Document Control. DOWNLOADED AND/OR HARD COPY UNCONTROLLED Verify that this is the correct version before use.



Similar documents
Software and Hardware Configuration Management

Centerwide System Level Procedure

Procedure for Document Control and Management

Configuration Management Plan (CMP) Template

This procedure applies to the following categories of documents:

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL

Quality Procedures and Work Instructions Manual

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

Intland s Medical Template

Camar Aircraft Products Co. QUALITY MANUAL Revision D

Standard Operating Procedure

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

Draft Copy. Change Management. Release Date: March 18, Prepared by: Thomas Bronack

Document Control. White Paper By Galaxy Consulting. At Your Service Today Tomorrow We Appreciate The Privilege Of Serving You! Abstract.

Quality Management Plan Procedure

Software Project Management Plan (SPMP)

ITRM Guideline CPM Date: January 23, 2006 SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE

NABL NATIONAL ACCREDITATION

Document Management Process

NSSC Enterprise Service Desk Configuration Management Database (CMDB) Configuration Management Service Delivery Guide

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22

<name of project> Software Project Management Plan

Quality Enhancement Unit Environmental Management System Module 6. Document Control

Gatekeeper PKI Framework. February Registration Authority Operations Manual Review Criteria

Tools to Aid in 21 CFR Part 11 Compliance with EZChrom Elite Chromatography Data System. White Paper. By Frank Tontala

How To Use A Court Record Electronically In Idaho

QUALITY SYSTEM DOCUMENTATION CONTROL

The President of Inductors Inc. is the senior executive responsible for operations.

QUALITY MANAGEMENT PROCESS

Contingency Planning and Disaster Recovery Internal Control Questionnaire

April , 2008, 2009, 2010 GXS, Inc. All Rights Reserved.

Template K Implementation Requirements Instructions for RFP Response RFP #

Standard Operating Procedure: EMS Document Control and Record Keeping

Owner-User Pressure Equipment Integrity Management Requirements

Change Management Process. June 1, 2011 Version 2.7

CORPORATE QUALITY MANUAL

System Build 2 Test Plan

U. S. Department of Energy Consolidated Audit Program Checklist 5 Laboratory Information Management Systems Electronic Data Management

Guidelines for Best Practices in Data Management Roles and Responsibilities

PHASE 3: PLANNING PHASE

Quality Manual ALABAMA RESEARCH & DEVELOPMENT. This Quality Manual complies with the Requirements of ISO 9001:2008.

Document Control Software

Compliance Response Edition 07/2009. SIMATIC WinCC V7.0 Compliance Response Electronic Records / Electronic Signatures. simatic wincc DOKUMENTATION

Special Permits Program Desk Guide

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

FORT KNOX. Environmental Management System Manual EMS-01 FORT KNOX. Environmental Management System Manual. Reference Number: Revision Date: 19MAY15

Full Compliance Contents

ITSM Process Description

Dryden Centerwide Procedure (DCP) Code X. DMS Audit Preparation and Execution

SOP-RTMKTS Test and Approve Operations Software Applications. Contents

IHE IT Infrastructure Technical Framework Supplement

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards

Cisco Change Management: Best Practices White Paper

Declaration of Conformity 21 CFR Part 11 SIMATIC WinCC flexible 2007

INTERNET AND COMPUTER ACCEPTABLE USE POLICY (AUP)

Peer Review Process Description

Engineering Procurement Construction Quality Plan

OPERATIONAL CAPABILITY TECHNOLOGY QUESTIONNAIRE

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

Implementing Title 21 CFR Part 11 (Electronic Records ; Electronic Signatures) in Manufacturing Presented by: Steve Malyszko, P.E.

LIVINGSTON COUNTY CREDIT CARD PROCEDURES

KAREN E. RUSHING. Audit of Purchasing Card Program

Union County. Electronic Records and Document Imaging Policy

WHS DOCUMENT CONTROL GUIDELINES

Request for Proposal. Contract Management Software

ISO 9001:2008 Audit Checklist

Danske Bank Group Certificate Policy

FORT RUCKER Environmental Management System Title: Internal Auditing

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)

CONFIGURATION MANAGEMENT PLAN GUIDELINES

PHASE 9: OPERATIONS AND MAINTENANCE PHASE

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION

Peer Review Process Description

FILEHOLD DOCUMENT MANAGEMENT SYSTEM 21 CFR PART 11 COMPLIANCE WHITE PAPER

Idaho Records Center A Program of the Idaho State Archives

Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements

Guidance for Industry Computerized Systems Used in Clinical Investigations

ISMS Implementation Guide

Guidance on IRB Continuing Review of Research

Information Management: A common approach

This interpretation of the revised Annex

Quality System: Design Control Procedure - Appendix

Workflow Templates Library

Build (develop) and document Acceptance Transition to production (installation) Operations and maintenance support (postinstallation)

Fermilab Computing Division Service Level Management Process & Procedures Document

Rowan University Data Governance Policy

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

Records Management Services We re not just paper. We are compliance.

IT Application Controls Questionnaire

AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE

Transcription:

DOWNLOADED AND/OR HARD COPY UNCONTROLLED Verify that this is the correct version before use. AUTHORITY DATE Jeffrey Northey (original signature on file) IMS Manager 10/16/2014 Richard Grigg (original signature on file) Process Owner 10/15/2014 Document ID/Link Form 1000 IMS Master List IMS Version History ISO 9001:2008 IVV QM IVV 10 IVV 16 NPR 1441.1 T2002 T2003 T2004 REFERENCES Title Document Change Request NASA IV&V Management System Documentation Master List IMS Version History Overflow Document International Organization for Standardization: Quality Management Systems Requirements NASA IV&V Quality Manual Software and Hardware Configuration Management Control of Records NASA Records Retention Schedules System Level Procedure Template Work Instruction Template Template/Supporting Document Template If any process in this document conflicts with any document in the NASA Online Directives Information System (NODIS), this document shall be superseded by the NODIS document. Any external reference shall be monitored by the Process Owner for current versioning. 1 of 16

1.0 Purpose The purpose of this system level procedure (SLP) is to establish a consistent method for preparation, approval, issuance, revision, cancellation, tracking, and maintenance of NASA IV&V Management System (IMS)-controlled documentation. 2.0 Scope This SLP is applicable to all documentation that pertains to the IMS. This includes all documents specifically designated as IMS Documents, which include all SLPs, Work Instructions (WIs), templates, supporting documents, and forms. 3.0 Definitions and Acronyms Official NASA IV&V roles and terms are defined in the Quality Manual. Specialized definitions identified in this SLP are defined below. 3.1 Document Change Request (DCR) Log The DCR Log is a spreadsheet used by the Custodian (DCC) to track DCRs. The DCR Log captures information including the assigned DCR number, DCR number assignment date, IMS Document number and name, approval date, and Process Owner (PO). The DCR Log helps to ensure that there is only one DCR open per IMS Document at a time. 3.2 Document Change Request Originator (DCR Originator) A DCR Originator is any NASA IV&V civil service or contract employee who requests an addition, revision, or cancellation of an IMS Document. 3.3 Document Package The Document Package consists of the DCR and copies of the Review Drafts that contain reviewer comments. 2 of 16

3.4 Document User A document user is any NASA IV&V civil service or contract employee who uses the IMS and is covered by the NASA IV&V Program s International Organization for Standardization (ISO) 9001:2008 certification. 3.5 IMS Documents IMS Documents are all IMS SLPs, WIs, templates, supporting documents, and forms. 3.6 Review Draft A Review Draft is a copy of a revised IMS Document that is evaluated in accordance with this SLP. 3.7 Reviewer A Reviewer is anyone who reviews a revised or new IMS Document or a cancellation request. Types of Reviewers may include: Peer Reviewer, Technical Reviewer, and Records Reviewer. The document PO and the Approving Official also serve as Reviewers providing input and approval during the document change process. 3 of 16

3.8 Acronyms CAR DCC DCR ECM GPR IMS ISO NODIS NPD NPR PAR PO QM SLP URL WI Corrective Action Request Custodian Document Change Request Enterprise Content Management Goddard Procedural Requirements NASA IV&V Management System International Organization for Standardization NASA Online Directives Information Service NASA Policy Directive NASA Procedural Requirements Preventive Action Request Process Owner Quality Manual System Level Procedure Uniform Resource Locator Work Instruction 4 of 16

4.0 Process Flow Diagrams The following diagrams depict processes described in this document, and the responsibilities and actions that shall be performed by process participants or their designees. Any information supplemental to a depicted process will appear after the diagram. 4.1 Addition, Revision, or Cancellation of an IMS Document This section applies to the addition, revision, or cancellation of IMS Documents, which includes: SLPs, WIs, templates, supporting documents, and forms. 5 of 16

Document Change Request (DCR) Originator Custodian (DCC) Process Owner (PO) Peer Reviewer(s) Approving Official Submits DCR Logs request in DCR Log. Assigns DCR # (and Peer Reviewers if necessary) Evaluates Request Receives notification that the DCR was not accepted NO (with justification) Accepts Request? Marks the DCR as Rejected in DCR Log Yes Creates/updates document with Track Changes On if needed Prepares Document Package Reviews document, provides feedback, and signs DCR Collaborates with DCC to address editorial changes if needed Performs technical reviews (unless a cancellation), and signs DCR Evaluates feedback, revises document if needed, and signs DCR Prepares final version (unless a cancellation). Updates DCR Log. Updates electronic files: IMS Master List, ISO Mapping Diagram and IMS Reference Mapping Diagram. Publishes/cancels electronic documents (Final version, Master List, Mapping Diagrams), Notifies IMS Users of document updates Ensures changes are appropriately communicated Reviews document package, and signs DCR Assigns File #, Files Document Package The IMS Manager shall assign a PO for any new IMS Document. necessary, the IMS Manager shall reassign POs for existing documents. If All documents added to or modified within the IMS must conform to the guidelines provided within the IMS Document templates: T2002, System 6 of 16

Level Procedure Template; T2003, Work Instruction Template; and T2004, Template/Supporting Document Template. 4.1.1 Initiating The Document Change Request (DCR) Originator shall propose the addition, revision, or cancellation, of an IMS Document by completing Form 1000, Document Change Request. On the DCR, the Originator shall include the document number and title, as well as comments clearly identifying any modifications to be made, and the rationale for why these changes are being proposed. The Originator shall then forward the completed DCR to the Document Control Custodian (DCC). 4.1.2 Processing The DCC shall save an electronic copy of the DCR in the IMS directory on the Enterprise Content Management (ECM) System. If the DCR is associated with a new IMS Document, the DCC will assign a document number and confer with the IMS Manager to assign a PO. The DCC shall also specify Peer Reviewers. Only minor editorial updates to a document are exempt from the Peer Review process. In all other instances of addition, revision or cancellation to the IMS, the DCC shall designate on the DCR form one or more peers to perform the Peer Review. If the Process Owner is not an Office Lead, then the relevant Office Lead will be assigned as one of the Peer reviewers. If the DCR is associated with a Corrective Action Request (CAR) or Preventive Action Request (PAR), the DCC will specify that the CAR/PAR Originator is included as a Peer Reviewer, if not already part of the review/approval process. The PO shall evaluate the DCR to determine if the DCR is acceptable and applicable. 7 of 16

4.1.2.1 Acceptance If the PO accepts the DCR, the PO will incorporate the modifications into the document, and return the modified document to the DCC. The DCC will prepare a document package. As part of the package preparation, the DCC will create a working subfolder in the IMS Documents folder on the ECM System as a place to store associated documents in electronic format. 4.1.2.2 Rejection 4.1.3 Peer Review If the PO rejects the DCR, the PO shall provide rationale for the rejection to the DCR Originator and DCC. For tracking purposes the DCC will document the rejection in the DCR Log. Peer Reviewers shall review and provide comments on the additions, revisions, or cancellation being proposed in the Review Draft. After commenting, they should sign the DCR and return the document package to the PO. The PO shall evaluate the Peer Review comments and modify the document accordingly. If the PO decides not to address some or any of the Peer Review comments, he/she shall provide rationale to the Peer Reviewer(s) as to why the comments would not result in modifications to the document. After all modifications are completed, the PO shall sign the DCR and forward the Document Package to the DCC. The Review Draft from the PO may be in hard or electronic format. 8 of 16

4.1.4 IMS Technical Edit Review The DCC shall conduct a technical edit review of the draft IMS document. The technical edit review includes: Review the IMS Modifications Needed Spreadsheet for any changes that need to be incorporated. Inspection of the Review Draft for technical and grammatical deficiencies and make modifications where needed. Review of the Records Table in Section 6.0, Records, to verify that all records pertinent to the documented process have been captured in the table, and that all records retention periods and locations are correct and up to date. The person who performed the Records Review shall sign the DCR. Move Version History information that has exceeded its retention period to the Version History Overflow Document. If any modifications resulting from the technical edit review significantly alter the logic or process of the document, the DCC shall return the Review Draft to the PO for verification of correctness and approval. After addressing any such modifications, the PO shall return the Review Draft to the DCC. Once the technical edit review is completed, the DCC shall sign the DCR and forward the document package to the Approving Official. 4.1.5 Final Review The Approving Official shall review the modifications proposed in the document package. If the Approving Official approves the document package (or approves with comments), he/she shall sign the DCR and forward the document package with any comments to the DCC for further processing. 9 of 16

If the Approving Official does not approve, he/she shall return the document package to the DCC for resolution. The DCC shall modify the Review Draft, collaborating with the PO as needed to address the Approving Official s concerns. The modified document package shall be returned to the Approving Official for further review. 4.1.6 Final Processing The approved Document Package will be delivered to the filing system mailbox for filing. The DCC shall post electronic copies of final versions of new and updated documents to the IMS electronic repository. If a cancellation is approved the DCC shall remove the prior posted documents and show the title as canceled; after a reasonable period the title shall be removed completely. The DCC shall update the IMS Master List, ISO Mapping Diagram, IMS Reference Mapping Diagram, and IMS Version History Overflow Document as needed. The DCC shall publish the final draft, IMS Master List, ISO Mapping Diagram, and IMS Reference Mapping Diagram; and notify document users of all document updates via email. Upon publication, the Process Owner shall ensure that the changes are appropriately communicated. The PO should consider at least the following items: magnitude of the change(s) the target audience(s) communication mechanism(s) potential training sessions 4.2 Controlled Versions Electronic versions of documents made available through the IMS electronic repository are the official, controlled versions. Copies printed from these versions are considered uncontrolled and must bear a notice analogous to: Verify that this is the correct version before use. 10 of 16

The DCC shall verify that published documents match the current IMS Master List and shall resolve any discrepancy by auditing Master List revisions and the DCR Log. The DCC shall remove obsolete versions of all IMS Documents when posting revised documents to the IMS electronic repository. 4.3 Controlling External Changes All NASA and Center directives e.g., NASA Policy Directives (NPDs), NASA Procedural Requirements (NPRs), Goddard Procedural Requirements (GPRs), etc. are available electronically from the NASA Online Directives Information Service (NODIS) repository (http://nodis3.gsfc.nasa.gov). If any process in the IMS conflicts with any document in the NASA Online Directives Information System (NODIS), the IMS Document shall be superseded by the NODIS document. Any external reference shall be monitored by the Process Owners for current versioning. 4.3.1 Process Owner Monitoring This process applies to all POs that use external documents or other references (e.g. websites ) in their IMS processes. POs shall ensure that their IMS processes reference any external sources used in the enactment of those processes. For a given external reference: If only the most current version is applicable, the PO shall include only the source for verifying that current version (e.g., the publisher or originator). If any version older than the most current version is applicable, the PO shall specify which version is being referenced. The PO shall be responsible for monitoring all external references captured in his/her IMS Documents in order to ensure that his/her IMS processes maintain correct references and proper adherence to applicable standards. 11 of 16

4.4 IMS Annual Document Review The IMS Annual Document Review is a control mechanism to ensure IMS documents are reviewed by their respective Process Owners on a regular basis to ensure accuracy of our process documents and for areas of potential improvement. The DCC shall inform POs of any modifications that have been noted in the IMS Modifications Needed Spreadsheet, including both exclusive modifications and blanket modifications that apply to all or many documents. During the IMS Annual Document Review, POs shall review the IMS document(s) they own for at least the following: Any inaccuracies Any organizational changes affecting the document Any process changes Any metric changes Any new or now obsolete external references Any Reference Document changes including titles Any links, URL s, or email address changes Any changes to databases or other data repositories used Any potential areas of improvement Refer to the IMS Master List to see details of who the PO is for each IMS document. If a Process Owner says no changes are needed but editorials are ready, then using a non-peer Review DCR may be appropriate. 4.5 Contingency Plan If the IMS electronic repository file is temporarily inaccessible, document users shall contact the DCC to determine the current versions of documents and forms. 12 of 16

5.0 Metrics Any metrics associated with this SLP are established and tracked within the NASA IV&V Metrics Program. 6.0 Records The following records will be generated or updated and filed in accordance with this SLP and IVV 16, Control of Records, and in reference to NPR 1441.1, NASA Records Retention Schedules. Record Name Original Vital Responsible Person DCR Log Y N DCC Document Package Y N DCC IMS Master List Y N DCC IMS Reference Mapping Diagram IMS Version History Overflow Document ISO Mapping Diagram Y N DCC Y N DCC Y N DCC Retention Requirement Destroy when 7 yrs old (1/26.5A) Destroy when 7 yrs old (1/26.5A) Destroy when 7 yrs old (1/26.5A) Destroy when 7 yrs old (1/26.5A) Destroy when 7 yrs old (1/26.5A) Destroy when 7 yrs old (1/26.5A) Location ECM System Filing System IMS Web Site, ECM System IMS Web Site, ECM System IMS Web Site, ECM System IMS Web Site, ECM System 13 of 16

VERSION HISTORY Version Description of Change Rationale for Change Author Effective Date Basic Initial Release John 01/29/1998 Griggs IT/204 A T Revision information older than 7-year retention period relocated to Version Various 04/30/1998 04/13/2007 History Overflow Document U Updated process flow diagrams to align Stephanie 01/18/2008 with Facility Management paradigm Ferguson V Updated Shared Network Drive links Stephanie 06/13/2008 Ferguson W Changed IV&V Facility to IV&V Program ; updated Shared Drive path Stephanie Ferguson 12/11/2008 X Y Z Changed references to IMS documents from SLPs and WIs to SLPs, WIs, templates, supporting documents, and forms. Updated process and diagrams to include Records Review Updated process flow to clarify steps following Technical Review Stephanie Ferguson 04/15/2009 Sara Cain 01/12/2010 Sara Cain 04/08/2010 14 of 16

VERSION HISTORY Version Description of Change Rationale for Change Author Effective Date AA Added reference document precedence statement; clarified Section 4.1.2, Processing To avoid confusion over which doc has precedence; and to ensure someone (PO) is verifying that external docs are still current. Stephanie Ferguson 07/14/2010 AB AC AD AE Updated Section 4.3 to remove necessity of Master List hard copy; clarified the content of Section 4.6.1 Updated Section 4.2, 4.2.2, and 4.2.3 to reflect actual review process. Technical and Records Reviews may be performed in parallel. Updated Section 4.0 for clarity (flow). Added IMS Reviews in section 4.2.2 to encompass Technical, Records and Final reviews. Removed MLC. Removed CAR/PAR Originator. Renamed to ; removed Data section. Updated Section 4.0 for clarity (flows). Added Annual Document Review PO responsibilities. Removed Technical Reviewer, Records Liaison/Custodian. Electronic copy is the official version. Electronic backup copies exist. Process changes for efficiency have been tried and found to be effective. Simplifying for easier user comprehension No actual data controlled by this SLP. Some POs had questions about ADR. Continued simplification. Sara Cain 09/15/2010 Richard Grigg Richard Grigg Richard Grigg 01/06/2011 03/14/2011 10/24/2011 15 of 16

VERSION HISTORY Version Description of Change Rationale for Change Author Effective Date AF Remove cancellation flow; incorporate Office Lead as one of the Peer Reviewers when the Process Owner is not the Office Lead. Add IMS Modifications Needed Spreadsheet references. Cancellation handled the same as any other revision. Eliminated the possibility that changes would be made without Office Lead being aware. Richard Grigg 04/20/2012 AG AH AI Add capture of rationale. Clarify process of DCR rejection by PO. Add a requirement for process owners to provide training or familiarization to their users when a document is updated. Add blanket modifications to ADR process. Update external references to include websites and any other references. Update flow to add PO requirement to communicate changes. Add references to Version History Overflow Document. Rationale for changes is frequently lost or documented in email or other hard to retrieve documents. Updates may be made without users being aware; then processes may not be properly followed. PAR: 2014-P-415. Blanket modifications may be overlooked if not deliberately implemented at ADR. External references are not just documents anymore. Version history overflows are captured in an IMS document that is published. Richard Grigg Richard Grigg Richard Grigg 01/31/2013 03/10/2014 10/16/2014 16 of 16