Dam-break flood plain model by WMS



Similar documents
SIMULATION TIGRIS RIVER FLOOD WAVE IN MOSUL CITY DUE TO A HYPOTHETICAL MOSUL DAM BREAK

DAM BREACH MODELING AN OVERVIEW OF ANALYSIS METHODS. Tony L. Wahl, Hydraulic Engineer, Bureau of Reclamation, Denver, CO,

SIMPLIFIED INUNDATION MAPS FOR EMERGENCY ACTION PLANS. National Dam Safety Review Board Emergency Action Plan Workgroup

USSD Workshop on Dam Break Analysis Applied to Tailings Dams

Employing Appropriate Software for Dam break Analysis and Flood Line rendering

NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN)

** Pressure represents energy when a. pressure difference is available.

STATE OF COLORADO DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER RESOURCES GUIDELINES FOR DAM BREACH ANALYSIS

Martine Jak 1 and Matthijs Kok 2

Using HEC-RAS for Dam Break Studies

Flood Zone Investigation by using Satellite and Aerial Imagery

Numerical Modeling of Dam Failure Phenomenon Using Software and Finite Difference Method

A Flood Warning System for City of Findlay, Ohio

Catchment Scale Processes and River Restoration. Dr Jenny Mant The River Restoration Centre therrc.co.uk

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2015

COMPARING DSS-WISE- LITE TO OTHER DAM BREACH SOFTWARE

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Emergency Spillways (Sediment basins)

FLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM

Ruissellement du Bassin Précipitation Abstractions Hydrogramme Flux de Base. Superposition Routage

The application of Web GIS in emergency flood control system

Evaluation of Open Channel Flow Equations. Introduction :

THE UNIVERSITY OF TRINIDAD & TOBAGO

Hydraulics Prof. A. K. Sarma Department of Civil Engineering Indian Institute of Technology, Guwahati. Module No. # 02 Uniform Flow Lecture No.

CHAPTER 2 HYDRAULICS OF SEWERS

Stability Assessment of Chamshir Dam Based on DEM, South West Zagros

Quality Assurance Reviews of Hydraulic Models Developed for the Central Valley Floodplain Evaluation and Delineation Program

Application of Google Earth for flood disaster monitoring in 3D-GIS

Open Channel Flow Measurement Weirs and Flumes

Evaluation of Forest Road Network Planning According to Environmental Criteria

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

Hydrogeological Data Visualization

...Eq(11.6) The energy loss in the jump is dependent on the two depths y 1 and y 2 3 = E =...Eq(11.7)

The Rational Method. David B. Thompson Civil Engineering Deptartment Texas Tech University. Draft: 20 September 2006

Exercise (4): Open Channel Flow - Gradually Varied Flow

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

SECTION STORM DRAINAGE TABLE OF CONTENTS

2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT

Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by:

A n. P w Figure 1: Schematic of the hydraulic radius

STORMWATER MANAGEMENT CHECKLIST

CHAPTER 5 OPEN CHANNEL HYDROLOGY

Environmental Data Management Programs

Lecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used:

USGS StreamStats Web Application for Kentucky

Impact of water harvesting dam on the Wadi s morphology using digital elevation model Study case: Wadi Al-kanger, Sudan

Chapter 9. Steady Flow in Open channels

Simulating Sedimentation Model in Balarood Dam Reservoir Using CCHE2D Software

Stream Channel Cross Sections for a Reach of the Boise River in Ada County, Idaho

Reservoir Simulations for the Delaware River Basin Flood of June, 2006

TVM 4155 Numerical modelling and hydraulics 10. March OpenFOAM homework

CHICKASAW COUNTY, MISSISSIPPI, AND INCORPORATED AREAS

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION

Storm Drainage Systems

2D Modeling of Urban Flood Vulnerable Areas

Guidance for Flood Risk Analysis and Mapping. Changes Since Last FIRM

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR

A COMPACT MODEL FOR PREDICTING ROAD TRAFFIC NOISE

What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation)

CITY UTILITIES DESIGN STANDARDS MANUAL

The Study of the Land-use Change Factors in Coastal Land Subsidence Area in Taiwan

Discussion about the practicability of implementing flood risk. management and urban flood insurance in China. Longhua Gao, Xiaoqing Zhou

How To Understand And Understand The Flood Risk Of Hoang Long River In Phuon Vietnam

AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA

Charles R. Gamble TENNESSEE DEPARTMENT OF TRANSPORTATION CANE CREEK FLOOD-FLOW CHARACTERISTICS AT STATE ROUTE 30 NEAR SPENCER, TENNESSEE

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P Turbidity Monitoring Plan

FLOW CONDITIONER DESIGN FOR IMPROVING OPEN CHANNEL FLOW MEASUREMENT ACCURACY FROM A SONTEK ARGONAUT-SW

CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow

Lecture 4: Streamflow and Stream Gauging

Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D

Integrated Water and Sediment Management of Yellow River

MAPPING THE ST. FRANCIS DAM OUTBURST FLOOD WITH GEOGRAPHIC INFORMATION SYSTEMS

Appendix 4-C. Open Channel Theory

Survey of the relation of Customer Value with CRM function. (Case study of Cement Factory of Hormozgan)

Sediment Entry Investigation at the 30 Degree Water Intake Installed at a Trapezoidal Channel

Chapter 12 - HYDROLOGICAL MEASUREMENTS

A Simple Flow Measuring Device for Farms

Effect of Changes in the Hydraulic Conditions on the Velocity Distribution around a L-Shaped Spur Dike at the River Bend Using Flow-3D model

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Development of information management system of dams in China based on. WebGIS

MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING

FEMA Flood Zone Designations

The AIR Inland Flood Model for the United States In Spring 2011, heavy rainfall and snowmelt produced massive flooding along the Mississippi River,

Remote Sensing, GPS and GIS Technique to Produce a Bathymetric Map

Guo, James C.Y. (2004). Design of Urban Channel Drop Structure, J. of Flood Hazards News, December,

Reservoir hazard analysis and flood mapping for contingency planning

LR 314 Working Group 5 Final Report

Estimation of Adjacent Building Settlement During Drilling of Urban Tunnels

Sharp-Crested Weirs for Open Channel Flow Measurement, Course #506. Presented by:

Passenger Terminal Amsterdam

Design Charts for Open-Channel Flow HDS 3 August 1961

LIDAR and Digital Elevation Data

ADDING VALUE TO BOM FLOOD PREDICTIONS (WITHOUT MESSING AROUND WITH MODELS)

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.

Design and Re-Use Of Shovadans In Today's Architecture "With Due Attention To Have Thermal Energy Of The Earth"

Real Time Flood Alert System (RTFAS) for Puerto Rico

Manning Friction in Steep Open-channel Flow

A PHOTOGRAMMETRIC APPRAOCH FOR AUTOMATIC TRAFFIC ASSESSMENT USING CONVENTIONAL CCTV CAMERA

Modelling floods and damage assessment using GIS

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin

Transcription:

2011 2nd International Conference on Environmental Engineering and Applications IPCBEE vol.17 (2011) (2011) IACSIT Press, Singapore Dam-break flood plain model by WMS Mahdi Moharrampour 1+, Amin Khodabandeshahraki 2 and Mahya Katuzi 3 1 Young researchers club Islamic Azad University, buinzahra Branch, buinzahra, Iran 2 Department of Civil Engineering, Islamic Azad University, buinzahra Branch, buinzahra, Iran 3 Department of Electricity Engineering, Islamic Azad University, Qazvin Branch, Iran Abstract. Realizing the heavy contents of water is caused by barrier breakage that it can make enormous waves in shoal. When it s breaking, we would have such big financial damages certainty but criminal damages depends on several different factors such as the wreck region, the population who live in that region and the alarm time before the breakage. So one of the most important factors for inventing the financial and criminal damages are, calculating the water height in river in ideal manner and the water height which was produced by flood waves movement in barrier breakage. WMS software (Latrine region reconstruction system) is so pervasive and important software for graphical models in water engineering and in all cases of hydrologic and hydraulic latrine region. WMS is so strong software for automatic reconstruction observation steps of latrine region such as automatic tightening of latrine region boundaries, calculating the physical and geometrical parameters of region, calculating and producing the overlapped layers in GIS system as same as these factors ( determining the prevalence cycloid, rainfall depth, rough coefficient ). Extraction the phenomenal segments from ground numeral maps and some other different factors. One of the most useful usages of this software is Delineate Floodplain.So in this project, Using specifications Bidakan barrier and estimate dam-break parameters in this barrier that which is located in the center of Iran, breaking the Bidakan barrier was simulated with WMS and the divided region s flood of this breakage around 15 kilometers of it was presented by using of geographical information system (GIS) and WMS software. Finally, the SMPDBK model s results were compared with DAMBRK s results and the results show that the SMPDBK model has 10 percent average errors lower than other model. Keywords: dam-break model, WMS software, flood plain, GIS, embankment Bidakan 1. Introduction Welcome Terrestrial barriers are one of the oldest structural installations that rudimentary necessary of man to agricultural base and water made them to create the terrestrial barriers. Precedence of terrestrial barriers manufacturing in different shapes and dimensions is related to far history. Manufacturing the terrestrial barriers encounter to widespread ovation in Iran and it s clear that the numbers of these barriers are much more than other kinds of barriers in all over of country but unfortunately the breakages of terrestrial barriers are more than other kind of barriers. Otherwise, the flood of the barrier breakage encounters to several different constructions around it and there are financial damages certainly so the flood of the barrier breakage will be studied and examined exactly. Water height calculation in river and the water height of the waves that are produced from flood wave s movements are so important. The Watershed Modeling System (WMS) is a comprehensive graphical modeling environment for all phases of watershed hydrology and hydraulics. WMS includes powerful tools to automate modeling process such as automated basin delineation, geometric parameter calculation; GIS overlay computations (CN, rainfall depth, roughness coefficient, etc), cross-section extraction from terrain data and many more. + Corresponding author. Tel.: + 982824223562; fax: +982824225316. E-mail address: m62.mahdi@yahoo.com 247

One of the most important applications of this software is for flood sheet. Simulation of terrestrial barrier breakage and flood maps of Bidakan terrestrial barrier were presented by using WMS software and SMPDBK model. 2. The studied area Bidakan storage barrier is terrestrial kind with a clay core, 40 meter height (37 meter water height) that is generated on sir dare river and it s located on 41 kilometers west of Haruni village and it s so near to Amir Abad village. The average yearly Discharge of the river in barrier is about 0.619 m3/s that it s estimated to 19.52 m3 yearly. Bidakan barrier storage has 8.47 million m3 volumes in normal level (2552 meter) and river foam level in barrier area is 2515 meter and the barrier crown level is 2555 meter. Bidakan terrestrial barrier is shown in fig (1). Fig. 1: Bidakan terrestrial barrier 3. Barrier breakage simulation by using WMS software and SMPDBK model First, dam-break parameters of Bidakan terrestrial barrier for using in SMPDBK model and WMS software were estimated them then, they were modeled. 3.1. Estimating the breakage parameters The parameters were estimated by using different equations and Bidakan terrestrial barrier data. The results are shown in tables (1) t0 (4). Table1: Estimating the average width of Bidakan terrestrial barrier breakage Average breakage width(meter) 120 142 /7 89 /2 The equation of estimated breakage width USBR ( 1999) Vantan and Gilt Ferolich ( 1995) Table2: Estimating the breakage time of the Bidakan terrestrial barrier Breakage time (hour) Estimated equation 1.32 USBR ( 1999) 0.6-1.05 Vantan and Gilt 0.48 Ferolich ( 1995) Table 3: Estimating the slope of the Bidakan terrestrial barrier breakage Breakage slope (horizontal to vertical) 1 1.4 Estimated equation Vantan and Gilt Ferolich ( 1995) 248

Table4: Estimating the maximum removal Discharge from Bidakan terrestrial barrier breakage Maximum removal Discharge (m3/s) 13073 15273 10945 17573 14289 12419 11132 3746 6889 Estimated equation Kirkpatrik SCS Hagen Reclamation Sing and esnorason makdonald and Langoich menopolice Kosta Ivance Ferolich 3.2. SMPDBK model The simplified Dam-Break (SMPDBK) was developed by the National Wealth service (NWS) for predicting downstream flooding produced by a dam failure. This program is still capable if producing the information necessary to estimate flooded areas resulting from dam- break flood waters while substantial reducing the amount of time, data and experts required to run a simulation of the more sophisticated unsteady NWS DAMBRK or now called FLDWAV. Otherwise the more barrier breakage models such as SMPDBK and DAMBRK are presenting only the maximum removal circuits. The process of the Bidakan barrier breakage was presented by using the estimated breakage parameters and cross-sections around 15 kilometers of the barrier and SMPDBK model and WMS software. Entrance variables of SMPDBK model, SMPDBK s results, WMS software and the flood map of the Bidakan barrier breakage are presented in table (5), (6) and fig(6) respectively. Table 5: Entrance variables of SMPDBK model Scale Meter Meter Million cubic meters Square meter Meter Minute (m3/s) Value 2555 2515 10 /27 89 /2 29 111 /5 Entrance variables Barrier crown level Foam final level (breakage) Storage volume Reservoir area Breakage final width Necessary time for breakage flow The turbines and spillway Table6: SMPDBK model and WMS software results at the down of the Bidekan terrestrial barrier Maximum flood time (Hour) 8/43 10/60 11/00 9/77 10/20 10/23 12/04 12/76 12/42 17/86 9/91 9/99 10/28 9/35 Maximum flood level (meter) 2523/83 2510/59 2491/00 2467/11 2449/71 2449/71 2447/73 2412/75 2393/09 2376/04 2218/13 2156/78 2113/43 2089/89 Maximum circuit (m3/s) 13071 12940 12678 12551 12426 12301 12178 11377 11272 11073 10853 10744 10637 10530 Distance from barrier (Kmeters) 0/00 0/58 2/33 2/95 3/49 4/28 4/91 7/92 8/63 9/67 12/10 12/89 13/71 14/23 249

Fig. 2: Changing the maximum removal circuits at the down of the Bidakan barrier Fig. 3: Changing the maximum flood level at the down of the Bidakan barrier Fig. 4: Changing the maximum flood time at the down of the Bidakan barrier Fig. 5: Topographic lines and cross-section at the down of the Bidakan barrier before operating the model. Fig. 6: The flood map of breakage at the down of the Bidakan barrier. 4. conclusion 250

In the recent study and project that have done about this subject, the distance from start time and break time isn t determined exactly so, alarm time can t be determined exactly. Unfortunately in recent projects, there isn t any subject about the start time of breakage, whereas, start time of breakage is so important and necessary for determining the financial and criminal damages. Qualm analysis has to be done for predicted equation of breakage parameters and removal circuits. There s such a big qualm for prediction of breaking width, breaking time and maximum removal circuits. equations of breakage width, breakage time and maximum removal circuit. Therefore it s so benefit to recognize the qualm scale and it s operation on predicted methods parameters and studying about barrier breakage danger. Qualm is calculated for several parameters: breakage width: ±1/3 equal to the observed value, for breakage time: ±1 equal to real value. Qualm analysis results show that breakage time and width of Bidakan terrestrial barrier that were calculated with Ferolich method are 89.2 meter and 29 minute respectively. Barrier disconnection Buffalo Creek, average error of SMPDBK model were predicted in maximum circuits so the transferring time was 10-20 percent and level error of maximum flood was 1 foot. SMPDBK was compared with DAMBRK model; the results show that SMPDBK has average error 10 percent lower than other model. SMPDBK model is so benefit not only in emergency barrier breakage but also for calculating the level of probable flood and transfer time before barrier disconnection. In long time project for preparing against a big catastrophe with enough equipment such as a good computer for estimating the level of probable flood and the time of the maximum flood, DAMBRK model is more reliable, but in short time project with narrow equipments and sources SMPDBK are more reliable for determining the level of maximum flood, Discharche and transfer time. SMPDBK is so benefit and good model for preparing during the barrier disconnection but it has so limitation, first prediction precision of SMPDBK model is related exactly to arrival necessary data precision. ( Maximum Data are made by operator) so operators have to prepare the best data whereas this model is guessed in normal state so several different parameters such as barrier base failures or other failures around it, aren t considered, so in this condition the maximum flood isn t estimated properly and other models have to be used. Maximum removal circuits from Bidakan barrier by using SMPDBK model is 13071 m3/s. Procedure of Bidakan barrier maximum removal circuit shows that maximum removal circuit is in the barrier region. 5. References [1] Hasanzadeh, Y, barrier breakage hydraulic, first edition,tehran, big barrier national committee. [2] Rahimi, H.Terrestrial barrier, 1382, first edition, Tehran, Tehran university. [3] Vicher,DL and Heger, Vach, Barrier hydraulic, 1382, Translated by Masoud Ghodsian, Tarbiat Modarres university. [4] Consultant engineer of Maharab Omran gostar, Bidekan terrestrial barrier report, 1383. [5] Brown, C.A., and W.J. Graham, Assessing the Threat to Life from Dam Failure, Water Resources Bulletin, vol. 24, no. 6, December, 1988. 251

[6] Costa, John E, Floods from Dam Failures, U.S. Geological Survey Open-File Report 85-560, Denver, Colorado, 1985 [7] Engineers and Scientists, 2nd ed., Harrison M. Wadsworth, Jr., editor. McGraw-Hill, New York, NY, Goubet, A, Risqes Associees aux Barrages, La Houille Blacche, No. 8, (1979) [8] ICOLD/CIGB, Dambreak Flood Anaysis, Review and recommendation, (1995). [9] Rogers, J. David, and David J. McMahon, Reassessment of the St. Francis Dam Failure, Dam Safety, 10th Annual ASDSO Conference, Kansas City, Missouri, September 26-29, 1993. [10] 12. Singh, V.P., 1996. Dam breach modeling technology. Kluwer, Dordrecht, the Netherlands. [11] WAHL, TONY L, Predicting Embankment Dam Breach Parameters - A Needs Assessment, U. S. Bureau of Reclamation, Denver, Colorado, USA, 1998. [12] Wetmore, J, Fread, D, THE NWS SIMPLIFIED DAM-BREAK FLOOD FORECASTING MODEL, The National Weather Service (NWS), 1991. [13] Wurbs, R. A.,, Dam-Breach Flood Wave Models, Journal of Hydraulic Engineering, Vol. 113, No. 1, 1987 [14] Zhu, Y., Visser, P.J. and Vrijling, J.K, Review on embankment modeling. In: Wieland, M., Ren, Q. and Tan, J.S.Y. (Eds), New Developments Dam Engineering, Taylor & Francis Group, London, UK, 2004b. [15] Yonghui, Breach Growth in Clay-Dikes, Hohai University, China, 2006 252