PROJECT ATN GROUND-GROUND AND AIR GROUND APPLICATIONS IN THE SAM REGION



Similar documents
Follow-up to the activities of Project D2 - Ground-ground and air-ground applications in the SAM Region. (Presented by the Coordinator) SUMMARY

CAR/SAM REGIONAL PLANNING AND IMPLEMENTATION GROUP (GREPECAS)

GREPECAS Project G3. Implementation of the Quality Management System in AIM units. (Presented by the Secretariat) SUMMARY

Implementation of performance-based navigation (PBN) in the SAM Region FOLLOW-UP ON ACTIVITIES OF THE PBN OPERATIONAL IMPLEMENTATION PROJECT

Implementation of the Quality Management System in AIM units PROJECT G3 IMPLEMENTATION OF THE QUALITY MANAGEMENT SYSTEM IN AIM UNITS

TRANSITION TO THE NEW ORGANISATION OF GREPECAS. (Presented by the Secretariat)

Update of the NOTAM Contingency Plan. (Presented by the Secretariat) Summary

Review of the ATN CAR/SAM planning / implementation activities

Regional References on solution/ mitigation of FPL problems. (Presented by Secretariat) EXECUTIVE SUMMARY

IMPLEMENTATION OF ADS-C & CPDLC SERVICES

(Presented by the MEVA/TMG Coordinator)

(GREPECAS) ATTACHMENT 2 REPORT OF THE FIFTH MEETING OF THE CNS COMMITTEE OF THE ATM/CNS SUBGROUP OF GREPECAS (CNS/COMM/5)

INTERNATIONAL CIVIL AVIATION ORGANIZATION ASIA AND PACIFIC OFFICE CHECKLIST FOR IMPLEMENTATION OF GROUND/GROUND ATN NETWORK INFRASTRUCTURE

Caribbean/South American Air Traffic Flow Management Concept of Operation

Project G3: Development of quality specifications applicable to the AIM digital environment (SAM) (Presented by the Secretariat) Summary

INTERNATIONAL CIVIL AVIATION ORGANIZATION. Meeting/workshop of Air Traffic Management (ATM) Authorities and Planners (Lima, Peru, 18 to 21 July 2000)

GREPECAS AIR NAVIGATION DEFICIENCIES DATABASE (GANDD) USER GUIDE CAR/SAM REGIONS

ICAO State Safety Programme (SSP) Introduction

GUIDANCE ON SECURITY FOR THE IMPLEMENTATION OF IP NETWORKS

International civil aviation organization. COM CO-ORDINATION MEETING (Afghanistan, Islamic Republic of Iran and Pakistan)

NFPL IMPLEMENTATION ATS OPERATIONAL ASPECTS

CNS/ATM SYSTEMS IN INDIA

ICAO/LACAC NAM/CAR/SAM

Global Air Navigation System Performance Based Air Navigation eanp Framework

Performance management Identification of metrics

IBM Bluemix José Miguel Ordax

Curriculum Reform in Computing in Spain

Ad-hoc Working Group: MPLS VPN support VoIP and Data (AMHS, ATFM, AIDC, OPMET databanks, etc.)

Cooperation Agreements for SAR Service and COSPAS-SARSAT STATUS OF SAR AGREEMENTS IN THE NAM/CAR/SAM REGIONS. (Presented by the Secretariat) Summary

Action Plan of the Bolivarian Republic of Venezuela for the activities to reduce CO2 emissions

Common Regional Virtual Private Network (CRV) Of Asia/Pacific Air Navigation Planning and Implementation Regional Group (APANPIRG)

FAA International Strategies 2010 to 2014 Western Hemisphere Region

Block 0: Capabilities within our Grasp

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking

DRAFT TERMS OF REFERENCE. (Presented by the Secretariat) SUMMARY

REPORT OF THE FIFTH MEETING OF AERONAUTICAL TELECOMMUNICATION NETWORK (ATN) IMPLEMENTATION CO-ORDINATION GROUP OF APANPIRG (ATNICG/5)

ICAO State Safety Programme (SSP) Overview 4ta Jornada de Seguridad Operacional del INAC Caracas, Venezuela, November 2011

August / Agosto 2015 Phillips Elementary School Parent Calendar of Classes / Calendario de Clases para Padres. Mon Tue Wed Thu Fri

ESSIP OUTLINE DESCRIPTION FOR THE IMPLEMENTATION OF THE VOICE OVER INTERNET PROTOCOL IN ATM

CRV Terms of Reference. Chonlawit Banphawatthanarak CRV TF Chairman MID IP Network Workshop (Cairo, Egypt, January 2016)

SITA AIRCOM Service (VHF & Satellite)

International Civil Aviation Organization South American Regional Office

Visión general de la integración con asanetwork

Aeronautical Communications Panel. Use of Internet Protocols Suite (IPS) As a Provision for. Aeronautical Internetworking

CAR/SAM REGIONAL PLAN FOR THE

( T A C T ) C A ) I A

Agility2.0. Enterdev S.A.S. Collin Kleine

INTERNATIONAL CIVIL AVIATION ORGANIZATION ASIA AND PACIFIC OFFICE ASIA/PACIFIC ATN NETWORK SERVICE ACCESS POINT (NSAP) ADDRESSING PLAN

- 1 - INTERNATIONAL CIVIL AVIATION ORGANIZATION. First meeting of the MIDANPIRG MID-AMC Steering Group (MID-AMC STG/1)

Evaluation of an exercise for measuring impact in e-learning: Case study of learning a second language

Review of the conclusions formulated by the CAR/SAM AIS/ATM/CNS 02/00 Informal Meeting

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)

Advanced Data Link Infrastructure Solution for Next Generation of Air Traffic Management

Public Sector Enterprises (Combined Use of IPSAS and IFRS) Marcia Maurer August 2, 2013

ICAO New FPL Format Interpretation of different set of rules -

Curriculum Vitae Lic. José Rafael Pino Rusconi Chio +52 (998)

Supervisión y sistemas de información para la industria.

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS

Official Journal of the European Union L 13/3

New Metal Bridge Clip-ons ENJOY SUN

J Intercultural communica0on, mee0ngs and nego0a0ons Seminars and case studies

INTERNATIONAL CIVIL AVIATION ORGANIZATION MIDDLE EAST OFFICE ICAO MID IP NETWORK WORKSHOP. (Cairo, Egypt, January 2016) SUMMARY OF DISCUSSION

ATC Networks are the application area for VoIP in ATM

INTERNATIONAL CIVIL AVIATION ORGANIZATION. Caribbean/South American Air Traffic Flow Management Concept of Operation (CAR/SAM CONOPS ATFM)

Aeronautical Telecommunication Network (ATN) Comprehensive ATN Manual (CAMAL)

ATFM Line of Action 7 Consistency between Airport Slots, FPL and ATFM Slots

Sept. 09 Sept. 10 MASSACHUSETTS INSTITUTE OF TECHNOLOGY Boston, USA Civil & Environmental Engineering Supervisor: Dr. Nigel Wilson Visiting Scholar

UNIVERSIDAD PONTIFICIA COMILLAS FACULTY OF ECONOMICS AND BUSINESS ADMINISTRATION

UNIVERSIDAD LOYOLA ANDALUCÍA

Area Navigation (RNAV) and Required Navigation Performance (RNP)

International Civil Aviation Organization

Motorcycle as a new massive mode of urban transportation: a challenge for many LA countries, cities and citizens

REVIEW OF AIP SUPPLEMENT. (Presented by Singapore) Attached is a copy of the AIP SUPP for review by the Meeting.

1.- NAME OF THE SUBJECT 2.- KEY OF MATTER. None 3.- PREREQUISITES. None 4.- SERIALIZATION. Particular compulsory 5.- TRAINING AREA.

AERONAUTICAL TELECOMMUNICATION NETWORK PANEL WORKING GROUP 3 - FIFTEENTH MEETING. Agenda item: 4.2 Review Trials and Implementation Activities

AIR TRAFFIC FLOW MANAGEMENT (ATFM)

GUIDE TO SUPPORT THE IMPLEMENTATION OF THE QUALITY MANAGEMENT SYSTEM AERONAUTICAL METEOROLOGY SERVICES (MET/QMS) IN THE CAR/SAM REGIONS.

Equipping Our Human Resources to work in a regional framework Towards Global ATFM Delivering ATM Ops Performance via Regional Network Collaboration

Cuánto se demora una pit stop?

Assessment of changes to functional systems in ATM/ANS and the oversight thereof

How To Write A Report On A Drug Company

V UAIPIT INTERNATIONAL CONGRESS V CONGRESO INTERNACIONAL UAIPIT

Regulation of Air Traffic Service SMS and. Air Traffic Service Units/Facilities SMS

REPORT OF THE KNOWLEDGE TRANSFER NETWORK*

Federal Aviation Administration. Connection

Air Traffic Service Providers Entry Control Procedures Manual 3. Approved Provider s Operations Manual

Transcription:

PROJECT ATN GROUND-GROUND AND AIR GROUND APPLICATIONS IN THE SAM REGION SAM Region PROJECT DESCRIPTION (PD) PD N D2 Programme Project Title Starting Date Ending Date Ground-ground and Air-ground Telecommunications Infrastructure (Programme Coordinator: Onofrio Smarrelli) Objective Scope Metrics Strategy Goals ATN Ground-ground and Air-ground Applications in the SAM Region Project Coordinator: Omar Gouarnalusse (Argentina) Contributing experts: Javier Vittor (Argentina), Andres Jansen (Brazil) May 2010 June 2016 Develop the implementation of ATN ground-ground and air-ground applications in the SAM Region Implementation of SAM ATN ground-ground and air-ground applications, including, at least: Operational integration of international AMHS connections in the SAM Region Operational integration of international AIDC connections in the SAM Region Guidelines for the implementation of DCL, DATIS, DVOLMET & CPDLC services through VDL in the SAM Region Number of AMHS interconnections as per CAR/SAM FASID Table 1Bb Number of AIDC interconnections as per CAR/SAM FASID Table 1Bb Drafting of following guidelines: Guideline for the use of AIDC / Guideline for the establishment of ground-air data links in terminal, approach and aerodrome areas / Guideline for the implementation of DCL, DATIS and DVOLMET systems / Guideline for the implementation of CPDLC through VDL in the SAM Region All tasks will be conducted by experts nominated by States and organizations of the SAM Region members of the project ATN Ground-ground and Air-ground Applications in the SAM Region, under management of the project coordinator, in coordination with the programme coordinator. Communications among Project members, as well as between the Project coordinator and programme coordinator, shall be carried out through teleconferences and the Internet. In addition, the programme coordinator, together with the project coordinator and the contributing experts, can convene at SAM/IG implementation meetings Once studies are completed, the results will be submitted to the ICAO programme coordinator as a final consolidated for its analysis, review, approval and presentation at the GREPECAS PPRC Complete all AMHS interconnections by December 2015 Complete the drafting of MoU for the interconnection of AMHS by mid-2013 Complete the migration towards the implementation of AMHS interconnection through IP protocol by December 2015 Complete AIDC installation between adjacent ACCs by mid-2016 Complete the drafting of MoU for AIDS systems interconnection by the end of 2013 Complete AIDC installation between adjacent FIRs by mid-2016

- 2 - Complete the drafting of guideline material for the use of AIDC; for the establishment of ground/air data links in terminal, approach and aerodrome areas; and for the implementation of DCL, DATS and DVOLMET. Justification Related Projects The implementation of ground-ground and air-ground data communications infrastructure will contribute to the reduction of air traffic control incidents, increasing the capacity of the transition of information with regard to the currently analogue based applications This project contributes to the implementation of the SAM, CNS 02, ATM 05,, MET 03, MET04 and AIM 02 of the Air Navigation System Performance-Based Implementation Plan for the SAM Region (SAM PBIP) Automation (systems interconnection) ATFM Improve ATM Situational Awareness Implementation of the ICAO New Flight Plan Format

- 3 - Project Deliverables Relationship with Performance Based Regional Plan (PFF) Responsible Status of Implementation 1 Delivery Date Remarks Document on regional strategy for the implementation of ground-ground and air-ground applications in the SAM Region CNS 02 Omar Gouarnalusse (Argentina) June 2012 An initial review to the strategy was presented at SAM/IG/8 meeting (Lima, Peru, 10-14 October 2011) In July 2012, the Project Coordinator presented a preliminary version of the guideline, which is being examined by the programme Coordinator, and will be presented at SAM/IG/10 meeting for its review and approval. The guideline will be based on the Argentinean experience in the IP AIDC implementation between the Cordoba and Ezeiza ACCs. The GREPECAS-approved Interface control (ICD) for data communications among ATS units in the Caribbean and South American Regions will be reviewed. Guideline for the use of AIDC with the aim of reducing coordination errors Javier Vittor (Argentina) November 2012 Guideline for the establishment of ground-air data links in terminal, approach and aerodrome areas CNS 02 CNS 02 PFFs SAM MET 03 y 04 Programme Coordinator October 2012 An initial plan for data link implementation was drafted, and presented at SAM/IG/8 meeting. Pending is the designation of an expert for the conduct of this activity Guideline for the implementation of DCL, DATIS, DVOLMET systems Andrés Jansen (Brazil) June 2013 The guideline will be based on the Brazilian experience in the implementation of these systems This activity has still not started 1 Gray: Activity has not started Green: Activity has or will deliver planned milestone as scheduled Yellow: Activity is behind schedule on milestone, but still within acceptable parameters to deliver milestone on time Red: Activity has failed to deliver milestone on time, mitigation measures need to be identified and implemented

- 4 - Project Deliverables Relationship with Performance Based Regional Plan (PFF) Responsible Status of Implementation 1 Delivery Date Remarks Operational integration of AMHS among States ATM 05 MET 03, MET 04 AIM 02 States / Project Coordinator / Programme Coordinator December 2015 Of all the AMHS installed in the Region, the following are interconnected in AMHS (P1 Protocol) Peru-Colombia, Guyana- Suriname, Argentina-Paraguay Other States are in the process of implementation, having drafted and signed MoUs to this end Follow-up to the implementation of AMHS integration is carried out at SAM/IG meetings Operational integration of AIDC service between adjacent ACCs States / Project Coordinator / Programme Coordinator June 2016 To date no AIDC interconnection trials have been held between the Ezeiza and Cordoba ACCs. The integration is still not being used operationally Many States of the Region have drafted and signed MoUs to carry out the integration Monitor the implementation of ATN ground-ground and airground applications activities in the SAM Region ICAO March 2010- June 2016 Resources necessary Designation of experts for the conduct of some of the deliverables

GRUPO REGIONAL CAR/SAM DE PLANIFICACION Y EJECUCION / CAR/SAM REGIONAL PLANNING AND IMPLEMENTATION GROUP (GREPECAS) APLICACIONES TIERRA TIERRA Y AIRE TIERRA DE LA ATN EN LA REGION SAM / ATN GROUND GROUND AND AIR GROUND APPLICATIONS IN THE SAM REGION ID Task Name Duration 1 Aplicaciones Tierra tierra y Aire tierra de la ATN en 1190 days la Región SAM/ ATN Ground ground and Air ground Applications in the SAM Region 2 Documento de estrategia regional para la 240 days implantación de aplicaciones tierra tierra y aire tierra de la Región SAM/ Regional strategy for the implementation of ground ground and air ground applications in the SAM Region 3 Recolectar información /Collect information 50 days 4 Entrega de propuesta de borrador / Delivery of 103 days 5 Revision de la propuesta borrador / Review of 82 days 6 Entrega o final / Delivery of final 5 days 7 Guía de orientación para el uso del AIDC con la 247 days finalidad de reducir errores de coordinación/guideline for the use of AIDC with the aim of reducing coordination errors 8 Recolectar información /Collect information 47 days 9 Entrega de propuesta de borrador / Delivery of 84 days 10 Revision de la propuesta borrador / Review of 85 days 11 Entrega o final / Delivery of final 5 days 12 Guía de orientación para el establecimiento de 287 days enlaces de datos tierra aire en área terminal, aproximación y aeródromo/guideline for the establishment of ground air data links in terminal, approach and aerodrome areas 13 Recolectar información / Collect information 27 days 14 Entrega de propuesta de borrador / Delivery of 5 days 15 Revision de la propuesta borrador / Review of 79 days 16 Seminario/Taller de Aplicaciones Tierra/Tierra y 5 days Tierra Aire de la ATN / Seminar Workshop of Ground Ground and Ground Air ATN Applications 2010 2011 2012 2013 2014 2015 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 10/05 28/11 01/08 29/06,Omar Gouarnalusse / Argentina ( CP) 01/08 07/10 Omar Gouarnalusse / Argentina ( CP), 10/10 29/02 Omar Gouarnalusse / Argentina ( CP),,Estados SAM 01/03 22/06 Omar Gouarnalusse / Argentina ( CP) 25/06 29/06 01/12 09/11 Javier Vittor (Argentina) 01/12 03/02 Javier Vittor (Argentina) 06/02 31/05 Omar Gouarnalusse / Argentina ( CP), 01/06 27/09 Javier Vittor (Argentina) 05/11 09/11 01/09 05/10 01/09 07/10 10/10 14/10 Omar Gouarnalusse / Argentina ( CP),Estados SAM 01/02 21/05 10/09 14/09-5 -

GRUPO REGIONAL CAR/SAM DE PLANIFICACION Y EJECUCION / CAR/SAM REGIONAL PLANNING AND IMPLEMENTATION GROUP (GREPECAS) APLICACIONES TIERRA TIERRA Y AIRE TIERRA DE LA ATN EN LA REGION SAM / ATN GROUND GROUND AND AIR GROUND APPLICATIONS IN THE SAM REGION ID Task Name Duration 17 Entrega o final / Delivery of final 5 days 18 Guía de orientación para la implantación de sistemas DCL, DATIS, DVOLMET / Guideline for the implementation of DCL, DATIS, DVOLMET systems 435 days 2010 2011 2012 2013 2014 2015 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 01/10 05/10 10/10 07/06 19 Recolectar información /Collect information 155 days 20 Preparación y entrega de propuesta de 101 days borrador / Preparation and delivery of draft proposal 21 Revision de la propuesta borrador / Review of 104 days 22 Preparación o final / Preparation of 66 days final 23 Entrega o final / Delivery of final 5 days 24 Integración operacional del servicio AMHS entre 1071 days Estados / Operational integration of AMHS among States 25 Implantacion de la integración operacional de 1071 days sistemas AMHS 26 Integración operacional del servicio AIDC entre 816 days ACC s adyacentes / Operational integration of AIDC service between adjacent ACCs 27 Implantación de la integración operacional del 816 days AIDC 28 Monitorear las actividades de implantación de las 1190 days aplicaciones tierra tierra y aire tierra de la ATN en la Región SAM / Monitor the implementation of ATN ground ground and air ground applications activities in the SAM Region 29 Monitorear las actividades de implantación de las aplicaciones tierra tierra y aire tierra de la ATN en la Región SAM / Monitor the implementation of ATN ground ground and air ground applications activities in the SAM Region 1190 days 10/10 11/05 14/05 01/10 Estados SAM,Omar Gouarnalusse / Argentina ( CP), 08/10 28/02 01/03 31/05 03/06 07/06 10/05 16/06 Estados SAM 10/05 16/06 14/10 28/11 Estados SAM 14/10 28/11 10/05 28/11 10/05 28/11-6 -