December 2003 EPB 241B. Some sections are completed, some are partially complete and some are left blank.

Similar documents
Water Quality Contingency Planning Standard EPB 540B

Emergency Response Planning for Small Waterworks Systems

EMERGENCY RESPONSE PLAN. For COWICHAN BAY WATERWORKS DISTRICT

Emergency Planning for Water Utilities in Manitoba

EMERGENCY RESPONSE PLAN FOR AZU SMALL WATERWORKS SYSTEM

DRINKING WATER SUPPLY CONTINGENCY PLAN WATER SUPPLY CONTINGENCY PLAN FOR: VILLAGE OF WARSAW DATE:

Emergency/Disaster Response Plan

The Village of Malta

Bacteriological Follow-up Protocol for Waterworks Regulated by Saskatchewan Environment

Emergency Response Planning Template for Public Drinking Water Systems

APPENDIX G-Emergency Response Plan Template

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment

Emergency Response Plan for Drinking Water Systems in First Nations Communities. Guide and Template

DRINKING WATER SUPPLY CONTINGENCY PLAN WATER SUPPLY CONTINGENCY PLAN FOR: PWS ID NUMBER: COUNTY: POPULATION SERVED: DATE:

Clark University. Water Outage Preparedness and Response Plan. Revised January 11, 2013

COMPREHENSIVE DRINKING WATER SOURCE-TO-TAP ASSESSMENT GUIDELINE

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

Emergency Response Plan

Jefferson Parish Department of Water Emergency Plan

Repair and Disinfection of Water Mains Water Protection Program fact sheet

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

PUBLIC WATER SYSTEM EMERGENCY RESPONSE PLAN INTRODUCTION TO THE MODEL PLAN

Presented By: Fred J. Sánchez Water Quality Operations Supervisor

BULK WATER HAULING GUIDELINES

Healthcare Water System Repair Following Disruption of Water Supply

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

Cross Connection Control and Backflow Prevention Program Guidelines

EMERGENCY RESPONSE PLAN

Guidelines for Issuing a Boil Water Notice. Prepared by the Bureau of Public Water Supply Mississippi State Department of Health

DESIGNATED RESPONSIBLE PERSONNEL:

Standard Operating Procedures for Water Line Response and Repair. 2/12/2014 Illinois State University Environmental Health and Safety

AWWA Small Systems Pipe Repair Checklist, as published in July 2008 Opflow Question of the Month

Revised April (May) 2015

Emergency Response Plans and Network Marketing Systems in Oregon

WATER SUPPLY CONTINGENCY PLAN CITY OF LAKE WOBEGON, MINNESOTA

What is water main cleaning & lining

FREQUENTLY ASKED QUESTIONS

Environmental Incident Response Plan Farm A

RENEW. A Water Main Cleaning and Lining Program Designed to Improve Water Quality and Service

WATER QUALITY AND STANDARDS Vol. I -Management of Water Supplies After A Disaster - Yasumoto Magara, Hiroshi Yano

New Jersey Department of Environmental Protection Division of Water Supply & Geoscience. Water Main Break. Guidance Manual

REPORT CITY OF DAWSON CREEK. Potable Water System Emergency Response Plan

Abnormal Operating Conditions Emergency Plans and Public Awareness Plans for Natural Gas Systems

SECTION DISINFECTION OF PIPE AND WATER STORAGE FACILITIES

Emergency Plan. This emergency plan provides a format of data essential in an emergency situation.

Drinking Water Sector - Damage Assessment Report

Site Attendance Guidelines for Automated/Unattended Monitoring and Process Controlled Facilities

What To Do When Your Well is Flooded. Common Sense Steps To Take If Your Well Is Covered by Flood Water

Water System Disinfection

STANDARD OPERATING PROCEDURES FOR ALL WATERMAIN DISTRIBUTION REPAIR & INSTALLATION

Emergency Response Plan

Even collection systems with high-performing operation and maintenance programs will eventually

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses

Appendix D Water Services Use Cases

Parts per million (ppm) or Milligrams per liter (mg/l): one part by weight of analyte to 1 million parts by weight of the water sample.

Newmarket-Tay Power Distribution Ltd.

Report to Customers on. Water Quality. Introduction: Where Does Water Come From? Water Quality. For Supply Year. Important Phone Numbers

Treatment options for hydrogen sulfide. Testing for hydrogen sulfide

Municipality of Strathroy-Caradoc

Water Storage Tanks. (Cisterns) Drinking water and your health. Water Hauling. Rainwater Collection. Construction Material

CRS Report for Congress

Water Main Breaks After Normal Operating Hours

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-A412 Water Connection Repair

At the end of today s seminar you should be better. Recognize the causes of Sewer Lateral backup. Identify techniques to protect your home from

MAINE DRINKING WATER PROGRAM (DWP) POLICY FOR ISSUANCE AND REMOVAL OF DRINKING WATER ORDERS

Effective Microbial Control Strategies for Main Breaks and Depressurization

Inexpensive Leak Detection for Small Waterworks. Virginia Department of Heath Office of Drinking Water Catalog Number: HTO/005/2015

Public Health Assessment Tool

Preparing for a Water Emergency

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

Emergency Plan Starter Kit


Water Main Break During Normal Operating Hours

Nova Scotia Environment. A Guide to Assist Nova Scotia Municipal Water Works Develop a Comprehensive Operations Manual

PREVENTING WET OR FLO ODED BASEMENTS

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL Testing - General

Important safety tips for Electric and Gas Safety. Source: PSEG Hurricane Irene Web site on InfoCentral

On Site Sewage System Maintenance Inspections. March Building and Development Branch Ministry of Municipal Affairs and Housing

contractors, etc. and establish relationships with lease and rental companies.

Construction Specification for Sewer Bypass Flow Pumping

EMERGENCY ACTION PLAN CONTAMINATED WATER SUPPLY (BIOLOGICAL)

Emergency Guideline for Food Facilities during Boil Water Advisory or Other Public Notices

Director of Utilities. Manager. Distribution Supervisor. Utilities Analyst. Account Clerk. Water. Conservation Specialist.

2. AUDIT OBSERVATIONS

5 Precautions during construction and repairs

ANNEX B. Severe Flood MUNICIPAL Emergency Response Plan TOWN OF GRAND BAY-WESTFIELD

Equipment Breakdown. The extended property coverage you need for the equipment you rely on.

Number September 2014 SEWER LIABILITY

NAIT Guidelines. Implementation Date: February 15, 2011 Replaces: July 1, Table of Contents. Section Description Page

Public Water System. Consumer Confidence Report Template

Managing Water Infiltration into Buildings. Water Damage Check List

The 3rd Busan Global Water Forum Multi-Parameter Water Quality Monitoring System. Aqua of Sep 2015 Kyung-Yup Hwang

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE WATER QUALITY FAILURE ACTION TRIGGERS

Modeling, GIS Software Optimizes Water Main Cleaning By Paul F. Boulos

Advanced_O&M_Task_List_Example_Tool_06_02_16: O&M Example

The Pipelines Regulations, 2000

United States Environmental Protection Agency

GUIDANCE FOR WATER UTILITY RESPONSE, RECOVERY & REMEDIATION ACTIONS FOR MAN-MADE AND/OR TECHNOLOGICAL EMERGENCIES

NON-PUBLIC FACILITIES MEPS ARTICLE 2 PLUMBING SERVICES SPECIFICATIONS TABLE OF CONTENTS

Transcription:

Note: As of October 1, 2012 The Water Security Agency and Saskatchewan Ministry of Environment share responsibility and authority for the administration of The Environmental Management and Protection Act, 2002, and The Water Regulations, 2002 as pertaining to prescribed waterworks or sewage works in Saskatchewan. Therefore, all material contained within this document applies to waterworks or sewage works governed by the Water Security Agency or the Saskatchewan Ministry of Environment in accordance with their assigned responsibility. Waterworks Emergency Response Planning Template December 2003 EPB 241B Example Waterworks Emergency Plan The information provided is only for demonstration purposes and is not intended to be a complete Waterworks Emergency Plan. Some sections are completed, some are partially complete and some are left blank. This is only intended as an example to give owners and operators of a water system a better idea of how to complete a Waterworks Emergency Plan.

Waterworks Emergency Plan Community Of Date Completed: Date Approved By Waterworks Owner: Table of Contents Section 1 Introduction and Policy Statement... 2 Section 2 - Emergency Response Contact List... 4 Section 3 - Organizational Responsibilities... 6 Waterworks Emergency Planning Task Force Members... 6 Water Quality Crisis Management Cell (suggested members)... 6 General emergency procedures... 6 Section 4 - Notification and Communication... 7 Emergency notification to customer... 7 Emergency numbers distribution... 7 Media communications... 7 Official statements... 8 Signs... 8 Section 5 - Technical Action Plans... 8 1) Flood conditions... 8 2) Outbreak of a waterborne disease... 9 3) Contamination of source... 9 4) Loss of source... 9 5) Treatment process failure... 9 6) Power failure... 10 7) Distribution system problems... 10 (Major emergency)... 10 8) Customer complaints... 12 Section 1 Introduction and Policy Statement The intent of this emergency plan is to ensure the safety of consumers and the protection of life, property and the environment in the most efficient way possible in the event of an unexpected incident. In particular, this plan deals with events that may affect water quality. The performance goals and acceptable levels of service are outlined below. Goal 1: Life safety The primary goal of the water system is to ensure the safety of its users. At all times, safe, clean water should be provided to the public. Examples of conditions that should never occur are the failure of the distribution system; the distribution of contaminated water; the release of hazardous materials and the collapse of structures. 2

Goal 2: Fire suppression Water for fire suppression should be made available as soon as possible after a disaster or emergency. Goal 3: Public health needs Water is essential to life and health however some needs are more immediate than others. For instance, hospitals, care homes and emergency shelters require a continuous supply of potable water. 3

Section 2 - Emergency Response Contact List Community/Waterworks Name Waterworks owner Source water Water treatment plant location Personnel contact - Telephone / Fax Numbers Telephone Contact Name Home Cell Fax Operator s name Alternate operator 1 Alternate operator 2 Alternate operator 3 Emergency Contact Numbers Telephone Contact Name Home Cell Fax Public Health Inspector Medical Health Officer Environmental Project Officer Saskatchewan Emergency Planning 24 Hour Line - 7 Days a Week Saskatchewan Environment (SE) EcoRegion Office SE Spill Emergency Number Police Ambulance Fire department Municipal engineer Pump manufacturer Chlorinator manufacturer Chemical supplier Excavation services Call Before You Dig # Electrician Plumbing services Bulk water hauler Bottled water supplier Regina 306-787-9563 Saskatoon 306-933-6116 Outside Province 1-800-667-7525 306-953-2980 4

Water Quality Crisis Cell Members and Waterworks Emergency Planning Task Force Menbers Name Telephone Contact Name Work Cell Fax Emergency coordinator Spokesperson Spokesperson Crew foreperson Advisors Advisors Advisors Advisors Priority Contacts Name Telephone Contact Name Home Cell Fax Hospital Dentists Childcare facilities Senior citizen home Bakeries Restaurants Water companies Breweries School boards Organizations for immunesuppressed Other utilities supplied Utility Contact Numbers Telephone Contact Name Work Cell Fax Sask Power Sask Tel Sask Water Sask Energy CP Railways CN Railways 5

Section 3 - Organizational Responsibilities In this section, an organizational chart should be inserted. It should be shown who reports to whom during an emergency. In addition, contact information for the Waterworks Emergency Planning Task Force Members and the Water Quality Crisis Cell members should be included. Waterworks Emergency Planning Task Force Members Mayor (name, address, contact information) Waterworks manager - (name, address, contact information) Town administrator - (name, address, contact information) Environmental Project Officer - (name, address, contact information) Medical Health Officer (name, address, contact information) Other - (name, address, contact information) Q. Smith Operator A Organization Chart John Doe Manager A. Name Operator B A. Nother Admin. Assist. Water Quality Crisis Management Cell (suggested members) Water Quality Crisis Coordinator Typically waterworks manager (larger center) or Administrator (smaller center(name, address, contact information) Public Relations Coordinator (technical)- Typically waterworks manager (name, address, contact information) Public Relations Coordinator Mayor (name, address, contact information) Crew Foreman Maintenance Manager (name, address, contact information) Advisors Saskatchewan Environment (name, address, contact information) Advisors local Health District (name, address, contact information) Advisor Emergency Measures Coordinator (name, address, contact information) Advisor Administrator (name, address, contact information) General emergency procedures In general, a waterworks incident should follow these steps: 1. the waterworks owner/operator(s) monitor the distribution system and treatment plant for trigger events. The local Health District monitors the public for a public health trigger; 2. all incidents are reported to the Water Quality Crisis Coordinator; 3. the Water Quality Crisis Coordinator evaluates the event, determines if a trigger has been met and classifies all events, even those without a Technical Action Plan (TAP); 4. the Water Quality Crisis Coordinator activates the Water Quality Crisis Management Center (CMC), if called for; 5. the CMC directs the implementation of the TAP and recommends further actions, if required. This may require the notification of the Emergency Measures Organization for the municipality or corporation; 6. the CMC utilizes the Communication Plan to advise the public; 6

7. when the emergency is over, CMC is deactivated; and 8. the Water Quality Crisis Coordinator prepares a report on the incident and presents it to the Waterworks Emergency Planning Task Force for evaluation. Section 4 - Notification and Communication Emergency notification to customer The system notifies all system users via the following manner in case of an emergency (Check all that apply): Telephone calls (phone list location) Door to door Media release Other Emergency numbers distribution System users are provided the names and phone numbers of the system personnel to contact in case of emergency via the following manner (check all that apply): Billing Newsletter Other Media communications In any crisis situation, the media will receive information only from the designated spokesperson(s). The spokesperson(s) will call a media conference, give information over the phone or release a written statement. The website (www.yoursite.ca) will be updated as information becomes available. In the case of a major emergency or disaster, the emergency hotline will be manned 24 hours a day until the CMC determines that the crisis has ended. The phone at the office (###-####) will be utilized for this purpose. Media contacts Radio Radio Station-One Address Switchboard Phone: 306-###-#### Address Fax Phone: 306 ###-#### News Director 306 ###-#### News Department: 306 ###-#### Public Service Announcements 306 ###-#### Newspapers Paper-One Address Switchboard Phone: 306-###-#### Address Fax Phone: 306 ###-#### News Director 306 ###-#### News Department: 306 ###-#### Television TV-One Address Switchboard Phone: 306-###-#### Address Fax Phone: 306 ###-#### News Director 306 ###-#### News Department: 306 ###-#### Public Service Announcements 306 ###-#### Public Service Announcements 306 ###-#### 7

Official statements Emergency Boil Water Order Has Been Issued (Insert standard press release here) Emergency Boil Water Order Has Been Rescinded (Insert standard press release here) Precautionary Drinking Water Advisory Has Been Issued (Insert standard press release here) Precautionary Drinking Water Advisory Has Been Rescinded (Insert standard press release here) Refute a False Water Contamination Report (Insert standard press release here) Signs All example signs (Precautionary Drinking Water Advisory & Emergency Boil Water Order) are available from Saskatchewan Environment s document entitled Bacteriological Follow-up Protocol for Waterworks Regulated by Saskatchewan Environment, November 2002, EPB 205. Section 5 - Technical Action Plans Many emergency situations can lead to water quality degradation, for example, a main break, a power outage, pumping equipment failure or a natural disaster. Other emergency situations are a direct result of a water quality problem such as a waterborne disease outbreak, bacterial contamination of the distribution system or contamination of the source of supply. Water service can be disrupted by these events and water quality can be threatened if not degraded. The technical action plans included in this document are only examples and may not apply to your water system. TAPs are not typically included in your Municipal/Corporate Emergency Plan and therefore must be contained in the Water Quality Contingency Plan. The TAPs included in this document are only examples and may not apply to your water system 1) Flood conditions Trigger events: widespread flooding occurs. (Disaster) Actions notify SE Environmental Project Officer (EPO); notify users of the potential for water contamination, loss of pump, power, etc. Users should be advised to store some drinking water in advance and to boil any suspect water for at least one minute; notify priority customers; contact local media for public service announcement (where all customers can not be notified by phone); and Contact EPO), Saskatchewan Emergency Planning and others as necessary. 8

2) Outbreak of a waterborne disease Trigger events: local Health District notifies the water system of a confirmed outbreak. (Major emergency to disaster) 3) Contamination of source Trigger event: gross deterioration of source water due to a spill, vehicle accident or natural causes. (Major emergency) 4) Loss of source Trigger tvent: Access to source water is lost due to intake problems or natural causes (Major emergency) 5) Treatment process failure a) Loss of chlorine residual leaving plant Trigger events: chlorine level leaving the plant is less than 0.1 mg/l free chlorine. (Minor emergency) b) Loss of chlorine residual in distribution system Trigger events: chlorine levels at any place in the distribution system is less than 0.1mg/l free chlorine or 0.5 mg/l total chlorine. (Major emergency) c) Increased turbidity in filter effluent Trigger event: the effluent turbidity of a filter is greater than 0.3 N.T.U. (Minor emergency) Sudden increases generally indicate a system disturbance or treatment failure notify users of the potential for water contamination. Users should be advised to boil any suspect water for at least one minute; notify priority customers; contact local media for public service announcement (where all customers can not be notified by phone; and shut down pump; notify SE Environmental Project Officer; notify users; notify priority customers; contact government agencies (see below) for advice and assistance; and contact local media for public service announcement (where all customers can not be notified by phone). shut down pump; notify users; notify users of the potential for water contamination. Users should be advised to boil any suspect water for at least one minute; notify users of the potential for water contamination. Users should be advised to boil any suspect water for at least one minute; notify users of the potential for water contamination. Users should be advised to boil any suspect water for at least one minute; EPO), Saskatchewan Emergency Planning and others as necessary EPO), Saskatchewan Emergency Planning and others as necessary. Environmental Project Officer) and others as necessary. EPO), Chlorinator and chlorine suppliers Environmental Project Officer), Chlorinator and chlorine suppliers EPO) 9

d) Microbial contamination detected Trigger event: a positive microbial test result is received for the treated water. (Routine incident to major emergency) e) Pump system failure Trigger events: all pumps fail and unable to supply water or distribution system pressure drops (Minor Emergency) f) Other treatment process failure Trigger events: loss of coagulation, or other significant process failures. (Routine incident to major emergency) 6) Power failure Trigger events: power outage. (Minor emergency) 7) Distribution system problems a) Backflow or back siphonage/ significant loss of pressure in the system Trigger events: backflow or contamination is widespread throughout the distribution system (Major emergency) Follow Saskatchewan s Bacteriological Protocol for Waterworks Regulated by Saskatchewan Environment EPB 205 procedures document notify users of interruption of service; and notify priority customers. notify users of the potential for water contamination. Users should be advised to boil any suspect water for at least one minute; start backup generator, if possible; notify users of interruption of service if backup pump not capable of maintaining supply; call SaskPower. notify users of to boil their water for at least one minute or take other disinfection procedures or as instructed by SE ; purge and disinfect lines as directed. As per Saskatchewan s Bacteriological Followup procedures document. EPO), Pump supplier EPO) EPO) EPO) 10

b) Water breaks - sanitary repair procedures Trigger event: main line breaks (Major emergency) Repairing a main break is the most common type of emergency maintenance in a distribution system. Depending on site-specific conditions, a main break may be a source of contamination. For example, if the damaged pipe is below the water table or in contact with a sewage or storm water main, contamination may occur. As noted, maintenance procedures differ for main breaks between those breaks likely and unlikely to cause contamination. Contact your local EPO if you are unsure about whether contamination is expected for a particular break. If contamination is not expected: call excavation contractor; treat the replacement pipe and fittings with a chlorine solution; and notify downstream users of interruption of water service, if required. If the existing main is partially or wholly dewatered, some of the following steps may be necessary to repair the main: Actions (AWWA C651-99): control water loss by completely or partially shutting down the main. flushing may be used to minimize flow toward the damaged main, thus reducing the extent of possible contamination; water should be reduced to a level below the break as quickly as possible.groundwater may be treated with hypochlorite while repairs are underway. If the water appears to be clear, a 25 to 50 ppm dose may be sufficient. If sewage is present, a dose greater than 100 ppm is suggested; customers at higher elevations than the break should be notified to shut off the inlet valve at their meter to prevent siphoning of hot-water tanks or water softeners; extensive flushing may be used to purge possible contaminants and to bring clear water to the point of damage; chlorine residuals should be checked hourly to evaluate the effectiveness of pumping and flushing procedures; mains which have been repaired after a break or leak need to be cleaned, disinfected and monitored before being returned to service; and monitoring that follows a main disinfection or the addition of a new facility usually entails a check for microbial activity, ph, turbidity, color, disinfectant residual, odor and an analysis for volatile organic compounds that may be associated with the application of coatings. Owners of the water system, excavation contractor and others as necessary EPO), excavation contractor and others as necessary. Trigger event: storage facility break (Major emergency) Emergency repair of finished water storage facilities is warranted by conditions such as: penetration due to localized corrosion; penetration or splits due to extensive metal loss; high turbidity and/or bacteria from excessive sediment; or animal contamination due to screen failure. Generally, emergency maintenance on steel or concrete storage facilities involves temporarily plugging a hole or other penetration in the facility wall. Ultimately, however, the temporary repair should be replaced with a welded patch. temporarily plug hole or other penetration in storage facility wall, if required flush the water from the storage facility; notify users if an interruption in service is expected; contact government agencies (see below) for advice and assistance; and contact contractor to permanently repair puncture. (ie. welded patch on a steel reservoir). 11 EPO), Saskatchewan Emergency Planning and others as necessary

8) Customer complaints Trigger event: consumer complaint (Routine incident) Water quality complaints should be logged in a retrievable format for tracking and reporting purposes. Tracking the complaints can help identify problem areas of the system. Temporary fixes (such as flushing) should not be used to address chronic water quality problems (such as excessive chlorine demand, turbidity, sediment, corrosive water, etc.). log the water quality complaint; investigate the water quality complaint; None 12