<Project Name> Quality Assurance Plan

Similar documents
<Project Name> Deployment Plan

<Company Name> <Project Name> Software Development Plan. Version <1.0>

<Project Name> Bill of Materials

<Project Name> Configuration Management Plan

Quality Management Plan Template

Change Management Plan Template

<PROJECT NAME> PROJECT MANAGEMENT PLAN

Appendix H Software Development Plan Template

Service Catalogue. Creation Date

Software Project Management Plan (SPMP)

SOFTWARE DEVELOPMENT PLAN

Time Monitoring Tool Software Development Plan. Version <1.1>

When the template is complete, the whole Product Description document can be printed and approved.

Supporting Workflow Overview. CSC532 Fall06

3C05: Unified Software Development Process

Example IEEE software project management plan (SPMP)

Time Monitoring Tool Configuration Management Plan. Version <3.0>

Appendix 2-A. Application and System Development Requirements

<name of project> Software Project Management Plan

Program Lifecycle Methodology Version 1.7

DATA ITEM DESCRIPTION

Appendix O Project Performance Management Plan Template

Software Test Plan (STP) Template

Project QA and Collaboration Plan for <project name>

System Development and Life-Cycle Management (SDLCM) Methodology

<Project Name> Software Quality Assurance (SQA) Plan. <Document Control Number>

Reaching CMM Levels 2 and 3 with the Rational Unified Process

Requirement Management with the Rational Unified Process RUP practices to support Business Analyst s activities and links with BABoK

This is the software system proposal document for the <name of the project> project sponsored by <name of sponsor>.

8. Master Test Plan (MTP)

The Rap on RUP : An Introduction to the Rational Unified Process

Data Management Maturity Model. Overview

Project Plan for <project name>

System Development and Life-Cycle Management (SDLCM) Methodology. Approval CISSCO Program Director

Basic Unified Process: A Process for Small and Agile Projects

Appendix E Program Management Plan Template

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

Design Specification for IEEE Std 1471 Recommended Practice for Architectural Description IEEE Architecture Working Group 0 Motivation

Page Numbering for a Thesis or Dissertation

HOW TO PAGE A DOCUMENT IN MICROSOFT WORD

NYU. Business Solution Engineering Project Sample Application XXX

Frank Tsui. Orlando Karam. Barbara Bernal. State. University. Polytechnic. Ail of Southern JONES & BARTLETT LEARNING

Abstract. 1 Introduction

Leveraging RUP, OpenUP, and the PMBOK. Arthur English, GreenLine Systems

Ansur Test Executive. Users Manual

Enterprise Test Management Standards

PROJECT SCOPE STATEMENT

Achieving CMMI Level 2 in the Configuration Management Process Area Using IBM Rational Software Solutions

Theme 1 Software Processes. Software Configuration Management

ENOVIA Aerospace and Defense Accelerator for Program Management

GAMP 4 to GAMP 5 Summary

Development Methodologies

Using the Thesis and Dissertation Templates

Library Requirements

Project Management in the Rational Unified Process

Template K Implementation Requirements Instructions for RFP Response RFP #

Service Transition. ITIL is a registered trade mark of AXELOS Limited.. The Swirl logo is a trade mark of AXELOS Limited.. 1

Project Management Guidelines

NOAA NESDIS CENTER for SATELLITE APPLICATIONS and RESEARCH DOCUMENT GUIDELINE

What is a life cycle model?

The most suitable system methodology for the proposed system is drawn out.

Rational DOORS Next Generation. Quick Start Tutorial

Styles, Tables of Contents, and Tables of Authorities in Microsoft Word 2010

Configuration Management Plan (CMP) Template

Issue Management Plan Preparation Guidelines

TRANSPORT CANADA MARINE SAFETY PLEASURE CRAFT OPERATOR COMPETENCY PROGRAM QUALITY MANAGEMENT SYSTEM FOR ACCREDITATION

Software Process and Project Plan

Sample Pages for TEMPLATE FOR A SOFTWARE DOCUMENTATION MANAGEMENT PLAN

Plan-Driven Methodologies

CMS INFORMATION SECURITY (IS) CERTIFICATION & ACCREDITATION (C&A) PACKAGE GUIDE

System Requirements Specification (SRS) (Subsystem and Version #)

ISO 9001:2000 Its Impact on Software

Modellistica Medica. Maria Grazia Pia, INFN Genova. Scuola di Specializzazione in Fisica Sanitaria Genova Anno Accademico

SOFTWARE ASSURANCE STANDARD

Software Configuration Management Plan

Using the ETDR Word Template Masters Theses and Reports

INTERNATIONAL SERVICES CONTRACT TEMPLATE INTERNATIONAL SERVICES CONTRACT

Teamcenter 8.3. Getting Started with Vendor Management. Publication Number PLM00184 B

Appendix A Contractor Quality Control Plan The Contractor Quality Control Plan is the Contractor s management plan for executing the contract.

STATE OF MICHIGAN PROCESS AND PRODUCT QUALITY ASSURANCE (PPQA) PROCESS MANUAL State Unified Information Technology Environment (SUITE)

Digital Continuity in ICT Services Procurement and Contract Management

TDDC88 Lab 2 Unified Modeling Language (UML)

ISO 9001:2008 Internal Audit Guidance

IT Baseline Management Policy. Table of Contents

The information presented in this manual is subject to change without notice.

Use Cases. Reference: Craig Larman, Applying UML and Patterns, Ch. 6

QUALITY MANAGEMENT SYSTEM REVIEW AND APPROVAL TEMPLATE (DOE G A, Appendix A, )

Maximizing the Use of Slide Masters to Make Global Changes in PowerPoint

EndNote Cite While You Write FAQs

STS Federal Government Consulting Practice IV&V Offering

Microsoft Project Server Integration with SharePoint 2010

CTRNet Standard Operating Procedure Administration of Standard Operating Procedures

How Rational Configuration and Change Management Products Support the Software Engineering Institute's Software Capability Maturity Model

3 What s New in Excel 2007

Rational Rational ClearQuest

GUIDELINES FOR PREPARATION, CONTENT & EVALUATION OF TECHNICAL REPORTS

Transcription:

<Project Name> Version <1.0> [Note: The following template is provided for use with the Rational Unified Process. Text enclosed in square brackets and displayed in blue italics (style=infoblue) is included to provide guidance to the author and should be deleted before publishing the document. A paragraph entered following this style will automatically be set to normal (style=body Text).] [To customize automatic fields in Microsoft Word (which display a gray background when selected), select File>Properties and replace the Title, Subject and Company fields with the appropriate information for this document. After closing the dialog, automatic fields may be updated throughout the document by selecting Edit>Select All (or Ctrl-A) and pressing F9, or simply click on the field and press F9. This must be done separately for Headers and Footers. Alt-F9 will toggle between displaying the field names and the field contents. See Word help for more information on working with fields.]

Revision History Date Version Description Author <dd/mmm/yy> <x.x> <details> <name> SDLC Internal Use Only SDLC, 2000 Page 2 of 7

Table of Contents 1. Introduction 4 1.1 Purpose 4 1.2 Scope 4 1.3 Definitions, Acronyms and Abbreviations 4 1.4 References 4 1.5 Overview 4 2. Quality Objectives 4 3. Management 5 3.1 Organization 5 3.2 Tasks & Responsibilities 5 4. Documentation 5 5. Standards and Guidelines 5 6. Metrics 6 7. Review and Audit Plan 6 8. Evaluation and Test 7 9. Problem Resolution and Corrective Action 7 10. Tools, Techniques and Methodologies 7 11. Configuration Management 7 12. Supplier and Subcontractor Controls 7 13. Quality Records 7 14. Training 7 15. Risk Management 7 SDLC Internal Use Only SDLC, 2000 Page 3 of 7

1. Introduction [The introduction of the should provide an overview of the entire document. It should include the purpose, scope, definitions, acronyms, abbreviations, references, and overview of this.] 1.1 Purpose [Specify the purpose of this.] 1.2 Scope [A brief description of the scope of this ; what Project(s) it is associated with and anything else that is affected or influenced by this document.] 1.3 Definitions, Acronyms and Abbreviations [This subsection should provide the definitions of all terms, acronyms, and abbreviations required to properly interpret the. This information may be provided by reference to the project Glossary.] 1.4 References [This subsection should provide a complete list of all documents referenced elsewhere in the Quality Assurance Plan. Each document should be identified by title, report number (if applicable), date, and publishing organization. Specify the sources from which the references can be obtained. This information may be provided by reference to an appendix or to another document. For the this should include: Documentation Plan Measurement Plan Test Plan Software Development Plan Problem Resolution Plan Configuration Management Plan Subcontractor Management Plan Risk Management Plan] 1.5 Overview [This subsection should describe what the rest of the contains and explain how the document is organized.] 2. Quality Objectives [This section should reference the section of the Software Requirements Specification that deals with quality requirements.] SDLC Internal Use Only SDLC, 2000 Page 4 of 7

3. Management 3.1 Organization [Describe the structure of the organization responsible for Quality Assurance. The Rational Unified Process recommends that the Software Engineering Process Authority (SEPA) be responsible for the process component of Quality Assurance. The Rational Unified Process further recommends that the evaluation of product be done within the project (most notably by an independent test team) and by joint customer/developer review.] 3.2 Tasks & Responsibilities [Describe here the various Quality Assurance tasks that will be carried out for this project and indicate how they are synchronized with the project's major and minor milestones. These tasks will include: Joint Reviews Process Audits Process Reviews Customer Audits For each task, identify the worker responsible for its execution.] 4. Documentation [Enclose the Documentation Plan artifact by reference. Also, list here the minimum documentation that must be produced during the project to ensure that the software product that is developed satisfies the requirements. The suggested minimum set is: Software Development Plan (SDP) Test Plan Iteration Plans Software Requirements Specification (SRS) Software Architecture Document User Documentation (e.g. manuals, guides) Configuration Management Plan Provide pointers to the Development Case to show where in the process the adequacy of these documents is evaluated.] 5. Standards and Guidelines [This section references any standards and guidelines that are expected to be used on the project, and addresses how compliance with these standards and guidelines is to be determined. The relevant artifacts are enclosed by reference. The suggested set for the Rational Unified Process is: Development Case Business Modeling Guidelines User-Interface Guidelines Use-Case Modeling Guidelines Design Guidelines SDLC Internal Use Only SDLC, 2000 Page 5 of 7

Programming Guidelines Test Guidelines Manual Style guide] 6. Metrics [This section describes the product, project, and process metrics that are to be captured and monitored for the project. This is usually addressed by enclosing the Measurement Plan artifact by reference.] 7. Review and Audit Plan [This section contains the Review and Audit Plan. The Review and Audit Plan specifies the schedule, resources, and methods and procedures to be used in conducting project reviews and audits. The plan details the various types of reviews and audits to be carried out during the project, and identifies any external agencies that are expected to approve or regulate the artifacts produced by the project. This section should identify: Review and Audit Tasks Describe briefly each type of review and audit that will be carried out on the project. For each type, identify the project artifacts that will be the subject of the review or audit. These may include Joint Customer-Developer Technical and Management Reviews, Process Reviews and Audits, Customer Audits, Internal Technical and Management Reviews. Schedule Detail here the schedule for the reviews and audits. This should include reviews and audits scheduled at project milestones, as well as reviews that are triggered by delivery of project artifacts. This subsection may reference the project or iteration plan. Organization and Responsibilities List here the specific groups or individuals to be involved in each of the identified review and audit activities. Describe briefly the tasks and responsibilities of each. Also, list any external agencies that are expected to approve or regulate any product of the project. Problem Resolution and Corrective Action This subsection describes the procedures for reporting and handling problems identified during project reviews and audits. The Problem Resolution Plan may be referenced. Tools, Techniques and Methodologies Describe here any specific tools, techniques or methodologies that are to be used to carry out the review and audit activities identified in this plan. You should describe the explicit process to be followed for each type of review or audit. Your organization may have a standard Review and Audit Procedures Manual, which may be referenced. These procedure descriptions should also address the collection, storage and archiving of the project s Review Records. A suggested set of reviews and audits (drawn from the Rational Unified Process) to use as a basis for planning is: Requirements Review (maps to the traditional Software Specification Review) Architecture Review (maps to the traditional Preliminary Design Review) Design Review (maps to the traditional Critical Design Review) SDLC Internal Use Only SDLC, 2000 Page 6 of 7

Note that the product-, technique-, criteria-, and metrics- related aspects of these reviews is addressed in the Rational Unified Process itself and instantiated in the Evaluation Plan section of the SDP. The Review and Audit Plan section of the will concern itself with the Joint (customer, developer) Review aspects, for example, artifacts required, responsibilities, conduct of the review meeting, pass or fail criteria. Functional Configuration audit (to verify all requirements in the SRS have been met) Physical configuration audit (to verify that the software and its documentation are complete and ready for delivery) Process audits Process reviews Managerial reviews (Project Approval Review, Project Planning Review, Iteration Plan Review, PRA Project Review) Post-mortem reviews (Iteration Acceptance Review, Lifecycle Milestone Review, Project Acceptance Review).] 8. Evaluation and Test [This section references the Software Development Plan (Evaluation Plan section) and the Test Plan.] 9. Problem Resolution and Corrective Action [This section references the Problem Resolution Plan.] 10. Tools, Techniques and Methodologies [A list of any tools, techniques and methodologies that are to be used when performing Quality Assurance activities.] 11. Configuration Management [This section references the Configuration Management Plan.] 12. Supplier and Subcontractor Controls [This section references the Subcontractor Management Plan.] 13. Quality Records [Descriptions of the various quality records that will be maintained during the project, including how and where each type of record will be stored and for how long.] 14. Training [List here any training activities necessary for the project team to achieve the needs of the Quality Assurance Plan.] 15. Risk Management [This section references the Risk Management Plan.] SDLC Internal Use Only SDLC, 2000 Page 7 of 7