EPA Region 3/ Pa Dept of Environmental Protection Streamlining the Process for the One Cleanup Program Under RCRA
|
|
|
- Susan Gregory
- 9 years ago
- Views:
Transcription
1 EPA Region 3/ Pa Dept of Environmental Protection Streamlining the Process for the One Cleanup Program Under RCRA September 2005 On April 21, 2004, Pennsylvania Environmental Protection Secretary Kathleen A. McGinty and EPA Region III Administrator Donald Welsh signed an agreement that makes Pennsylvania s Land Recycling Program the first in the nation to serve as a onestop shop for state and federal standards guiding the cleanup of brownfield sites. The Memorandum of Agreement (MOA) clarifies how sites remediated under Pennsylvania s brownfields program may also satisfy requirements for three key federal laws: the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response Compensation Liability Act (CERCLA), commonly referred to as Superfund, and the Toxic Substances Control Act (TSCA). Since the signing of the MOA, sites subject to RCRA Corrective Action have been able to satisfy their RCRA obligations and, concurrently obtain liability relief under Pennsylvania s Act 2. Now, the Land Recycling Program and the EPA Region 3 RCRA program have developed a streamlined process to guide these joint efforts. Key features are: a lead project manager to serve as a single point of contact for the client, the simplification of process steps on most projects, and much faster approvals. Attached are the flowchart and description of the new process. Questions on these can be directed to Dave Hess, or Paul Gotthold, (215)
2 1. FACILITY elects to enroll in One Cleanup Program; submits electronic NIR 2. DEP & EPA assign project managers who contact FACILITY 3. Meeting/call for all three parties to agree on approach based on MOA criteria. Likely site visit 4.1 SIMPLE (No trigger) DEP LEAD (SHS, SSS) 4.2 EPA LEAD (SSS) Routine Act 2 process w/periodic update to EPA Site Characterization Complete and EPA concurrence Remedial Investigation DEP Final approval and Act 2 release Followup work and environmental indicator completed. EPA concurrence Risk Assessment EPA review Proposed final report meeting/call Cleanup Plan and Post- Remedial Care Plan, if req EPA Final decision including public notice Submit Act 2 Cleanup Plan or Final Report as appropriate Proposed Final Report meeting/call Final Review and Approval Act 2 Release Submit Final Report Final Review and Approval Act 2 Release 5 RCRA Obligation Completed EPA Prepare Statement of Basis, public comment
3 EPA/DEP MOA Flowchart Description 1. Facility Elects to enroll in OCP, Submits NIR Any site that is listed for RCRA Corrective Action can choose to participate, simply check the optional box on the Web electronic NIR. 2. DEP & EPA assign project managers Upon receipt of NIR, DEP will contact EPA and through discussion, a project manager will be assigned from both agencies and an agency lead will be determined. Assigned Lead Project Manager contacts facility 3. Meeting/call for all three parties to agree on approach Either a meeting or teleconference will then take place to discuss the site and project particulars. Of particular interest are elements that would effect which path (below) will be applicable. This is largely base on MOA criteria. A site visit may be deemed appropriate. An Environmental Indicator (EI) form should be competed in draft to identify data gaps and help direct the pending site characterization. 4. Three possible paths to proceed 4.1. Simple- No trigger; DEP lead - Complete Cleanup - No GW above MCL - Soils remediation only (can use the site-specific pathway elimination option). If any of the following circumstances (triggers) exist, EPA RCRA staff will be involved in further review as outlined in the Agreement. (1) Groundwater plume that exceeds drinking Water standards is migrating past the property boundary (2) GW in aquifers not used for drinking under Act 2(Non-use aquifer determination) (3) Pathway elimination (waste left in place). (4) Properties being sub-divided prior to completion of the remediation of the whole property Properties being sub-divided prior to completion of the remediation of the whole property (5) Site Currently undergoing corrective action under an EPA program (6) Remediations that do not include all known substances All affected media and identified substances must be included in the process. There may be groundwater contamination but must meet the Act 2 Statewide health standard for used aquifers. All substances identified in soil must meet the Act 2 Statewide health standards assuming used aquifer Routine Act 2 process w/ EI and Periodic update to EPA The cleanup will follow the routine Act 2 process per administrative and technical requirements. In addition the draft EI will be revised to incorporate additional data
4 obtained through the Act 2 site characterization. This is done by the remediator and finalized by EPA DEP Final approval and Act 2 relief. Upon Act 2 approval, a letter will be sent to the remediator and to EPA Region EPA Review Although generally accepting the Act 2 approval, EPA will review the site information to prepare the Final Decision EPA Final Decision EPA will provide for a public notice, a comment period, and a Final Decision go to step DEP Lead (SHS, SSS) This path allows for remediation to a site-specific standard through a risk assessment or the Statewide health standard Site Characterization Complete Triggers mentioned in may exist in some cases. Therefore, site characterization must be complete and a standard selected. If any of the screening triggers above are present, DEP will coordinate with EPA to assure RCRA concerns are met. Normally, this can be done through discussion and further clarification of factors that assure human health protection. Additional information may be needed to resolve any questions and assure such protection. EPA concurrence via meeting or teleconference briefing. If extraordinary new information exists, it potentially could result in the site becoming an EPA lead Follow-up work and environmental indicator completed An environmental indicator determination must be completed after site characterization that addresses all pathways.. This can be completed by the remediator, but must be finalized by EPA Interim Meeting/ Conference Call** Submit Act 2 cleanup plan or final report as appropriate Since this path allows either or both of the Statewide health and site-specific standards, the next step is either a final report or a cleanup plan. Note: a post remediation care plan is required if institutional and or engineering controls are being implemented. The Act 2 process will proceed normally even when EPA requires additional information.
5 4.2.5 Final review and approval; Act 2 relief Go to Step ** The purpose of this contact is to confirm that all parties understand and agree on either the appropriate remedy or the demonstration of attainment. 4.3 EPA Lead (SSS) An EPA lead may be deemed appropriate if EPA and the facility have a long established relationship or the Facility is already working under an Order or other agreement Remedial Investigation An investigation would take place meeting both Act 2 and RCRA requirements Risk Assessment If required by either Act 2 or RCRA, a risk assessment would be completed to determine if physical remediation is necessary. (Risk assessment could indicate that risk is already acceptable.) Cleanup Plan and Post-remediation care plan, if required The site-specific and RCRA processes provide for a cleanup plan. If the plan utilizes either institutional or engineering controls, he plan must include post remediation care details. As examples, this may be inspection, maintenance and reporting procedures for a cap, or just routine reexamination to confirm the continued presence of the institutional control Meeting or conference call DEP final approval and Act 2 relief As normally applied, Act 2 review and approval will take place EPA prepares statement of basis; public comment The EPA RCRA process of statement of basis and public comment will be applied. Public comments rarely result in additional work being required Go to step 5 5 RCRA Obligation completed.
Program One Cleanup Program. ----------------------------- PA DEP and Region 3 EPA. Nick Molina Chief Special Projects Land Recycling Program
Pennsylvania Land Recycling Program One Cleanup Program Memorandum of Agreement ----------------------------- PA DEP and Region 3 EPA Nick Molina Chief Special Projects Land Recycling Program Purpose of
Uniform Environmental Covenants Act (UECA) Frequently Asked Questions (FAQs)
Uniform Environmental Covenants Act (UECA) Frequently Asked Questions (FAQs) Remediators, consultants, attorneys and real estate professionals have identified a number of questions concerning the provisions
MEMORANDUM OF UNDERSTANDING BETWEEN THE ENVIRONMENTAL PROTECTION AGENCY AND THE NUCLEAR REGULATORY COMMISSION
MEMORANDUM OF UNDERSTANDING BETWEEN THE ENVIRONMENTAL PROTECTION AGENCY AND THE NUCLEAR REGULATORY COMMISSION CONSULTATION AND FINALITY ON DECOMMISSIONING AND DECONTAMINATION OF CONTAMINATED SITES I. Introduction
RCRA Corrective Action Workshop On Results-Based Project Management: Fact Sheet Series
United States Environmental Protection Agency Office of Solid Waste RCRA Corrective Action Workshop On Results-Based Project Management: Fact Sheet Series EPA March 2000 www. FACT SHEET #1 HISTORY OF RCRA
Use of Alternate Concentration Limits (ACLs) to Determine Cleanup or Regulatory Levels Under RCRA and CERCLA
U.S. Department of Energy Office of Environmental Policy and Assistance ACL Information Brief DOE/EH-413-9912 (December 1999) DEPARTMENT OF ENERGY UN ITED STATES OF AMERICA Use of Alternate Concentration
Federal Remediation Technologies Roundtable Arlington, VA November 14, 2013 Jim Woolford, Director Office of Superfund Remediation and Technology
Federal Remediation Technologies Roundtable Arlington, VA November 14, 2013 Jim Woolford, Director Office of Superfund Remediation and Technology Innovation Presentation Outline Importance of Groundwater
Risk-Based Decision Making for Site Cleanup
July 2013 Risk-Based Decision Making for Site Cleanup The Oklahoma Department of Environmental Quality (DEQ) has adopted a risk based decision making process to provide a framework for determining cleanup
Before beginning any construction or demolition activities at your construction site,
VII. Hazardous Substances (Superfund Liability) Requirements for Construction Activities Before beginning any construction or demolition activities at your construction site, you should evaluate the site
Incorporating Greener Cleanups into Remedy Reviews
Association of State and Territorial Solid Waste Management Officials (ASTSWMO) Incorporating Greener Cleanups into Remedy Reviews Prepared by the Greener Cleanups Task Force Under the Sustainability Subcommittee
DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER SUPPLY MANAGEMENT. Principles for Ground Water Pollution Prevention and Remediation
DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER SUPPLY MANAGEMENT DOCUMENT NUMBER: 383-0800-001 EFFECTIVE DATE: December 1, 1996 TITLE: AUTHORITY: POLICY: Principles for Ground Water Pollution Prevention
Site Cleanup in Connecticut
Site Cleanup in Connecticut Taking the Mystery Out of Dealing with Contaminated Property in Connecticut: Information for Property Owners, Buyers, Sellers, Attorneys, Bankers, Insurance Representatives
USEPA Risk-Based Standards for Controlling Contaminated Sites Soil Screening Levels (SSLs) April 2, 2007 Aaron Yeow, USEPA
USEPA Risk-Based Standards for Controlling Contaminated Sites Soil Screening Levels (SSLs) April 2, 2007 Aaron Yeow, USEPA Relevant United States Environmental Laws Comprehensive Environmental Response,
STATEMENT OF BASIS HYPERGOL SUPPORT BUILDING SWMU 65 NATIONAL AERONAUTICS AND SPACE ADMINISTRATION KENNEDY SPACE CENTER BREVARD COUNTY, FLORIDA
STATEMENT OF BASIS HYPERGOL SUPPORT BUILDING SWMU 65 NATIONAL AERONAUTICS AND SPACE ADMINISTRATION KENNEDY SPACE CENTER BREVARD COUNTY, FLORIDA PURPOSE OF STATEMENT OF BASIS This Statement of Basis (SB)
FIVE-YEAR REVIEW REPORT MASON COUNTY LANDFILL SUPERFUND SITE LUDINGTON, MICHIGAN FEBRUARY, 2001
FIVE-YEAR REVIEW REPORT MASON COUNTY LANDFILL SUPERFUND SITE LUDINGTON, MICHIGAN FEBRUARY, 2001 I. INTRODUCTION Section 121(c) of the Comprehensive Environmental Response, Compensation and Liability Act
Performance Management for Environmental Remediation Projects. William C. Lattin, PMP US Department of Energy Idaho Operations Office
Performance Management for Environmental Remediation Projects William C. Lattin, PMP US Department of Energy Idaho Operations Office Course Objectives Awareness of the types of cost estimating used to
Federal Facility Cleanup. Reggie Cheatham, Director Federal Facilities Restoration and Reuse Office
Federal Facility Cleanup Reggie Cheatham, Director Federal Facilities Restoration and Reuse Office NAS Best Practices Workshop January 9, 2014 Overview of Presentation Facts about Federal Facility Cleanup
Using a Phase I Environmental Site Assessment to Document Compliance with HUD Environmental Standards at 24 CFR 58.5(i)(2) or 50.
Using a Phase I Environmental Site Assessment to Document Compliance with HUD Environmental Standards at 24 CFR 58.5(i)(2) or 50.3(i) Introduction HUD policy requires that all properties that are being
DRAFT. GROUNDWATER REMEDY COMPLETION STRATEGY: Moving Forward with Completion in Mind
GROUNDWATER REMEDY COMPLETION STRATEGY: Moving Forward with Completion in Mind Table of Contents 1. Introduction...2 1.1 Purpose and Scope...2 1.2 Background...3 2. Elements of a Groundwater Remedy Completion
ESSENTIALS OF ENVIRONMENTAL LAW. Craig B. Simonsen, Paralegal Seyfarth Shaw LLP
ESSENTIALS OF ENVIRONMENTAL LAW Craig B. Simonsen, Paralegal Seyfarth Shaw LLP This presentation is based on Craig B. Simonsen s, Essentials of Environmental Law, 3 rd Ed. (Pearson Prentice Hall, 2007)
New Cumberland Army Depot Formerly Used Defense Site (FUDS) Marsh Run Park Site Restoration Community Meeting
New Cumberland Army Depot Formerly Used Defense Site (FUDS) Marsh Run Park Site Restoration Community Meeting Fairview Township, York County, Pennsylvania April 23, 2013 N US Army Corps of Engineers Depot
Alternate Concentration Limits/Groundwater Cleanup Levels. Title slide
Alternate Concentration Limits/Groundwater Cleanup Levels Title slide 1 Alternate Concentration Limits (ACL) Terms and Definitions 40 CFR 264 Subpart F Definitions Regulated Unit Ground Water Protection
UNDERGROUND STORAGE TANK SYSTEM CLOSURE REPORT FORM
APPENDIX D COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF ENVIRONMENTAL CLEANUP AND BROWNFIELDS UNDERGROUND STORAGE TANK SYSTEM CLOSURE REPORT FORM - Facility I.D. Facility
PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WASTE MANAGEMENT
PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WASTE MANAGEMENT DOCUMENT NUMBER: 250-4000-004 TITLE: Program Implementation Guidance EFFECTIVE DATE: September 17, 2005 AUTHORITY: The Solid
How To Understand And Understand Solid And Hazardous Waste
Learning Objectives Solid and Hazardous Wastes Gene D. Schroder PhD To understand the sources of solid and hazardous wastes. To understand methods of solid waste disposal. To evaluate the health risks
ENVIRONMENTAL PROTECTION AGENCY
ENVIRONMENTAL PROTECTION AGENCY Fees Requires application fees for state isolated wetlands permits to be credited to the Surface Water Protection Fund, which is used for the administration of surface water
SECTION A - 2 HAZARDOUS MATERIALS REGULATIONS
SECTION A - 2 HAZARDOUS MATERIALS REGULATIONS A. Overview of Federal Hazardous Materials Legislation There are a number of Federal laws that regulate hazardous materials. The following is a brief overview
This is Superfund. A Community Guide to EPA s Superfund Program
This is Superfund A Community Guide to EPA s Superfund Program IF THERE IS A SUPERFUND SITE in your neighborhood, you are probably wondering, what will happen? and, what can I do? This brochure will give
WATER SUPPLY WELL RECEPTOR SURVEY GUIDANCE DOCUMENT
STATE OF CONNECTICUT DEPARTMENT OF ENERGY AND ENVIRONMENTAL PROTECTION WATER SUPPLY WELL RECEPTOR SURVEY GUIDANCE DOCUMENT Bureau of Water Protection and Land Reuse Remediation Division September 2009
11.0 WORK SCHEDULE, WORK PLANS, AND ASSOCIATED REPORTS
11.1 INTRODUCTION 11.0 WORK SCHEDULE, WORK PLANS, AND ASSOCIATED REPORTS This section describes the format and content of the work schedule, supporting plans and reports, and the process for updates and
Case Study: City Of Stockton V. BNSF Railway
Portfolio Media. Inc. 860 Broadway, 6th Floor New York, NY 10003 www.law360.com Phone: +1 646 783 7100 Fax: +1 646 783 7161 [email protected] Case Study: City Of Stockton V. BNSF Railway Law360,
Analysis of Brownfields Cleanup Alternatives. Axles & Gears Facility 4808 South 26 th Street Omaha, Nebraska. Prepared For:
Analysis of Brownfields Cleanup Alternatives Axles & Gears Facility 4808 South 26 th Street Omaha, Nebraska Prepared For: Metropolitan Area Planning Agency MAPA) 2222 Cuming Street Omaha, Nebraska 68102
Executive Summary of the FCSAP Long-Term Monitoring Planning Guidance
Executive Summary of the FCSAP Long-Term Monitoring Planning Guidance 0 DISCLAIMER Her Majesty is not responsible for the accuracy or completeness of the information contained in the reproduced material.
VAPOR INTRUSION SCREENING LEVEL (VISL) CALCULATOR USER S GUIDE
VAPOR INTRUSION SCREENING LEVEL (VISL) CALCULATOR USER S GUIDE U.S. ENVIRONMENTAL PROTECTION AGENCY OFFICE OF SOLID WASTE AND EMERGENCY RESPONSE OFFICE OF SUPERFUND REMEDIATION AND TECHNOLOGY INNOVATION
Office of Environmental Quality Five Year Strategic Plan July, 2017 - June 2022
Office of Environmental Quality Five Year Strategic Plan July, 2017 - June 2022 Agency Number: 13-856 Program: Office of Environmental Compliance Program Authorization: La. R.S. 30:2011(C)(1)c) Vision
Department of Veterans Affairs VA Directive 0057. VA Environmental Management Program
Department of Veterans Affairs VA Directive 0057 Washington, DC 20420 Transmittal Sheet January 15, 2010 VA Environmental Management Program 1. REASON FOR ISSUE. To update the Department of Veterans Affairs
Environmental Guidance. Guide to Selecting Compliant Off-Site Hazardous Waste Treatment, Storage and Disposal Facilities. Environmental.
DOE/EH-0427R Environmental Environmental Guidance Guidance Guide to Selecting Compliant Off-Site Hazardous Waste Treatment, Storage and Disposal Facilities September 1994 (Revised May 2001) U.S. Department
RCRA Corrective Action Definitions
U.S. Department of Energy Office of Environmental Policy and Guidance RCRA Information Brief DOE/EH-413-044r (Revised September 2002) RCRA Corrective Action Definitions BACKGROUND: On October 7, 1999,
EXHIBIT B-1 BILL OF SALE
EXHIBIT B-1 BILL OF SALE KNOW ALL MEN BY THESE PRESENTS, that NATIONAL FUEL GAS DISTRIBUTION CORPORATION, a Pennsylvania corporation, having principal offices at 1100 State Street, PO Box 2081, Erie, Pennsylvania
Case Study 3 Conservation Chemical Company, Kansas City, Missouri, EPA Region 7
29 technologies. The large amount of waste at the site poses a difficult problem for which some innovative cleanup technologies, including in situ techniques to avoid excavation, could have been considered
Joseph G. Maternowski Shareholder
Joseph G. Maternowski Shareholder Practicing in the areas of Environmental, Administrative, Litigation, Business and Real Estate Law. Positions Held: Shareholder, Hessian & McKasy, P.A., January 2012 to
Maine DEP s Dry Cleaner Initiative
Maine DEP s Dry Cleaner Initiative Becky Blais, Environmental Specialist Division of Remediation Protecting Maine s Air, Land and Water Goals of the Dry Cleaner Initiative (DCI) Identify current or former
Report on the Need for New York to Refinance the Superfund
Page 1 of 5 Reports Policy Guide Reports Speeches Legislative Initiatives Report on the Need for New York to Refinance the Superfund June 11, 2003 Toxic Waste Many people around the country live in areas
The Navajo Nation Environmental Protection Agency (NNEPA) Superfund Program and Community Involvement
The Navajo Nation Environmental Protection Agency (NNEPA) Superfund Program and Community Involvement Presented By: Freida S. White, Environmental Program Supervisor NNEPA Superfund Insert Slide Title
DRY CLEANING PROGRAM QUALITY ASSURANCE MANAGEMENT PLAN
DIVISION OF ENVIRONMENT QUALITY MANAGEMENT PLAN PART III: DRY CLEANING PROGRAM QUALITY ASSURANCE MANAGEMENT PLAN Revision 3 January 8, 2013 Kansas Department of Health and Environment Division of Environment
Comprehensive Five-Year Review Guidance
United States Environmental Protection Agency Superfund Office of Emergency and Remedial Response (5204G) EPA 540-R-01-007 OSWER No. 9355.7-03B-P June 2001 omprehensive Five-Year Review Guidance Office
Environmental laws have been enacted to protect natural resources and the public health. A number
Workers Whistleblower Protection Under Seven Federal Environmental Laws Protecting Workers Who Exercise Rights PWWER A PROJECT OF THE NATIONAL Committees for Occupational Safety and Health NETWORK FACTSHEET
Technical Impracticability Decisions for Ground Water at CERCLA Response Action and RCRA Corrective Action Sites
U.S. Department of Energy Office of Environmental Policy and Assistance RCRA/CERCLA Information Brief DOE/EH-413/9814 (August 1998) Technical Impracticability Decisions for Ground Water at CERCLA Response
Harvard University. Hazardous Waste Program Overview
Harvard University Hazardous Waste Program Overview Outline Cradle-to-grave approach Hazardous Waste related laws RCRA inspections at Universities Roles and Responsibilities Sink Disposal Labelling requirements
CHAPTER VI OTHER ENVIRONMENTAL STATUTES
CHAPTER VI OTHER ENVIRONMENTAL STATUTES In this chapter Overview... VI-1 Legislative Framework for Addressing Hazardous Waste Problems... VI-3 CERCLA: The Hazardous Waste Cleanup Program... VI-9 OVERVIEW
CITY CLERK MEMORANDUM 15-70
CITY CLERK MEMORANDUM 15-70 DATE: November 12,2015 TQ: Honorable Mayor and Members of City Council FROM: Bruce Applegate, Acting City Clerk SUBJECT: ADDITIONS TO THE NOVEMBER 16, 2015 CITY COUNCIL AGENDA
DIVISION OF ENVIRONMENT QUALITY MANAGEMENT PLAN PART III: SUPERFUND (MACA) PROGRAM QUALITY ASSURANCE MANAGEMENT PLAN
DIVISION OF ENVIRONMENT QUALITY MANAGEMENT PLAN PART III: SUPERFUND (MACA) PROGRAM QUALITY ASSURANCE MANAGEMENT PLAN Revision 3 February 21, 2012 Kansas Department of Health and Environment Division of
CHAPTER 4 TYPES OF COST ESTIMATES
CHAPTER 4 TYPES OF COST ESTIMATES 1. INTRODUCTION All projects, both construction and environmental restoration, require cost estimates to plan and budget the project efficiently. Numerous estimates are
Private Property Owners Frequently Asked Questions
Private Property Owners Frequently Asked Questions The purpose of this list of questions and answers is to address some concerns a landowner may have about owning a Brownfield property. 1. What is the
The Comprehensive Environmental Response,
Purpose and Applicability of Regulations The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980 to clean up the nation s hazardous waste sites
Carson River Mercury Superfund Site Management Strategies and Goals. May 2011
Carson River Mercury Superfund Site Management Strategies and Goals May 2011 Staff at NDEP Responsible for CRMS Jeff Collins - Supervisor Over 21 years experience as environmental consultant working on
STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF UNDERGROUND STORAGE TANKS TECHNICAL GUIDANCE DOCUMENT - 008
STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF UNDERGROUND STORAGE TANKS TECHNICAL GUIDANCE DOCUMENT - 008 Effective Date - January 13, 1992 Revised Date - November 19, 1993
8.30 PBS SR-0030 Soil and Water Remediation
8.30 PBS SR-0030 Soil and Water Remediation 8.30.1 Background After 40 years of producing nuclear materials for defense and non-defense uses, the SRS shifted its strategic direction and resources from
COST AND PERFORMANCE REPORT
COST AND PERFORMANCE REPORT Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon September 1998 Prepared by: SITE INFORMATION Identifying Information: United
The Comprehensive Environmental Response,
Purpose and Applicability of Regulations Chapter 7 The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980 to clean up the nation s hazardous
9.1 HUMAN HEALTH RISK ASSESSMENT
9.0 RISK ASSESSMENT This Section of the HSCA Guidance describes the methods and procedures for performing a Human Health Risk Assessment (Section 9.1) and Ecological Risk Assessment (Section 9.2). 9.1
ENVIRONMENTAL RISK STRATEGIES INSTITUTE
RISK STRATEGIES INSTITUTE RISK MANAGEMENT A Professional Curriculum The University of Houston and the Environmental Risk Strategies Institute (ERSI) are pleased to announce our partnership to provide continuing
UNDERGROUND OIL STORAGE TANKS
L E S P E R A N C E M E N D E S L A W Y E R S UNDERGROUND OIL STORAGE TANKS A Property Owner s Guide Robert J Lesperance and Naomi R Rozenberg If your home, townhouse or condominium was built before 1970,
The BoRit Asbestos Piles, Ambler, Pennsylvania Lenny Siegel February, 2007
The BoRit Asbestos Piles, Ambler, Pennsylvania Lenny Siegel February, 2007 At CPEO s Brownfields 101 workshops, I normally explain my understanding of the benefits of Brownfields redevelopment. At blighted
Description Purpose Health Education. Health Assessment. Outcomes of the program Partners Contact Information
1 Description Purpose Health Education Message Mapping Developing Community Interaction Health Assessment Identifying Contaminants of Concern Elements of Exposure Pathways Outcomes of the program Partners
EPA s proposed hazardous waste pharmaceutical regulations
EPA s proposed hazardous waste pharmaceutical regulations November 4, 2015 By J. Timothy Ramsey The United States Environmental Protection Agency ( EPA ) published proposed regulations in the Federal Register
State of Rhode Island Department of Environmental Management Division of Site Remediation. Policy Memo 95-01
State of Rhode Island Department of Environmental Management Division of Site Remediation Policy Memo 95-01 Guidelines for the Management of Investigation Derived Wastes 1.0 Purpose The purpose of this
U. S. Army Corps of Engineers Ground Water Extraction System Subsurface Performance Checklist
U. S. Army Corps of Engineers Ground Water Extraction System Subsurface Performance Checklist Installation Name Site Name / I.D. Evaluation Team Site Visit Date This checklist is meant to aid in evaluating
Citizen Suit Provisions. Restoring Hazardous Landscapes! Science, Justice, and Law! Declaration of National Environmental Policy
Declaration of National Environmental Policy Restoring Hazardous Landscapes! Science, Justice, and Law! Professor John Wargo! PLSC 215b/EVST 255b Environmental Politics and Law Lecture 7: February 4, 2010
DIVISION OF ENVIRONMENT QUALITY MANAGEMENT PLAN VOLUNTARY CLEANUP AND PROPERTY REDEVELOPMENT PROGRAM QUALITY ASSURANCE MANAGEMENT PLAN
DIVISION OF ENVIRONMENT QUALITY MANAGEMENT PLAN PART III: VOLUNTARY CLEANUP AND PROPERTY REDEVELOPMENT PROGRAM QUALITY ASSURANCE MANAGEMENT PLAN January 29, 2015 Kansas Department of Health and Environment
Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination
Inventory of Performance Monitoring Tools for Subsurface Monitoring of Radionuclide Contamination H. Keith Moo-Young, Professor, Villanova University Ronald Wilhelm, Senior Scientist, U.S. EPA, Office