Uniform Application of MARPOL Annex I, Revised Regulation 12



Similar documents
ST. VINCENT AND THE GRENADINES

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

Technical Bulletin. Oil Record Book entries: Machinery space operations (Part 1) Including January 2011 amendments to Technical Bulletin 24

IMO WORK PROGRAMME OF THE COMMITTEE AND SUBSIDIARY BODIES

ежглеяис тгс йубеямгсеыс

Survey Guidelines for MARPOL Annex I under the Harmonized System of Survey and Certification (HSSC), 2011

REVISED CONSOLIDATED FORMAT FOR REPORTING ALLEGED INADEQUACIES OF PORT RECEPTION FACILITIES

Merchant Marine Circular No. 178

Oily Water Separator SKIT/S-DEB

Discharge of Water & Waste from Marine Vessels Standards & Regulations (MARPOL Convention)

Frequently Asked Questions: North American Emission Control Area (ECA) U.S. Coast Guard Office of Commercial Vessel Compliance

GUIDELINES FOR THE DRAINAGE OF FIRE-FIGHTING WATER FROM CLOSED VEHICLE AND RO-RO SPACES AND SPECIAL CATEGORY SPACES OF PASSENGER AND CARGO SHIPS

ROOD BOVEN GROEN GARBAGE RECORD BOOK FOR ALL NAUTICAL AFFAIRS CONSULTING TRAINING SHIPMANAGEMENT. Name of ship: Distinctive number or letters:

Technical Interpretation by the Administration

Fuel Treatment and Conditioning Systems

Regulation of 15 September 1992 No. 693 concerning the Form and Keeping of Log Books for Ships and Mobile Offshore Units

Bunkers Regulatory and Practical Considerations. Piraeus, 8 November 2012 Capt. Simon Rapley

THE REPUBLIC OF LIBERIA LIBERIA MARITIME A

Marine pollution prevention pocket checklist Revision 3

Procedure Manual. Shipboard Oil Pollution Emergency Plan (SOPEP)

Marpol 73/78 Annex VI Regulations for the Prevention of Air Pollution from Ships. Technical and Operational implications

How To Check If A Shipyard Is Asbestos Free

Introducing Vessel Environmental Compliance Reporting and Energy Management: From ESRG

IACS QUALITY MANAGEMENT SYSTEM CERTIFICATION SCHEME (QSCS)

Frequently asked questions

Annex IV of MARPOL 73/78. Regulations for the Prevention of Pollution by Sewage from Ships

Engine Room Console 6

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society

Corrosion protection of crude oil cargo tanks new IMO regulations

WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL

Issues and measures for use of low-sulfur fuel oil

General Information for Ship Owners to obtain the International Air Pollution Prevention certificate according to MARPOL 73/78 Annex VI

INTERPRETATIONS OF, AND AMENDMENTS TO, MARPOL AND RELATED INSTRUMENTS. Management of boiler/economizer washdown water

PureDry. Technical information Waste Fuel Recovery and Sludge minimization

ANNEX 5 RESOLUTION MEPC.127(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT OF BALLAST WATER MANAGEMENT PLANS (G4)

GUIDANCE ON DETENTION AND ACTION TAKEN

FURTHER TECHNICAL AND OPERATIONAL MEASURES FOR ENHANCING ENERGY EFFICIENCY OF INTERNATIONAL SHIPPING

SOx - FUEL CHANGE MANUAL. Manual No. 01

Ballast Water Management

Case 2:16-cr JCC Document 4 Filed 03/09/16 Page 1 of 9. By~ Deputy

(a) Purpose. The purpose is to safeguard potable water supplies by preventing backflow into public water systems.

IMO. 8 June 1998 *** I:\CIRC\MSC\848.WPD INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

EMISSIONS FROM MARINE ENGINES VERSUS IMO CERTIFICATION AND REQUIREMENTS OF TIER 3

Centre for Oceans Law & Policy Global Challenges and Freedom of Navigation. Panel VI: Balancing Marine Environment and Freedom of Navigation

FLORIDA HAZARDOUS WASTE MANAGEMENT REGULATIONS THAT DIFFER FROM FEDERAL REQUIREMENTS

Fact sheet 6: for farmers

Frequently Asked Questions

MARPOL Compliance. Training course brochure

ST. VINCENT AND THE GRENADINES

IMO Ships Systems & Equipment (SSE 1)

M. Dogliani Energy Efficiency Design Index (EEDI): norme IMO ed aspetti tecnici. PORT&SHIPPING TEC Green - Shipping Summit - Novembre 2011

Recognized Org: Bureau Veritas. Organization. to Detention: Ship Management:

How To Prevent Over Water Activities

Oily Water Separators

CITY of LOS ANGELES DEPARTMENT of BUILDING and SAFETY

CHAPTER PETROLEUM CONTACT WATER

Environmental Compliance

Domino VGS. Domino. Vertical Gravity Separator VGS. Oil Out. Clean Water Outlet. Oily Water In. Sludge Outlet. Everything Water PTY LTD

RULE DRY CLEANERS USING SOLVENT OTHER THAN PERCHLOROETHYLENE

Detainable and ISM Related Deficiencies noted in PSC inspection report of Class NK & NK-SMC ships in April 2015

Fee tariff for services of Port of Gdansk Authority SA

Ballast Water Management WÄRTSILÄ AQUARIUS BALLAST WATER MANAGEMENT SYSTEMS

GUIDANCE FOR DEVELOPMENT OF SPILL AND SLUG PREVENTION CONTROL PLANS AND FACILITIES FOR THE CITY OF ATTLEBORO SEWER USERS

Merchant Marine Circular No. 152

Prevention Pollution by Garbage from Ships in China. E Hailiang Deputy Director Maritime Safety Administration People s s Republic of China

RULE ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS

Managing Floor Drains and Flammable Traps

Tanker Officer Training Standards (TOTS) 4B Chemical Tanker Simulator Verification Course

Law Relating to the Prevention of Marine Pollution and Maritime Disaster

Hot Regulatory and Enforcement Issues: ECA, Ballast Water, VGP and the Jones Act

Marine System Technology Concepts and High Performance Equipment for the Engine Room from GEA Westfalia Separator

Copyright 2012 Mayekawa Mfg. Co.,Ltd. All Rights Reserved.

FLASH TANK ECONOMIZER PRODUCT GUIDE

TABLE OF CONTENT

IMO. REVIEW OF MARPOL ANNEX VI AND THE NO x TECHNICAL CODE. Development of Standards for NO x, PM, and SO x. Submitted by the United States

Separation technology solutions from GEA Westfalia Separator for the treatment of fluids in industrial applications

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion

Registered under: Instruction to RO s Nr. 10 Ban on the use of Asbestos on board ships

Exhaust Scrubbers. What you need to know. Move Forward with Confidence

Septic System Owner s Manual

CLASSIFICATION NOTES

International Maritime Dangerous Goods (IMDG) Special Provision 961 and 962

IMO REQUIREMENTS FROM JULY 2015 TO JULY 2018 INCLUSIVE

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

NFPA31FuelOilPiping 1 Revised

ADMINISTRATIVE SERVICES MANUAL

FACILITY ENVIRONMENTAL COMPLIANCE

DNVGL-CP-0209 Edition March 2016

Total water management. Water and wastewater treatment systems for ships and offshore

Sulphur Content in Marine Fuels

GUIDELINES FOR VOLUNTARY USE OF THE SHIP ENERGY EFFICIENCY OPERATIONAL INDICATOR (EEOI)

Environmental Permitting Guidance

Fact sheet 6: for farmers

Procedural Requirements for ISM Code Certification

77 ILLINOIS ADMINISTRATIVE CODE, PART 890 (NEW) ILLINOIS PLUMBING CODE (02/04) SUBPART I: WATER SUPPLY AND DISTRIBUTION

Session 4 Progress on Major Oceans and Climate Issues. Curbing Air Pollution from Ships, Geo-engineering Issues

Maritime and Coastguard Agency LogMERCHANT SHIPPING NOTICE. Training & Certification Guidance: UK Requirements for Engine Room Ratings

Sample Written Program. For. Flammable Liquids

OVERSEAS MARINE CERTIFICATION SERVICES (OMCS)

Remediation of Water-Based Drilling Fluids and Cleaning of Cuttings

Transcription:

(Dec 2011) Uniform Application of MARPOL Annex I, Revised Regulation 12 1. History of Revised Regulation 12 of MARPOL Annex - Following an increase in the number of prosecutions due to MARPOL Annex I sludge tank related issues, at MEPC 55 in October 2006 commenced a review of MARPOL Annex I Regulation 12. - A correspondence group looked into all sludge tank issues including Oil Record Books, IBTS and plan approval, reporting to DE 51 through paper DE 51/18/1. - DE 51 reviewed the CG report and a new Regulation 12.1bis was introduced to further define sludge tanks. - This was discussed at MEPC 58 where Regulation 12 was again reviewed and amended, Regulation 12.1bis becoming Regulation 12.2. MEPC.1/Circs 641 and 642 were also issued. - MEPC 59 further developed the text, issuing MEPC 187(59) and MEPC.1/Circ 676 (IBTS). - Korean paper MEPC 61/7/7 introduced a new Unified Interpretation concerning oil residue (sludge) service tanks. This text still included original UI 17.1.3 which stated that,.3. there should be no interconnections between the sludge tank discharge piping and bilge-water piping other than possible common piping leading to the standard discharge connection referred to in regulation 13. During discussions at MEPC 61, new MARPOL Unified Interpretations were approved and the old UI 17.1.3 was deleted. - MEPC.187(59) entered into force on 1 January 2011. - In July 2011 at MEPC 62 a new Unified Interpretation was agreed, published as MEPC.1/Circ 753 confirming that that Regulation 12.2.2 should not be retroactively applied to ships delivered before 1 January 2014, and reinstating the text from old UI 17.1.3 stating that, There should be no interconnections between the sludge tank discharge piping and bilge-water piping other than possible common piping leading to the standard discharge connection referred to in regulation 13. 2. Implications for ships: - This applies to new and existing vessels. - In effect, the change moved IMO Unified Interpretation 17.1.3 for vessels with keel laying after 31 December 1990; to a Regulation to vessels delivered after 1 January 2014. - Incinerator oil mixing tanks are now regarded as (sludge) service tanks. - In July 2011, at MEPC 62 a new Unified Interpretation was approved stating that Regulation 12.2.2 should not be retroactively applied to ships delivered before 1 January 2014 (contract before 1 January 2011; or in absence of contract keel laying before 1 January 2012; or delivered before 1 January 2014). Page 1 of 12 IACS Rec. 2011

3. Documents referenced: - MARPOL consolidated edition 2006. - MEPC.187(59). - MEPC 61 Meeting report Annex 14, modified by IMO MEPC.1/Circular 753 - MEPC.1/Circular 641. - MEPC.1/Circular 642, modified by MEPC.1/Circular 676. 4. Revised Regulation 12.2.1 - Designated - Regulation 12 2.1 states that, The oil residue (sludge) tank(s) shall be provided with a designated pump for disposal that is capable of taking suction from the oil residue (sludge) tank(s). - The Unified Interpretation to Regulation 12.2 states that, A designated pump should be interpreted as any pump used for the disposal of oil residue (sludge) through the standard discharge connection referred to in regulation 13, or any pump used to transfer oil residue (sludge) to any other approved means of disposal such as an incinerator, auxiliary boiler suitable for burning oil residues (sludge) or other acceptable means which are prescribed in paragraph 3.2 of the Supplement to IOPP Certificate Form A or B. - A Dedicated" pump is not necessary. - The Unified Interpretation requires that the pump is used as the means for the disposal of sludge. - It also implies that it may also pump oily bilge water to the standard discharge connection for disposal ashore. 5. Revised Regulation 12.2.2 - Sludge discharge piping - Regulation 12.2.2 states that The oil residue (sludge) tank(s) shall have no discharge connections to the bilge system, oily bilge water holding tank(s), tank top or oily water separators except that the tank(s) may be fitted with drains, with manually operated self-closing valves and arrangements for subsequent visual monitoring of the settled water, that lead to an oily bilge water holding tank or bilge well, or an alternative arrangement, provided such arrangement does not connect directly to the bilge piping system. - The Unified Interpretation published under MEPC.1/Circular 753 states that, There should be no interconnections between the sludge tank discharge piping and bilgewater piping other than possible common piping leading to the standard discharge connection referred to in regulation 13. - For ships delivered before 1 January 2014*, existing arrangements where the oil residue (sludge) tank(s) have discharge connections to oily bilge water holding tank(s), tank top or oily water separator may be accepted. Page 2 of 12 IACS Rec. 2011

- * Ship delivered before 1 January 2014 means a ship:.1 for which the building contract is placed before 1 January 2011; or.2 in the absence of a building contract, the keel of which is laid or which is at a similar stage of construction before 1 January 2012; or.3 the delivery of which is before 1 January 2014. - Ships delivered before 1 January 2014 will need to comply with the requirements in force at the time the ship was built. - Ships delivered after 1 January 2014 will need to comply with the requirements as shown below. 6. Revised Regulation 12.2.2 - Decanting Sludge to Bilge - Regulation 12.2.2 states that, The oil residue (sludge) tank(s) shall have no discharge connections to the bilge system, oily bilge water holding tank(s), tank top or oily water separators except that the tank(s) may be fitted with drains, with manually operated self-closing valves and arrangements for subsequent visual monitoring of the settled water, that lead to an oily bilge water holding tank or bilge well, or an alternative arrangement, provided such arrangement does not connect directly to the bilge piping system. - However, there is an exception to this general rule which allows draining of settled water from the sludge tank if certain conditions are met. 1. the water is drained only to the bilge water holding tank or bilge well (not to the bilge piping system or other bilge areas); and 2. the drains have a manually operated self-closing valve; and 3. the draining operation is visually monitored. - Visually monitored means monitoring the draining operation in real-time either through a site glass or through a funnel, whereby the draining can be stopped immediately if oil is seen. Page 3 of 12 IACS Rec. 2011

Sludge Tank The hopper is the preferred solution, as it is a more robust alternative to observe the drained fluids. A will have a tendency to become dirty over time, making visual observation difficult. In case of the double bottom bilge holding tank, the second valve needs to be installed under the hopper. Manually operated self-closing valve Bilge Tank - If the previous arrangement is not possible, such as in way of double bottom spaces, then the following could be a possible solution (an exemption would be required from the Flag Administration): - ing settled water from the double bottom oil residue (sludge) tank to an oily bilge water holding tank provided that the requirements of MARPOL Annex I, Regulation 12.2 are met and the other requirements of Regulation 12.2.2 are satisfied i.e.: 1. the water is pumped only to the oily bilge water holding tank or bilge well by a small oily sludge pump; and 2. the pumping operation is visually monitored by a responsible person; and 3. the stop/start control panel of the oily sludge pump must be located close to the operator checking the transfer of settled water. - If settled water is removed from the oil residue (sludge) tank using this method, the discharge line leading from the oil residue (sludge) tank must be connected directly to the oily bilge water holding tank or bilge well and must not under any circumstances connect directly to any section of the bilge piping system or bilge area. - In the event that the double bottom oil sludge or bilge holding tanks are damaged by grounding or stranding, the engine room may progressively flood via the transfer line to the bilge holding tank or via hopper as shown below. To prevent this situation, the above transfer lines are to be provided with manually operated self-closing valves or stop/close valves where appropriate to prevent the ER flooding in the event of damage to these double bottom tanks. Page 4 of 12 IACS Rec. 2011

The hopper is the preferred solution, as it is a more robust alternative to observe the drained fluids. A will have a tendency to become dirty over time, making visual observation difficult. Manually operated selfclosing/stop/close valves* Small Stop/start control panel of the oily sludge pump Sludge Tank Bilge * ) The second valve needs to be installed under the hopper, if settled water is transferred to the bilge holding tank. No valve needs to be installed under the hopper in case where settled water is transferred to the bilge well. Page 5 of 12 IACS Rec. 2011

7. Acceptable Arrangements for ships delivered after 1 January 2014 The following diagrams describe, in simplified form, some common compliant arrangements found on ships: Screw-down non-return valves The above arrangement is considered acceptable: - Where common arrangements are provided for the discharge of bilge water and sludge through the standard discharge connection, a screw-down non-return valve must be provided to prevent the accidental discharge of sludge to the bilge system. - The screw-down non-return valve stops possible discharge of oil residue (sludge) to the 15 ppm Filter Unit and also the Oil Bilge. Page 6 of 12 IACS Rec. 2011

Screw-down non-return valve The above arrangement is considered acceptable: - Where there are common arrangements for discharge of bilge water and sludge through the standard discharge connection, a screw-down non-return valve is arranged in the line to the common piping leading to the standard discharge connection required by Regulation 13. To satisfy this interpretation, the common line with a screw-down non-return valve is to be arranged on the suction side of the pumps; and - The screw-down non-return valve stops possible discharge of oil residue (sludge) to the 15 ppm Filter Unit and also to the Oil Bilge. Page 7 of 12 IACS Rec. 2011

(Sludge) Service Tank Screw-down non-return valves Incinerator The above arrangement is considered acceptable: - Where common arrangements are provided for the discharge of bilge water and sludge through the standard discharge connection, and the sludge can also be transferred to an incinerator, screw-down non-return valves must be provided to prevent the accidental discharge of sludge to the bilge system. - The screw-down non-return valve stops possible discharge of oil residue (sludge) to the 15 ppm Filter Unit and also the Oil Bilge. Page 8 of 12 IACS Rec. 2011

(Sludge) Service Tank Screw-down non-return valves Incinerator The above arrangement is considered acceptable: - Where common arrangements are provided for the discharge of bilge water and sludge through the standard discharge connection, and the sludge can also be transferred to an incinerator, screw-down non-return valves must be provided to prevent the accidental discharge of sludge to the bilge system. - This arrangement also allows for the transfer of suitable oily bilge water to the incinerator oil residue (sludge) service tank for burning. - The screw-down non-return valve stops possible discharge of oil residue (sludge) to the 15 ppm Filter Unit and also the Oil Bilge. Page 9 of 12 IACS Rec. 2011

8. Non-Compliant Arrangements for ships delivered after 1 January 2014 The following diagrams describe, in simplified form, some common non-compliant arrangements: Screw-down non-return valve The arrangement above is not acceptable as there is a sludge discharge connection to the oily water separator, bilge system and prohibited under Regulation 12.2.2. **************************************************** The arrangement above is not acceptable as there is a sludge discharge connection to the oily water separator, bilge system and prohibited by Regulation 12.2.2. Page 10 of 12 IACS Rec. 2011

The arrangement above is not acceptable as there is a sludge discharge connection to the oily water separator and bilge system prohibited by Regulation 12.2.2. **************************************************** Screw-down non-return valves The above arrangement is not acceptable as there is a sludge discharge connection to the oily bilge water holding tank prohibited by Regulation 12.2.2. Page 11 of 12 IACS Rec. 2011

The arrangement is not acceptable as there is a sludge discharge connection to the oily water separator, Bilge system and prohibited by Regulation 12.2.2. **************************************************** (Sludge) Tanks The arrangement above is not acceptable as there is a sludge discharge connection to the oily water separator, Bilge system and prohibited by Regulation 12.2.2. This arrangement is also not acceptable under MEPC.1/Circ.641 paragraph 5.3, as it is not permissible to use a common discharge pipe as an internal sludge transfer pipe between sludge tanks. End of Document Page 12 of 12 IACS Rec. 2011