Carson River Mercury Superfund Site Management Strategies and Goals. May 2011

Similar documents
Summary of Frequently Asked Questions and Answers: The Asarco Settlement and Bunker Hill Superfund Cleanup

Chapter 9. Selected Watershed Initiatives in the Great Basin Region

Mine Plan of Operations Reclamation Bond Checklist

Introduction to Lockheed West Seattle. Working Together. Site Background. Lockheed West Seattle Superfund Site

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

The BoRit Asbestos Piles, Ambler, Pennsylvania Lenny Siegel February, 2007

CHAD R. GOURLEY SPECIALTY EMPLOYMENT

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

ARIZONA DEPARTMENT OF WATER RESOURCES

This is Superfund. A Community Guide to EPA s Superfund Program

Fiskville Training College

CONSTRUCTION PERMIT SUBMITTAL CHECKLIST

SURFACE REMEDIATION AND MANAGEMENT OVERVIEW

Our Environment, Our Future

Water Quality and Water Usage Surveys

North Branch Chicago River Watershed-Based Plan

Risk-Based Decision Making for Site Cleanup

Alternate Concentration Limits/Groundwater Cleanup Levels. Title slide

Addendum. Use Attainability Analysis for Site Specific Selenium Criteria: Alkali Creek. February 23, 2009

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

Use of Alternate Concentration Limits (ACLs) to Determine Cleanup or Regulatory Levels Under RCRA and CERCLA

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY

A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1

Site Description and History

Gold Ray Dam Interagency Technical Team Meeting

Sources to Seafood: Mercury Pollution in the Marine Environment Background on Presenting Scientists

Daybreak s Environmental History

3. The submittal shall include a proposed scope of work to confirm the provided project description;

EXHIBIT A LOCATION MAP AND LAND USE INFORMATION

RCRA Corrective Action Workshop On Results-Based Project Management: Fact Sheet Series

FIVE-YEAR REVIEW REPORT MASON COUNTY LANDFILL SUPERFUND SITE LUDINGTON, MICHIGAN FEBRUARY, 2001

U.S. Fish and Wildlife Service CHARLES M. RUSSELL NWR Outreach Notice

How To Plan A Buffer Zone

ENVIRONMENTAL SCIENCE What can I do with this degree?

Part B Integrated Monitoring Design for Comprehensive Assessment and Identification of Impaired Waters Contents

NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY

Chapter 3 Planning Issues, Opportunities, and Constraints

Upper Roanoke River (Roanoke and Botetourt Counties, Cities of Roanoke and Salem, Town of Vinton) TMDL Implementation (Cleanup) Plan Development

A. Flood Management in Nevada

Addendum D. Nomination of Moody Wash ACEC

Silver Bow Creek Watershed Restoration Plan

EPA Region 3/ Pa Dept of Environmental Protection Streamlining the Process for the One Cleanup Program Under RCRA

Programs. Department-wide Programs Funding

2012 Program Report. Agricultural Group Drainage Program

Pamela Birak, Jordan Lake State Park, Chatham County, NC

E&SC Training & Certification

Site Cleanup in Connecticut

The Navajo Nation Environmental Protection Agency (NNEPA) Superfund Program and Community Involvement

Wyckoff/Eagle Harbor Site Bainbridge Island, Washington

MINING AND WATER POLLUTION

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016

4.2 Buena Vista Creek Watershed

Natural Resource Management Profile

About Pure Earth and the Toxic Site Identification Program

A Correlation of Environmental Science Your World, Your Turn 2011

NRC s Program for Remediating Polluted Sites J.T. Greeves, D.A. Orlando, J.T. Buckley, G.N. Gnugnoli, R.L. Johnson US Nuclear Regulatory Commission

QUESTIONS AND ANSWERS WATERS OF THE U.S. PROPOSAL

GAO PIPELINE PERMITTING. Interstate and Intrastate Natural Gas Permitting Processes Include Multiple Steps, and Time Frames Vary

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

HFQLG Project Evaluation Form

DEQ Response to Comments regarding the Public Notice for a Coal Mining Project in the Panther Creek watershed In Craig and Nowata Counties.

CHAPTER I: INTRODUCTION. Background

Office of Solid Waste and Emergency Response. ECO Update. The Role Of Natural Resource Trustees In The Superfund Process

SECTION SITE PREPARATION

DISTRICT VALUES STATEMENTS, GOALS, ACTION ITEMS, AND ONGOING TASKS FOR 2015 Adopted by the Board of Directors December 10, Values Statements.

Environmental Remediation Examples and Remediation Strategic Planning

Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination

Ouachita River Floodplain Restoration Upper Ouachita NWR, Louisiana

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

Arizona s Large Fires Suppression vs. Restoration. WESTCAS Fall 2011 Meeting Bruce Hallin Manager, Water Rights and Contracts October 27, 2011

UNIVERSITY GEOLOGY DAYTON. and ENVIRONMENTAL GEOLOGY

12 ENERGY Introduction

SECTION TEMPORARY ENVIRONMENTAL CONTROLS

Water Clean- up Crew. Learn about water quality and how to solve different water quality problems. Time Needed 1 hour

Section Operations Section Organizational Guidance

Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site

Cleanup Settlement Account

United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado

For additional information on qualifications and experience of representative EDGE senior staff members, please contact us.

Ocean Dumping Act: A Summary of the Law

30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT

Transcription:

Carson River Mercury Superfund Site Management Strategies and Goals May 2011

Staff at NDEP Responsible for CRMS Jeff Collins - Supervisor Over 21 years experience as environmental consultant working on complex environmental sites across the Pacific and Mountain West. Jack Yates - Environmental Science Staff Over 20 years experience working toward reclamation of abandoned mine and Superfund sites with similar issues to CRMS. Significant experience creating GIS database systems to map and manage collected site data. Dave Friedman - Environmental Science Staff Nine years experience as an environmental consultant working on a number of sites, including Superfund sites, on the East Coast. Twelve years experience working on remediation sites and solid waste issues for NDEP.

CRMS Overview Preserve and document site history Refine definition of the CRMS Streamline identification and evaluation process using updated electronic means Improve communications between stakeholders Clarify responsibilities for land developers and property owners

1990 s EPA Compilation Map of Mill Site Locations 113 Total

2011 NDEP Compilation Map of Mill Site Locations (236 Total) and Risk Zones

Update on the CRMS Operating Unit 1 (OU-1) Defined as the upland areas from New Empire to the Six Mile Canyon fan along the Carson River; Gold, Six Mile and Seven Mile Canyons from Virginia City down to their confluence with the Carson; and mill impacted areas in Washoe Valley and down Steamboat Creek. It consists of contaminated soils, waste rock, tailings piles and areas now impacted by erosion of these materials. OU-1 will need continued management and monitoring to assure public protection from mine wastes; therefore, NDEP has requested EPA further refine the location of where these wastes actually reside. The most significant health risk in OU-1 is direct contact and ingestion of contaminated soils.

Update on the CRMS Operating Unit 2 (OU-2) OU-2 is defined as the water, sediment and biologic resources of the Carson River, Lahontan Reservoir, Washoe Lakes, Steamboat Creek, associated Irrigation Ditches and Stillwater Wildlife Refuge. EPA Contractor and USGS are continuing studies of OU-2 areas and will be producing a (RI/FS). The most significant health risk posed by mercury in OU-2 is consumption of fish and waterfowl from affected lake & river systems.

CRMS Operable Unit Locations

What work still needs to be done? Comprehensive identification of mercury mill sites to preserve history and refine site boundary. Current time frame to begin archeological field work is Summer 2011. Continued soil sampling to allow refinement of site boundary to include only areas with contaminated mine wastes. Continued removal of contamination, if necessary, at sites where contamination is identified that exceeds accepted standards and puts human health at risk. On-going monitoring and sampling of soil disturbances at new developments and existing residences in areas of probable contamination.

What are the challenges? Adequate Federal funding is necessary. Better lines of communication between EPA/NDEP, local jurisdictions and the public (Fact Sheets). 1. Improved website to provide access to maps, reports, data, and any other resources or information pertaining to the CRMS. 2. Participation by NDEP/EPA in local organizations like Town Advisory Councils, Community Advisory Boards and LEPCs to stay current on local planning goals, initiatives, and needs.

What are the challenges? 3. Revised Long Term Sampling and Response Plan (LTSRP) The LTSRP was established in the Record of Decision to be the guidance document that identifies the management goals and strategies of OU-1 by providing a clear sampling plan for proposed disturbance of soils within contaminated areas. Proposed revisions are intended to update this document based on current information and provide a clear path forward for all stakeholders.

What are the benefits? Continued confidence that environmental conditions are at safe and healthful levels for the most vulnerable populations; i.e. children. Additional removal of mercury impacted tailings, if necessary. As new data verifies areas are not significantly impacted by historic mine wastes and impacted sites are cleaned up or capped; federal and state oversight will be reduced appropriately with the longterm goal of reducing the physical size and extent of the site.

Contacts and Resources Jeff Collins (775) 687-9381 Jack Yates (775) 687-9547 NDEP s CRMS Website: http://ndep.nv.gov/bca/carsonriver/criver_1.htm