1 Smart Metering Implementation Programme: Testing Baseline Requirements Document 10 th August 2015
2 Testing Baseline Requirements Document Technical and Procedural requirements for demonstrating the testing objectives under the Smart Energy Code (SEC) 1. The documents listed in this Testing Baseline Requirements Document shall: a) for the purposes of the SIT Objective set out in Section T2.2 of the SEC, be the documents referred to in Section T2.3(b) of the SEC regarding the technical and procedural requirements which support the Sections referred to in Section T2.2, specifically Sections E, G and H.; b) for the purposes of the Interface Testing Objective set out in Section T3.2 of the SEC, be the documents referred to in Section T3.3(b) of the SEC regarding the technical and procedural requirements which support the Sections referred to in Section T3.2, specifically Sections E, G, H and O; and, c) for the purposes of the SRT Objective set out in Section T5.2 of the SEC, be the documents referred to in Section T5.3(b) of the SEC regarding the technical and procedural requirements which support the Sections referred to in Section T5.2, specifically Section L. Subsidiary documents forming part of the SEC (copies of which are available on the developing SEC section of the SECAS website) 1.1. the SMKI Device Certificate Policy; 1.2. the SMKI Organisation Certificate Policy; 1.3. the SMKI Compliance Policy; 1.4. the DCC Gateway Connection Code of Connection. Draft versions of subsidiary documents yet to be incorporated into the SEC, (copies of which are available on the developing SEC section of the SECAS website) 1.5. Draft Version 1.0 of the Incident Management Policy; 1.6. Draft Version 1.0 of the Registration Data Incident Management Policy; 1.7. Draft Version 1.0 of the Registration Data Interface Code of Connection; 1.8. Draft Version 1.0 of the DCC User [Gateway] Interface Code of Connection; The Draft documents listed in above have each been reviewed by the Secretary of State to assess their suitability as a document for the purposes of design, build and test, following development by the DCC, and have been submitted to the Smart Metering Implementation Programme s Technical Business and Design Group with a recommendation that they are baselined (in some instances subject to caveats). It is the intention of the Secretary of State to update the documents listed above to the version that is designated at the point at which that designation occurs. 1
3 1.9. Draft version of the Message Mapping Catalogue submitted to the Secretary of State on 29 May 2015; Draft version of the DCC User [Gateway] Interface Specification (DUIS) submitted to the Secretary of State on 29 May 2015; Draft version of the Registration Data Interface Specification (REGIS) Submitted to the Secretary of State on 30 January 2015; Draft version of the Self-Service Interface Design Specification submitted to Secretary of State on 18 June 2015; Draft version of the Self-Service Interface Code of Connection submitted to the Secretary of State on 22 July 2015; Draft version of the Non Gateway Interface Specification submitted to the Secretary of State on 28 May 2015; Draft version of the Error Handling Strategy submitted to the Secretary of State on 19 December 2014; Draft version of the Threshold Anomaly Detection Procedures submitted to the Secretary of State on 10 April 2014; Draft version of the DCC Gateway Connections Code of Connection submitted to the Secretary of State on 30 June 2015; Draft version of the Common Test Scenarios Document submitted to the Secretary of State on 30 June 2015; Draft version of the SMKI and Repository Test Scenario Document submitted to the Secretary of State on 15 July 2015; The draft documents listed in above have been submitted to the Secretary of State following their development by the DCC and are pending review by the Secretary of State to assess their suitability as a document for the purposes of design, build and test, prior to their submission to the Smart Metering Implementation Programme s Technical Business Design Group with a recommendation that they are baselined. It is the intention of the Secretary of State to update the documents in the aforementioned list to the versions that are approved by the Technical Business and Design Group at the point at which the approval is given Draft version of the IKI Certificate Policy submitted to the Secretary of State on 29 January 2015; Draft version of the DCCKI Certificate Policy submitted to the Secretary of State on 27 February 2015; Draft versions of the DCCKI Interface Design Specification and DCCKI Repository Interface Design Specification submitted to the Secretary of State on 27 February 2015; Draft versions of the DCCKI Code of Connection and DCCKI Repository Code of Connection submitted to the Secretary of State on 27 February 2015; Draft version of the DCCKI Registration Policies and Procedures (RAPP) submitted to the Secretary of State on 27 February 2015; Draft version of the SMKI Interface Design Specification submitted to the Secretary of State on 29 July 2015; Draft version of the SMKI Code of Connection submitted to the Secretary of State on 29 July 2015; 2
4 1.27. Draft version of the SMKI Repository Interface Design Specification submitted to the Secretary of State on 29 July 2015; Draft version of the SMKI Repository Code of Connection submitted to the Secretary of State on 29 July 2015; Draft version of the SMKI Registration Policies and Procedures (RAPP) submitted to the Secretary of State on 8 July 2015; Draft version of the SMKI Recovery Procedure submitted to the Secretary of State on 1 July 2015; The draft documents listed in above have been submitted to the Secretary of State following their development by the DCC and are pending review by the Secretary of State to assess their suitability as a document for the purposes of design, build and test, prior to their submission to the Smart Metering Implementation Programme s Transitional SMKI Policy Management Authority Group (TPMAG) with a recommendation that they are baselined. It is the intention of the Secretary of State to update the documents in the aforementioned list to the versions that are approved by the TPMAG at the point at which the approval is given The Draft consultation version of the Enduring Test Approach Document published on 12 June 2015; The Draft consultation version of the Enduring Test Approach Document published on 10 July 2015; The draft documents listed in above are being developed by the DCC before being submitted to the Secretary of State prior to their designation into the SEC, which is subject to a Secretary of State review of the documents to ensure that they are fit to be designated. It is the intention of the Secretary of State to update the documents listed in to the version that is designated at the point at which that designation occurs. Draft versions of the following technical specifications and other documentation (copies of which are available on request to the Secretary of State): Version of the Great Britain Companion Specification (GBCS) plus all Category 1, Category 2 and Category 4 Issue Resolution Proposals (IRPs) discussed and categorised at the DCC s Issue Resolution Board; Version 1.58 of the Smart Metering Equipment Technical Specifications plus all Category 1, Category 2 and Category 4 IRPs discussed and categorised at the DCC s Issue Resolution Board; Version 1.46 of the Communications Hubs Technical Specifications plus all Category 1, Category 2 and Category 4 IRPs discussed and categorised at the DCC s Issue Resolution Board; Version 1.1 of the CPA Security Characteristics. The current baseline for SIT is GBCS v0.8.1, SMETS v1.58, CHTS v1.46 and CPA SC v1.1. The DCC is currently impact assessing the IRPs referenced above and developing proposals for when these will be implemented. Once the DCC s proposals are agreed by the Secretary of State, then it is the intention of the Secretary of State to update the versions of the documents in the aforementioned list and approve these changes at the Technical Business and Design Group. 3
5 1.37. Draft version of the DCC User Interface Services Schedule (SEC Appendix E), detailed in Appendix F of the March 2015 Smart Energy Code Government Response Draft version of the CPL Requirements Document, detailed in Appendix B of the Government Consultation on new Smart Energy Code content and related licence amendments July Draft version of the Inventory Enrolment and Withdrawal Procedures, detailed in Appendix B of the Government Consultation on new Smart Energy Code content and related licence amendments July Draft version of the Service Request Processing Document, detailed in Appendix B of the Government Consultation on new Smart Energy Code content and related licence amendments July The draft subsidiary documents listed in above have each been developed by DECC. It is the intention of the Secretary of State to update the documents listed above to the version that is designated at the point at which that designation occurs, or if further versions are issued for consultation or in a Government Response, prior to their designation. 4
Consultation on DCC Enduring Release Management Policy. Consultation opens: 18 September 2015
Consultation on DCC Enduring Release Management Policy Consultation opens: 18 September 2015 Consultation closes: 16 October 2015 Classification: DCC Public Table of Contents 1 Introduction... 4 1.1 Objective...
Section Development History/Status Origin Link (to relevant. documentation) SEC stage 4 consultation. SEC Stage 4 consultation Content first proposed
SECTION O development version [This is a development version of Section O. It contains: The designated content (currently SEC4.5 as at 28 th September 2015) Black text Content that has been concluded on
SMKI Recovery Procedure
- file formats Consultation opens: 23 September 2015 Consultation closes: 7 October 2015 Version: v1.0 Date: 23 September 2015 Author: Classification: Jonathan Jennings, Andy Barraclough DCC Public Document
Spotlight on the SEC Seminar. 23 rd October 2015 10:00 15:00
Spotlight on the SEC Seminar 23 rd October 2015 10:00 15:00 Welcome Jill Ashby Head of Code 10:00 10:10 Gemserv 2 Housekeeping Gemserv 3 Speakers Today Jill Ashby Alys Garrett David Barber George McGregor
Incident Management Policy
Incident Management Policy Draft SEC Subsidiary Document DCC Public 01 July 2015 BASELINED VERSION 1 DEFINITIONS Term Black Start CPNI Code of Connection Crisis Management Disaster HMG Incident Party Interested
SEC Guidance I Processing of Service Requests, Responses and Alerts
Overview Communications with Devices comprising Enrolled Smart Metering Systems will be managed through the submission of Service Requests by users of the DCC s Enrolment and Communications Services (
SMKI Recovery Procedure
SMKI Recovery Procedure Consultation open: 1 July 2015 Consultation closes: 29 July 2015 DCC Public Page 1 of 55 Contents 1 Introduction... 3 1.1 Purpose & Interpretation...3 1.2 Scope...3 2 Overview of
Updated SIT1 functionality (annex to SIT Approach Document) request for SEC Panel approval
To: SEC Panel 2 nd Floor, Ibex House 42 47 Minories London EC3N 1DY 15 th July 2015 Dear colleague, Updated SIT1 functionality (annex to SIT Approach Document) request for SEC Panel approval Purpose This
Operations update - DCC Industry Day 25 th March 15
Operations update - DCC Industry Day 25 th March 15 Dave Broady Operations Director, Smart DCC Eliot Miles Lead Service Architect, Smart DCC Augmenting SEC obligations with Operational Readiness input
Incident Management Policy
Incident Management Policy Author: DCC Date: 9th May 2014 Page 1 of 10 Contents 1 Incident Management Policy 3 1.1 Incident Management Policy General Provisions 3 1.2 Pre-requisites to log an Incident
Smart Meters Programme Schedule 1 (Interpretation and Definitions) (CSP Central version)
Smart Meters Programme Schedule 1 (Interpretation and Definitions) (CSP Central version) Schedule 1 (Interpretation and Definitions) (CSP Central version) Amendment History Version Date Status v.1 Signature
Competition and Markets Authority Energy market investigation: Notice of possible remedies Response of Smart DCC Ltd
Competition and Markets Authority Energy market investigation: Response of Smart DCC Ltd 05 August 2015 DCC Public Page 1 of 7 1 Executive summary 1. Smart DCC Ltd, known as the Data and Communications
Government Response on Home Area Network Solutions: Implementation of 868MHz
Government Response on Home Area Network Solutions: Implementation of 868MHz Government Response to the Consultation on Home Area Network (HAN) Solutions: Implementation of 868MHz and Alternative HAN solutions
DATA RECOVERY SOLUTIONS EXPERT DATA RECOVERY SOLUTIONS FOR ALL DATA LOSS SCENARIOS.
UK-London: IT services: consulting, software development, Internet and support 2011/S 165-273114 CONTRACT NOTICE. Services
1/6 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:273114-2011:text:en:html UK-London: IT services: consulting, software development, Internet and support 2011/S 165-273114 CONTRACT
Smart Meters Programme Schedule 2.5. (Security Management Plan) (CSP South version)
Smart Meters Programme Schedule 2.5 (Security Management Plan) (CSP South version) Schedule 2.5 (Security Management Plan) (CSP South version) Amendment History Version Date Author Status v.1 Signature
Smart Meters Programme Schedule 8.6. (Business Continuity and Disaster Recovery Plan) (CSP North version)
Smart Meters Programme Schedule 8.6 (Business Continuity and Disaster Recovery Plan) (CSP North version) Schedule 8.6 (Business Continuity and Disaster Recovery Plan) (CSP North version) Amendment History
Data Communications Company (DCC) price control guidance: process and procedures
Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: [email protected] Overview: The Data and Communications Company (DCC) is required
Smart Metering Implementation Programme
Smart Metering Implementation Programme Foundation Smart Market The Government s final response to the consultation on the Foundation Smart Market 24 July 2013 Department of Energy and Climate Change 3
Re: New Reporting Requirements Related to Smart Meter Deployment and the Application of Time-of-Use Pricing
Ontario Energy Board P.O. Box 2319 27th Floor 2300 Yonge Street Toronto ON M4P 1E4 Telephone: 416-481-1967 Facsimile: 416-440-7656 Toll free: 1-888-632-6273 Commission de l énergie de l Ontario C.P. 2319
European Code of Conduct on Data Centre Energy Efficiency
European Code of Conduct on Data Centre Energy Efficiency Introductory guide for applicants Version 1.0.0 1 of 5 1 Summary This document provides guidance notes for organisations wishing to sign the European
DCC User Gateway Interface Design Specification. Annex - Service Request Definitions 1 Product Management Service
DCC User Gateway Interface Design Specification Annex - Service Request Definitions 1 Product Management Service Author: DCC Version: v0.8 Draft Date: 12 th September 2014 Page 1 of 47 Contents 1 Product
PUBLIC. Response to consultation on EMR data flows
PUBLIC Response to consultation on 28 April 2014 CONTENTS INTRODUCTION... 3 1. Background... 3 2. ELEXON s proposal to the CfD Counterparty... 3 RECOMMENDATION TO DECC ON MECHANISMS FOR PARTIES TO EXCHANGE
Smart Metering Implementation Programme. Smart Metering Equipment Technical Specifications Version 1.58
Smart Metering Implementation Programme Smart Metering Equipment Technical Specifications Version 1.58 Draft document V1.58 28 November 2014 Department of Energy and Climate Change 3 Whitehall Place London
Proposal Form for Directors & Officers Liability Insurance
Proposal Form for Directors & Officers Liability Insurance Guidance Notes and Important Notices These TICES apply to this Proposal and any attached Addenda 1. The answers to this form preferably should
Questions raised on committee updates in EMR
Item Raised Question ELEXON Response by: 1 ISG153 Re: Creation of Subsidiary Company for EMR work What will it cost ELEXON to create the new subsidiary company? What happened to the subsidiary that was
iso20000templates.com
iso20000templates.com Public IT Limited 2011 IT Service Policy Document Ref. ITSM01001 Version: 1.0 Draft 1 Document Author: Document Owner: V 1.0 Draft 1 Page 1 of 11 Revision History Version Date RFC
IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B);
Ontario Energy Board Commission de l énergie de l Ontario EB-2007-0063 IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B); AND IN THE MATTER OF applications by electricity
Smart Meter Wide Area Network DCC Assurance Strategy
Smart Meter Wide Area Network DCC Describing the means by which DCC seeks to ensure that Communication Service Providers meet their connectivity and coverage service commitments Version: v1.0 Date: 2016-03-07
Key USP s. Multiple PCI level GRC tool
PCI GRC tool Introduction GP history Visa level 1 approved hosting facility Niche product for a specific problem Reduce BAU cost and cost of PCI compliance Reduce cost in managing 3rd parties PCI stakeholder
European Code of Conduct on Data Centre Energy Efficiency
EUROPEAN COMMISSION DIRECTORATE-GENERAL JRC JOINT RESEARCH CENTRE Institute for Energy Renewable Energies Unit European Code of Conduct on Data Centre Energy Efficiency Introductory guide for applicants
HP Service Manager. Software Version: 9.40 For the supported Windows and Linux operating systems. Processes and Best Practices Guide (Codeless Mode)
HP Service Manager Software Version: 9.40 For the supported Windows and Linux operating systems Processes and Best Practices Guide (Codeless Mode) Document Release Date: December, 2014 Software Release
Business Process Design Team Level 2 Process Diagram
Business Process Design Team Level 2 Process Diagram SUBJECT : Customer Switching Scenario 2 Title: Dual fuel prepayment domestic customer with SMETS2 metering TOM Ref: tom_v2_final_17112015_0 Author Phil
NOTICE OF AMENDMENT TO A CODE AMENDMENTS TO THE DISTRIBUTION SYSTEM CODE BOARD FILE NO.: EB-2013-0311
Ontario Energy Board P.O. Box 2319 2300 Yonge Street 27 th Floor Toronto ON M4P 1E4 Telephone: 416-481-1967 Facsimile: 416-440-7656 Toll free: 1-888-632-6273 Commission de l énergie de l Ontario C.P. 2319
EU Directive on Network and Information Security SWD(2013) 31 & SWD(2013) 32. A call for views and evidence
EU Directive on Network and Information Security SWD(2013) 31 & SWD(2013) 32 A call for views and evidence 22 nd May 2013 Contents Contents... 2 Overview: The EU Directive on Network and Information Security...
Report on the EMR Delivery Body s performance of its functions in relation to the Capacity Market
Report on the EMR Delivery Body s performance of its functions in relation to Report Publication date: 19 June 2015 Team: EMR Team Contact: Sujitra Krishnanandan; Matthew Pearson Tel: 020 3263 9832; 020
Smart Metering Implementation Programme
Smart Metering Implementation Programme BPDG Sign-Off for Process Cycle 1 Process Review Summary 25 August 2011 Agenda BPDG model approach for Process Cycle 1 sign-off Agenda for future meetings (1 September
CMI Level 5 Professional Consulting Top Up Document June 2015 Version 3
CMI Level 5 Professional Consulting Top Up Document June 2015 Version 3 Contents Introduction 3 Top Up Summary 3 Certificate in Management Consultancy Essentials 3 Top Up requirements for the CMI Level
EMR: Consultation on Balancing and Settlement Code subsidiary documents
EMR: Consultation on Balancing and Settlement Code subsidiary documents URN: 14D/108 April 2014 Department of Energy and Climate Change 3 Whitehall Place London SW1A 2AW Telephone: 0300 068 4000 Website:
Guidance for Sponsor Applications for Tier 2 and Tier 5 of the Points Based System in the Isle of Man. Appendix A
Guidance for Sponsor Applications for Tier 2 and Tier 5 of the Points Based System in the Isle of Man Appendix A 1 Corporate Entities Company incorporated or registered under: - 1. Companies Act 1931 to
BSc (Hons)/MSc Business Economics and Investment Analysis (F/T) SH541
BSc (Hons)/MSc Business Economics and Investment Analysis (F/T) SH541 1. Objectives The Department of Economics and Statistics is offering a four and a half year full time BSc (Hons)/ MSc Programme in
TERMS OF REFERENCE OF THE AUDIT COMMITTEE
MODERN DENTAL GROUP LIMITED (Incorporated in the Cayman Islands with limited liability) TERMS OF REFERENCE OF THE AUDIT COMMITTEE (adopted on 25 November 2015) 1 MODERN DENTAL GROUP LIMITED Terms of Reference
Incident Management Process Report Q1, 2011
Incident Management Process Report Q1, 2011 Robert Gormley, Acting Process Owner 6 th April 2011 Our Incident Management process has been in place since November, supported by the UniDesk application.
MSc Financial Economics SH506
MSc Financial Economics SH506 1. Objectives The objectives of the MSc Financial Economics programme are: To provide advanced postgraduate training in financial economics with emphasis on financial markets
Procedures for validation and accreditation
Procedures for validation and accreditation Published by the Quality and Academic Support Office, Directorate of Students and Education Support Latest Edition (March 2002, updated August 2009 and 2013
Appendix 10: Improving the customer experience
Appendix 10: Improving the customer experience Scottish Water is committed to delivering leading customer service to all of our customers. This means we deliver the following activities: We will ensure
Accreditation of qualifications for registration as an oral health practitioner
Accreditation of qualifications for registration as an oral health practitioner Purpose Approved by the Dental Council: August 2005 Updated: May 2008 Governance Structure Update: 8 August 2011 Updated:
ICT Category Sub Category Description Architecture and Design
A A01 Architecture and Design Architecture and Design Enterprise & Business Architecture A02 Architecture and Design Information Architecture A03 Architecture and Design Solution Architecture B Benchmarking
CHINA PIONEER PHARMA HOLDINGS LIMITED
Purpose CHINA PIONEER PHARMA HOLDINGS LIMITED (Incorporated in the Cayman Islands with limited liability) (Stock Code: 01345) Terms of Reference for Audit Committee of the board of directors of the Company
The Software Experts. Software Asset Management Services & Solutions
The Software Experts Software Asset Management Services & Solutions one WORLD CLASS SOFTWARE ASSET MANAGEMENT Make Optimised IT Simple Simplify the management of IT assets and minimise financial, legal
Business Continuity Management Framework
Business Continuity Management Framework Date of Issue: November 2013 Review Date: November 2014 Written by: Jackie Orchard Risk & Business Continuity Manager Authorised by: Signed off by: DCC Francis
Identity and Access Management Services. G-Cloud 7
Identity and Access Management Services G-Cloud 7 Who We Are Kainos is one of the longest standing independent digital technology companies in UK. We provide digital technology solutions that enable companies
Information Governance Strategy. Version No 2.0
Plymouth Community Healthcare CIC Information Governance Strategy Version No 2.0 Notice to staff using a paper copy of this guidance. The policies and procedures page of PCH Intranet holds the most recent
Balancing and Settlement Code BSC PROCEDURE BSCP537. QUALIFICATION PROCESS FOR SVA PARTIES, SVA PARTY AGENTS AND CVA MOAs
Balancing and Settlement Code BSC PROCEDURE BSCP537 QUALIFICATION PROCESS FOR SVA PARTIES, SVA PARTY AGENTS AND CVA MOAs APPENDIX 3 GUIDANCE NOTES ON COMPLETING THE SAD Version 2.0 Date: 10 September 2007
Superseded by T MU AM 04001 PL v2.0
Plan T MU AM 04001 PL TfNSW Configuration Management Plan Important Warning This document is one of a set of standards developed solely and specifically for use on the rail network owned or managed by
Certification Fee Structure for Green-e Climate and Green-e Energy
Certification Fee Structure for Green-e Climate and Green-e Energy Formerly Appendix C: Green-e Energy Certification Fee Schedule and Appendix C: Green-e Climate Certification Fee Schedule Each entity
Smart Meters Programme Schedule 4.1
Smart Meters Programme Schedule 4.1 (Contractor Solution) (SMKI version) V1.1 1 Schedule 4.1 (Contractor Solution) This Schedule 4.1 (Contractor Solution) is formed of the following parts: Part A Introduction
Co-operative Energy, Co-operative House Warwick Technology Park, Warwick CV34 6DA.
Terms and Conditions May 2014 Co-operative Energy: General Terms and Conditions for Domestic Customers Only Applicable from 1st June 2014. Co-operative Energy Limited is a limited liability company registered
Committee Response 26 th October 2015
EUA response to the Investor confidence in the UK energy sector inquiry This submission is from the Energy and Utilities Alliance (EUA) a not for profit trade association that provides a leading industry
Standard conditions of the Electricity Distribution Licence
Gas and Electricity Markets Authority ELECTRICITY ACT 1989 Standard conditions of the Electricity Distribution Licence Standard conditions of the Electricity Distribution Licence 30 October 2015 SECTION
Polish Financial Supervision Authority. Guidelines
Polish Financial Supervision Authority Guidelines on the Management of Information Technology and ICT Environment Security for Insurance and Reinsurance Undertakings Warsaw, 16 December 2014 Table of Contents
3000_115 Competency Standard: Certified Practitioner in Asset Management (CPAM)
3000_115 Competency Standard: Certified Practitioner in Asset Management (CPAM) Asset Management Council GENERAL Holders of this certificate will have an understanding of the contribution that they make
CHINA CITY INFRASTRUCTURE GROUP LIMITED 中 國 城 市 基 礎 設 施 集 團 有 限 公 司 (Incorporated in the Cayman Islands with limited liability)
CHINA CITY INFRASTRUCTURE GROUP LIMITED 中 國 城 市 基 礎 設 施 集 團 有 限 公 司 (Incorporated in the Cayman Islands with limited liability) TERMS OF REFERENCE FOR THE AUDIT COMMITTEE - 1 - Definitions 1. For the purposed
EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014. 2014 No. [XXXX]
EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014 2014 No. [XXXX] 1. This explanatory memorandum has been prepared by the Department for Energy
Gatekeeper PKI Framework. February 2009. Registration Authority Operations Manual Review Criteria
Gatekeeper PKI Framework ISBN 1 921182 24 5 Department of Finance and Deregulation Australian Government Information Management Office Commonwealth of Australia 2009 This work is copyright. Apart from
CHAPTER 9 FRAUD, ABUSE, AND OVERUTILIZATION
CHAPTER 9 FRAUD, ABUSE, AND OVERUTILIZATION OVERVIEW OF THE PROBLEM The ACA includes funding to support more aggressive efforts to eliminate fraud and abuse, and to recover overpayments in Medicare, Medicaid,
Review of remote casino, betting and bingo regulatory return and gambling software regulatory return. Consultation document
Review of remote casino, betting and bingo regulatory return and gambling software regulatory return Consultation document October 2013 Contents 1 Introduction 3 2 Background and context 5 3 Reasons for