICY & MANAGEMENT SYSTEM GUIDE

Proposed (Concrete Cutting And Drilling) Environmental Management Plan

ENVIRONMENTAL PORT INDEX

C:\Documents and Settings\l.platts\Desktop\EMS Manual & Procedures\Aspects & Impacts\EMS 01a Environmental Aspects & Impacts Register.

Environmental Protection Agency. Best Practice Guidelines for. Dry Cleaning

NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM

Identifying Environmental Aspects

Good Housekeeping BMP

AURV471482A Plan and manage compliance with environmental regulations in the body repair industry

Combustible Dust - Things that go Boom. W. Jon Wallace, CSP, MBA Workplace Group, LLC O: E: jwallace@workplacegroup.

Environmental Health and Safety Management Plan

Nu G Medical Waste System Technology (Pyrolysis / Thermal Decomposition)

CitySwitch Green Office Sustainability Action Plan Small Business

IMPLEMENTING ISO 14001:

Our footprint. We believe in our people and support them to champion change. Environmental Awareness. Sustainable Design

Safety Data Sheet. SECTION 1: Identification. SECTION 2: Hazard identification

A NOVEL ION-EXCHANGE/ELECTROCHEMICAL TECHNOLOGY FOR THE TREATMENT OF AMMONIA IN WASTEWATER

Environmental Policy. JRI Orthopaedics Limited

RULE DRY CLEANERS USING SOLVENT OTHER THAN PERCHLOROETHYLENE

Toxic Release Inventory (TRI) Reporting (SARA Title III Section 313)

WASTE WATER TREATMENT for surface treatment applications

S.S. Chen Environmental & Bioprocess Technology Centre SIRIM

ENVIRONMENTAL MANAGEMENT SYSTEM PLANNING GUIDANCE UNDER THE TOXICS USE REDUCTION ACT (TURA)

Greening Our Future By Educating Tomorrow s Workforce. Module 2: Lean Manufacturing and the Environment

Oman Environmental Services Holding Company

Safety Data Sheet. Document Group: Version Number: Issue Date: 05/26/15 Supercedes Date: 10/09/14

Urban Environmental Management in Singapore. Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency

DECLARATION OF RAW AND MELAMINE FACED WOOD PARTICLEBOARD. SAIB S.p.A.

MEMBRANE TECHNOLOGY TREATING OILY WASTEWATER FOR REUSE

Capita Symonds Real Estate Sustainability Report 2012 Royal London Asset Management Portfolio

Policy measures for the prevention and minimization of hazardous wastes

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

It s time for H.E.R.O. Energy Saving Strategy for. Tunnel & Shuttle Kilns

PHARMACEUTICAL AND CHEMICAL WASTE MANAGEMENT

USE OF PHOSPHATES IN THE UNITED STATES NEAR COSTAL AREAS

We make rational and conscientious use of our

Removing Heavy Metals from Wastewater

BP Texas City Refinery

Best Practice Guide BPGCS007

CSX Public Safety, Health, and Environmental Management System

Green Procurement Guidelines. Aerospace Company

Comptel Environmental Program

Environmental Performance Data Calculation Standards

Introducing the Improved MAS DRD "Waterless" Cleaning System for Plastic Film, Flakes and Fibers

Hand Dishwashing Detergents

T 465 Bucasan Pino Date of issue: Page 1 of 10

LOCAL ARRANGEMENTS FOR WASTE DISPOSAL (BEGBROKE SITE)

Council Member agencies are listed in bold italics.

Why Xerox? Xerox Emirates and the Environment

Operations Unit Custodial Services Staff and Managers/Supervisors who administer the policy.

Preton Ltd, white paper: Environmental issues associated with toner and ink usage. March, 2010

How To Write A Life Cycle Assessment

Transcription:

LTES Management System (EMS) Programmes 0

TABLE OF CONTENTS ENVIRONMENTAL MANAGEMENT PROGRAM DESCRIPTION... 2 Supplies... 2 Soap & Detergents... 2 Energy Use... 2 Water Use... 2 Water Discharges... 2 Solid/Liquid Wastes... 2 EMS training... 2 ACTION PLANS (TO ACHIEVE OBJECTIVES AND TARGETS)... 3 Management Programme for Solid Waste Reduction... 3 Management Programme for Water Discharges... 4 Management Programme for Water Use... 5 Management Programme for Energy Use Reduction... 6 Management Programme for Hazardous Detergents Reduction... 7 Management Programme for EMS training... 8 Management Programme for Supplies... 9 TRACKING AND MEASURING PROGRESS... 10 Supplies... 10 Soap & Detergents... 10 Energy Use... 10 Water Use... 11 Water Discharges... 11 Solid/Liquid Wastes... 11 EMS training... 11 REFERENCES... 12 1

ENVIRONMENTAL MANAGEMENT PROGRAM DESCRIPTION Annual Objectives and Targets Objectives Supplies Increase use of recyclable and recycled materials and equipment in supplies Reduce amount of supplies used Soap & Detergents Reduce usage of hazardous detergents Targets Increase use of suppliers that provide recyclable and recycled materials and equipment by 15% by Implement recycling of supplies (plastic, laser cartridges, metal) respectively by Implement reuse programme for print cartridges by Reduce use of high-voc detergents by 25% by January 2015 Energy Use Reduce energy usage Reduce electricity use by 2% by Reduce oil/gas use by 2% by Water Use Reduce water use Reduce water use by 2% by Water Discharges Reduce volatile organic compounds (VOCs) in wastewater discharges Solid/Liquid Wastes Reduce solid waste Reduce hazardous waste EMS training Organize and perform training on Social Management System Increase use of aqueous cleaners by 20% by January 2015 Reduce solid waste by 10% by material reuse by Reduce hazardous waste by 25% by January 2015 All employees undergo EMS training by 2

ACTION PLANS (TO ACHIEVE OBJECTIVES AND TARGETS) Management Programme for Solid Waste Reduction Functional Area: All Functional Areas Activity or Process: Equipment Upgrade and Consumables Consumption Objective: Study Waste Reduction Target: Complete study by July 2014 Category: Control/Maintain Improve X Study or Investigate No. 1 Action Plan: Study of Potential Waste Reduction Identify potential waste initiatives Identify list of suitable equipment vendors to achieve volume Perform evaluation, technical feasibility and cost analysis of select vendors Responsible Resources Project Start Project Party Needed Date Completion Date Web sites on January, 2014 March, 2014 D List of steps to be taken to fulfill poll. Prevention initiative and responsibilities Vendors March, 2014 April, 2014 D List of potential vendors / Vendor Vendor Data from April, 2014 June, 2014 D Comparative cost analysis of vendors vendors D Technical feasibility analysis Present recommendation to management for waste Presentation / Vendor equipment June, 2014 July, 2014 D list of evaluations and recommendations for waste 3

Management Programme for Water Discharges Functional Area: Administration Activity or Process: Office Administration, Cleaning and Support Objective: Study of volatile organic compounds (VOCs) in wastewater discharges Target: Complete study by July 2014 Category: Control/Maintain Improve X Study or Investigate No. 2 Action Plan: Study of of volatile organic compounds (VOCs) in wastewater discharges Identify potential VOC initiatives Identify list of suitable vendors to achieve Perform evaluation, technical feasibility and cost analysis of select vendors Responsible Party / Vendor Vendor Resources Project Start Project Needed Date Completion Date Web sites on January, 2014 March, 2014 D List of steps to be taken to fulfil VOC initiative and responsibilities Vendors March, 2014 April, 2014 D List of potential vendors Data from vendors April, 2014 June, 2014 D Comparative cost analysis of vendors D Technical feasibility analysis Present recommendation to management for VOC / Vendor Presentation equipment June, 2014 July, 2014 D list of evaluations and recommendations for VOC 4

Management Programme for Water Use Functional Area: Administration Activity or Process: Water Supply and Consumption Objective: Study Water Use Reduction Target: Complete study by July 2014 Category: Control/Maintain Improve X Study or Investigate No. 3 Action Plan: Study of Potential Water Use Reduction Identify potential water use initiatives Identify list of suitable water supply equipment vendors to achieve volume Perform evaluation, technical feasibility and cost analysis of select vendors Prepare presentation and personnel training material for water use Responsible Party / Vendor Vendor Resources Project Start Project Needed Date Completion Date Web sites on January, 2014 March, 2014 D List of steps to be taken to fulfil water use initiative and responsibilities Vendors March, 2014 April, 2014 D List of potential vendors Data from vendors Web sites on water use April, 2014 June, 2014 D Comparative cost analysis of vendors D Technical feasibility analysis March, 2014 June, 2014 D Training material for water use Present recommendation to management for water use / Vendor Presentation equipment June, 2014 July, 2014 D list of evaluations and recommendations for water use 5

Management Programme for Energy Use Reduction Functional Area: All Functional Areas Activity or Process: All Daily Activities Objective: Study Waste Reduction Target: Complete study by July 2014 Category: Control/Maintain Improve X Study or Investigate No. 4 Action Plan: Study of Potential Energy Use Reduction Identify potential Energy Use initiatives Identify list of suitable building construction vendors to achieve energy use Perform evaluation, technical feasibility and cost analysis of select vendors Prepare presentation and personnel training material for energy use Responsible Party / Vendor Vendor Data from vendors Resources Project Start Project Needed Date Completion Date Web sites on January, March, 2014 D List of steps to be taken to fulfil Energy Use 2014 initiative and responsibilities Vendors March, 2014 April, 2014 D List of potential vendors Web sites on Energy Use April, 2014 June, 2014 D Comparative cost analysis of vendors D Technical feasibility analysis March, 2014 June, 2014 D Training material for energy use Present recommendation to management for energy use Presentation / Vendor equipment June, 2014 July, 2014 D list of evaluations and recommendations for energy use 6

Management Programme for Hazardous Detergents Reduction Functional Area: Administration Activity or Process: Office Administration, Cleaning and Support Objective: Study Hazardous Detergents Reduction Target: Complete study by July 2014 Category: Control/Maintain Improve X Study or Investigate No. 5 Action Plan: Study of Potential Hazardous Detergents Reduction Identify potential Hazardous Detergents initiatives Identify list of suitable equipment vendors to achieve volume Perform evaluation, technical feasibility and cost analysis of select vendors Responsible Resources Project Start Project Party Needed Date Completion Date Web sites on January, 2014 March, 2014 D List of steps to be taken to fulfil Hazardous Detergents initiative and responsibilities Vendors March, 2014 April, 2014 D List of potential vendors / Vendor Vendor Data from April, 2014 June, 2014 D Comparative cost analysis of vendors vendors D Technical feasibility analysis Present recommendation to management for Hazardous Detergents Presentation / Vendor equipment June, 2014 July, 2014 D list of evaluations and recommendations for Hazardous Detergents 7

Management Programme for EMS training Functional Area: Management Activity or Process: and Social Training Objective: Prepare and Social Training material Target: Complete material by January 2014 Category: x Control/Maintain Improve Study or Investigate No. 6 Action Plan: Prepare and Social Training material Identify applicable EMS training areas Prepare EMS training material Define EMS training schedule Responsible Party Resources Needed Web sites on EMS training Web sites on EMS training Data from all functional areas Project Start Date September, 2013 September, 2013 September, 2013 Project Completion Date January, 2014 January, 2014 January, 2014 D List of specific EMS training areas D EMS training material D EMS training schedule Present recommended EMS training to management Presentation equipment September, 2013 January, 2014 D list of evaluations and recommendations for EMS training 8

Management Programme for Supplies Functional Area: Vendor management Activity or Process: Office Administration and all Functional Areas Objective: Study increased use of suppliers that provide recyclable and recycled materials and equipment Target: Complete study by July 2014 Category: Control/Maintain Improve X Study or Investigate No. 7 Action Plan: Study potential increase of recyclable and recycled materials and equipment Responsible Party Identify potential recycling initiatives Identify list of suitable vendors to achieve recyclable/recycled / Vendor supplies Perform evaluation, technical Vendor feasibility and cost analysis of select vendors Resources Project Start Project Needed Date Completion Date Web sites on January, 2014 March, 2014 D List of steps to be taken to fulfil recycling initiative and responsibilities Vendors March, 2014 April, 2014 D List of potential vendors Data from vendors April, 2014 June, 2014 D Comparative cost analysis of vendors D Technical feasibility analysis Present recommendation to management for increased use of recyclable and recycled materials and equipment / Vendor Presentation equipment June, 2014 July, 2014 D list of evaluations and recommendations for use of recyclable and recycled materials and equipment 9

TRACKING AND MEASURING PROGRESS Tracking Objectives, Targets, Operational Controls, and Measurement Objectives Targets Monitoring and Measurement Supplies Increase use of use of recyclable and recycled materials and equipment Increase use of suppliers that Year 2012: provide recyclable and recycled Recyclable material: 50% of materials and equipment by 15% by value of total supplies Recycled material: 10% of value of total supplies 2013 first half: Recyclable material: 60% of value of total supplies Recycled material: 13% of value of total supplies Reduce amount of supplies used Soap & Detergents Reduce usage of hazardous detergents Implement recycling of supplies (plastic, laser cartridges, metal) respectively by Implement reuse programme for print cartridges by Reduce use of high-voc detergents by 25% by Year 2012: minimal recycle/reuse of print cartridges 2013 first half: 50% of print cartridges are recycled/reused Year 2012: 0% of detergents classified as non hazardous 2013 first half: 20% of detergents classified as non hazardous Energy Use Reduce energy usage Reduce electricity use by 2% by Reduce oil/gas use by 2% by Year 2012: electricity: 14658 kwh oil: 650 lt 2013 first half: electricity: 6825 kw oil: 0 lt 10

Water Use Reduce water use Water Discharges Reduce VOCs in wastewater discharges Reduce water use by 2% by Increase use of aqueous cleaners by 20% by Year 2012: water use: 120500 lt 2013 first half: water use: 61300 lt Year 2012: 40 kg of detergents (no hazardous classification) 2013 first half: 21 kg of detergents (no hazardous classification), 5 kg classified as non hazardous Solid/Liquid Wastes Reduce solid waste Reduce solid waste by 10% by material reuse by Year 2012: Recyclable material: 50% of value of total supplies Recycled material: 10% of value of total supplies 2013 first half: Recyclable material: 60% of value of total supplies Recycled material: 13% of value of total supplies Reduce hazardous waste Reduce hazardous waste by 25% by EMS training Organize and perform training on Social Management System All employees undergo EMS training by Year 2012: 20% of waste classified as non hazardous 2013 first half: 30% of waste classified as non hazardous Year 2012: Short EMS training as part of induction training 2013 first half: Action plan for full scale EMS training programme in place 11

REFERENCES IBM s Requirements for Suppliers on Corporate Responsibility and Management, Release Version 3.0; Release Date 24 February, 2013 ISO 14001 - management systems Requirements with guidance for use US Protection Agency http://www.epa.gov 12