CONSTRUCTION PERMITS AND CERTIFICATES A Helpful Guide



Similar documents
Botetourt County, Virginia. Frequently Asked Questions

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

A Guide for the Homeowner/Builder

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Does Wall Township require an inspection by the building department on resale of a home?

City of Fort Smith Building Permit Process Frequently Asked Questions

Residential Building Permit Process

Property Condition Disclosure Statement

PARK COUNTY BUILDING PERMIT GUIDE PO Box 517 Fairplay, CO Fax: Inspections:

Building Code Inspections and Fees

City of St. Charles Basement Finish or Remodel

RRIO Checklist. Use of checklist: Definitions: Limitations

The purpose of this document is to provide standards for persons requesting or subject to County building inspections.

Residential Building Permits

City of Hill Country Village Residential Construction/Development Packet

PERMIT APPLICATION. PLEASE PRINT LEGIBLY INCLUDE STREET NUMBER/NAME, CITY & STATE 1 Job Name:

Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows:

Exhibit B. Property Acquisition and Disposition Division Residential Design & Performance Standards

PDmB, Inc. Definitions

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

An Applicant s Guide to Residential Building Permits

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

A TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS

YOU VE BEEN HIRED AS A GENERAL CONTRACTOR

Bureau Veritas Contact Information

Frequently Asked Questions

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

HOMEOWNER S PERMIT GUIDE

CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

BUILDING SAFETY UNIT

INSPECTION REPORT. LOCATION OF PROPERTY 1234 Sample Street Tucson, AZ CLIENT Mr. & Mrs. John Q. Sample c/o Agent DATE OF INSPECTION 1/30/2008

The City of Basehor, Kansas

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Inspection Item COMMENTS

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

Residential Building Permit Guide

SECTION 1 - BUILDING CODE

Georgia Association of Home Inspectors

Building Construction and Development in Norristown: A User s Guide to the Land Development and Building Permit Process 1/25/11

APPLICATION FOR NEW CONSTRUCTION

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

TOWNSHIP OF WOODBRIDGE A HOMEOWNER S GUIDE TO THE PERMITTING & INSPECTION PROCESS

Inspection Report. Dream Home Inspections Second Ave. Frisco CO (970)

Botetourt County, Virginia. Residential Information Handout

Self-Home Inspection Checklist

PREPARED DATE: SIGNATURE AND SEAL INSPECTION REPORT PREPARED BY: PRINT NAME: REGISTRATION NUMBER: MAILING ADDRESS:

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Development Services Guidelines

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

Development Services Guidelines

C I T Y O F P E A R S A L L

2. What building projects are exempted? (permit not required)

PLAN SUBMITTAL INFORMATION

**ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

I NI NP R Inspected Items

TENT AND STAGE CUSTOMER ASSISTANCE GUIDE

October 5, 2015 Dear Client,

Crawford Inspection Services C.C.B. #

Vision Home Inspection

City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA ,

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

Gramercy Place Condo Association, Inc.

BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS

WHEN IS A PERMIT REQUIRED?

SINGLE-FAMILY EARTHQUAKE (SEISMIC) RETROFITS

Building Permits Permit Counter

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

Instructions for Obtaining a Certificate of Smoke Detector, Carbon Monoxide Alarm, and Kitchen Fire Extinguisher Compliance

PRE-OWNED MOBILE / MANUFACTURED HOME PRE-INSPECTION

Home Inspection Report

ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM REQUIREMENTS

NAVAJO COUNTY ADDENDA & ADDITIONS TO THE INTERNATIONAL BUILDING CODES. Public Works/Planning & Zoning Building & Safety AMENDED ( )

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

Building Information Packet

Zoning Department DECK PERMITS. Checklist

BUILDING & PLUMBING PERMIT APPLICATION

Building Permits: When are they required?

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

Additions and Alterations

INFORMATION BULLETIN NO.

City of Milford, Connecticut Information Regarding Permits

A HOMEOWNERS GUIDE TO BUILDING IN GREY HIGHLANDS

Residential Plan Routing Information

NEW HOME CONSTRUCTION

Real Property Title 10. Sales of Property Subtitle 6. New Home Warranties

Town of Trumbull, Connecticut Information Regarding Permits

City of Riverside Building & Safety Division Phone: (951)

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

PEPPER VINER HOMES WARRANTY GUIDELINES

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

Transcription:

CONSTRUCTION PERMITS AND CERTIFICATES A Helpful Guide Monroe Township Municipal Government Construction Office 125 Virginia Avenue Williamstown NJ 08094 856-728-9800 x 222 856-629-2143 FAX

2 P a g e APPLYING FOR A CONSTRUCTION PERMIT THINGS TO DO BEFORE YOU APPLY FOR A CONSTRUCTION PERMIT SUBMIT APPROVALS WITH YOUR CONSTRUCTION PERMIT APPLICATION This checklist represents the general requirements for the submission of a new construction permit application. It is not intended to be an all inclusive list as each application is unique and may require additional documentation. On the other hand, some items on this list may not apply to your application. This checklist is intended to be a guide only. If you have any questions please ask. You must supply a copy for your application, do not assume we have any of the following: Pineland Approval - Certificate of Filing. Planning Board Approval. Wetlands Approval, or proof of no wetlands (not necessary if Pinelands). Monroe Township Zoning Permit. COAH Development Fee Form. Lot Grading Plan Approval from Township Engineer. Survey approved by Township Engineer. Plot Plan showing location of proposed structure. State, County, or Township Curb Opening Permit. State, County, or Township Street Opening Permit (utility hookups). Well and Septic Approval from Gloucester County Dept of Health (required for all new construction and additions) Monroe Twp and Gloucester County Utilities Authority Water & Sewer Connection Permits. Gloucester County Soil Conservation District Permit or Exemption. NJ Builders License, NJ Home Improvement Contractors Registration, or other applicable license. Gloucester County and Monroe Twp Board of Health Dept approval for all Commercial Kitchens. All Prior Approvals will require a Final Approval from the issuing agency before a Certificate of Occupancy will be issued from the Construction Office. A Contractors ignorance to the Code cannot be our responsibility! Rev 7/25/12

3 P a g e APPLYING FOR A CONSTRUCTION PERMIT PLANS TO INCLUDE WITH YOUR APPLICATION Two (2) sets of sealed plans prepared by an architect or engineer licensed by New Jersey. (A Resident Homeowner can draw plans without a seal.) Building Plan shall include: Sealed truss layouts and profile sheets. Pre-Engineered floor joist layout showing all pointload and connection details. Exterior foundation drain or engineered soil certification. REScheck or Equivalent. Mechanical layout for heating and air conditioning. When rebar is used in a foundation, show #4 copper wire attachment being used for grounding electrode. List straps or bolts with manufacturer and size. List after market add-on (manufacturer, size and adhesive). Corrosion report if on new pressure treated wood. Hurricane clips for uplift. List all joist hangers and nails for specific loads. Note all load paths and column attachments. Note floor-to-floor connection (wall overlap or mechanical connecters). Electrical Plan shall include a top view of the floor plan showing the location for lights, receptacles, and switches. Conductor sizes and circuit breaker sizes must be noted on the plan. Plumbing Plan shall include the location of plumbing fixtures shown on the floor plan; piping schematic showing sanitary drains and vents; water supply with hot and cold piping to fixtures; gas pipe schematic showing all proposed appliances; pipe sizes and diametrics. Fire Plan shall include smoke detectors noted on the Electrical Plan: 1 each bedroom, 1 in hallway within 10 feet of bedrooms, 1 each floor level. Also include 1 carbon monoxide detector in hallway within 10 feet of bedroom. Prototype Plan shall have a Floor Plan of the specific model showing options. Mirror plans will not be accepted. If you have any questions regarding the plan requirements for your project please contact the appropriate Sub-Code Official, Monday-Friday, between 7 AM and 8:30 AM. Building Sub-Code Official ext. 220 (leave message) Electrical Sub-Code Official, Jim Morrison ext. 221 Plumbing Sub-Code Official, Steve D Amico ext. 502 Fire Sub-Code Official, Lou Polillo ext. 299 7/25/12

4 P a g e BEFORE SIGNING THE CERTIFICATION IN LIEU OF OATH indicating that you are performing the work yourself, please consider the following: 1. The laws requiring new home builders to be registered and contractors in the various trades, such as plumbing or electrical work, to be licensed were adopted to protect homeowners and homebuyers. If you are signing this Certification to provide cover to an unlicensed homebuilder or contractor, you are forfeiting the protection afforded to you under the law. The contractor that you have hired may or may not be qualified. And if you encounter problems with this contractor, the government will not be able to help you because you signed the Certification indicating that you are performing the work yourself. In the case of the construction of a new home, you are forfeiting your right to a new home warranty. Every new home builder in New Jersey is required to be registered with the State and to give a warranty to each purchaser. The warranty covers almost all defects in workmanship or materials, including appliances, for the first year; plumbing, mechanical (heating and air conditioning), and electrical systems for the first two years; and major structural defects for ten years. Further, the warranty will actually pay for the correction of defects if the builder fails or refuses to do so. By signing the Certification, you are giving up that protection. 2. You are violating the criminal laws of this State if you sign a Certification indicating that you are doing the work yourself when, in fact, you are paying someone else to do it.

5 P a g e NOTICE TO PERMIT HOLDERS & INSPECTORS Calls requesting inspection results will be directed to the appropriate Subcode Official or their voicemail. Building: ext 220 (leave message) Electric: Jim Morrison ext 221 Plumbing: Steve D Amico ext 502 Fire: Lou Polillo ext 299 Office Support Personnel are instructed not to answer inspection questions. All Inspectors shall apply a sticker at the inspected job site. Permit Holders are asked to read the sticker. If they still have a question, please contact the appropriate Subcode Official. Every effort will be made for all inspections requested by 3 PM to be scheduled for the following work day. Fire inspections will be Monday, Wednesday and Friday. Rev. 7/25/12

6 P a g e A Permit is ready for a Certificate of Occupancy when the file is complete BLOCK LOT PERMIT # Date in File Building Tech Sub-Code Official Approval Framing Checklist Electrical Tech Sub-Code Official Approval Plumbing Tech Sub-Code Official Approval Fire Tech Sub-Code Official Approval Home Warranty (not for Model/Sample Homes until CCO d) Zoning Officer Compliance Foundation Location Survey (REQUIRED ASAP after Foundation & Engineer Compliance Letter Inspection) Sealed Final Survey Engineer Final Compliance Letter GCSCD Approval (Soils) Request for CO ( Request for TCO with Conditions: ) Sealed Compaction Letter Concrete Slips Insulation Certificate GCDOH Well Approval GCDOH Septic Approval Board of Health County Local Water Meter Receipt (Monroe Municipal Utility Authority) DGS 7/25/12 rev.

7 P a g e CERTIFICATE OF OCCUPANCY REQUIREMENTS PRIOR TO CO BEING ISSUED 1. All final inspections, building/electrical/plumbing/fire/elevator, including minor work (fences, signs, roofing, siding, etc.) 2. Final approval of water by Gloucester County Board of Health 204 E Holly Ave, Sewell NJ 08080, 856-218-4180 3. Warranty Plan state or private 4. Final Survey 5. Certificate of Occupancy Request Form 6. Compaction Letter 7. a. Final septic approval by Gloucester County Board of Health b. Final well approval by Gloucester County Board of Health 204 E Holly Ave, Sewell NJ 08080, 856-218-4180 8. Final Approval of Gloucester County Soil Conservation District 14 Parke Place Blvd, Suite-C, Sewell NJ 08080 856-589-5250 9. Proof of COAH obligation satisfied 10. Water meter approval of Monroe Municipal Utility Authority 1452 Glassboro Rd, Williamstown NJ 08094, 856-629-7586 11.All approved construction debris receipts 12.Addresses must be conspicuously displayed for final inspections 13.Final landscaping/engineering approval/zoning compliance 14.FOOD ESTABLISHMENTS ONLY: Gloucester County Board of Health approval 204 E Holly Ave, Sewell NJ 08080, 856-218-4170 Monroe Township Board of Health 125 Virginia Avenue, Williamstown NJ 856-728-9800 x 213 Rev. 7/25/12