Quality Assurance DOC 9906 Vol 1 Step 5&6: Apply Criteria & Document and Store

Similar documents
PBN Aeronautical Charts and Procedure Design

ICAO-ENAC PBN PROCEDURE DESIGN COURSE

Quality Assurance Manual for Flight Procedure Design

OPERATING MINIMA FOR AEROPLANES AND HELICOPTER OPERATIONS PURPOSE REFERENCE 4.0 DEFINITION

Air Traffic Service Providers Entry Control Procedures Manual 3. Approved Provider s Operations Manual

AIRCRAFT PERFORMANCE Pressure Altitude And Density Altitude

Block 0: Capabilities within our Grasp

Título ponencia: Helicopter IFP. Point-in-Space (PinS)

Single Stage Light Business Case Template

Advisory Circular. U.S. Department of Transportation Federal Aviation Administration. AC No: Change: Date: 06/22/2011 Initiated by: AFS-460

Título ponencia: Towards the GBAS Operational Approval. Organizado por:

Título ponencia: RNP APCH Implementation

ANI Procedure Design Training Program and Concept

Area Navigation (RNAV) and Required Navigation Performance (RNP)

Required Navigation Performance Authorization Required (RNP AR) Procedure Design Manual

Direct Approach Consulting Inc.

PBN Operational Approval Application and Documentation. ICAO PBN Operational Approval Course

PROJECT MANAGEMENT FRAMEWORK

Título ponencia: Guidance for GBAS Operations Implementation

Airways New Zealand submission to the Civil Aviation Authority's 2016 Manawatu Airspace Review

Data Review and Analysis Program (DRAP) Flight Data Visualization Program for Enhancement of FOQA

OPERATIONS CIRCULAR. OC NO 2 OF 2014 Date: 1 st May Continuous Descent Final Approach (CDFA) 1. PURPOSE

ATFM Line of Action 7 Consistency between Airport Slots, FPL and ATFM Slots

Meeting of the Cooperation Arrangement for the Prevention of Spread of Communicable Diseases Through Air Travel

CAAP 89W-1(0) Guidelines on provision of obstacle information for take-off flight planning purposes

EUROCONTROL Guidelines for Cold Temperature Corrections by ATS

Performance-based Navigation and Data Quality

Document Control in an ISO Environment

Development and Validation of Procedures. ICAO PBN Seminar Development and Validation of Procedures

LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents

Guide to Enterprise Life Cycle Processes, Artifacts, and Reviews

Implementation of performance-based navigation (PBN) in the SAM Region FOLLOW-UP ON ACTIVITIES OF THE PBN OPERATIONAL IMPLEMENTATION PROJECT

FIFTH MEETING OF THE AFI REGION AIS/MAP TASK FORCE

1. Background and business case

Civil Aviation Authority of Nepal Regulatory Employees Training Plan

Vision and Scope Document

COMMUNICATION MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:

SYSTEM GLOBAL NAVIGATION SATELLITE SYSTEM LANDING TECHNOLOGY/PRODUCT DEVELOPMENT

CHAPTER 6. Precision Approach Systems

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

IBAC Bulletin B00-2 Pacific Implementation of RVSM and RNP 10/50NM Lateral

ICAO Safety Management Systems (SMS) Course Handout N 5 Cuzco International Airport operation

Ref.: AN 13/2.5-09/45 19 June 2009

Clinical Risk Management: Agile Development Implementation Guidance

USER REQUIREMENTS CHAPTER 16 STATIC DATA REQUIREMENTS

IT Project Management Methodology. Project Scope Management Support Guide

Software Validation in Clinical Trial Reporting: Experiences from the Biostatistical & Data Sciences Department


Quality Assurance Manual for Flight Procedure Design

SOFT 423: Software Requirements

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014

AERONAUTICAL INFORMATION CIRCULAR 26/15

References to Computer and Software in FDA s CGTPs (Final Rule and Draft Guidance) for HCT/Ps Preamble to the CGTP Final Rule

Flight Operations Briefing Notes

Critical Limitations of Wind Turbine Power Curve Warranties

Efficient and reliable operation of LED lighting is dependent on the right choice of current-limiting resistor

ITS Projects Systems Engineering Process Compliance Checklist

CMMI: Specific Goals and Practices

To provide a procedure and associated guidelines to facilitate the management of project dependencies.

Air Traffic Management Services Plan

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking

Takeoff & Landing Data (TOLD) Software and Training for C-130J

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS

8. Master Test Plan (MTP)

A. Amendments to AMC/GM to Part-FCL

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

Network Rail Infrastructure Projects Joint Relationship Management Plan

THE FLIGHT COMPUTER TRUE AIRSPEED (TAS)

Digital Archives Migration Methodology. A structured approach to the migration of digital records

NOTICE TO AERODROME CERTIFICATE HOLDERS (NOTAC) No. 02/2013

10.1 Communications Planning 10.2 Information Distribution Figure Performance Reporting 10.1 Communications Planning 10.

Flight Safety Foundation. Approach-and-landing Accident Reduction. Tool Kit. FSF ALAR Briefing Note 4.2 Energy Management

Objectives of this session

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects

12 AERO Second-Quarter 2003 April CAPT. RAY CRAIG 737 CHIEF PILOT FLIGHT OPERATIONS BOEING COMMERCIAL AIRPLANES

Introduction to the forecasting world Jukka Julkunen FMI, Aviation and military WS

Crosswalk Between Current and New PMP Task Classifications

The CRM 49 day success programme. Learn how to take control of your business destiny with our mentored CRM skills development service.

Hong Kong Aviation Requirements

Description: ToR RMT.0411 (OPS.094) Issue 2. Group Composition: GC RMT.0411 (OPS.094) Issue 4

SCHEDULE 8 Generalist Project Services Framework 2015

CODE: E.003 Financial Services BUDGET AND BUSINESS PLANNING POLICY. 1.2 The essential activities covered by this policy include:

Quality Management System: 1, 2, 3

INTRODUCTION TO PROJECT MANAGEMENT

Multi-Engine Training And The PTS

COMPANY LOGO. Project Charter Project Charter

Agile Metrics. It s Not All That Complicated

Business Continuity Management Planning Methodology

Fuel Efficiency Board & Event Measurement System

Feasibility Study Proposal & Report Guide. Industrial Optimization Program

13.0. Safety Management and Airspace Protection

Business Continuity Planning Workshop Michael Kirk The CIPSA Public Sector Procurement Forum May 25 th, Canberra

Partnering for Project Success: Project Manager and Business Analyst Collaboration

Transcription:

ICAO WACAF Workshop 1 st 4 th September 2015 Quality Assurance DOC 9906 Vol 1 Step 5&6: Apply Criteria & Document and Store

Steps 5 & 6 Apply Criteria Document and Store Conclusion

Apply Criteria

Apply Criteria Once the relevant data have been collected and the draft IFP has been approved, the design activity can commence. An individual designer should be nominated as the responsible designer. Continued coordination with interested/affected stakeholders should be maintained throughout the design phase. International procedure design criteria are detailed in: PANS-OPS (Doc 8168), RNP AR Procedure Design Manual (Doc 9905). ICAO regularly reviews and amends these criteria.

Apply Criteria The technical report includes: Applicable design criteria; Data sources and set of input data used for the design (airport, terrain, obstacles); All calculations including transformation parameters used; All design parameters used (speeds, bank angles, wind velocity, temperature, descent / climb gradients, height loss, obstacle assessment surface (OAS), etc.); Any deviation from selected criteria including justification and link to validation as required; Full design rationale, construction details; Design assumptions and constraints; Document version and date; Draft elements for publication including chart and coding table as applicable; Any other pertinent points of interest resulting from the FPD process, e.g. software tools used for the design, advantages and drawbacks of the assessed scenarios.

Apply Criteria To enhance the integrity throughout the design process, the use of automated or semi-automated tools is recommended. All software tools should be validated. Guidance on the validation of software tools is provided in Volume 3 Flight Procedure Design Software Validation. The documentation should include a clear statement of compliance with the State-approved criteria together with detailed notes on any deviations and evidence of approval for each deviation. There should also be a record of each design review and sign-off.

Document and Store

Document and Store Traceability is the key element in the design of a new IFP. All assumptions made and methods used in the implementation of a new or modified FPD should be documented in a uniform manner and kept available at least during the lifetime of the IFP. Provide documented details Integrity of data Digital archiving is better but not always simple. Each state to establish a method and process. As far as applicable, the archived data should remain available in a state permitting a repetition or validation of the process in a later stage.

Conclusion

Conclusion Tasks and content of those two steps are clearly identified in the DOC 9906 Detailed design output must be accessible, complete and properly documented and stored as they are inputs to the safety assessment and validation steps. Also necessary for maintenance of IFP. Role of state is limited to : Providing information for designer request Providing list of requirements and any specificities for the documentation and storage (already at Project specification stage)

Quality Assurance Introduction Any Questions?