Switching project. Target Operating Model and updated project governance. Ciaran MacCann and Andrew Wallace 3 November 2014



Similar documents
By to Andrew Wallace Smarter Markets Ofgem 9 Millbank London. 11 August Dear Andrew,

Decision. Moving to reliable next-day switching. Contact: Andrew Wallace, Senior Manager. Publication date: 10 February 2015 Team: Retail Markets

Moving to reliable next-day switching

DCC Release Management Strategy

Government response: EMR consultation on industry code and licence modifications

Ofgem Change of Supplier Expert Group (COSEG) 20 May 2013

Consultation on DCC Enduring Release Management Policy. Consultation opens: 18 September 2015

EMR: Consultation on industry code and licence modifications

Government and Ofgem Action Plan: Challenger Businesses (Independent Energy Suppliers)

Statement of the Basis of Charges for The Provision of Data Services provided by Western Power Distribution (West Midlands) plc April 2015

Proposed debt assignment protocol for prepayment customers. A consultation document

ElectraLink s New Data Flow Services

Data Communications Company 2 nd Floor, Ludgate House 245 Blackfriars Road London, SE1 9UF

Date: 7 March Dear Colleagues, White label providers Call for evidence

PUBLIC. Response to consultation on EMR data flows

More than Warm Wishes

Smart Metering Implementation Programme: Testing Baseline Requirements Document

Customer Service Charter Guidelines

Incident Management Policy

Consultation Paper CER/16/031. February

Data Communications Company (DCC) price control guidance: process and procedures

20th February 2015 ScottishPower Standard Domestic Tariff. Prices. Your domestic gas and electricity pricing information

EMR: Consultation on Balancing and Settlement Code subsidiary documents

Central Hosting. Case Study

Our Services for Partners

Payment Systems Regulator

Due Process for the GRI Reporting Framework

Business Process Design Team Level 2 Process Diagram

Electricity settlement reform moving to halfhourly

United Kingdom Competition Network (UKCN) Statement of Intent

Standard conditions of electricity supply licence

DATED 1 JUNE The DISTRIBUTION BUSINESSes as named herein. - and - The SUPPLIERs as named herein. - and - Elexon Limited (as the BSC Agent)

UK-London: IT services: consulting, software development, Internet and support 2011/S CONTRACT NOTICE. Services

Project Nexus Workgroup. Reconciliation Meeting 1

Government Response on Home Area Network Solutions: Implementation of 868MHz

Section Development History/Status Origin Link (to relevant. documentation) SEC stage 4 consultation. SEC Stage 4 consultation Content first proposed

Project Nexus - Meeting Scenarios and Review

E-MEX Panel Update March 2014

How Electricity Market Reform may affect independent renewable generators. Robert Buckley Cornwall Energy

Draft Integration Scheme for the Ayrshire Parties 18 December 2014

DEFINITIONS Glossary of Terms Section A The Code of Practice SCOPE OF THE CODE In Scope...

Competition and Markets Authority Energy market investigation: Notice of possible remedies Response of Smart DCC Ltd

Smart metering A REPORT PREPARED FOR CENTRICA. October Frontier Economics Ltd, London.

Carbon Path to Alan Aldridge Executive Director Energy Services and Technology Association

SMKI Recovery Procedure

Financial Settlement Strategy

Smart Metering Implementation Programme: Communications Business Model

Global Settlement the Residual Meter Volume Interval Proportion

Code of Conduct for Marketing Retail Energy in Victoria

Corporate Social Responsibility Best Practice Principles The Far EasTone Telecommunications Co., Ltd. Approved by Board of Director Meeting on

UNC Distribution Workgroup Agenda 10:30 Thursday 25 June 2015 via teleconference: Participant Code #

ELECTRICITY DISTRIBUTION LICENCE: STANDARD CONDITIONS

Implementation Date: 5 working days after Authority Decision. Background to the modification proposal

How To Get A Green Deal On Energy From British Gas Business

Smart Metering Implementation Programme

The Gas and Electricity Regulated Providers (Redress Scheme) Order Consultation Document

Reconciliation by Difference (RbD) Issues Log: RbD related issues currently in discussion within the industry

Electricity Market Reform: Catering for smaller players and onsite generation under EMR. REA 27 March 2013 Chris Hemsley, DECC

Minutes of APUC Board Meeting held at a.m. on Friday 9 January 2009 at 14 New Mart Road, Edinburgh

Electricity Market Reform (EMR) Panel of Technical Experts for the Enduring Regime:

WP133 - EMR Metering Disputes Resolution Procedure

Process Validation Workshops. Overview Session

Dear Colleague, Summary

This contract is between us, Extra Energy Supply Ltd and you, our customer.

Central Data Service Provider Contract Management Review and Steering Group. Terms of Reference

Standard conditions of the Electricity Distribution Licence

Citizens Advice Response to DECC s Consultation on the timing of the review of the Data Access and Privacy Framework

An Implementation Date for Alternative Modification P169 of 10 Working Days after the Authority s decision;

1. Executive summary 5

Consultation on Customer Bad Debt in Electricity & Gas Markets CER 11/044. ESB Networks Response

COMPLIANCE FRAMEWORK AND REPORTING GUIDELINES

How To Support Non Traditional Business Models In The Energy Market

Network Rail Infrastructure Projects Joint Relationship Management Plan

Section 69 Order: modification of the Solicitors Regulation Authority Compensation Fund

MANAGING DIGITAL CONTINUITY

Ofgem s approach to smart metering

Ofgem Corporate Strategy

Response to Ofcom s consultation on price rises in fixed term contracts

Spotlight on the SEC Seminar. 23 rd October :00 15:00

INTERGOVERNMENTAL AGREEMENT FOR THE NATIONAL DISABILITY INSURANCE SCHEME (NDIS) LAUNCH

Wales Procurement Policy Statement

ST ANDREWS COMMUNITY HOSPITAL AND HEALTH CENTRE PROJECT MANAGEMENT AND MONITORING THE BOARD S OBLIGATIONS

Electricity Market Reform:

CONTRACT MANAGEMENT FRAMEWORK

TERMS OF REFERENCE Electronic Communications Resilience and Response Group (EC RRG)

(SEC4.0) and (SEC4.1) indicates when new sections and appendices were added to the SEC. Section Title Section Title Definitions and Interpretation

Standard conditions of electricity supply licence

You may reuse this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence.

Terms and conditions for business

Decisions and Actions

Response by the ENA to Ofcom s 30/06/05 consultation on "Next Generation Networks Further Consultation" 21st CN proposals

Water Charges Plan Decision Paper (Executive Summary)

Efficiency Scrutiny Committee 16 th September 2014 IT - Scrutiny of the Service Review process and viability of options for change

ISO Energy Management System

The Payments Council's Roadmap and Its Success

This Report is provided for: Decision Endorsement Assurance Information

Final Report. Profile Class 1 4: Mandating HH Settlement Cost Benefit Analysis. Executive Summary

The Energy UK Safety Net Protecting Vulnerable Customers from Disconnection 17 April 2014

DIETETIC CREDENTIALING COUNCIL TERMS OF REFERENCE. DAA member (APD) appointed by the Board from the membership of the council for a two year term.

RIIO-T1 business plan submission London Tuesday 6 September 2011

Transcription:

Switching project Target Operating Model and updated project governance Ciaran MacCann and Andrew Wallace 3 November 2014

Contents 1. Update on road map for reform 2. Review approach and undertake gap analysis on Level 0 Target Operating Model (TOM) that we propose to publish in January alongside our decision document 3. Review our updated governance framework 4. Next steps 2

Suppliers to halve switching timescales by end 2014 1. Secure a reliable three week switch now Industry implementing modifications to support halving switching timescales from 6 to 10 Nov 2014 Most suppliers expected to be gaining customers in new timescales by start of next year 2. Speed up switching in the short term 3. Longer term reform 3

Recap on reliable next day switching discussion from last SMCG 1. Secure a reliable three week switch now 2. Speed up switching in the short term June 14 consultation respondents supported our proposals to radically reform the switching arrangements to make them fast and reliable. There was also support to centralise registration under the DCC with SEC governance We propose to lead the project and use our Significant Code Review (SCR) powers We have identified four project phases through to implementation (see Annex) starting with a Blueprint phase where we will define market requirements in a TOM 3. Longer term reform 4

Do you agree with our approach and objectives for the TOM? Publish a Level 0 TOM document alongside our policy statement of reforms. Will be first picture of future arrangements (what we know now and issues for resolution) Will support development of this picture (foster communication; transparency, traceability of issues and requirements). We will lead resolution of issues during Blueprint phase leading to a consultation on a Level 1 TOM. This will inform the next, Detailed Level Specification (DLS), phase. 5

1. Vision, objectives and scope (faster, reliable, cost effective,switching) Do you agree with the main elements of the TOM? 2. Design principles (to convey vision and objectives to guide TOM) 3. As-is arrangements (to baseline for comparison of future) 4. Requirements - design, governance, charging, price control, and delivery (i.e. view of state of future arrangements) 5. Areas for development - design, governance, charging, price control, and delivery (i.e. issues to resolve) 6

Central Registration Service (CRS) design Do you agree that we have identified the correct CRS and Switching areas for development? CRS data: Data items held (including new items), responsibility and access (including enquiry services) CRS interface: Supporting business processes, formats and technology (eg comms protocols) Other registration requirements: Role in supporting other market functions eg settlement, network charging, smart metering and environmental schemes (eg Green Deal and FITs). Interface to network MPxN creation and destruction process Faster switching design Registration: End to end process for how a change of supplier process will operate Objections: Design processes with and without objections Dual fuel: How dual fuel switching will operate Cooling-off arrangements: What happens when a customer cancels a contract Prevention of erroneous transfers: Design arrangements that can support suppliers switching the correct supply point Change of supplier meter reading: Ensure accurate and timely COS read for billing, settlement and network charging Security Key: Incorporating the enduring security arrangements Lock-out period: Is a lock-out period after a switch still required Non-domestic consumers: What additional requirements need to be incorporated eg gas nomination process TPIs: Role in supporting fast and accurate switching and access to CRS data 7

Do you agree that we have identified the correct Governance areas for development? CRS and switching governance arrangements Governance framework: SEC structure and governance (including modification rules and assurance), changes needed to existing codes (MRA, BSC, DCUSA, DTSA, UNC, SPAA) DCC governance: Obligations and incentives to support outcomes for consumers Obligations on market participants: Obligations on data use and access, including the roles and responsibilities of SEC and non-sec parties 8

Do you agree that we have identified the correct Charging areas for development? CRS charging Charging methodology: Requirements and principles to be included in DCC license; methodology in the SEC. Amend existing network charging methodologies. CRS charging: Who pays, how much and invoicing 9

Do you agree that we have identified the correct Funding areas for development? CRS price control Enduring CRS price control: Structure, obligations and incentives Existing price control: Exiting network price control arrangements with respect to registration 10

Do you agree that we have identified the correct Delivery Approach areas for development? CRS delivery CRS procurement: Develop a procurement strategy including role of Ofgem in approving appointment CRS development: How will the CRS be built once procured CRS testing: Strategy for testing CRS to ensure that it work and is fit for purpose Market readiness Market readiness strategy: Provide market assurance that the new arrangements are ready to go live. This will include arrangements to demonstrate that the market definition and regulatory changes are fit for purpose and that all market participants are ready to go-live. Focus of this area is on developing appropriate testing. Transition and implementation Transition and Implementation scheme: How the new CRS and switching rule will come into effect and how old rules will be turned off. It will include how data will be migrated to the CRS and will describe the go-live implementation technique Governance: Party roles in developing, overseeing, delivering implementation scheme. What governance framework the scheme will come under. Identify interactions with market readiness (above). 11

We would welcome further views on our amended governance structure Ofgem Management Programme Board Owner SRO Senior User Senior Supplier Senior Level Stakeholder group Programme Manager Monitor Product delivery Design Authority PMO Monitor Product delivery Design and impact assessment team Report Input External Design Advisory Group Business Process Design* Regulatory Design* Commercial* Delivery Strategy* *Ofgem-led and chaired 12

We would welcome views on our proposed workgroup structure Business Process Design Focus on CRS design and switching design Potential for sub-group on metering issues Regulatory Design Focus on CRS and switching governance arrangements and CRS charging Exclude overarching obligations and incentives on DCC to secure the establishment and provision of a CRS Commercial Focus on what is needed to secure the establishment and provision of a CRS This includes the overarching obligations and incentives on DCC, price control arrangements and developing a procurement strategy. Delivery Strategy Focus on how to implement the new arrangements once codes and licence modifications have been agreed. This will include CRS delivery (other than procurement strategy) Market Readiness and Transition and Implementation Scheme. 13

Next steps We want to continue to test our draft TOM and implementation plan with stakeholders prior to publication Aim to publish these alongside our decision document and SCR launch statement in January 2015 14

ANNEX 15

Project phases PHASE 1 PHASE 2 PHASE 3 PHASE 4 Blueprint Detailed Level Specification Enactment Design, build and test Target Operating Model (TOM) of how reforms will work Develop outline Implementation Scheme Updated Impact Assessment (IA) Identify the high-level changes needed to codes and licences Describe in detail how the reforms will work Includes detailed process maps, definition of data flows and data items Further update to IA Draft modifications to codes and licences Industry parties required to raise modifications to codes. Ofgem consult on licence modifications Licence and industry codes mods approved by Ofgem Central Registration Service Provider (CRSP) will build and test Industry parties will implement reforms and test Transition Go live 16