For personal use only

Similar documents
For personal use only

How To Mine And Treat Ore From Castle Hill Stage 1

Cannon Big Pit Given the Green Light

Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS).

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value

Resources Rising Stars

GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER

ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT

Interim Financial Report for the half-year ended 31 December 2011

C R A D L E / T R E M O N T J V A C Q U I R E S % O F P A N D A H I L L L I C E N C E S

WARWICK AND ATLAS IRON ANNOUNCE MERGER TO CONSOLIDATE PILBARA IRON PROJECTS

DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS

For personal use only

Positioned for Production: Exploring for Growth

INVESTOR PRESENTATION JULY 2013

ALCYONE REPORTS JORC SILVER RESOURCES

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000

Quarterly Activities Report - for the period ended 31 December 2015

Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back

September 2015 Quarterly Activities Report

FOCUS MINERALS LIMITED

Ruby Joint Venture commenced to explore Montepuez East Ruby Project in Mozambique Kroussou Zinc-Lead Project in Gabon advancing

Update on Heap Leach potential of the Murchison gold project

JUNE 2015 QUARTERLY REPORT

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015

For personal use only

Ferrex plc ( Ferrex or the Company ) Acquisition of Gold Mining Company in Australia and Strategic Review

QUARTERLY REPORT FOR THE PERIOD TO 31 MAY 2012

For personal use only

JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.

Pathway to Production

Ironbark Zinc Limited

Merlin Diamonds Limited

September 2010 Quarterly Report

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015

ASX ANNOUNCEMENT 2 December 2014 PRESENTATION

ANNUAL GENERAL MEETING November 2015

Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q at Grants Patch Gold Tribute Project, Australia

AIM: KEFI 6 March KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE

ACQUISITION OF SIGNIFICANT COAL ASSETS IN INDONESIA AND STRENGTHENING OF INDO MINES BOARD

Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016

HORSE WELL GOLD PROJECT W.A

LETTER OF INTENT FOR PROJECT FUNDING AND OFF-TAKE AGREEMENT FOR NICANDA HILL

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2014

BAUXITE RESOURCES LIMITED

QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2015

The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include:

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015

HALF-YEAR REPORT TO 30 JUNE 2003

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

For personal use only

For personal use only

QUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2015

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

Highlights. Metro Mining Limited (ASX:MMI) Quarterly Activities Report September Successful Share Issue Raises A$5.6 Million

Detour Gold Provides New Life of Mine Plan for Detour Lake

Highlights. Completion of farm-out in Tanzania. Drill support contract awarded in Tanzania. Competent Person s Report commissioned

The Unparalleled Opportunity of Colluli the Colluli Potash Project presented by Danakali

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015

UPDATE ON SRIG - ALTONA TRANSACTION AGREED WORK AND DRILLING PROGRAMME COMMENCES

RC drilling identifies high grade gold in bedrock at Pacific Dunes Corkwood Camp Scale Target

Mines and Money Presentation

Quarterly Activities Report For the quarter to 31 December 2015

Press Release 30 th October 2015

Cummins Range Rare Earths Project

PNG Mining & Petroleum Investment Conference December Geoff Day Executive General Manager PNG and Indonesia

SOUTH BLOCK A ( SBA ) PEAK S JV PARTNER KRX ENERGY SECURES ADDITIONAL FUNDING

PALADIN ENERGY LTD ACN

Quarterly Activities Report

DIVIDEND REINVESTMENT PLAN

Mineralisation remains open in all directions with an untested downhole EM conductor at depth

Corporate Presentation February 2016

Quarterly Activities Report

Savannah North Scoping Study Looking into the future 3 February 2016

For personal use only

Annual Financial Report

Beowulf Mining Plc ( Beowulf or the Company )

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb TORONTO

For personal use only

Interview with Paul Atherley, Managing Director of Berkeley Energia (911733, ASX: BKY, London: BKY)

Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015

Change of Company Name to Neometals Ltd (ASX: NMT)

Report for the Quarter Ended 31 December 2015

A B N NOTICE OF ANNUAL GENERAL MEETING, EXPLANATORY STATEMENT AND PROXY FORM

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

NEW GOLD DISCOVERY IN GHANA WEST AFRICA

Transcription:

LIMITED ABN 48 106 732 487 ASX Announcement 12 July 2011 Matsa Secures Up To AUD$8.6 Million Funding HIGHLIGHTS Agreement for equity funding of up to AUD$8.6 million with New York investment fund, SpringTree Special Opportunities Fund, LP ( SpringTree ) AUD$100,000 per month tranches (option to increase to AUD$500,000 per month) over 18 months Supplements already adequate liquidity position Provides additional working capital if required, to develop the Norseman Gold Project Funding secured on attractive terms INTRODUCTION Matsa Resources (ASX:MAT) ("Matsa" or the "Company") is pleased to announce it has entered into an agreement with a USbased institutional investment fund SpringTree Special Opportunities Fund, LP ( SpringTree ), managed by SpringTree Global Investors, LLC, to provide funding of up to AUD$8.6 million over 18 months. The facility, which supplements Matsa's existing adequate liquidity position, will provide additional working capital if required, as the Company continues progress towards developing its flagship 1.47 million ounce Norseman Gold Project. CORPORATE SUMMARY Executive Chairman Paul Poli Director Frank Sibbel Director & Company Secretary Andrew Chapman Shares on Issue 122.35 million Unlisted Options 18.75 million @ 27.3c + Top 20 shareholders Hold 58% Share Price on 12 July 2011 23.5 cents Market Capitalisation $28.14 million Head Office: Suite 11, 139 Newcastle Street, Perth Western Australia 6000 Tel: +61 8 9230 3555 Fax: +61 8 9227 0370 Kalgoorlie Office: Suite 1, Vosper House, 31-33 Dugan Street, Kalgoorlie 6430 Tel: +61 8 9021 7200 Fax: +61 8 9021 7277 Bangkok Office: Unit 1808, Pacific Place 2, Sukhumvit Road, Klongtoey, Bangkok Tel: +66 0 2653 0258 Fax: +66 0 2653 0258 reception@matsa.com.au www.matsa.com.au

Matsa has secured the facility at a highly competitive rate with safeguards to minimise unnecessary dilution in the event of adverse market conditions. Under the Agreement, SpringTree will invest AUD$100,000 on execution and will invest a further AUD$1.7 million to AUD$8.5 million in Matsa. Executive Chairman Paul Poli said the funding provides Matsa with additional working capital if required, as Matsa continues seeking a financier to partner it in developing the Norseman Gold Project. Matsa last week announced it was in talks with three potential Chinese investors, with further strong expressions of interest from others. AUD$100,000 per month, increasing to AUD$500,000 per month on mutual consent if and when needed; The agreement enables Matsa to issue shares at prices that are linked to market prices prevailing at the time of their future issuance and potentially at premiums to their current share price, thereby minimising potential dilution for shareholders. It allows Matsa to take advantage of future growth in share prices. The price at which the shares will be issued in the monthly tranche will be 91.5% of the average of three consecutive daily volume weighted average prices ( VWAPs ) of Matsa shares during a specified period prior to the date of issuance of shares; Matsa already has an adequate liquidity position with approximately $1.5 million in cash as at 30 June 2011, and minimal debt. This funding from SpringTree will provide extra working capital if and as required to enable the Company to continue moving ahead with developing our Norseman Gold Project for the benefit of shareholders with confidence. Our priority, as always, has been to ensure we achieve a result based on the best possible terms for our shareholders. Significantly, we have negotiated a funding that provides real safeguards to prevent any unnecessary dilution in the event of a change in Matsa's outlook by having a $0.20 per share floor threshold at a very low cost to Matsa" added Mr Poli. Summary of key features: Funding up to AUD$8.6 million over 18 months, comprising tranches of Matsa can opt to refuse to issue shares in a particular month if the Company's share price falls below the floor price protection level of $0.20. Matsa will grant SpringTree 1,250,000 options with the exercise price equal to 120% of the average of the VWAPs per share during the 20 trading days prior to the date of execution of the agreement. The agreement attracts a $150,000 commitment fee payable in shares and is secured against 500,000 shares. The terms of the agreement do not permit shares to be issued, and there is no agreement to issue shares under the agreement, if shareholder approval is first required under the Listing Rules. The initial investment of $100,000 will proceed following the execution of the Agreement and does not require shareholder approval. Page 2

The terms of the Agreement allow the Company the freedom to enter into future debt or other financing arrangements and to raise additional equity as the Company sees fit. In addition, the agreement does not restrict the Company s ability to enter into strategic industry partnerships and undertake acquisitions or dispositions of assets and shares in the future. "This is another very positive development in Matsa's on-going strategy as we continue progressing towards developing our Norseman Gold Project," Mr Poli said. SpringTree has made a number of investments in ASX-listed resources companies in the past two years, and our portfolio has performed very well. We have been impressed with Matsa s management team and progress to date. SpringTree hopes that its funding will enable Matsa to implement its growth plans and unlock the value of its Norseman Gold Project assets said Phillip Valliere, Executive Vice President & Head of New Investments at SpringTree. Page 3

BACKGROUND About Matsa: Matsa is an ASX listed exploration and development company based in Western Australia. The Corporate office is located in Perth with offices in Kalgoorlie and Bangkok, Thailand. About SpringTree Global Investors, LLC: SpringTree Global Investors LLC is a New Yorkbased asset management company that makes equity and equity-linked investments in public companies around the world, with a focus on small-cap to mid-cap companies requiring US$5 million - US$150 million in funding. The Company aims to increase shareholder wealth through the discovery and development of mineral properties within Australia and South East Asia. It is committed to developing its Norseman Gold Project (Resource Table is shown in Table 1 below) and associated magnetite by-product to generate cash flow for shareholder benefit. For further Information please contact: Paul Poli Executive Chairman Frank Sibbel Executive Director Phone +61 8 9230 3555 Fax +61 8 9227 0370 Email reception@matsa.com.au Web www.matsa.com.au Mineral resources and reserves The information in this report that relates to mineral resources and reserves, is based on information compiled by Richard Breyley, who is a member of the Australasian Institute of Mining and Metallurgy. Richard Breyley is a full time employee of Matsa Resources Limited. Richard Breyley has sufficient experience which is relevant to the style of mineralisation and the type of ore deposit under consideration and the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Richard Breyley consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Page 4

Figure 1 - Australian project locations Norseman Gold Project Resources (>1g/t Au) Tonnes Grade Ounces (Million) (g/t) Indicated Mt Henry 5.6 1.9 350,000 Selene 11.8 1.6 600,000 North Scotia 0.2 5.2 36,000 Total 17.6 1.8 990,000 Inferred Mt Henry 4.9 1.8 280,000 Selene 3.1 1.4 140,000 North Scotia 0.3 2.2 24,000 Abbotshall 0.5 2.0 30,000 Total 8.9 1.7 480,000 Grand Total 26.5 1.7 1,470,000 Table 1 - Norseman Gold Project Resources 1) All Resources are reported to a lower cut-off grade of 1.0g/t. 2) Rounding, conforming with the JORC code may cause computational errors. Page 5