Planning & Scheduling CSTM 462. Managing a project through time and resources. The need for proper planning and scheduling.

Similar documents
Scheduling Best Practices

Scheduling Best Practices

The management of the projects with MS Project

Project Planning and Scheduling

Primavera P6 Exercise Worksheet

Spec. Standard: 11/27/ Revision: 11/27/06

Project Management Dr. James A. Bednar

Assessment guide. Certificate IV in Project Management BSB41507

Project Management Fact Sheet:

Certified Project Management Professional VS-1079

Programmes. Unit 3: P lanning construction work processes and efficient use of resources in construction and the built environment.

MICROSOFT OFFICE PROJECT - SYLLABUS

Core Scheduling Papers: #6 Schedule Levels Major Projects

Subcontractor Involvement Project Tracking Progress Curves. CSTM 462 Fall 2012

SYLLABUS 12/14/2012 CONE 425 Construction Planning, Scheduling, & Control Spring, 2013 Rev. 0. Syllabus Spring, 2013

PROGRAMMING TECHNIQUES. Chapter 5(Part 2)

TD AMERITRADE Park Omaha

Chapter 9 Computer Scheduling Projects should be scheduled one byte at a time

CRITICAL PATH METHOD (CPM) SCHEDULES

LONG INTERNATIONAL. Long International, Inc Whistling Elk Drive Littleton, CO (303) Fax: (303)

Module 3: The Project Planning Stage

PN /16/ CRITICAL PATH METHOD PROGRESS SCHEDULE

SCHEDULING AND PROJECT MANAGEMENT

Estimating Activity Durations CSTM 462

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING)

Review of Schedule Specification Requirements District SAP/WBS breakdown Asset template Cost & Resource Loading Stored Material Costs

Construction of A hospital Building

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

Project Scheduling by Critical Path Method (CPM)

Name of course: Residential Construction Site Management (RCSM) Level 1

Memorandum. Jeff Jasper, P.E. Director, Division of Design. Technical Support TEBM, Division of Construction. From: Jeremiah Littleton, P.E.

763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule

Precedence Diagram Method. CSTM 462 Planning & Scheduling

Software Application: Information System Elements. Project Management in Information Technology (IT) Projects. Project Scheduling basics

Almost everyone in the planning and scheduling profession

The principles, processes, tools and techniques of project management

Residential Adjustments. Overview 4.1

EXHIBIT 2-2-C PROGRESS SCHEDULES

The work breakdown structure can be illustrated in a block diagram:

Work Breakdown Structure & Schedules

Required: Fundamentals of Building Construction: Materials and Methods, 5th EditionEdward Allen, Joseph Iano, ISBN: x, 2009

CISC 322 Software Architecture. Project Scheduling (PERT/CPM) Ahmed E. Hassan

Software Project Management Part 2: Work Breakdown Structures

Scheduling Estimating Module

MATERIALS: The Contractor shall provide the latest version of Primavera SureTrak software.

LECTURE -08 INTRODUCTION TO PRIMAVERA PROJECT PLANNER (P6)

An Introduction to the Management Principles of Scheduling

Time Management. Part 5 Schedule Development. Richard Boser

Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects

Scheduling Fundamentals, Techniques, Optimization Emanuele Della Valle, Lecturer: Dario Cerizza

Short Interval Production Schedule Research

Demonstrate and apply knowledge of project management in

Building Code Inspections and Fees

The Plan s Journey From Scope to WBS to Schedule

Project management Project Management

TABLE OF CONTENTS CHAPTER DESCRIPTION PAGE

ONLINE SUPPLEMENTAL BAPPENDIX PROJECT SCHEDULES WITH PERT/CPM CHARTS

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S

Time Management. Herb Pollard III

WORK PROGRAM GUIDELINES

Chapter 2: Project Time Management

INTRODUCTION: Plan and Schedule Development Create a Work Breakdown Structure (WBS) The detailed guidelines and examples start on the following page.

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities

Planning a Soundproof Performance Building Within Budget. Education Session #5, Track 3 October 06, 2015, 11:15 AM 12:15 PM

Project Management SCM Pearson Education, Inc. publishing as Prentice Hall

MULTI-RESIDENTIAL BUILDING SOLUTIONS

PROJECT MANAGEMENT IN PRIMAVERA P6 WEB ACCESS REL 7

Level 2 Scheduling Training

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

Linear Schedules for Tunnel Projects

10 Project Management with PERT/CPM

Seattle Public Schools Building Excellence IV Projects Under Construction

Frequently Asked Questions

Project Management Concepts and Strategies

MnDOT Project Management Office Presents: Schedule Float. Presenter: Jonathan McNatty, PSP Senior Schedule Consultant DRMcNatty & Associates, Inc.

Introduction to IT Project Management

STEP-BY-STEP. construction guide. Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet.

Collaborative Scheduling using the CPM Method

Goals of the Unit. spm adolfo villafiorita - introduction to software project management

Chapter 8 Planning and Scheduling

Oracle Primavera P6 Enterprise Project Portfolio management Overview Programme Reference # 201A

SECTION CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Instruction Manual 19/9/01. Flat Roof Carport

MnDOT Project Management Office Presents: Schedule Updates. Presenter: Eric Costantino Senior Schedule Consultant DRMcNatty & Associates, Inc.

Commercial Building Valuation Report

Application of MS Project Software for Time and Cost Management in Real Estate Construction

All references to Pre-Construction Services in this Specification shall apply to requirements for CM-R and DB contract types only.

B D E F

Chapter 2: Foundations

pm4dev, 2015 management for development series Project Schedule Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

Design Development Quality Management Phase Checklist Project Phase Checklist Series

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5

Transcription:

Planning & Scheduling CSTM 462 Managing a project through time and resources. The need for proper planning and scheduling.

Project Management Objectives 1. Eliminate or reduce project RISK. 2. Obtain a thorough understanding of PROJECT OBJECTIVES/MILESTONES. 3. Formulate strategy for achieving objectives with available RESOURCES. 4. Develop a framework for MONITORING AND CONTROLLING THE PROJECT

What is it? Defining activities for a project, through their relationships we can identify the project duration. We will learn a new way of managing projects through the critical path method.

Learning Objectives Understand the Scheduling players Time is of the essence Success or Failure Think in Man-hours Estimators can lead to costs schedulers look to hours. Understand WBS Understanding Steps

Understand the Scheduling players Worker Owner And all between.

Why schedule the construction project? Owner Owner requirement Communication of the construction plan Monitor and measure progress Manage change General Contractor/Subcontractor/ Supervisors/Worker in Field Establish production goals Manage change Communication of the construction plan

Time is of the essence Success or Failure Think in Man-hours Estimators can lead to costs schedulers look to hours.

Time is of the Essence Time shall be strictly of the essence of the contract. The Contractor shall promptly begin the work under the contract and all portions of the project made the subject of the contract shall be begun and so prosecuted with necessary plant, equipment, procedures, and overtime that they shall be completed and ready for full use in the time stated in the special conditions.

Understand WBS

A Work Breakdown Structure helps in organizing what needs to be done in small packages of activities.

Work Breakdown Structure The work breakdown structure (WBS) is a hierarchical system that represents the construction project in increasing levels of detail to define, organize and display the project work in measurable and manageable components.

Work Breakdown Structure Level 1 Level 2 Level 3 Level 4 Level 5 Project Subproject Sub-network Activity Sub-activity

Work Breakdown Structure Project Construction Start-up Mobilization Procurement Adminstration Start-Up Testing Sitework Footings Floor Slab Framing Roof System Finishes Mechanical Electrical Excavate Footings Reinforce Footings Place Footings Building Shop Play Area

Example WBS 3 Unit Townhouse Unit One (WBS) Site Work (WBS) Excavate Footings (Activity) Build foundations (WBS) Erect structure (WBS) Install Mechanical/Electrical (WBS) Electrical Rough-In (Activity) Electrical Finish (Activity) Interior finish (WBS) Exterior Finish (WBS)

WBS-Residence Build 1800 SF Residential Structure Foundation Framing/Structure Exterior Cladding Finishes M/E/P Survey Site Excavate Pour Footings Lay block foundation walls

Not Organized

Organized

Lets look at it as a layperson. Steps to complete a project. Brushing your teeth Cooking dinner

What is it? Defining activities for a project, through their relationships we can identify the project duration. The relationships of each activity When one activity can start The sequence of each activity The duration of each and when it can finish. We will learn a new way of managing projects through the critical path method.

Understanding Steps Everyone identifies steps differently. Standards in Industry The Key is: LEVEL OF DETAIL

Level of Detail Owner requirement As needed to manage the project Sequencing & Experience No more than five days Type of work Hour to day duration Project Requirements

Nature of the Work Productivity should increase as experience is gained for repetitive tasks. Activities composed of repetitive tasks should benefit from the increased task productivity and have decreasing activity durations. Depending on the work, difficulty can increase if uncommon work tasks are grouped together in an activity.

# of Activities or Steps Room Deck Residence Warehouse Movie Theater Office Building School Regional Airport Hospital Hydroelectric Dam Power Plant Nuclear Plant

CPM Scheduling

BAR CHARTS The most commonly used method of planning and scheduling construction projects. A historical tid-bit in the history of planning and scheduling. The bar chart was developed by Henry L. Gantt around the turn of the century and is sometimes referred to as the GANTT CHART

Bar Chart Schedules Bar Chart Preparation Identify Activities Estimate Activity Durations Develop Activity Sequence Construct Bar Chart

Constructing a Bar (Gantt)Chart How should the bar (Gantt) chart schedule be laid out? What time units should be used? Should work days or calendar days be used? What about non-continuous work?

Gantt Chart Advantages & Disadvantages Easy to prepare Easily Understood A good communication tool Does not show the relationships between activities. Lack of relationships between activities. Difficult to determine what the effect of an activity that is ahead or behind schedule will have on the overall project.