ICT Benchmarking: Better Practice Roadmap



Similar documents
ICT Benchmarking: Better Practice Roadmap Attachments

Australian Government ICT Trends Report

Request for Proposal. Supporting Document 3 of 4. Contract and Relationship Management for the Education Service Payroll

Migrating to the Cloud. Developing the right Cloud strategy and minimising migration risk with Logicalis Cloud Services

Commonwealth Risk Management Policy

Selecting a project management methodology

Applying CMMI SM In Information Technology Organizations SEPG 2003

ICT Business Case Guide

POSITION INFORMATION DOCUMENT

POSITION INFORMATION DOCUMENT

Financial Considerations for Government Use of Cloud Computing

MANAGING DIGITAL CONTINUITY

Guidance for Australian Government Agencies and Funding Recipients

Maturity Model. March Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce

Australian Government Cloud Computing Policy

Director Global IT Service Delivery Information Services

Project Assessment Framework Establish service capability

POSITION INFORMATION DOCUMENT

Australian Government Cloud Computing Policy

SIAM Procurement G-cloud 7 framework

UNSOLICITED PROPOSALS

Information Management & Technology (IM&T) Strategic Plan

Enhanced Commonwealth Performance Framework. Discussion Paper

SourceIT User Notes. Specific Clauses. Licence and Support Contract Commercial off-the-shelf Software RELEASE VERSION 2.

<Business Case Name> <Responsible Entity> <Date>

Cloud-Based ICT Services Checklist

Role Description Enterprise Architect and Solutions Delivery Manager

Capitalisation of Software

ISEB MANAGER S CERTIFICATE IN ITIL INFRASTRUCTURE MANAGEMENT. Guidelines for candidates who are taking the ICT Infrastructure Examination

Developing and Managing Internal Budgets. top-down. embed. hasing variation. allocation. forecasting. bottom-up

This work is copyright and owned by the Commonwealth of Australia.

Management of Accounts Receivable

Sample Exam. IT Service Management Foundation based on ISO/IEC 20000

Standard 1. Governance for Safety and Quality in Health Service Organisations. Safety and Quality Improvement Guide

Information Sharing Lessons Learned from Gateway Reviews: Gate 5 Benefits Realisation Review

TEC Capital Asset Management Standard January 2011

AUSTSWIM Strategic Plan January 2014 December 2017

Research Data Management Framework: Capability Maturity Guide

Protective security governance guidelines

Application Value Assessment

Assurance Reviews Process - A Handbook for Conducting Assurance Reviews Resource Management Guide No Archived

ITIL 2011 Lifecycle Roles and Responsibilities UXC Consulting

Framework: Supporting transformation of government financial

Information Communication Technology

Quick Guide: Meeting ISO Requirements for Asset Management

Management of Business Support Service Contracts

Report to Parliament No. 4 for 2011 Information systems governance and security. Financial and Assurance audit. Enhancing public sector accountability

Digital Asset Manager, Digital Curator. Cultural Informatics, Cultural/ Art ICT Manager

Guide to the National Safety and Quality Health Service Standards for health service organisation boards

Continuous Risk Management Guidebook

The Rise of Service Level Management in ITIL V3. April Oblicore, Inc.

Consultancy spending approval process: Initial guidance to NHS foundation trusts

Information Management: A common approach

Expert. Trusted. Effective. IT managed services tailored to you. From Modern Networks.

CONTROL AND COMPLIANCE AUDITS

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)

Job Description. Job Title: Department: ICT Service Support Manager Responsible to:

Global Mobility Outsourcing

Resource Management Guide No Property Management Planning Guidance

Cloud Computing Strategy. an addendum to the. Queensland Government. ICT Strategy Queensland Government

Single Stage Light Business Case Template

Internal Audit Quality Assessment Framework

ITIL Managing Digital Information Assets

Client Skills: Skills required by Government as the Construction Industry Client

ITIL. Lifecycle. ITIL Intermediate: Continual Service Improvement. Service Strategy. Service Design. Service Transition

Mapping the Technical Dependencies of Information Assets

The Human Capital Management Systems Business Case A Checklist to assist agencies developing a business case

NSW Government ICT Benefits Realisation and Project Management Guidance

POSITION INFORMATION DOCUMENT

Employability Skills Summary

Delivering value to the business with IAM

Transition and Transformation. Transitioning services with minimal risk

Australian National Audit Office. Human Resource Management Performance Audit

ICT Category Sub Category Description Architecture and Design

Intelligent Customer Function (ICF)

Industry Metrics for Outsourcing and Vendor Management

Big Data Strategy Issues Paper

WHAT IS SOFTWARE PERFORMANCE ENGINEERING? By Michael Foster

TGA key performance indicators and reporting measures

Australian Computer Society. Policy Statement

SECTION 1 POSITION DETAILS. Classification: Executive Level 1 Salary $94,445 - $104,254* Enabling Services

SITA Service Management Strategy Implementation. Presented by: SITA Service Management Centre

Australian Government Data Centre Strategy March Coordinated. Efficient. Sustainable.

NEC Contact Centres (Genesys)

Information Services Strategy

Third Party Identity Services Assurance Framework. Information Security Registered Assessors Program Guide

AER reference: 52454; D14/54321 ACCC_09/14_865

Transcription:

ICT Benchmarking: Better Practice Roadmap PART 1 VERSION 1.0 ICT Benchmarking: Better Practice Roadmap 1

Licensing The Department of Finance and Deregulation is licensed to use, reproduce, adapt, modify, distribute and communicate the information contained in the ICT Benchmarking: Better Practice Roadmap document. With the exception of the Commonwealth Coat of Arms, and subject to any copyright notices contained in individual documents, all material presented in the ICT Benchmarking: Better Practice Roadmap document is provided under a Creative Commons Australia Licence (Attribution-NonCommercial 3.0 Unported) (http://creativecommons.org/licenses/by-nc/3.0/). To the extent that copyright subsists in a third party (such as in the material relating to the definitions of cost elements and service towers at pages 6 to 8), permission will be required from the third party to reuse the material. The document must be attributed: ICT Benchmarking: Better Practice Roadmap. Use of the Coat of Arms The terms under which the Coat of Arms can be used are detailed on the following website: http://www.itsanhonour.gov.au/coat-arms/. Contact us Inquiries regarding the licence and any use of this data are welcome at: ICT Skills, Capability and Investment Branch Australian Government Information Management Office Department of Finance and Deregulation John Gorton Building King Edward Terrace Parkes ACT 2600 Email: AGIMO.feedback@finance.gov.au The capability maturity model used in this document is loosely aligned with CMM and other maturity model principles, but it is in no way endorsed by Carnegie Mellon Software Engineering Institute, or represented as a valid CMM or CMMIcompatible product. CMM, CMMI and Capability Maturity Model are registered in the US Patent & Trademark Office by Carnegie Mellon University. ICT Benchmarking: Better Practice Roadmap 2

Contents 1. Executive Summary 4 1.1 Purpose 4 1.2 Roadmap to improved ICT Benchmarking 4 1.3 The Benefits of Improving Benchmarking Maturity 5 2. ICT Benchmarking Roadmap 7 2.1 Capability Maturity Model 7 2.2 Strategies to Improve Maturity 9 2.3 Level 1 to Level 2 9 2.4 Level 2 to Level 3 10 2.5 Level 3 to Level 4 10 2.6 Level 4 to Level 5 11 2.7 Implementation Assistance 12 3. Models for Preparing Cost and Personnel Data 13 3.1 Preparing Cost and Personnel Data 13 3.2 Investment 15 4. Volume Information 16 4.1 Collecting Volume Data 16 Attachments Separate document Part 2 ICT Benchmarking: Better Practice Roadmap 3

1. Executive Summary A mature ICT organisation actively manages ICT expenditure; the benchmarking process is integrated within the management planning and control framework. 1.1 Purpose Benchmarking is the process of improving performance by continuously identifying, understanding, and adapting practices and processes. The Australian Government conducts ICT Benchmarking to measure improvement in the efficiency and effectiveness of ICT services in Financial Management and Accountability Act agencies. This Guide has been developed to: improve the quality of the benchmarking data; and streamline the preparation process for agencies. The Guide provides a number of alternative solutions for preparing ICT benchmarking data, which can be tailored to the individual requirements of agencies and the level of investment that is considered appropriate. The proposed solutions are based on actual working models from Australian Government agencies. The Guide, intended for Chief Information Officers, Chief Financial Officers, senior managers, and the practitioners responsible for preparing the benchmarking data, provides a framework for self assessment based on a capability maturity model. Agencies are encouraged to share better practice in ICT benchmarking and AGIMO can facilitate this by providing contacts in mature organisations (see section 2.7). 1.2 Roadmap to improved ICT Benchmarking Agencies can identify what level of maturity they currently have and develop strategies to improve performance and move to the next level of maturity. The capability maturity model (CMM) provides a road map to advise agencies on the strategies to achieve the next level of maturity. Based on a continuum of five levels 1 as presented in Figure 1, each level in the CMM incrementally builds on the performance criteria in the lower levels. 1 The CMM levels are based on the P3M3 format.

Figure 1 Capability Maturity Model Level 5 Optimised Level 2 Repeatable Level 3 Defined Policies, processes and standards are well defined Level 4 Managed Risks are defined and managed Evidencebased funding Rigorous measurement Best in class processes Knowledge management Exploiting opportunities Source of competitive advantage Level 1 Initial Individual heroics Each year a new process High cost and inefficient Established process Common language Right people assigned Basic tools in place Uniformly applied Data integrity is acceptable Able to meet timeframes Efficient systems and processes High data integrity Low level data integrity Extended timeframe 1.3 The Benefits of Improving Benchmarking Maturity Many agencies are using benchmarking as a systematic tool for better ICT expenditure decision making. They benchmark their performance against their peers, identify where improvements can be made and seek out best practice from other organisations. The following table summarises how using this Guide to improve your benchmarking maturity can have wider organisational benefits. ICT Benchmarking: Better Practice Roadmap 5

Table 1- The Benefits of Improving Benchmarking Maturity Organisational Benefit Sustainability of operations Maintenance of assets Better system performance Maintain human resource capability Better in-house / outsource decisions Better service levels Improved relationship with business Benchmarking Maturity Improvement Evidence-based funding Strategy and best practice defined for each Service Tower Business systems generate volume data Monthly attribution of personnel costs to Service Towers Clearly defined BAU baseline Depth of understanding of the cost structure, drivers and pressures Informed negotiations to support funding requirements ICT Benchmarking: Better Practice Roadmap 6

2. ICT Benchmarking Roadmap 2.1 Capability Maturity Model To assist agencies determine their current level of maturity the Benchmarking CMM Tool is provided on the Finance website. Table 2 provides a high level overview of the CMM and a guide to determining current maturity; the people, process and system elements required to move to higher levels. A detailed description CMM is available in Attachment A. Table 2 Elements of the Capability Maturity Model Criteria Level 1 - Initial Level 2 - Repeatabl e Level 3 - Defined Level 4 - Managed Level 5 - Optimised Benchmarking People Appropriately skilled and experienced practitioner X Assign responsibility for each Service Tower to IT Managers X X Business rules defined X X Validation process to ensure correctness of data Centralised procurement and purchase orders X X X X X X System Functional tool in place to prepare benchmarking data Code supplier transactions to Service Towers X X X X Business systems generate volume data X X X ICT Benchmarking: Better Practice Roadmap 7

Criteria Level 1 - Initial Level 2 - Repeatabl e Level 3 - Defined Level 4 - Managed Level 5 - Optimised External personnel data is available from standard process Monthly attribution of personnel costs to Service Towers Project ledger with Work Breakdown Structure (WBS) Benchmarking data is available at the service tower level at any time during the year X X X X X X X X X X X X X X X Management of ICT Expenditure People Senior Manager appointed at the appropriate level of seniority with functional responsibility for managing resources and controlling ICT expenditure X X X Explain variations between years X X Clearly define business as usual baseline X X Depth of understanding of benchmarking structure X X BM data informs strategies X X Strategy and best practice defined for each Service Tower Depth of understanding of the cost structure, drivers and pressures X X X X X X X Centralised CIO organisation X X X X Informed negotiations to support growth in BAU funding System Align benchmarking data structures with management planning and control framework (e.g. budgeting and reporting) X X X X X X X ICT Benchmarking: Better Practice Roadmap 8

2.2 Strategies to Improve Maturity The roadmap is intended to advise agencies on the strategies to achieve the next level of maturity in the CMM. Any investment by agencies to improve the ICT benchmarking process requires a value proposition (i.e. benefits outweigh the costs). Further investment can be more readily justified if the benchmarking process is integrated within the management planning and control framework and is not viewed as an annual compliance process. Further detail on the CMM is available in the Attachments. Figure 2 illustrates the high-level strategies to move from one level to the next along the roadmap. Figure 2 ICT Benchmarking Road Map Financial, personnel and operational data is available at the Service Tower level at any time during the year Level 5 Optimised Align the data structures in business systems to capture data (ie transactions, volume, FTE) Level 4 Managed Establish business rules, Service Tower responsibilities, and define BAU baseline Level 3 Defined Develop better source data collection and cost attribution process Level 2 Repeatable Level 1 Initial 2.3 Level 1 to Level 2 Level 1 Initial is an ad-hoc process that is not well defined and is considered inefficient, relying on the effort of key individuals. Level 2 Repeatable is an established process which is repeated on a consistent basis each year using a common language and appropriately skilled and experienced staff. The proposed strategies to advance from Level 1 to Level 2 include: Define the process for the preparation of the benchmarking data to establish a common language; Socialise the Business Rules with IT Managers to improve the level of awareness; Ensure that an appropriately skilled and experienced person is assigned to prepare the benchmarking data (i.e. depth of understanding of ICT processes and business functions and ICT cost drivers and cost structure, and business and cost analyst skills); and Develop a cost attribution process, ie the Base Model (see section 3) to assign input costs to Service Towers, including documenting the management estimates used to attribute cost and personnel data to Service Towers etc. ICT Benchmarking: Better Practice Roadmap 9

2.4 Level 2 to Level 3 Level 3 Defined has well defined policies, processes and procedures which are uniformly applied to generate quality data in an efficient and timely process. The proposed strategies to advance from Level 2 to Level 3 include: Develop a functional attribution model to calculate the costs and attribute the personnel data (ie the Base Model); Establish a well defined data collection process for collecting source data (financial, human resources, and operational 2); Define Business Rules in a formal document which has been disseminated to all IT Managers; Assign responsibility for each Service Tower to an IT Manager who is required to sign off on the benchmarking data, explain any material variations between years, consider the benchmarking data, discuss with comparable agencies, and suggest performance improvement strategies where relevant; and Clearly define the BAU baseline and separate resources between BAU and non-bau activities. 2.5 Level 3 to Level 4 Level 4 Managed involves management engaging in extensive debate on funding levels, performance and resource management strategies based on substantive evidence which has been generated from robust systems and processes. The proposed strategies to advance from Level 3 to Level 4 include: Align the data structures in the Financial Management Information System (FMIS) and supporting systems to the benchmarking data formats, ie the Extended Model (see Section 3); Direct data capture of supplier transaction data against Service Towers using purchase orders; Time recording and project ledger to capture staff effort and attribute costs and FTE to BAU and non-bau activities; Map asset classes to Service Towers in the Asset Register to determine depreciation costs; Operational volume data and IT contractor FTE is directly accessible from functioning business systems as a standard reporting process; Centralise ICT expenditure (i.e. minimise decentralised ICT functions); 2 Operational data is based on evidence and not guesstimates. ICT Benchmarking: Better Practice Roadmap 10

Develop performance improvement strategies for each Service Tower which have been informed by the benchmarking data and follow up discussions with comparable agencies; Appoint a Senior Manager (i.e. Financial Controller 3) to be responsible for controlling ICT expenditure and managing resources and ensuring an effective front door (i.e. no additional funding no additional services); Develop separate budgets for BAU and non-bau; and Negotiate funding levels with the Executive based on informed discussions underpinned by substantive evidence. 2.6 Level 4 to Level 5 Level 5 Optimised is a source of competitive advantage that enables agencies to exploit opportunities and achieve best in class results. The proposed strategies to advance from Level 4 to Level 5 include: Integrate the ICT benchmarking process into the management planning and reporting processes and generate management information by Service Tower as a standard management report, ie the Advanced Model (see Section 3); Use the benchmarking data to inform the sourcing strategy and define service categories for market testing; Share better practice processes with peer agencies; Define the BAU baseline Service Level Standards (SLS) for each Service Tower and socialise with business units; and Develop a funding model which accounts for growth in workload associated with changes in the business and ICT environment and agree any changes in the BAU baseline upfront in business cases (i.e. flow on costs). 3 The Financial Controller would have management responsibility for all functions described in the paper entitled Management of ICT Expenditure. ICT Benchmarking: Better Practice Roadmap 11

2.7 Implementation Assistance Further detail on implementing the Roadmap is available in the Attachments. A number of agencies, which are currently at different levels of maturity, have indicated their willingness to assist other agencies with strategies and practical advice to improve operations. AGIMO is able to provide contact details and facilitate discussions between agencies. ICT Benchmarking: Better Practice Roadmap 12

3. Models for Preparing Cost and Personnel Data 3.1 Preparing Cost and Personnel Data Three alternative models are provided for the preparation of the cost and personnel data required for the ICT benchmarking process: Base Model: this is an end of year attribution process which is largely based on management estimates (Level 2 Repeatable, and 3 Defined ); Extended Model: this builds on the Base Model s attribution process with a more robust costing tool, capture of supplier costs by Service Tower at the transaction data entry point, and utilises staff effort data from time recording system to attribute internal and external personnel costs to Service Tower (Level 4 Managed ); and Advanced Model: fully integrated FMIS solution with the financial source data capture at the transaction data entry point and alignment of data structures (Level 5 Optimised ). Figure 3 illustrates the alignment of the roadmap with the three models for preparing cost and personnel data. Figure 3 Cost and Personnel Data Preparation Models ADVANCED MODEL Level 5 Optimised EXTENDED MODEL Level 4 Managed BASE MODEL Level 3 Defined Level 2 Repeatable Level 1 Initial ICT Benchmarking: Better Practice Roadmap 13

Table 3 provides a summary of the key features of each of the three models. These models together represent an incremental approach to achieving best practice (i.e. they build progressively on each other to achieve the goal of best practice). Table 3 Alternative Models for Preparing Cost and Personnel Data Base Model Defined End of year attribution process to attribute input costs and personnel data to Service Towers and other outputs Well defined and documented business rules for the preparation of the benchmarking data Fully functional cost model using spreadsheet tools based on defined business rules to prepare the cost and personnel data Validation process to ensure the correctness of the benchmarking data Structured data collection process using standard templates High level of reliance on management estimates Extended Mode Managed Evidence based cost driver data using staff effort data sourced from a time recording system for internal and external personnel (replace management estimates where appropriate) Standard process for maintaining external personnel FTE data (hourly rates, start/end dates, cost centre and contribution areas) Depreciation costs are captured by asset class and mapped to Service Towers Billing data from major suppliers identifies the split by Service Tower Use of an FMIS costing module to undertake the cost attribution to Service Towers Advanced Model Optimised Align internal systems with the benchmarking data structures (e.g. Service Towers, ICT cost elements, and contribution areas) All ICT supplier transactions are captured at the transaction data entry point by Service Tower in all financial applications in the FMIS (e.g. payables, purchasing and assets) Centralised procurement and use of purchase orders to code all ICT supplier transactions to Service Towers Costs coded to a Project Ledger with a multiple level WBS data structure which includes Service Towers (centrally managed data structure) Monthly attribution of internal and external personnel to Service Towers based on time sheet data Classify internal and external personnel against Contribution Areas Consistent data entry process for actual and budget data Resource planning at the individual resource level to determine the level of effort for each activity performed using ICT Benchmarking: Better Practice Roadmap 14

Base Model Defined Extended Mode Managed Advanced Model Optimised the WBS hierarchy Financial, personnel and operational volume data is available at the Service Tower level at any time during the financial year and is included in standard management reports 3.2 Investment The base model requires a modest level of investment and represents an effective solution for agencies to prepare benchmarking data and improve ICT cost management. The extended model represents a step improvement from the base model to improve the level of data integrity. The advanced model requires a significant investment and could be considered by for large agencies with a considerable level of ICT expenditure. As agencies may be is at a different stage of development, the extent of change, and level of investment, when implementing any of the models would be expected to vary across agencies. Detailed guidance on developing the Base, Extended and Advanced Models for cost and personnel data is available in the Attachments. ICT Benchmarking: Better Practice Roadmap 15

4. Volume Information 4.1 Collecting Volume Data For many agencies the collection of volume information (with the exception of simple data sets such as the number of personal computers (PCs)) is not supported by established processes and systems for data capture. There is an opportunity to improve the level of data integrity through establishing standard processes and business rules. A key issue is the cost/benefit advantage of the level of investment required to establish a more structured environment for the collection of this data, especially where the data is only used for external compliance. This section provides better practice data collection methods for each volume metric required to be reported as part of the ICT benchmarking process (Level 4 Managed ). It also suggests value added uses of the data for agencies. Table 4 provides a summary of the volume information required for the ICT benchmarking process. Further detail is provided in the Attachments. Table 4 Volume Information Service Tower Benchmarking Data Method Applications Not applicable Mainframe Capacity and utilisation Mainframe management systems Midrange Volumes, operating system (OS) instances, physical servers, central processing units (CPU) and utilisation data Configuration Management Data Base and/or software asset management systems and network monitoring software Storage Storage capacity Storage management systems WAN Gateways LAN and RAS Wide area Network (WAN) link capacity Upload and download volume information Number of active and used Local Area Network (LAN) ports Network management systems Management systems Management systems End User Infrastructure Number of standard operating Configuration Management Data Base or asset management ICT Benchmarking: Better Practice Roadmap 16

Service Tower Benchmarking Data Method environments (SOEs) and users Number of items Average time to replace items system Voice Services Number of devices Configuration Management Data Base or asset management system Help Desk Number of calls and incidents Service desk management system Facilities Volume (square meters) Future planning for the data centre and power requirements Facilities management reporting Infrastructure management planning Detailed guidance on developing volume data is available in the Attachments ICT Benchmarking: Better Practice Roadmap 17