Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements



Similar documents
Building Code Inspections and Fees

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Single Family Residential Building Permit Questions & Answers

Additions and Alterations

The purpose of this document is to provide standards for persons requesting or subject to County building inspections.

PARK COUNTY BUILDING PERMIT GUIDE PO Box 517 Fairplay, CO Fax: Inspections:

INFORMATION BULLETIN NO.

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

Mobile Home Pre-Inspection Checklist

Development Services Guidelines

INFORMATION BULLETIN NO.

Uniform Construction Code (UCC) Building Permit Application Package

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS

COMMONLY USED RESIDENTIAL BUILDING CODES

Residential Building Permit Process

Certification: Building Plans Examiner. Exam ID: B3

City of Fort Smith Building Permit Process Frequently Asked Questions

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

TENT AND STAGE CUSTOMER ASSISTANCE GUIDE

Residential Building Permits Information

Development Services Guidelines

RESIDENTIAL/COMMERCIAL

Elevating Your House. Introduction CHAPTER 5

City of St. Charles Basement Finish or Remodel

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

Building Construction and Development in Norristown: A User s Guide to the Land Development and Building Permit Process 1/25/11

The minimum reinforcement for the stem wall is the placement of:

Bureau Veritas Contact Information

BUILDING SAFETY UNIT

How To Make A House Safe

2010 Residential Water Heater Replacement Check List

The City of Basehor, Kansas

Chapter 3 Pre-Installation, Foundations and Piers

RESIDENTIAL SITE INSPECTIONS

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

Stormwater/Wetland Pond Construction Inspection Checklist

BEFORE YOU BUILD GUIDE

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION

Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR)

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

Building Information Packet

Frequently Asked Questions

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

C I T Y O F P E A R S A L L

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Uniform Construction Code (UCC) Manufactured Homes. Modular Homes. Building Permit Application Package

City of Mt. Juliet Public Works

2014 FLORIDA BUILDING CODE

Vision Home Inspection

City of West Chicago Community Development Department 475 Main Street, West Chicago, IL Phone: (630) x 131 / Fax: (630)

Flood Risk Considerations

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

Georgia Association of Home Inspectors

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Botetourt County, Virginia. Residential Information Handout

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

COUNTY OF DUPLIN BUILDING INSPECTIONS DEPARTMENT PO BOX 950 KENANSVILLE, NC PHONE: (910) FAX: (910)

PDmB, Inc. Definitions

Building Permits: When are they required?

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

Reference Guide for Obtaining Permits and Utility Services For New Construction

Preparation for 2015 Residential Code Changes Discussion with Local Builders and Designers

VILLAGE OF BETHALTO COMMERCIAL BUILDING PERMIT APPLICATION

A Guide for the Homeowner/Builder

Residential Building Permit Guide

How To Write A Building Code In Kendall County

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

City of Mandeville. Guidelines for Construction and Development

Guidebook for General Requirements for Building in Gordon County

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

NAVAJO COUNTY ADDENDA & ADDITIONS TO THE INTERNATIONAL BUILDING CODES. Public Works/Planning & Zoning Building & Safety AMENDED ( )

Bond Release Process for New Subdivision Developments in Fairfax County

CONSTRUCTION PERMITS AND CERTIFICATES A Helpful Guide

BUILDING PERMIT SPECIFICATIONS

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

SECTION 19 RESIDENTIAL CONSTRUCTION IN FLOODZONES

Residential Plan Routing Information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Sample Drawing Package for One and Two Family Dwelling Applications

Lot Number. City. Architect Name SUBCONTRACTORS - COMPLETE AND ATTACH LIST ON PAGE 4

Estimating Database Checklist

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

Uncovered Decks & Porches

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

Town House Center Highway North Huntingdon, PA 15642

Part I: Overview and Procedure

VILLAGE OF BETHALTO RESIDENTIAL BUILDING PERMIT APPLICATION AND INFORMATION

Sewage Compliance Form Instructions

Transcription:

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements Charles County Government Planning and Growth Management P.O. Box 2150, La Plata, MD 20646 (301) 645-0692 Schedule your inspection one day in advance of the desired date by calling the inspection agency at (301) 645-3302 or (301) 870-8710. Building, Plumbing, Lateral, and Electrical inspection requests called in between 7:30 a.m. and 8:30 a.m. may be made on that day if the inspection agency has the availability to perform the inspection. Work shall not go beyond the point in each successive inspection listed below without first obtaining approval from the respective inspector. Your building permit under Intended Use specifies the building inspection codes applicable to your project. Required Inspections Building Inspection Requirements in Order Forest Conservation (Code FC) Call for inspection at (301) 645-0653 The forest conservation easement must be identified with approved signage and any required fencing in place in accordance with the Charles County Forest Conservation Ordinance and the approved Forest Conservation Plan. Prior to clearing or grading the lot and prior to any construction, schedule an inspection with the environmental inspector. Sediment and Erosion Control Initial Inspection (SEC1) Call for inspection at (301) 645-0700 All residential construction projects that require sediment and erosion control must have an inspection of the approved Sediment and Erosion Control measures as shown on the approved site plan. This inspection must be approved before a footing inspection can be scheduled. Preliminary Inspection (Code 10) Call for this inspection after the issuance of the building permit however, prior to the commencement of construction. Footing Inspection (Code 11) Trenches and piers must be dug to specifications as set forth on the plans with the required reinforcing steel, forms, grade stakes and footing steps (if required) in place. Any fill under footings must be certified for bearing capacity by a Maryland registered engineer. Footings must be free of standing water, ice, mud, debris, etc. All required sediment and erosion control devices must be in place, e.g., silt fence, stabilized construction entrance. Call for inspection prior to placing concrete. Foundation Reinforcement Inspection (Code 13) All formwork for concrete walls and reinforcement for concrete or masonry walls must be installed and secured in place. Call for inspection prior to placing concrete. Engineered foundation wall designs shall be submitted at permit application or to the building inspector at time of wall reinforcement inspection. Page 1 of 6 11/07

Foundation Inspection (Code 12) Masonry or concrete walls for basement, crawlspace, or monolithic footing and slab construction shall be constructed to the final elevation with anchor bolts or straps in place and any required parging, waterproofing and subsoil drains complete. Foundation walls for any and all types of foundations shall not be backfilled until the foundation wall is inspected and approved by the building inspector. In addition, backfill shall not be placed against a foundation wall supporting 4 feet or more of unbalanced fill until the wall has sufficient strength and has been anchored to the floor deck above unless the wall has been engineered to support backfill without the floor deck in place. Framing construction shall not proceed until after an approved foundation inspection. Concrete Slab Base Inspection (Code 14) Gravel base course, vapor barrier, reinforcement, conduit, piping accessories, and perimeter insulation (if required) must be in place over an undisturbed or engineered earth subgrade compacted earth base. Call for inspection prior to placing concrete. Complete Load Path Inspection (Code 18) An inspection of the complete load path must be performed prior to the building framing inspection. The complete load path is a series of wall and roof ties that are installed on a building that are designed to reduce up lift during high wind storms. The sill plate, band board, trusses and all components of the exterior walls are tied to the foundation using metal ties approved for this purpose. The ties are installed at the same intervals as the foundation anchors or straps. All straps are required to be installed with the appropriate nails or screws as stated by the manufacturer of the straps. Provide the inspector with strap information detailed on the form received when obtaining a building permit from Charles County. A certified design of the complete load path signed and sealed by a registered architect or structural engineer may be presented to the inspector at the time of inspection in lieu of the form noted above. Sprinkler Hydrostatic Test Call for inspection at (443) 550-6820 or 1-866-629-9882 The sprinkler contractor will schedule a hydrostatic test to be witnessed by the State Fire Marshal inspector. This test must be successfully completed prior to framing close-in inspection. The Fire Marshal inspector will provide an inspection report to the sprinkler contractor. A copy of the inspection report is to be placed at or on the main electrical panel box to be verified complete prior to the framing/close-in inspection (Code 16) Framing Close-In Inspection (Code 16) All work to building structure must be complete. This includes windows, doors, roofing, and mechanical, plumbing and electrical rough-ins. If floor and/or roof trusses are used, provide the inspector with truss shop drawings signed and sealed by a Maryland registered professional engineer. Suspended ceilings must be inspected prior to installation of ceiling panels. The electrical and plumbing rough work must be approved by the respective inspector(s) prior to approval of a framing close-in inspection. Call for inspection prior to installing any insulation or drywall. In residential construction, it is acceptable to schedule the electrical and plumbing rough inspections and the framing inspection on the same day. At the time of framing close-in inspection for a new single family dwelling or townhouse provide the building inspector with a written certification signed and sealed by a Maryland registered land surveyor or Professional Engineer verifying the correct foundation wall location and first floor elevation. For a lot size greater than one acre, a foundation wall location certification only shall be required. Page 2 of 6 11/07

Energy Efficienty Inspection (Code EE) Framing inspection must be approved prior to doing any insulation. Installation installed at roof, walls and floors at required R values and thickness. Ceilings - R38, vaulted ceilings -R30, wall above grade - R13, floors - R19. All faced wall and ceiling insulation must be stapled over framing. All un-faced insulation must be covered with vapor. Fire-Resistance Rated Walls and Floor/Ceiling Assemblies (Codes 15 & 17) Call for inspection after installation of lathing, wallboard and/or sheathing is in place, but prior to concealment of fasteners and joints. In multi-layer installations, each layer must be inspected prior to concealment. For inspection code 15, contact the inspection agency for special inspection requirements. Driveway Entrance Inspection (Code DW) Driveway entrance must be paved in accordance with the standard detail specified on your driveway entrance permit and, if applicable, the driveway entrance culvert pipe installed in accordance with the approved site plan. Call for inspection after completion of the above. For new single family dwelling and townhouse construction, this inspection must be completed at or before the time of the final building inspection. Floodplain Final Inspections (Code FLDP) Call for inspection at (301) 645-0618 All floodplain related construction must be completed and in strict compliance with the approved plan and the Floodplain Management Ordinance. Call for an inspection (301-645-0618) as soon as possible after all of the related work is complete. All necessary documents shall be submitted as soon as possible to avoid delay of the issuance of the Use and Occupancy Certificate. These documents may include: Completed Elevation Certificate Signed and Notarized Venting Affidavit Recorded Declaration of Land Restrictions Completed and Signed Final Floodplain Management Inspection Checklist Final Stormwater Management Inspection (Code SWMI) Call for inspection at (301) 645-0700 Stormwater management related construction must be completed and in strict compliance with the approved plan, the 2000 Maryland Stormwater Design Manual and the Stormwater Management and Storm Drainage Ordinance. To avoid delay of the issuance of the Use and Occupancy permit, you should call (301) 645-0700 48 hours in advance for inspections at the stages indicated and/or at the completion of the work. Sediment and Erosion Control Final Inspection (SEC3) Call for inspection at (301) 645-0700 Request inspection upon final and adequate stabilization (once vegetation is established, the site shall have ninety-five percent groundcover to be considered adequately stabilized) before removal of sediment controls. Final Inspection (Code 19) ALL WORK MUST BE COMPLETE, including yards, driveways, driveway entrances, insulation, railings and crawl space areas. All mechanical, electrical and plumbing must be complete and operate properly. The building inspector will collect the final sprinkler certification at this time. Call for inspection after the building is complete and prior to any occupancy. Page 3 of 6 11/07

When applying for a Certificate of Use and Occupancy for a new single family dwelling or townhouse and the building lot size is one acre or less, provide the Permit Administration office with an On-Site Drainage Certification form signed by the general contractor or the permit applicant. Critical Area Inspection (Code CRIT) Call for inspection at (301) 645-0540 All planting work must be complete or bond posted. Call the Planning Office at 301-645-0540 for information concerning bonding or to schedule an inspection. This must be done prior to occupancy. Forest Conservation Inspection (Code FCIN) Call for inspection at (301) 645-0540 All rough grading must be complete and all required Forest Conservation signs must be installed. Call the Planning Office at 301-646-0540 to schedule the inspection. Site Design and Architectural Review Board Inspection (Code SDARB) Call for inspection at (301) 645-0540 All exterior architectural work must be complete. Call the Planning Office at (301) 645-0540 to schedule the inspection. Plumbing and Gas Inspection Requirements in Order Plumbing permits must be secured prior to plumbing construction. When scheduling a plumbing inspection, please proved the plumbing permit number. Plumbing work must be installed by an approved, Maryland Registered Master Plumber or by a homeowner who has successfully passed the Charles County homeowner's plumbing examination. For information on the homeowner's plumbing examination contact Permit Administration at (301) 645-0692. Gas work must be installed by an approved Maryland Registered Master Plumber or Gas Fitter. Propane gas work may be installed by an individual with a Maryland Propane Gas Fitters Certification. Ground Work Inspection (Code 41) All below-ground plumbing and/or gas piping must be completely installed with proper bedding and ends of piping capped. Gas piping must have a pressure test inspection. Call for inspection prior to covering any pipes. Rough Inspection (Code 42) All drain lines, vents, water distribution lines and gas piping must be completely installed. Gas piping must have a pressure test inspection. Call for inspection prior to covering any pipes or installing any insulation or drywall. Gas Pressure Test Inspection (Code 50) The gas piping system must be complete with source of test pressure and with appliances and equipment isolated from the system. Test medium shall be air or inert gas. Test pressure shall be measured with an approved, calibrated manometer or dial gauge. The dial gauge shall be divided into increments of 1/10 psi with a range of 0 to 8 psi. The test pressure shall be at least 1 ½ times the maximum work pressure, but not less than 3 psi. Final Inspection (Code 49) ALL WORK MUST BE COMPLETE. All fixtures and/or gas appliances must be set and operable. All relief valves, shut-off valves and backflow preventors must be properly installed. Backflow prevention devices must be certified by the installer - provide the inspector with the certification report. Page 4 of 6 11/07

Residential Public Water and Sewer Lateral Inspection Requirements in Order Public water and sewer work must be installed by a Maryland Registered Master Plumber approved by the County s Water/Wastewater Permit Technician. When scheduling an inspection, please provide the water and sewer permit number (WS). Lateral Inspection (Code 43 - Water Lateral, Code 44 - Sewer Lateral or Code 46 - Combined Water and Sewer Laterals) Water and sewer lateral inspections may be scheduled separately or combined with both water and sewer lateral installations complete. If the inspections are scheduled separately, an inspection fee must be paid for each inspection. Water and sewer laterals must be placed on approved bedding material with proper horizontal and vertical (shared trench) separation between water and sewer services. Both water and sewer laterals must be at least 42 inches below finished ground level. A shared trench may require a pressure test of the sewer lateral - contact the inspector. Call for inspection prior to covering the pipes. Meter Inspection (Code 45) Meter rack must be secured in place with proper clearance around the rack. If required, a pressure reducing valve must be in place. The curb valve must be accessible and properly open and close. The curb valve box must be set plumb. From October 15 to March 15 of each year, the building must be provided with a permanent source of heat. Both the curb valve box and sewer cleanout must be set to proper grade and located at the limit of the County right of way. Only the cleanout may be located within asphalt or concrete covered areas when provided with a traffic-rated frame and cover. Electrical Inspection Requirements in Order Electrical permits must be secured prior to electrical inspection. When calling in to schedule an inspection, please provide the electrical permit number. Electrical work must be installed by an approved County licensed Master Electrician, or by a homeowner who has successfully passed the Charles County homeowner's electrical examination. For information on electrical applications and inspections or the homeowner's electrical examination contact Permit Administration at (301) 645-0692. Electrical Underground Inspection (Code 20) Proper electrical conductors and/or conduits secured in place with the ends of the conduits capped. Call for inspection prior to concealing the conductors and/or conduit. Electrical Rough Inspection (Code 21) All wiring (low and high voltage) and boxes must be installed and secured in place. Call for inspection prior to concealing any wiring. Electrical Service Inspection (Code 22) If separate service inspection is requested, call for inspection prior to concealing any wiring. Electrical Final (Code 29) All work must be complete. All electrical equipment, outlets, switches, lighting and appliances must be in place and operational. Page 5 of 6 11/07

General Items Concerning All Inspections 1. No inspections can be made until issuance of the building, plumbing, gas, electrical, driveway entrance and/or water and sewer utility sewer permit. 2. No work shall commence until issuance of the appropriate permit. 3. Post the building permit card at the lot where it is visible from the street. 4. The "Builder's Copy" of the plans, the conditions, the approved site plan, and the building permit must be kept on the job site and made available to the inspector upon request. 5. Any engineered drawings or inspection reports and/or engineer s certifications must be provided to the inspector at the time of inspection. 6. Re-inspection fee: If an inspection is made for building, plumbing, or electrical permits and a correction is necessary, a re-inspection is required. You must pay a $28.00 re-inspection fee at Permit Administration prior to re-scheduling your inspection. 7. For work not complete, or turned down at time of inspection, the re-inspection must be rescheduled for another day. 8. If you will not be ready for a scheduled inspection, please contact the inspection agency as early as possible to cancel the inspection. 9. Post the building permit card at the construction site, visible from the street. 10. All required inspections listed above must be complete in order to obtain a permanent Use and Occupancy Certificate. Temporary Use and Occupancy Certificates may be issued based on the approvals of the individual inspector. The following is a list of commonly requested telephone numbers for State and County agencies: Health Department... (301) 609-6751 Inspection Agency... (301) 645-3302 Electrical, Building, Plumbing & Residential Water and Sewer Lateral Inspections... (301) 870-8710 Planning & Growth Management Permit Administration... (301) 645-0692 or (301) 870-3935 Planning & Zoning... (301) 645-0540 or (301) 870-3896 Engineering... (301) 645-0618 or (301) 870-3937 SWM Inspections... (301) 645-0700 Web Site... www.charlescounty.org Fax... (301) 645-0575 Soil Conservation and Sediment Control... (301) 934-9588, Ext. 3 or (301) 870-3555 State Highway Administration...1-800-876-4742 or (410) 333-1350 State Fire Marshal... 443-550-6820 Signature - Owner/Agent Permit Specialist Page 6 of 6 11/07