Office Space Planning Guidelines August 2012



Similar documents
Supporting Agile Software Development With Agile Team Work Space

Executive Summary Environment/Behavior/Neuroscience Pre & Post- Occupancy Evaluation of New Offices for

Agile Office Space. Agile Center of Excellence Richard K Cheng

Office Space Standards and Guidelines Government of the Northwest Territories

THE UNIVERSITY OF EDINBURGH George Square Library

The WCO Guide to: A Glossary of Workplace Terms. The Workplace Consulting Organisation. Occasional Paper OP2 January 2013, v1.0

JSP 315 SCALE 45 1 OFFICES

Designer s Office in Malaysia: Comparative Analysis on Space Planning and Design Issues

9/19/2014. Facility Design with the Patients at the Center. Learning Objectives: A remarkable project

Interpolis Head Office Tilburg, Netherlands

Office Space Standards and Guidelines

Knoll Workplace Research. Adaptable by Design. Shaping the Work Experience. Dr. Michael O Neill Senior Director, Workplace Research Knoll, Inc.

Delivering Outstanding Value with Alternative Workplace Strategies

Collaborative Spaces. A White Paper by the Haworth Knowledge and Research Team

GUIDELINES FOR OFFICE SPACE ALLOCATION AT UMBC

REHUMANIZING THE FORMAL OPEN SPACE OFFICE DESIGN

Objectives. Chapter 4: Office Layout. Factors to Consider in Preliminary Panning. Benefits of Efficient Layout 1/15/2010

Space Management Guidelines

The Art Institute of Houston Summer 2010 Instructor : Rhonda Jones. 1. Concept Statement 7. One Line Diagram. 2. Program 8. Preliminary Floor Plan

NUMBER EFFECTIVE DATE. July 23, 2003

THE UNIVERSITY OF EDINBURGH. Number 5 Forrest Hill

Active Ergonomics for the Emerging Workplace. Dr. Michael O Neill

62% 40% 96% 90% 77% 40%

UTILIZAÇÃO DA LEAN METODOLOGIA. Desmistificando Aplicações Reais Para CME. Apresentado por John Kimsey

Revisiting Office Space Standards

From Conventional to Collaborative

Proportional Planning for the Adaptable Workplace

Open Office Plan. Function and Orientation. Space Characteristics. Material Properties Gregory Wolfe 2004 Senior Thesis Lighting / Electrical

THE UNIVERSITY OF EDINBURGH. Paterson s Land.

Part 2 Definitions for this Policy 2.1. ADA / TAS the Americans with Disabilities Act / Texas Accessibility Standards.

Open Plan and Enclosed Private Offices Research Review and Recommendations

THE LARGEST CONFERENCE CENTRE IN THE REGION

Cellular, Open Plan and Activity Based Workplace Arrangements

Houston, we have a solution

BUILDING NAMING RIGHTS

Tate s Wire & Cable Solution

Ahrend 750 The Smart Office. Ahrend 750 The Smart

GUIDE. SCHEDULING PROCESS For Canadian Practical Nurse Registration Examination (CPNRE ) COMPUTER-BASED TESTING. Information for Test Writers

THE DEVELOPMENT OF OFFICE SPACE AND ERGONOMICS STANDARDS AT THE CITY OF TORONTO: AN EXAMPLE OF SUCCESSFUL INCLUSION OF ERGONOMICS AT THE DESIGN STAGE

Data Center Cooling & Air Flow Management. Arnold Murphy, CDCEP, CDCAP March 3, 2015

Abbotsford Hospital & Cancer Centre Inc. Output Specification November 2004

Abbotsford Hospital & Cancer Centre Inc. Output Specifications November 2004 SITE ADMINISTRATION

Workplace Health, Safety & Welfare

Healthcare Solutions

Loss Prevention Reference Note. Adjusting the Computer Workstation. Glare Viewing Distance. Line of Sight Neck Posture Arm Posture Back Posture

FAUQUIER HIGH SCHOOL FAUQUIER HIGH SCHOOL 200 E MARKET STREET, CHARLOTTESVILLE, VA PH : WWW VMDO.COM

Preparing for a Trade Show: How to Market your Company Effectively. Piers Bocock

Multi-level order selector MO Series

How to Create a Productive Office Environment

The Empire State Building Repositioning an Icon as a Model of Energy Efficient Investment

WORKPLACE TRANSFORMATION: GSK AT THE NAVY YARD MAY 2013

Acoustic Comfort in the Workplace: Getting Back to the Basics

A WorkCafé transforms underutilized real estate, creating an on-site third place where people can meet, work, network, socialize and reenergize.

The Height of Efficiency & Innovation: The Alternative Workplace. How workplace strategy can impact real estate choices

Students were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces.

Just Because You Build It Doesn t Mean They Will Come

Back Porch. Insulation Option # 2 Includes Option #1 plus, Insulate Walls Separating Both Master Suites and Leisure Room

Consoles Product Guide. Great American Desk Company Great American Desk Company

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

Lean and Six Sigma Healthcare Fad or Reality. Vince D Mello President

Perspectives on Workplace Sustainability

125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008

Appendices: Ergonomic Case Study of an Audiologist Performing Visual Reinforcement Audiometry

Office Accommodation Workspace and Fitout Standards

Carts, Wall Mounts or Both? Exploring the Best Criteria when Implementing EMR Equipment

SPACE LOCATION, ALLOCATION, LAYOUT AND MEASUREMENT STANDARDS POLICIES

Green House, Hungary

Size & Range. for windows & doors. Company

COMPUTER LAB CLASSROOMS. A Planning Guide

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

Evaluating Occupant Load Factors for Business Operations

School Performance Specifications. SPACES Engineering Technical Meeting 22 September 2015

Designing and Building a Call Center For Mobile Money Financial Services

Room & Resource booking built on Microsoft Exchange & Outlook

Transcription:

August 2012

Assessment of Space Planning Principles What were the shortcomings of the former space planning? High proportion of space assigned to individual work space, low proportion to shared work space and support space Inflexible Did not support informal collaboration and teamwork Access to daylight and views were limited

What We Have Done Assessed user requirements Appraised the planning potential of the Secretariat Building Reviewed relevant best practice in public and private offices Developed space planning guidelines

Lessons From User Requirements Accommodate both interaction and individual concentrated work Support the need for privacy Deal with noise and distraction Support high levels of collaborative work More meeting spaces More varied settings for meetings Respond to users desire for change Greater consistency of space allocation Collocation is a higher priority than more individual space Better paper handling and file storage Present a fresh image for the UN in space and its management Improve environmental quality (air and temperature) Better ergonomics and more comfort

Pre-Renovation Typical Floor Plan Almost no perimeter open space Low level of shared spaces High level of individual space Wasted double circulation E N UP DOWN UP S DOWN TV W Interactive/support areas Open offices Enclosed offices

Former Individual Workspace Guidelines USG/ASG (420sqft) D-2 (336sqft) D-1(i) (258sqft) D-1(ii) (192sqft) P-5 (144sqft) P1-4 (96sqft) G-PL (80sqft) G-OL (48sqft) UNITED NATIONS SPACE GUIDELINES AND TYPICAL LAYOUT Many variations exist

New Space Planning Design Principles Provide more opportunity for team work/collegiality Improve flexibility in space use Allocate office space in a rationalized, simplified and streamlined way Realize organizational values of openness Use daylight and views Reduce wasted double circulation

New Individual Workspace Guidelines, Compared To Former Existing USG/ASG (420sqft) D-2 (336sqft) D-1(i) (258sqft) D-1(ii) (192sqft) P-5 (144sqft) P1-4 (96sqft) G-PL (80sqft) G-OL (48sqft) Workstyle A USG/ASG (384sqft) (Enclosed) Workstyle B Directors (192sqft) (Enclosed) Workstyle C Professionals (96sqft) (Open) Workstyle D General Services (64sqft) (Open) New

New Individual Workspace Guidelines Simplification of office size guidelines Implement 4 work space types (compared to currently 8+types) Work space sizes are multiples of each other, for easy reconfiguration USG/ASG 24 X16 =384sqft Professionals 12 X8 =96sqft Directors 12 X16 =192sqft General Services 8 X8 =64sqft Office Space Planning Guidelines

New Shared Resources on Every Floor Arrival Point Space Guideline 8 x12 = 96 sqft Visitors touchdown Space Guideline 8 x 8 = 64 sqft One per floor Resource Area Space Guideline 12 x16 = 192 sqft Typical 8 seats per floor Browsery Space Guideline 6 x8 = 48 sqft Typical 2 per floor Focus Booths Space Guideline 4 x6 = 24 sqft Typical 3 per floor Pantry Space Guideline 2 x10 = 20 sqft Typical 3 per floor

New Shared Meeting Spaces on Every Floor Small Meeting Room Space Guideline 8 x12 = 96 sqft Open Informal Space Guideline 8 x8 = 64 sqft Typical 2 per floor Typical 1 per floor Medium Meeting Room Space Guideline 12 x16 =192 sqft Soft Meeting Space Guideline 8 x 8 = 64 sqft Typical 2 per floor Typical 1 per floor Large meeting rooms are consolidated on the 15 th elevator crossover floors & 27 th

New Meeting Room Plans, Floors 15 & 27 Suite for short-term use Reception & Visitor Area with Resource area, Pantry, Coat Closet Combinable Conference Rooms Breakout Areas Touchdown Office Area Access through two Elevator Banks Conference Rooms

Open vs. Closed Spaces Pre-renovation Post-renovation

Individual vs. Shared Spaces Pre-renovation Post-renovation Plus shared meeting room floors 15 and 27

Circulation Pre-renovation No controlled security access Broken circulation pattern Primary and secondary closed floor circulation Post-renovation Option for controlled security access No division between departments Full loop around core Open floor circulation Point of Access

New Space Guidelines at Work in the Secretariat Building Professional workstation General Service workstation Pantry Professional workstation