REQUEST FOR PROPOSAL WAYFINDING AND SIGNAGE CONSULTANT



Similar documents
T170 Interior Design Technology MTCU Code Program Learning Outcomes

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608

Non-binding Calculation Recommendation

Department of Veterans Affairs VHA HANDBOOK Washington, DC July 1, 2011 INTERIOR DESIGN OPERATIONS AND SIGNAGE

Date: 09/26/13 Initiated by: AAS-100

Architect Competency Profile

Animal Health Center for Reid Park Zoo, Tucson, Arizona

Director's Order #52B: Graphic Design Standards

INTERIOR DESIGNER Competency Profile

PREQUALIFICATION DOCUMENT FOR CONSULTANTS FOR CIVIL WORKS. (Ref No. Secy/PPC/CVL/01)

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA

Signs And Graphics. Professional Signage and Graphics Solutions

Goals & Objectives. Chapter 9. Transportation

Segreti Design Scope of Interior Design Services

The Role of Building Construction Project Team Members In Building Projects Delivery

IBM Data Center Services. Building or upgrading your data center, while helping to minimize cost, risk and delay

Faculty Dr. Arafat Al-Naim, Dr. Rania Fawzi, Dr. Mohamed Galib, Dr. Majed Kamal Eldeen, Dr. Mohamed Sedeeq, Moh d Musa (M.A.)

Civil Engineering and Architecture (CEA) Detailed Outline

Innovation starts here OWN THE CITY. Branding Campaign. Services

1st semester Common Core subjects taught to all classes

Consultancy Services Proposal

City of Portland Job Code: CLASS SPECIFICATION Landscape Architect

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTANT SERVICES)

T109 Architectural Technology MTCU Code Program Learning Outcomes

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT

1. Upon receipt of a signed Budgetary Estimate, including an index number, the work of creating a Project begins as follows:

OAKLAND PARK COMMUNITY REDEVELOPMENT AGENCY

The English and Foreign Languages University, Tarnaka, Hyderabad , Telangana State.

BLOCK 400 PLANNED COMMUNITY DISTRICT

Total Credits for Diploma of Interior Design and Decoration 63

Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital

Signage - Improving access

Environmental Graphic Design

Schedule 5 - Design Development

PROPOSALS REQUESTED THE TOWN OF OLD ORCHARD BEACH POLICE DEPARTMENT FOR IP-BASED VOICE COMMUNICATION SYSTEM

Request for Proposal

Medical Spa Plan Development & Implementation

Exhibit F. VA CAI - Staff Aug Job Titles and Descriptions Effective 2015

Perkins Eastman is an Equal Opportunity Employer and a participant in the Federal E-Verify program. EOE/M/F/D/V

Note: All terms which are defined and which are used throughout this document appear in italicized text beginning with a CAPITAL letter.

Designing for Credibility Codebits 2014

Interim Terms of Reference for Consultancy Services

REQUEST FOR PROPOSAL

Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows:

CERES REDEVELOPMENT AGENCY COMMERCIAL REHABILITATION LOAN PROGRAM

LANDSCAPE ARCHITECT Competency Profile

CONSTRUCTION PROJECT MANAGER TERMS OF REFERENCE CENTRAL BANK OF LESOTHO PROPOSED EXTENSION BUILDING AND DISASTER RECOVERY SITE CONSTRUCTION PROJECTS

Multimedia. Master Level: Multimedia Content Manager. Specialist Level: Multimedia Content Specialist

1st semester Common Core subjects taught to all classes

CENTRAL BUSINESS DISTRICT STREETSCAPE AND IMPROVEMENT GUIDELINES

design review guide for secondary schools

Appendix 23. Sample of Invitation Letter for Submission of Fee Proposal for Acting as a Project Consultant for Maintenance and Improvement Works

CITY OF LAREDO PURCHASING DIVISION TERMS AND CONDITIONS OF INVITATIONS FOR BIDS

EDMONDS DOWNTOWN BUSINESS IMPROVEMENT DISTRICT REQUEST FOR PROPOSAL Branding/Marketing/Website Design

REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Appendix 1 Project Information. PS-0748-A Page 1 5/4/2016 Appendix 1

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No

Diploma of Graphic Design

Car Park Management Plan SouthGate, Bath SouthGate Limited Partnership

Bid closing date December 21, 2013

Volume II- Project Development Processes

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

NEWBURGH ENLARGED CITY SCHOOL DISTRIST NEWBURGH, NEW YORK REQUEST FOR PROPOSAL ARCHITECTURE SERVICES

The purpose of the policy is to establish guidelines for the administration of the School Planning and the School Construction programs.

Contents. Digital use..18 Presentations..20 Stakeholder Hub..22 Trademarks & Copyright..24 A summary..26

Randle Siddeley associates landscape architecture environment urban design

The profession of Landscape Architecture is highly diverse in the

OBJECTIVE Our primary objective is to build the MKTE brand identity, raise awareness of the event and stir interest for the targeted clients.

REQUEST FOR PROPOSAL (RFP) STARTUP CONNECT STARTUP CANADA 50 O CONNOR STREET, SUITE 300 OTTAWA, ONTARIO

A R C H I T E C T U R E

Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals:

Website Design, Development and Support Services. Request for Proposal For The Corporation of the Town of Gore Bay

ABBOTSFORD HOSPITAL & CANCER CENTRE

A guide to appointing an architect

GUIDELINES FOR THE ENGAGEMENT OF EXTERNAL CONSULTANTS/PROFESSIONAL SERVICES AT MEMORIAL UNIVERSITY

Project Implementation: Procurement & Contract Management. April 2012

Conservation. What is a CMP? Why do I need a CMP? What does a CMP contain? An information guide to

BUSINESS INCENTIVE PROGRAM POLICIES. Table of Contents

Request for Proposal Environmental Management Software

Terms of Reference. Egypt Post - Several position: Architects, Interior Design, Structure Design, Site Engineer and Electromechanical Design.

Alexandria National Cemetery SECTION NETWORK ANALYSIS SCHEDULE

Traffic Management Issue 1.0 Revision: v2 October 2014

Application for Approved (Overseas/Local) Third Party Inspection Agency for Lifting Equipment

Request For Proposal. Furnish Schneider Business Park Signs Design Build Services. For the Cibolo Economic Development Corporation Cibolo, Texas

PivotLoc Ladder Systems

Whistler Village Construction Management Strategy

Attachment 5 Electrical Engineering

REQUEST FOR PROPOSAL MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION

The procedure which the City of Hays will follow for the selection of an Architectural firm is as follows:

Olilo's AEC Design Services. SrinSoft Inc, Partners of

Request for Proposal Architectural/Engineering Services. Adapt/SouthRiver CHC. P a g e 1

Higher National Unit specification: general information. Developing Mobile Web Based Applications: An Introduction

PRIVATELY OPERATED TOURIST INFORMATION CENTER SIGNS GENERAL INFORMATION & APPLICATION

First 5 Trinity County Request for Proposal Website Design for First 5 Trinity County Complete Bids are Due October 2, 2015 at 5:00 p.m.

North Lakeland Discovery Center Master Plan

CONTENTS. 2 ASHRAE Logo Guide

Bristol Community College 777 Elsbree Street Fall River, MA 02720

ECG Engineering Consultants Group S.A., A multi-disciplinary quality E/A Company

GUIDANCE NOTE Building Control (Amendment) Regulations 2014 Procurement Implications for Contracting Authorities

Transcription:

REQUEST FOR PROPOSAL WAYFINDING AND SIGNAGE CONSULTANT Objective 1) The Wayfinding and Signage (W&S) Consultant shall develop a wayfinding and signage solution for the interior of Terminal One (only the airside), Terminal Two and new concourse, exterior of these areas, road access to the airport and car parks. The solution shall cover the front and back of house areas, as well as areas under construction. 2) The strategic location of these signage s and graphics shall identify, inform and enhance the image of the Airport. It will address the concept, aesthetic quality, material selection, ease of maintenance, ease of sign changes and recommendations regarding typical placement and function of each sign type. The design shall also express the means for guiding passengers to entrances, to a directory, to information desk and finally to the right destination. 3) A good wayfinding system provides smooth facilitation for airport users, from the time they arrive at the airport, till their departure. Airport users will have peace of mind when there are clear directions, instructions and information. Information on various facilities, services and functions of the airport are easily accessible. Airport users will have confidence in the system, and be provided with a stress- free environment to participate in other activities (e.g. commercial). Services 4) The W&S Consultant s services for Wayfinding, Signage and Graphics shall comprise: a) Survey and Analysis i) Review of drawings and establish programme requirements for interior and exterior wayfinding and signage. ii) Conduct a needs survey with RIOGaleão to establish concept and criteria of the project. iii) Verify systems presently in use by other airports as required to establish project requirements. iv) Ensure the basic requirements of all relevant Authorities, e.g. fire safety standards, barrier- free accessibility in buildings, land transport access, are identified. v) Analyze traffic patterns to determine logical pedestrian and vehicular traffic routes.

vi) Co- ordinate and work with the architecture, interior design, total building performance and landscape areas for overall concept and intentions. vii) Survey and analyze wayfinding and signage requirements. viii) Review locations of flight information displays. b) Design i) Design typical architectural and typographic standards for interior and exterior signage concept. ii) Present total wayfinding, signage and graphics design concept, to include: iii) Signage and graphics, which relate in function and design to identify, direct, inform and control passengers and visitors to the airport. iv) Signage systems and locations for intuitive wayfinding for passengers and visitors. v) Systems and materials of optimum flexibility and minimum maintenance. vi) Colors that relate with interior furnishings to enhance and enrich the visual environment. vii) Custom signage applications for major points of entry, identification, decision and asset tracking. viii) Signage typography, which will interface with the corporate identity and reinforce the image of the terminal. ix) Main (Portuguese) and secondary language requirements (English and another language). x) Usage of dynamic electronic wayfinding and signage elements shall be factored into the proposal where necessary or relevant. c) Prepare a schedule for the entire programme, from analysis, conceptualization, design, detailing, support on supplier qualification, support on prototype evaluation, support on installation, and documentation (not exhaustive listing). d) Present final proposed signage/programme to RIOGaleão for approval including:

i) Interior and exterior wayfinding, signage concepts and location plans. ii) Mandatory signage required by the Authorities. iii) Updated budget message schedule. iv) Other presentation / rendering as deemed necessary to effectively present the total concept. v) Amendments as required for endorsement. 5) The W&S Consultant shall propose comprehensive and effective wayfinding solution directing passengers to key airport services and facilities. The Consultant shall provide at least three (3) different options for consideration. 6) Signs with sufficient information shall be displayed at ideal locations around and within the proposed development to enable the public to clearly identify and easily orientate themselves. The placement of the signs shall take into consideration the natural field of vision of all different types of airport users. 7) Signage used shall be clearly identifiable using a consistent family of pictograms and arrows with the simplest possible designs to avoid confusion and ambiguity. 8) The signs shall be implemented with good wayfinding and signage practices, e.g. directional signs, directories, availability of relevant information, continuity of directions from sign to sign, clear lines- of- sight, clear of distractions and clutter, good legibility, consistent brand recognition (of the Airport), etc. 9) Guidelines and ground rules on spacial zoning shall be provided to guide placement of any infrastructure, which would affect the ambience of the airport. 10) Entrance identification and signage shall be provided; including those serving adjacent facilities (car parks, pedestrian thoroughfares, etc). 11) The W&S Consultant shall cover the following, a) Present the philosophy, design principles and usage guidelines of the signage system, for ease of future reference.

b) Provide details and drawings of signage fittings as required, suitable for inclusion in the tender set for signage installation. c) Review and assist RIOGaleão in the integration of mandatory, emergency and safety signage fittings with the general signage requirements. d) Attend to queries / clarifications, set evaluation criteria, conduct tender evaluation, analysis to recommend suitable specialist tenderers for the signage installation works. e) Review specialist signage contractor s design details, shop drawings of standard and special signage fittings for conformance to the intent of the signage consultant s design and specifications. f) Respond to contractor s technical queries within a reasonable period of time. g) Review shop drawings and technical specifications submitted by the specialist signage contractor for fabrication & installation work h) Inspect mock- ups of signage fittings during manufacture or installation as may be required i) Provide inspection role during construction including providing creative design solutions, rendering advice on selection of mandatory and statutory signs, conduct regular site inspections and supervisions. 12) Final setting up to end of Maintenance Period a) Witness final installation, adjusting and commissioning of signage installation. b) Review as- built Drawings and Operation & Maintenance Manuals and help resolve technical and contractual issues. c) Site inspection of all installed signs, generate punch list to RIOGaleão for reference and for project completion final sign- off. 13) During the Entire Project a) Review with the contractor s shop drawings, consult and coordinate with RIOGaleão on fixing detail and interfacing with finishes. b) Attend regular meetings with RIOGaleão as required by the project managers, architects, including project consultants meeting, design coordination meeting, technical co- ordination meetings, site progress meetings and any other contractor s technical meetings, if required.

c) Collaborate with RIOGaleão to incorporate and integrate the signage design concept with the overall structural, architectural and interior design concept, design constraints and limitations, mechanical and electrical provisions and requirements, and all necessary builder s works in connection therewith. Invitation to Tender 14) The price offered shall be broken down into the components shown in the Annex, and shall be in Brazilian Reals. The tender may be awarded in full or in parts. Payment would be made locally in Brazil. 15) Information including, but not limited to, the following shall be provided: a) Company directors and partners b) Ability to develop this project c) Experience of company with past and present list of commitments d) Financial standing for past three (3) years e) Knowledge of the local situation f) Proposal (in accordance with the items required shown in the Schedule of Tender) g) List of value- added services For questions, please contact us in writing at mariaelisa@

SCHEDULE OF TENDER Tender for the Wayfinding and Signage Consultancy Pricing Schedule S/N Item Price (BRL) 1 Analysis and Wayfinding Concept Basic guidelines and findings List of destinations and terminology Presentation of findings Presentation of concept and sketches Recommendations for information carriers to be designed and developed 2 Design Signage design schedule layout with sign numbers and sign locations of final signage, inventory list with sign content and sign details, definitive list of destinations and terminology Preliminary design drawings Final design of wayfinding system design drawings of information carriers, system of formats for each type of information carrier, basic template for each type of layout, use and organization of colours, colour specifications, use of pictograms, use and application of arrows, typography, description of materials to be used, functional design of mounting devices and structural elements 3 Detailing Final sign layouts Bill of quantities Qualitative requirements Construction drawings of information carriers Mounting instructions and complementary requirements 4 Support Supplier qualification Prototype evaluation Installation support 5 Documentation Evaluate installation Review wayfinding system for final approval Creating wayfinding manual TOTAL PRICE Value- Added Items (Optional) to be completed by bidder S/N Item Price (BRL)

EVALUATION CRITERIA Two stage process whereby the first stage would be to evaluate quality of the bidders. Only qualified bidders would be considered for the second stage, where the price proposals would be opened. Price- Quality (P/Q) ratio of 70/30, considering the Q aspect to be of substantive weightage. We are looking at proven airport signage specialists for this piece and the net will be cast wide. S/N Item Weightage (%) 1 Quality (30) Track record in specific area of expertise 10 Design, functional characteristics and aesthetics 20 2 Price (70) Total Price 60 Payment schedule 10 TOTAL 100 TIMELINE S/N Item Period 1 Release of RFP 6 October 2014 2 Time for RFIs and Answers 20 October 2014 3 Submission of all proposals, including price and 17 November 2014 qualifications 4 Evaluation and selection of winner 12 December 2014 5 Engagement of partner and beginning of project 12 January 2015