Presentation to Transportation, Technology & Infrastructure Committee



Similar documents
City Council Briefing November 3, 2015

Fiber to the Building & Project Velocity IP

CONNECTING THE WIRELESS TO THE WIRED NETWORK. By: Russ Schomber VP Network Services, Backhaul Services Group

Staff Report WIRELESS TELECOMMUNICATION FACILITY SITING REQUIREMENTS AND STANDARDS. December 16, 2014

Distributed Antenna Systems in Higher Education

Presented by Scott Thompson, Jay Ireland, Maria Browne, John Seiver, Jill Valenstein, and Jim Tomlinson October 23, 2013

CHAPTER 23 Wireless Communication Facilities

Council Policy for New Telecommunication Facilities

GROWTH OPPORTUNITIES FOR TOWERCOS IN DEVELOPED MARKETS

Deployment Trends That Impact Your Business

Pole Attachment Guidelines and Procedures Revision September 2015

HOW W I R E L E S S T E C H N O L O G Y WORKS

Section 2: Overview of Wireless Broadband Networks

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C ) ) ) ) ) ) ) ) COMMENTS OF THE CITY OF NEW YORK

1. Who is CenterPoint Energy Houston Electric, LLC?

Bell Mobility has submitted an application for a Radiocommunication Antenna System at 1360 Bloomington Road East (see location map below).

The key elements of GSL V s strategy are (see Item 1. Business of the Crown Castle 10-K for further discussion):

Broadband Technology Clinic. Burlington Telecom Advisory Board

The increasing demand for cellular

Bridging the Last Mile California s Wireless Internet Providers

How To Design An Outside Plant (Osp) Network Design

July 2014 Page U-1 TABLE OF CONTENTS

345 kv Brazos Valley Connection Project FAQs

Cell Tower Leases and Buyouts: The Church s Perspective By John W. Pestle prepared for UCC Southwest Conference January 9, 2013

How To Co-Location

Electronic and Postal Communications (Access, Co-location and Infrastructure sharing) G.N. No. 429 (contd)

TOWN OF MONSON CERTIFICATIONS-SPECIAL TOWN MEETING MAY 11, 2015

Ultrafast Fibre Frequently Asked Questions

AGL CONFERENCE: Perspectives & Case Studies in Small Cells and DAS

better broadband Redundancy White Paper

Current access technologies overview

Cell Service and Wireless Remedies for Reception & Coverage. Panel Host Kathleen Austin Panel Participants Dan Leaf Gordon Mansfield Richard Sherwin

communication tower means a tower or structure built to support equipment used to transmit communication signals;

VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT

Cellular Antenna Towers for Cellular Telecommunications Service or Personal Communications Services

Wireless Solution for Rural Broadband Access

Wireless Feasibility Survey And Site Survey For Sandersville, GA. Jay Sexton and Jeffrey Lee Georgia Tech Research Institute

State Telecom Legislation: Broken Promises NATOA 2012 Annual Conference New Orleans, Louisiana

Eligible individuals need to meet the requirements of the Federal Communications Commission Lifeline Program outlined below.

3 September 9, 2015 Public Hearing

AN ORDINANCE

Fixed Wireless Fact Sheet

Narrowband and Broadband Access Technologies

TENNESSEE REGULATORY AUTHORITY

TELEPHONE COMPANY PROPERTY TAX

Items Required to Submit for Specialized Certificate of Occupancy for Operating a Sexually-Oriented Business City of Fort Worth, Texas

CELL TOWERS LEASES BRANDON WILLS 2010

Money Maker or Tower of Terror? The Benefits (and Burdens) of Cellular Tower Leases

MEMORANDUM. Milestone Communications Presentation Proposed Cell Tower at Benjamin Tasker Middle School

The HetNet Bible (Small Cells and Carrier WiFi) - Opportunities, Challenges, Strategies and Forecasts: With an Evaluation of DAS & Cloud

UNDERSTANDING YOUR TELEPHONE BILL

Internet Service Overview

MPC STAFF REPORT WIRELESS TELECOMMUNCATIONS FACILITY February 19, 2013 MPC FILE NO PLAN

BAY OF PLENTY COUNCILS BROADBAND BUSINESS CASE STUDY SPECTRUM AUCTION REVIEW. April 2007

I. Call to Order. Roll Call. Approval of Minutes. a. October 13, Zoning Code Review: Telecommunications. a. Small Cell Antennas

Oman Broadband Company. 1 st of June 2014

It s All Interconnected.

Fixed Wireless Broadband

Town of Yorktown Comprehensive Plan 8. INFRASTRUCTURE

Existing Mapping Assets Useful for FirstNet Planning. Kenny Miller, DoIT Dr. Michael Scott, Salisbury U.

Location enhanced Call Center and IVR Services Technical Insights about Your Calling Customer s Location

The data can be transmitted through a variety of different communications platforms such as:

TECHMART 5201 Great America Parkway Santa Clara, California

In-Building Applications How to Differentiate Your Service

Alcatel-Lucent In-building Wireless Continuity Solution for Healthcare

REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES

FTTH ARCHITECTURE WHITE PAPER SERIES

Transcription:

Presentation to Transportation, Technology & Infrastructure Committee Proposed Master License Agreement for Use of the Rights-of-Way by Distributed Antenna and Small Cell Systems Presented By: Department of Administration & Regulatory Affairs November 12, 2015

WHAT IS THIS TECHNOLOGY? Distributed Antenna Systems (DAS) and Small Cell Antennas wireless networks Systems consist of antenna, control box, pole (usually CenterPoint s pole) and fiber leading to nearest cell tower or hub/base station. Supplement capacity for wireless telephone service companies for voice and data service (gaps in coverage not an issue in Houston; capacity issues in congested areas). 2

WHO ARE THE PROVIDERS? Neutral Host Providers i.e. Extenet, Crown Castle, Mobilitie, Zayo Build infrastructure for wireless companies Customers are wireless companies who lease node space from neutral host Wireless Companies i.e. Verizon Wireless, AT&T, Sprint, etc. Build infrastructure for their own use Co-location unlikely Can put several tenants into one space i.e. co-location 3

WHAT IS THE ISSUE? Private companies use the public rights-of-way ( ROW ) for provision of several types of services from electricity to transportation. The Texas Constitution requires private entities to compensate the City for use of the public ROW. ARA studied the type of technology being deployed and considered the various types of potential compensation approaches for use of the ROW that could be applied, surveying: Stakeholders both neutral host providers and wireless companies Other cities Best practices 4

PROPOSAL: MASTER LICENSE AGREEMENT Based on a thorough best practices analyses, a survey of other cities, and stakeholder feedback, we propose the City enter into a Master License Agreement ( MLA ) with each provider of these services that wishes to place DAS facilities in the ROW. The MLA will: Allow licensees access to use approved locations in the ROW to install their equipment. (Note: licensees are required to use city buildings in lieu of ROW when available in the desired area.) Require that proposed locations and equipment be approved by the City Engineer and subject to public safety criteria. Be non-exclusive to any single provider, i.e. any provider wishing to place DAS and small cell facilities in the ROW will enter into an MLA with the same terms and conditions. Have an initial term of five years (5) + three 5-year renewals for a total of 20 years Requires Fees: $2,000 per location per year if existing pole is used; $2,700 per location per year if new pole is installed; +$900 per year for each additional tenant on licensee pole. 2% annual escalator. 5

PUBLIC SAFETY & VISUAL STANDARD PROVISIONS The MLA imposes certain public safety and visual standard requirements on the placement of equipment in the ROW including: Approval of the location by the City Engineer Size restrictions for both antenna and control box No new poles unless no existing poles or streetlights are available and other criteria are met Distance Requirements: Minimum 300 ft distance between new poles (or any other pole that might support an antenna) unless otherwise approved by City Engineer Minimum 150 ft distance from City parks, unless otherwise approved by the City Minimum 150 ft distance from elementary, middle and high schools 6

PUBLIC SAFETY & VISUAL STANDARD PROVISIONS (cont d) No aboveground fiber in areas with underground utilities No new poles or ground equipment (cabinets) in areas with underground utilities No new poles in residential neighborhoods unless otherwise approved by the City Facilities placed in a Management District or other area designated by the City must be appropriately camouflaged (e.g., poles are flagpoles or lamp posts; control boxes are painted with artwork or hidden by vegetation) No exposed wires on poles leading from antenna to control box 7

SAMPLES 8

SAMPLES 9

SAMPLES 10

SAMPLES 11

QUESTIONS?