BOUALI Anis Mobile : +21654993919 Mail : anis-bouali@live.com PERSONAL DATA Date of Birth: 7 th of July 1981. Age: 34Years. Place of Birth: Tunis Nationality: Tunisian. M-S: Married Home Address: Tunis Work Experience From 13/09/2014 to 20/09/2015: Company name: Wood Style Furniture (Dubai) Position: Planning Manager Constructing a network of work appropriate for the specific project Identifying the best series of events in the correct order for the project to finish on time and on budget Presenting the schedule of work to others in the company and the client organization involved with the project Developing detailed yet simple to understand schedules and graphs Producing visual aids to help explain the schedule of work, including bar charts and network diagrams Using specialist computer software to help keep the project on course Monitoring the progress of the project at different stages of its development Making sure the achieved progress on the project fits the progress anticipated in the schedule 1/5
Keeping in contact with the project manager Making adjustments to schedules if necessary Liaising with individuals on the project (who may be in another country) via video conference Providing advice to people involved in the project Ensuring that all the separate elements of the project fit together and are working towards a common aim From 01/09/2011 to 30/06/2014: Company name: Emicool (Dubai) Position: Project Engineer Supports plant operations by identifying and solving operational problems. Identifies operational problems by observing and studying system functioning and performance results; investigating complaints and suggestions; interviewing process supervisors and operators; completing troubleshooting procedures. Identifies operational priorities by assessing operational objectives; determining project objectives, such as, efficiency, cost savings, energy conservation, operator convenience, and safety, environmental quality estimating relevance, time, and costs. Develops operational solutions by defining, studying, estimating, and screening alternative solutions; calculating economics; determining impact on total system. Anticipates operational problems by studying operating targets, modes of operation, unit limitations; monitoring unit performance. Improves operational quality results by studying, evaluating, and recommending process re-design; implementing changes; contributing information and opinion to unit design and modification teams. 2/5
Maintains safe and healthy work environment by following and enforcing standards and procedures; complying with legal regulations. Provides operational management information by collecting, analyzing, and summarizing operating and engineering data and trends. Updates job knowledge by participating in educational opportunities; reading professional publications; maintaining personal networks; participating in professional organizations. Accomplishes engineering and organization mission by completing related results as needed. From 20/09/2010 to 30/06/2011: Company name: SICOR (Tunisia) Position: Project Engineer Client: BOMBARDIER Canada Meeting with clients to develop solutions Preparation of drawings and sending them to our subcontractors in France Development of structure to simplify the operation of positioning the spindles wired during assembly by our client on their aircraft. Monitoring and control of our subcontractors for compliance with the date and quality required on the contract Organization of the teams worker and conduct of the different type of operation From 01/07/2007 to 31/12/2009: Company name: CASE4DE (Tunisia) Position: Research and development engineer Project: AIRBUS A-380 Design of the aircraft structure done section by section respecting the layout Standard using CATIA advanced feature. Allocation of space for each item in the aircraft 3/5
Creating a layout that will serve as the basis for development of each element of the aircraft Design of the VIP area and monument A380_Lopa Integration of seats and monuments in the assembly Managing the distribution of seats to provide maximum number on the plane or for more comfortability as requested by the client Integration of seats and monuments in the assembly Building seats. Creation of placards to be adapted to the new configuration of the aircraft Education: From 2004 to 2008: Mechanical Engineer From 1987 to 2001: High school in science Training and Project: TUNISAIR COMPANY From 15/02/2008 to 20/06/2008: Project of end of study to the airline company TUNISAIR which has the subject of design of a testing machine for the maintenance of the pneumatic valves to minimize the annual losses of the company to repair this equipment outside of the cuntrie due to the no judgment for the state of the equipment that it is functional or not. TUNISAIR COMPANY From 27/02/2006 to 25/03/2006: training as engineer course with the airline company TUNISAIR which aims at to develop a technical manual for the maintenance of the APU (Auxiliary Power Unit ATA 36) by applying AMDEC (new model of maintenance) for the determination of the modes of failure of the various bodies and their criticalities. TUNISAIR COMPANY From 08/08/2005 to 08/09/2005: training course with airline company TUNISAIR in which I tried to 4/5 have a general vision on the activity of maintenance when it is
Computer skills: Software of computer-aided design CAD: CATIA SolidWorks Analytical Mechanics: Abaqus Ansys IRIS Project Software Primavera planning Microsoft project Rockwell arena Simul8 Others: ERPI, Delphi, statistica, GPAO, GMAO office, internet Languages: s Arab: very good English: good French: very good More about me: I'm a person how enjoy working in an environment that offer's me a challenge at every corner. 5/5