General Comparison between 4D Software



Similar documents
Revit MEP. Autodesk Navisworks

Planning and Scheduling curriculum integration of BIM with industry input. Marcel Maghiar, Ph.D., Georgia Southern University BIM ACADEMIC SYMPOSIUM

Building Information Modeling for MEP Engineering. Revit MEP 2008

Mastering Microsoft Project 2010

Practical Strategy and Workflow for Large Projects: A Realistic Solution

NE-50413B Mastering Microsoft Project 2010

Mastering Microsoft Project B; 3 days, Instructor-led

AC : IMPLEMENTING BUILDING INFORMATION MODELING IN CONSTRUCTION ENGINEERING CURRICULA

HOW TO LINK AND PRESENT A 4D MODEL USING NAVISWORKS. Timo Hartmann t.hartmann@ctw.utwente.nl

MASTER CLASS INTEGRATED PROJECT MANAGEMENT SOFTWARE REPORT Timo Hartmann

Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering

Certified Instructors & Curriculum

BIM and Project Planning

Mastering Microsoft Project 2013

Software Development & Education Center. Microsoft Office (Microsoft Project 2010)

Mastering Microsoft Project 2013 Course: 55054A Course Length: 3 Days

Mastering Microsoft Project 2013

Getting Started with BIM (Building Information Modeling)

Oracle Primavera P6 Enterprise Project Portfolio management Overview Programme Reference # 201A

Proceedings of Meetings on Acoustics

Autodesk Solutions for Environmental Engineering. Engineering a better environment

Performance by design. Autodesk Revit MEP

SYLLABUS 12/14/2012 CONE 425 Construction Planning, Scheduling, & Control Spring, 2013 Rev. 0. Syllabus Spring, 2013

PROJECT CONTROL PROCEDURE (PROJECT STANDARDS AND SPECIFICATIONS)

INTRODUCTION. Prakash Chandar. S¹, Dhivya Shree. G² ABSTRACT

Thank you for joining today s technical webinar

SKANSKA S NEW HEADQUARTER IN HELSINKI, FINLAND. Tiina Koppinen Skanska Finland

Streamline your design-to-cost processes with Autodesk Navisworks

BIM: FOR PROJECT MANAGERS CSI Southwest Region Conference Program 1B 8:45am 11:00am

Questions and Answers

Design without compromise. Autodesk Revit. Architecture

Engineering and Construction

BUILDING INFORMATION MODELLING. The Designer. CIC East and IDBE. David Hymas

Autodesk Revit Architecture. Design without compromise.

A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL AND MECHANICAL ENGINEERING DEPARTMENT OF ARUP TURKEY

Project Management Tools

BIM ACROSS THE DESIGN-BUILD-OPERATE LIFECYCLE

LONG INTERNATIONAL. Long International, Inc Whistling Elk Drive Littleton, CO (303) Fax: (303)

PM eb. Software Report Technology in Construction Today

What is Costrac? Approval of Budget against WBS. Feasibility Study Completed. Define & Map WBS. Approval of WBS. Estimate

SharePoint for Engineering Document Management & Control

Execution Plan Template Design Modeling

powerproject 24 REASONS TO USE ASTA POWERPROJECT RATHER THAN PRIMAVERA FOR MANAGING CONSTRUCTION PROJECTS

ORACLE PROJECT MANAGEMENT

Collaborating Across Disciplines with Revit Architecture, MEP, and Structure

PROFESSIONAL PROJECT MANAGEMENT SOFTWARE FOR THE CONSTRUCTION INDUSTRY. Version 8

Unit 4: Time Management (PMBOK Guide, Chapter 6)

Feature Comparison of PTC Creo View MCAD. Product Suite. Topic Sheet. Page 1 of 6 Feature Comparison of PTC Creo View MCAD Product Suite

LACCD Building Information Modeling Standards For Design-Bid Build Projects

Line of Balance Scheduling: Software Enabled Use in the U.S. Construction Industry

Olilo's AEC Design Services. SrinSoft Inc, Partners of

PREDICTIVE AND OPERATIONAL ANALYTICS, WHAT IS IT REALLY ALL ABOUT?

Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE

Model, Analyze and Optimize the Supply Chain

Industry Foundation Classes (IFC)

CME 405 Building Information Modeling for Construction Management 3 Credits (3 Lecture Hours)

Asta Powerproject Enterprise POWERFUL PROJECT, PORTFOLIO AND RESOURCE MANAGEMENT SOFTWARE. astapowerproject.com

and 2010: rprise Increasingly, must ation, es, partners, s intelligence.

An Esri White Paper August 2010 Product Library in Esri Aeronautical Solution: Enabling Seamless Product, Data, and Document Management

Microsoft Project Server 2013

PROJECT MANAGEMENT IN PRIMAVERA P6 WEB ACCESS REL 7

Design without compromise. Autodesk Revit. Architecture 2010

ORACLE PROJECT PLANNING AND CONTROL

System Requirements. Autodesk Building Design Suite Standard 2013

Analytics for Performance Optimization of BPMN2.0 Business Processes

ORACLE HYPERION DATA RELATIONSHIP MANAGEMENT

Questions and Answers

A Construction-Oriented, 5D BIM Environment

Vico Office R3.0 Help

CDR.07. CPM Scheduling and How the Industry Views Its Use

Intelligent Resource Scheduling for Reduced Turnaround Durations. Rob Richards, Ph.D.

Deswik.Sched. Gantt Chart Scheduling

Performance by design. Autodesk Revit MEP

BIM BASICS AIRAH PRESENTATION SERIES. Mark Jacobson National BIM Operations Manager AE Smith & Son

PROJECT TIME MANAGEMENT. 1 Powered by POeT Solvers Limited

Explore. Analyze. Optimize. AutoCAD. Civil 3d

Oracle s Primavera P6 Enterprise Project Portfolio Management

Foreword. Version Parties to the COBIM project

Get to know your Autodesk Design and Creation Suites 2014

Questions and Answers

Spreadsheet Simulation

Better planning and forecasting with IBM Predictive Analytics

Project Document Manager. For Subcontractors

Collaborative Scheduling using the CPM Method

PRESTO: COST MANAGEMENT FOR CONSTRUCTION

MICROSOFT OFFICE PROJECT - SYLLABUS

ECDL / ICDL Project Planning Project Management Software Level 2. Syllabus Version 1.0 (UK)

Getting More Value from your BIM Process with Autodesk Collaboration and Data Management Products

Synchronous Building Information Model-Based Collaboration in the Cloud: a Proposed Low Cost IT Platform and a Case Study

PROJECTS. onepoint PROJECTS 13. Group Server and. Enterprise Cloud/Server. Tutorial

School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191

ORACLE HYPERION PLANNING

Microsoft Project 2007 Level 2: Working with Resources and Managing a Project

Software for Supply Chain Design and Analysis

An Interactive Visual Approach to Construction Project Scheduling

Transcription:

General Comparison between 4D Software (Navisworks, Synchro professional, Vico control, itwo and Navigator)

Comparison between 4D Software 4D BIM is the next generation of project management, including project planning and scheduling, data analytics, and management. 4D literally adds vision. It integrates detailed spatial data from the BIM model. The ability to visualize your project and analyze dynamic spatial data on your computer before you break ground creates a practice field for the delivery team that is highly engaging and efficient. Attribute Navisworks Synchro Professional Score out of 5 Navigator ITwo Vico Control Comments Ease of learning 2.5 3.5 2.5 3 2 Synchro appeared a lot easier to pick up and has a relatively simple user interface, also programme input is more advanced because it allows the user to input more complex programmes which include discrete functions such as start as late as possible, delays, float etc it also allows the user to compute the critical path. In all packages, it is simple to link elements from a 3d model to an activity/moment in time. Interoperability between Revit and Navisworks is really good, as both are Autodesk products. All the data from the BIM model is available in Navisworks and ready to be utilized for sophisticated purpose. Further, the switchback and synchronization options offered work very well with the tested workflow.

Extent of 4D features ( scheduling, project Analysis, conflict detection and what if scenarios) 3.5 4.5 2.5 2.5 3 Synchro software focuses on 4D programming and is very effective and can be done easily and intuitively as a planner for both simple and complex project operations, Costs/material/equipment/and location resources can also be associated with activities and reported accordingly. Navisworks, Navigator and Itwo does not allow the user to enter new tasks or complex discrete functions for programmes, although this is not necessary for producing presentation animations as the programme can often be fudged as required to show the idea of the project but not support management functions. Navisworks is fine for marketing ideas. Vico 4D system that uses line of balance method which is a special unique methodology that has no industrial following or foundation of support from academia or industry. It should be noted that both Navisworks and Synchro has additional functionality aside from animation that could find value in large building projects such as 3D clash detection, Synchro alone has 4D clash detection, real-time mark-ups, rendering, and the ability to cut a cross-section in the model at any point in time.

Animation time Animation Quality 2.5 3.5 2.5 2.5 2.5 Synchro is a lot easier to produce a simple animation and is less labour intensive. 4 3.5 2.5 2.5 3 Navisworks can produce more elegant animations, but it requires much more labour and is not intuitive. Vico, Navigator and Itwo animation is a bit frustrating and unnecessarily iterative given the objective. Import And Export ( File format, File Size, Snapshots and videos) 4 4 4 4 3.5 All software packages can export animations in a variety of AVI movie file formats and compression methods. Still images can be output from any view at any time. Synchro has many reporting functions for project planning and scheduling that are missing in the rest. Navisworks, Navigator, itwo and Vico has strong design review functions while Synchro is for project scheduling and project management functions using 4D features. Exchange with p6 and Auto linking 3 4.5 2.5 3 2.5 Clash Detection 4 2 4 4 2 rules Multiple users 1 5 1 1 4 Navisworks does not integrate with full round trip data exchange with p6. Synchro integrates with full round trip data exchange with p6 Vico, Navigator and Itwo does not integrate with full round trip data exchange with p6. 5D & QTO capabilities 3 3 1 5 4

Software Navisworks BIM Key Feature Point/Line Based Clashing Track status of clashes as they are found and resolved Export Reports XML import/export 4D Simulation Schedule linking from other project management software Set up planned and actual times to visualize deviations from the project schedule Export 4D simulations into a prerecorded.avi animation Create project presentations Rendering capability Synchro "What if" scenario with side by side comparative Analysis. Resource management Multiple baselines capability to compare actual performance against planned Progress tracking Rescheduling options Critical path planning and analysis Synchronization with MS Project and Primavera Ability to update the model Mark Up and Annotate E-mail tools Earn value analysis reports Resource and task usage reports Line of balance view Navigator Design Review and manipulation Photorealistic visualization Schedule simulation Clash detection Export Reports Interoperability: IFC, DGN, DWG, DXF, SKP, PDF, IGES, STEP, etc History tracking Database repository

Itwo 5D End-to-End Platform Combine Models from Multiple Sources 2D Takeoff Integration Schedule Integration Process. Finance Integration Create Organization Cost Code Standards Reconcile with Finance in Real-Time Utilize Finance Connectors Mobile Field Data Collection Collaborate with Project Stakeholders Vico Ability to input schedule in Gantt or linear format Location breakdown structure Ability to create quantity based schedules to see bill of quantities Resource histogram Control chart color coding Schedule forecast according to real progress inputs Link multiple projects Monte Carlo Risk analysis simulation Prerequisites check capability (For the procurement) Cost and cash flow capability Look ahead reporting capability Integration with MS Project and Primavera

Conclusion 1-Daynamic Analysis :

2.Head to head analysis:

3.Performance Analysis : As result I believe that : 1- Synchro is the most powerfull tool in the market for the 4D simulation and schedul analysis but with good rendering output, visual clash detection only and fair EVA capabilities. 2- Navisworks is Powerfull in Quantity take-of and clash detection with good 4D capabilites and good rendering output. 3- Vico is not recommended since it depends on flow line techniques. 4- Navigator is Powerfull in Quantity take-of and clash detection with poor 4D simulation capabilites and poor rendering output. 5- ITwo is very powerfull in 5D simulation and quantity take of with low 4D simulation capabilities and good clash detection reports.

Synchro ITwo

Navisworks Vico Control

Navigator