How wireless wheel monitors could identify railway track faults



Similar documents
Integration of PTC and Ride Quality Data. Presented by: Wabtec Railway Electronics, I-ETMS PTC Supplier. and

2/26/2008. Sensors For Robotics. What is sensing? Why do robots need sensors? What is the angle of my arm? internal information

Railway Business Strategy and R&D in Europe

NATIONWIDE WAYSIDE DETECTOR SYSTEM

SmartDiagnostics Application Note Wireless Interference

Warehouse Management Systems by the Numbers by Rene Jones

Increase System Efficiency with Condition Monitoring. Embedded Control and Monitoring Summit National Instruments

Again, thank you for becoming a LifeShield customer. We will continue to do everything we can to make sure you, your home and your family are safe.

THE CASE OF USING A VEHICLE-TRACK INTERACTION PARAMETERS AND IMPACT TEST TO MONITOR OF THE TRAMWAY

SuperValu Car Insurance FAQs

Big Data in Railroad Engineering

"The Amazingly Simple Success Secret You Can Learn in Two Minutes"

ProSmart. Predictive Condition Monitoring

Monitoring the Operation of Wind Turbines Alex Robertson, Vestas Northern Europe

SPECIAL REPORT THE FIVE STEPS TO SUCCESS IN YOUR INDIANA CAR ACCIDENT CASE

Duro Trac Conveyor System

IDD-213T User Manual. (Rev. 1.0) China Aerospace Telecommunications Limited

Rail Asset Management. Rail

Monitoring Software using Sun Spots. Corey Andalora February 19, 2008

control manual Optimal maintenance decisions for asset managers by andrew k.s. jardine and neil montgomery 44 Industrial Engineer

Accident / Incident Reporting Guidelines for Provincial Railways

BettyNet: Getting Started Guide

The Business case for monitoring points... PCM architecture...

/ transport Supervision at The Heart of Transport Network Security

ENERGY AWARE. Monitor User Guide

Support Services. Engineering solutions for operational excellence SERVING THE WORLD S RAILWAYS. Technical. Manufacturing Services

SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS

ARA Digital Train Radio System Functional Requirements For Australian Metropolitan Railway Operators. 19 September 2005

How the Internet of Things will change the way we monitor the Railways

Focus on Customer Information. Stationary, highly automated customer information systems. Innovative and reliable Information Technologies

SAFETY TECHNOLOGY TOOLKIT

Know-how and commitment are always included. Service offer of CG Drives & Automation

Monitoring the team s performance

Remote Monitoring and Satellite Communications

No List? No Problem.

Please Step Out of The Car

Barcodes and the Small Business Manufacturer

1,300 people, $100M annually into the regional economy. Upgrading Mine-Wide Wireless Network with Zero Downtime. square miles,

Filename: P4P 016 Todd: Kim: Todd: Kim:

Reducing Customer Churn

Critical analysis. Be more critical! More analysis needed! That s what my tutors say about my essays. I m not really sure what they mean.

International Security Systems Technician Training (CCTV modules)

Backup & Disaster Recovery

How To Take Action In New Jersey

Location Identification and Vehicle Tracking using VANET(VETRAC)

The sole purpose of the ad is to drive traffic to his landing page. By using Facebook ads is able to send highly targeted traffic there.

Digital Single Axis Controller

Head Start Guide. Dear Trader, Welcome to the Forex Profit Accelerator Head Start Guide!

CANPAYASYOU GO RENTAL INSURANCE TRANSFORM YOUR BUSINESS?

Your Vehicle Return Made Easy.

Building a CREDIT REPORT. Federal Trade Commission consumer.ftc.gov

Use your troubleshooting superpowers for good Application Note

STRUCTURE AND FLOWS. By Hagan Rivers, Two Rivers Consulting FREE CHAPTER

THEME Competence Matrix - Electrical Engineering/Electronics with Partial competences/ Learning outcomes

what is zipcar? confidential Zipcar Selma: Someone is waiting for me! Would you like to extend your

Sustainable Development Strategy

Arun Veeramani. Principal Marketing Manger. National Instruments. ni.com

The Top 5 Lessons Every Small Business Owner Needs to Learn to be Successful in Today s Unforgiving Business Climate TOP

Security for Railways and Metros

How To Teach Children To Read And Write

The 3 Biggest Mistakes Investors Make When It Comes To Selling Their Stocks

ERÖFFNUNG DES INNOVATIONSZENTRUMS ADAPTSYS

Reputation Management for Local Businesses: Protect Your Image

Test your talent How does your approach to talent strategy measure up?

Social Media- tips for use and development Useful tips & things to avoid when using social media to promote a Charity.

Getting Started with Turbo Your PC

Iknaia Asset and Personnel Tracking Management System for the Construction Industry

General Wireless Networking :: Connecting to Wireless Network

Railroad Accident Brief

Find what matters. Information Alchemy Turning Your Building Data Into Money

PA MATTHEWS AUDIO NSW STATE HIGH SCHOOL PA SYSTEMS WHITE PAPER

Contents. About Chris Cardell Marketing Strategies Revealed!

ToolWatch Enterprise, the most comprehensive system available today for managing your tools, equipment, materials and consumables.

Why you really do need to consider a WMS? - A white paper by Clydebuilt Business Solutions Ltd

Lowcountry Injury Law

ProCurve Networking. Troubleshooting WLAN Connectivity. Technical White paper

SBB Infrastructure, Measurement and Diagnostic Technology.

Sensor Devices and Sensor Network Applications for the Smart Grid/Smart Cities. Dr. William Kao

Transcription:

How wireless wheel monitors could identify railway track faults 19 January, 2016 By Ben Cronin Southeastern Railway has equipped its entire fleet with energy harvesting wireless sensors to predict wheel bearing failures. Now it wants to share the data generated by the technology with Network Rail to help it predict track faults. Train wheel bearing failures used to be a big headache for Southeastern Railway s engineering director Mark Johnson. The man who is responsible for the train operator s entire rolling stock and some 550,000 passengers daily, used to dread a fault occurring while one of his trains was in service. Should it happen in the wrong place, a fault could wipe out the whole of the South East for 24 hours, he says.

Perpetuum wireless sensors Configuring and cataloging the system The problem was that because all of the wheel bearings in Johnson s fleet sat in an enclosed system, there was minimal visual indication that a fault was about to occur. The bearings are designed to last for 2.2M.km but because of the harsh environment below the train, early life failures were beginning to creep in at 960,000km. The consequences of failure were so significant that Johnson had no choice but take a safety first approach to maintenance, scrapping an average of 64 bearings on a four car train for his entire 148 train fleet at half life stage. Previously, a lot of the industry was focusing on applying sensing technology that showed you a temperature increase when the bearing was about to fail, says Johnson. But one of the fundamental problems with that is, once the thing gets hot, the failure has already started. Another problem was trying to retrofit something onto a train that had already been built. We have been in meetings with our colleagues at Network Rail to ask what other information we can glean about the other half of the rail interface. Mark Johnson, Southeastern Railways Looking to reduce the frequency with which his trains had to return to the maintenance depot and improve the reliability of his fleet, Johnson turned to a technology provider he had encountered in another application.

We d come across Perpetuum and the way they had developed an energy harvesting device to power computers remotely using vibration, and had a discussion with them, says Johnson. The brainwave came from these guys that you could combine that technology with an accelerometer to measure the acoustic vibrations and the temperature on a wheel bearing in a very small package. 12 month trial Perpetuum came up with a wireless energy harvesting sensor node (see box below) that could be attached to the bearing case cover on the underside of trains. Southeastern then ran a 20 unit trial over a 12 month period to see if the technology could be used to predict wheel bearing faults. We wanted to build an understanding about which signals were the right ones to be looking for and how they change, says Johnson. We then overlaid that with what we were seeing in our physical inspections and evidence of the actual physical degradation [of the wheel bearings]. The trial was such a success that the operator fitted it to the whole fleet. Now we only have to replace the bearings on condition, says Johnson. Since we have had the kit on board, we have not seen a single failure for bearings as a result of the bearing starting to disintegrate, and in years previously we would see six to eight. Perpetuum wireless sensors An asset manager viewing data about the condition of the wheel bearing But Johnson also thought the technology could be used to help the civil engineers involved with track maintenance engineers.

We realised that the wheel is only one half of the interface, he says. So in recent times we have been in meetings with our colleagues at Network Rail to ask what other information we can glean about the other half of the rail interface. Just because the piece of kit isn t fixed to the solid piece of track that doesn t move, is there anything we can pick up from our wheel sets? Johnson thinks that the sensors o his trains could be employed to tell Network rail how its tracks are wearing and about the condition of its track beds. They re all dynamic things and something that s dynamic will always exert a frequency response, he says. Incomplete picture Network Rail uses three to four track monitoring trains to monitor the condition of the roughly 35,500km of track that it is tasked with maintaining. Given that the monitoring trains have to cover the entire network, and strategic train lines are given priority, Johnson argues that the infrastructure owner has an incomplete picture of its network and, when things go wrong, this unfairly causes reputational damage to Southeastern. There s nothing more frustrating than getting on a piece of track with a 70mph to 90mph speed limit but they ve got a temporary speed restriction of 15 mph because there s a broken rail or a soggy track bed, he says. Perpetuum wireless sensors Installation of the wireless sensor If we can start to understand what signal the track gives off when it starts to degrade, we have an opportunity to go in there before a speed restriction comes into place and make the repairs. It s a win win for everyone and we don t have to tell our passengers that our train is going to be 15 minutes late.

For Network Rail to take advantage of the 3.9GB of data that Southeastern is collecting through its wireless sensors, Johnson thinks both parties will have to come out of their silos and start to appreciate the railway and the trains operating on it as a single entity. Systems approach It s taking more of a systems approach towards the railway. The train operators are mainly interested in their wheel sets and how they optimise them; Network Rail looks at their tracks and how they can optimise them, when actually it s two halves of the same circle, he says. Any change that we do to our side of the interface will impact their maintenance regimes and vice versa. Once such a systems approach is adopted, Johnson thinks that Network Rail can begin to have more mature discussions with its operators about the best way to work together. You could ask if it s better for the wheel set to wear quicker and the rail head to not wear, thereby transferring more of the wear rate to the operator, or ask if the most cost effective way of doing things is to have harder wheels and replace the rails more often. Whether Network Rail will be expected to pay for Southeastern s data has yet to be decided, but Johnson thinks a discussion about data rights is inevitable. Both parties are willing to invest time and resources into the information this technology can generate, the next stage is to discuss rights, he says. How do we all make sure that the most is achieved? The sensor The Perpetuum wireless sensor node is attached to a wheel bearing case cover on the underside of the train. Vibrations picked up by the sensors also perform a useful function in driving the energy harvesters contained in one half of the node. The other half contains a three axis accelerometer, a temperature sensor, wireless communications, electronics and capacitors. The sensor has a 453mHz radio transmission which takes the data off the node, says Perpetuum commercial director Justin Southcombe. The energy harvesting and management system that provides the electronics with a smooth power supply is the top secret part of the technology. That allows the node to power itself, and when you add that to the fact that it communicates wirelessly, you realise it s completely autonomous. The node collects packages of data every minute and sends them to a data concentrator situated elsewhere on the train. One data concentrator is sufficient for up to five cars. To watch a video about the technology, click on the image below.