QMS Operational Procedure QOP-42-02



Similar documents
This procedure applies to the following categories of documents:

Documents, Records and Change Control

4.0 - QUALITY MANAGEMENT SYSTEMS

ISO 9001:2008 Audit Checklist

QUALITY MANUAL ISO Quality Management System

ISO 9001:2008 Quality Management System QMS Manual

ISO 9001:2008 Clause PR018 Internal Audit Procedure

QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA FAX

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL

ISO/IEC QUALITY MANUAL

Micro Plastics, Inc. Quality Manual

ISO 9001 Quality Systems Manual

Quality Manual ISO9001:2008

ALL PRODUCTS MFG & SUPPLY

QUALITY MANAGEMENT SYSTEM Corporate

QUALITY OPERATING PROCEDURE QOP QUALITY ASSURANCE SYSTEM MANUAL

ISO 9001:2000 Gap Analysis Checklist

QUALITY MANAGEMENT SYSTEMS MANUAL

Quality Systems Manual

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

0. 0 TABLE OF CONTENTS

The President of Inductors Inc. is the senior executive responsible for operations.

When printed the document is for reference only and is considered uncontrolled - refer to the Document Control System for the most current version

Quality Management System Manual

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards

This Business Management System Manual is based on ISO 9001:2008 requirements

Setting Up A Complaint Handling System. Presented by Sue Jacobs Principal Consultant, QMS Consulting, Inc. Complaint Systems

Eagle Machining, Inc. Quality Management System

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22

Quality Management System Manual

Quality Assurance System Manual

Quality Management System Manual

Revision Date Author Description of change Jun13 Mark Benton Removed Admin. Manager from approval

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)

UNCONTROLLED COPY FOR REFERENCE ONLY

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM

Quality Management System Manual

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011

ABC COMPANY INC ISO 9001:2000 QUALITY MANUAL

Auditing Process-based Quality Management Systems. Charlie Cianfrani and Jack West

ISO 9001:2000 AUDIT CHECKLIST

Implementing an Energy Management System Using ISO 50001

QUALITY MANUAL. IFS DOCUMENT CLASS: QLTY-100 IFS DOCUMENT NUMBER: QM4.2.2 PAGE 2 of 25 EFFECTIVE DATE: 11 SEPTEMBER 2015 REV O

CENTRIS CONSULTING. Quality Control Manual

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL

Contents of the ISO 9001:2008 Quality System Checklist

MEAT GRADING AND CERTIFICATION BRANCH QUALITY MANUAL

QUALITY POLICY MANUAL Document: Revision: E Effective Date: January 15, 2010

FINE LOGISTICS. Quality Manual. Document No.: Revision: A

Row Manufacturing Inc. Quality Manual ISO 9001:2008

ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) June 2014

Quality Management System General

CORPORATE QUALITY MANUAL

U. S. Department of Energy Consolidated Audit Program Checklist 5 Laboratory Information Management Systems Electronic Data Management

Cartel Electronics. AS 9100 Quality Systems Manual

ISO-9001:2000 Quality Management Systems

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

The Prophotonix (UK) Ltd Quality manual

EMS Example Example EMS Audit Procedure

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

Quality Management Systems Manual

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM ***** ISO 14001:2015 ENVIRONMENTAL MANAGEMENT SYSTEM

NABL NATIONAL ACCREDITATION

How to Use the Design Process to Manage Risk: Elements of Design Controls and Why It Matters

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702

QUALITY MANAGEMENT SYSTEM MANUAL LEC MARINE (KLYNE) LTD

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION

Surgi Manufacturing Quality Manual

Overview of Medical Device Design Controls in the US. By Nandini Murthy, MS, RAC

QUALITY MANAGEMENT SYSTEMS

Correspondence between ISO 13485:2003 and the US Quality System Regulation

Quality System Manual

Auditing HACCP Programs

ORACLE CONSULTING GROUP

Quality Management System Manual QM-QUA-001

ISO 9000 Introduction and Support Package: Guidance on the Documentation Requirements of ISO 9001:2008

LinkTech LLC 3000 Bunsen Ave. #A Ventura, CA 93003

DNV GL Assessment Checklist ISO 9001:2015

NIST HANDBOOK CHECKLIST CONSTRUCTION MATERIALS TESTING

QUALITY MANAGEMENT SYSTEM (QMS) ASSESSMENT CHECKLIST

AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE

ISO 14001:2004 EMS Internal Audit Checklist & Gap Analysis

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

QUALITY MANUAL WITH SUPPORTING PROCEDURES

I. PURPOSE This SOP describes policies, procedures, and record keeping requirements for all documents subject to change control.

QUALITY MANUAL GREAT LAKES INSTITUTE FOR ENVIRONMENTAL RESEARCH ANALYTICAL LABORATORIES. October 2008 Revision 08

Summary of Requirements for ISO 14001:2004 February 24, 2005

ONTIC UK SUPPLIER QUALITY SURVEY

Quality System Manual

Exar Corporation Quality Manual

Quality Management System Manual Revision L

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702

Quality Management System Manual ISO9001:2008

Quality Manual ALABAMA RESEARCH & DEVELOPMENT. This Quality Manual complies with the Requirements of ISO 9001:2008.

Quality, Environmental, Health and Safety Manual Toshiba International Corporation

Camar Aircraft Products Co. QUALITY MANUAL Revision D

Transcription:

QMS Operational Procedure QOP-42-02 DEVICE MASTER RECORD Issued by: Quality Assurance Eff. Date: 00/00/00 Rev.: A Pg. 1 of 4 ISO 13485 requires that for each type or model of medical device the organization shall "establish and maintain a file either containing or identifying documents defining product specifications..." CFR 820.181 requires the same kind of file or index, called Device Master Record (DMR), and in addition, explicitly requires that this index be itself a controlled document that is reviewed, approved and released in accordance with CFR 820.40. Although ISO 13485 is not as detailed and explicit as 820.181, one should conclude that the requirements are quite identical, and thus this procedure applies equally to both standards. I PURPOSE The purpose of this procedure is to provide for a system and instructions, and to assign responsibilities for establishing and maintaining Device Master Records (DMR). II APPLICATION This procedure applies to technical/engineering documentation for each type or model of medical device. III PROCEDURE 1 General 1.1 Device Master Record is an index (a table of contents) of device-specific documentation required for procurement of materials and components, manufacture, and evaluation of the device. In this procedure the DMR is just an index, and not a physical file or binder with the actual documents. The advantage of this approach is that documents don't need to be copied and maintained in special files. It is also easier to implement revision control and other document control requirements. But if you prefer to maintain physical DMR files, you can easily change this procedure (in particular this section and section 3) to describe how the physical files are established, maintained and controlled. There is really not much difference. You would still need a table of contents (in effect an index) for each binder or file folder. Physical DMR files may be more practical for relatively simple devices and in small companies. The advantage is that all documents are being kept together and thus are easy to manage. 1.2 DMR is also a current record and status of the physical configuration of the device. 1.3 Unique DMR is established for each type or model (family) of medical device manufactured by AAA Inc. Approved by/date: Jack Kanholm - 00/00/00

DEVICE MASTER RECORD Operational Procedure QOP-42-02 Rev.: A Pg. 2 of 4 2. Documents included in DMR 2.1 For each type or model of medical device the DMR includes the following types of documents: This list is based on 21 CFR Part 820.181, Device Master Record, but it also fully applies to ISO 13485. Edit this list carefully to delete any items that are not applicable (installation or sterilization, for example), and to add any documents that are relevant but are not included. Be sure to use the actual document names and designations as applicable for your type of products and processes (for example, blending versus assembly, etc.). 2.1.1 Device Specifications (DS): product trade and common names; intended uses; performance characteristics and theory of operation; physical characteristics; environmental limitations, product stability and storage requirements; user safety characteristics; component, subassembly and assembly drawings and specifications; bills of materials (or lists of ingredients); compositions; formulations; wiring and piping diagrams; software specifications. 2.1.2 Manufacturing Process Specifications (MP): process flow charts; process/assembly lines diagrams; equipment, tools, molds; manufacturing environment specifications; setup procedures; operator instructions; equipment maintenance procedures; validation reports for special processes; sterilization specifications, procedures, and validation reports; blank work orders, nonconforming product/process forms, and other reporting forms. 2.1.3 Quality assurance procedures and specifications (QA):

DEVICE MASTER RECORD Operational Procedure QOP-42-02 Rev.: A Pg. 3 of 4 quality system manual (QM); quality system operational procedures (QOP); quality system forms (QF); process control specifications/charts; control plans, instructions and acceptance criteria for incoming, in-process, and finished device inspection and testing; procedures and acceptance criteria for the verification of packaging, labeling, installation, and servicing activities; blank work order forms for recording inspection/testing activities, traceability, and other data for device history records; device release review/evaluation checklists. 2.1.4 Packaging and labeling specifications (PL): package drawings and specifications; filling/packaging procedures; label/labeling drawings; instruction manuals. 2.1.5 Installation, maintenance and servicing specifications (IMS): installation, specifications and instructions; maintenance instructions; servicing specifications and manuals. 2.2 Not all types of documents specified in this section are relevant for each type or model of device. For a particular device, the Chief Engineer, Production Engineer, Production Manager, and QA Manager decide jointly which specific documents are to be included in the DMR. Edit to accurately assign the responsibilities for determining the contents of the DMR. 3 Format of the DMR Index 3.1 DMR is maintained on computer in the form of an Excel spreadsheet. The model of the spreadsheet is provided in Form QF-42-02-1, Device Master Record Index. 3.2 Individual documents referenced in the DMR Index are identified by: code/number, title (or description), releasing/approval authority, placement/custodian of the original/master document, You probably noted that the DMR does not identify the effective date, revision level or

DEVICE MASTER RECORD Operational Procedure QOP-42-02 Rev.: A Pg. 4 of 4 distribution of its documents. The reason is that the same document may be referenced in several DMRs, and thus tracking of the revision status and distribution of this document would have to be done in several lists at once - A REAL NIGHTMARE. Instead, you want to have a document master list (refer to procedure QOP-42-01) that identifies the revision and distribution status for all documents, irrespective of whether they are included in any DMR or not, and have the DMRs just reference the document. Another advantage is that with this system the DMRs would not have to be updated every time a document is changed to a higher revision level. 3.3 To determine the effective date, revision level, and distribution of a document included in the DMR, the DMR Index is cross-referenced with the appropriate Document Control Master List, where the document status information is maintained (refer to Operational Procedure QOP-42-01, Control of Documents). 4 Review, approval and change control 4.1 The initial DMR Index, and any subsequent addition or deletion of documents form the index, are reviewed and approved by the QA Manager. Note that the DMR Index is reviewed and approved only for its completeness (to satisfy regulatory requirements) and not for the correctness of individual documents. Thus, the function that approves the index does not need to be very technical in any specific area, but must be "multidisciplinary" and aware of the regulatory requirements. 4.2 The review and approval of the DMR Index is for ensuring the completeness and relevance of the index, rather than for the correctness of the individual DMR documents. Individual documents in the index are independently reviewed and approved by their issuing authority, in accordance with Operational Procedure QOP- 42-01, Control of Documents. 4.3 DMR review, approval, change control, distribution control, retention of obsolete copies, and other document control requirements are the same as apply generally to controlled documents, as specified in Operational Procedure QOP-42-01, Control of Documents. V ASSOCIATED DOCUMENTS Form QF-42-02-1, Device Master Record Index Operational Procedure QOP-42-01, Control of Documents Operational Procedure QOP-42-03, Control of Records VI ASSOCIATED RECORDS Device master record (DMR) index: An index (a table of contents) of devicespecific documentation required for procurement of materials and components, manufacture, and evaluation of the device. Based on Form QF-42-02-1, Device Master Record.

QMS Operational Procedure QOP-82-02 INTERNAL QUALITY AUDITS Issued by: Quality Assurance Eff. Date: 00/00/00 Rev.: A Pg. 1 of 5 This procedure represents a classic and well-established approach to internal auditing, however, being true to the minimalist approach of this whole documentation, it may be somewhat light in the areas of auditor training and audit checklists. Try to strengthen these areas if you can. If internal auditing is new in your company and you don't have any established practices, you should incorporate this procedure without too many changes, and then review it, say, a year later when you get your own experience with operating this system. I PURPOSE The purpose of this procedure is to provide for a system and instructions, and to assign responsibilities for conducting internal audits of the quality management system. II APPLICATION This procedure applies to all processes and activities of the quality management system, and to all areas where the quality system is implemented. III PROCEDURE 1 Audit plan 1.1 Planning of internal audits is based on the Quality System Process Map diagram and the Quality System Process Matrix documented in the Quality Manual Section 4, Quality Management System, Clause 4.1.1, Process Approach. The quality system process map and matrix define all major quality system processes and for each process: Define component sub-processes, List pertinent sections of the quality manual and the operational procedures, Specify areas to be audited, and Reference relevant sections and clauses in the ISO 13485 standard (for auditing of compliance). 1.2 Quality Assurance is responsible for planning and scheduling internal audits of the quality system, manufacturing processes and products. Audit frequency is based on the status and importance of the processes, products and areas to be audited, as well as results of previous audits, internal/external nonconformities, and customer complaints. Each quality system process is audited at least once a year. An audit plan where all processes and activities are audited with the same frequency (for example, annually) is not acceptable. There must be some variation in audit frequency to demonstrate that audits are scheduled on the basis of the status and Approved by/date: Jack Kanholm - 00/00/00

INTERNAL QUALITY AUDITS Operational Procedure QOP-82-02 Rev.: A Pg. 2 of 5 importance of the audited area or activity. 1.3 Internal audits cover all quality management system processes and sub-processes; are conducted in all relevant departments, functions and areas; and cover all relevant shifts. Be sure that your audit plan reflects this requirement for covering all shifts. 1.4 Quality system audit plan and schedule is documented in a matrix, a model of which is provided in Form QF-82-02-1, Internal Audit Plan. The vertical side of the matrix lists processes of the quality system to be audited and the horizontal side lists audit dates and assigned auditors. More detailed scope and reference for the audit, to include relevant sub-processes, procedures, areas/functions and reference clauses of ISO 13485 standard, are provided in the Quality System Process Map diagram and the Quality System Process Matrix documented in the Quality Manual Section 4. Note that QF-82-02-1 is actually just the schedule component of the internal audit plan. The actual scope and reference for the internal auditing program are defined in the Quality System Process Map diagram and the Quality System Process Matrix. 1.5 Internal audit plans and cycles are synchronized with management reviews of the quality system (refer to Operational Procedure QOP-56-01, Management Review), so that complete results from the full auditing cycle are available in time for the management review meeting. 2 Audit team 2.1 The QA Manager is responsible for qualifying, training and assigning internal auditors. Personnel assigned to carry out internal audits are independent of those having direct responsibility for the audited activity. Edit this as appropriate to your company, but be sure to clearly communicate the requirement for objectivity and impartiality of the auditor. 2.2 Internal auditors are qualified on the basis of their education, experience and training. Minimum requirements are: Education: High School graduation Experience: Two years in the industry Training: 16 hours external or in-house training The training can be by an external course or seminar provided by a qualified institution (such as a registrar, accredited training organization, etc.), or in-house training provided by a qualified consultant/trainer. If training is provided in-house, the trainer must have documented qualifications as a Lead Auditor. The standard explicitly requires that internal auditors must be qualified, but does not state any particular qualification criteria. The criteria defined in this clause are just an example.

INTERNAL QUALITY AUDITS Operational Procedure QOP-82-02 Rev.: A Pg. 3 of 5 3 Preparing for audit Being true to the minimalist approach of this documentation, this procedure does not require auditors to use formal checklists. There should be no problem, as long as the auditors can demonstrate that they prepare for the audit, and that they keep notes during the course of the audit. However, if you want your internal audits to be meaningful and effective, you should not let inexperienced auditors to go out without a comprehensive checklist. Only seasoned, professional auditors can be trusted to cover the whole scope and properly pace an audit without the help of a checklist. 3.1 Auditors prepare for an audit by: Reviewing the Quality System Process Map diagram and the Quality System Process Matrix (documented in the Quality Manual Section 4), Identifying relevant clauses in the ISO 13485 standard and in applicable regulatory requirements (21 CFR 820), Refreshing their knowledge of the quality manual and relevant operational procedures, Reviewing nonconformity reports, customer complaints, and corrective action files, and Preparing questions and checklists. 4 Conducting and reporting the audit 4.1 The manager responsible for the area scheduled for audit is contacted at least one week in advance with the proposed audit date. The manager responds with a confirmation, or proposes an alternative date. 4.2 While conducting the audit, auditors seek objective evidence demonstrating whether the audited activities conform to the requirements of the documented quality system, and whether the system is effectively implemented and maintained. When a nonconformity is noted, it is brought to the attention of, and discussed with, the responsible manager. Before the end of the audit each noted nonconformity is documented using the Audit Nonconformity Report form (a model of the form is provided in QF-82-02-2, Audit Nonconformity Report). Auditors fill out only the first part of the form, describing the noted nonconformity. The form is then handed over to the responsible manager who uses its second part to propose a corrective action. 5 Corrective action and follow up In this procedure, the process for requesting and implementing corrective actions resulting from audit findings is incorporated into the Audit Nonconformity Report form. Thus, the general Corrective and Preventive Action procedure and form do not apply to audits. While, in theory, the general Corrective and Preventive Action system could be used for internal audit findings, it is not a good idea. Audit findings must always be addressed as a priority, and within a specified time frame; because an open

INTERNAL QUALITY AUDITS Operational Procedure QOP-82-02 Rev.: A Pg. 4 of 5 finding means that the quality system is technically in default. 5.1 Once a nonconformity is identified and documented, further processing of the nonconformity report is similar to the corrective action requests (Operational Procedure QOP-85-03, Corrective and Preventive Action). Upon receiving the report, the responsible manager investigates the cause of the problem noted as a nonconformity, proposes a corrective action to be taken, and indicates the date by which the corrective action will be fully implemented. The auditor reviews and approves the proposed action. 5.2 On, or immediately after the due date for implementation of corrective action, the auditor follows up with an inquiry or an audit to determine if the corrective action has been implemented and if it is effective. When there is objective evidence that the corrective action is effective, the nonconformity report is closed out. If more work is needed to fully implement the action, a new follow-up date is agreed upon. 6 Documentation and records 6.1 Internal audits, implementation of resulting corrective actions, and follow-up audits are documented using the Audit Nonconformity Report form, a model of which is provided in Form QF-82-02-2, Audit Nonconformity Report. 6.2 The first block of the form contains a description of the nonconforming condition, the second block contains the proposal for a corrective action, and the third block is reserved for the follow-up audit and close-out of the report. 6.3 Pending nonconformity reports are kept by the auditor who initially issued the report. Closed-out nonconformity reports are kept by Quality Assurance. 6.4 At the end of an auditing cycle, all nonconformity reports established during the cycle are compiled and analyzed, and are presented at the management review meeting (refer to Operational Procedure QOP-56-01, Management Review). IV ASSOCIATED DOCUMENTS Form QF-82-02-1, Internal Audit Plan Form QF-82-02-2, Audit Nonconformity Report Operational Procedure QOP-85-04, Corrective and Preventive Action Operational Procedure QOP-56-01, Management Review Operational Procedure QOP-42-03, Control of Records V ASSOCIATED RECORDS Internal audit plans: Plans for quality management system audits. Based on Form QF-82-02-1, Internal Audit Plan. Audit notes and checklists: Filled out checklists, notes, and comments/references made by auditors during the audit.

INTERNAL QUALITY AUDITS Operational Procedure QOP-82-02 Rev.: A Pg. 5 of 5 Audit Nonconformity Reports: Reports with audit findings and records of corresponding corrective actions. Established by auditors using Form QF-82-02-2, Audit Nonconformity Report.