City of Oviedo Commercial Shell Building Permit Application Guidelines



Similar documents
PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

Certification: Building Plans Examiner. Exam ID: B3

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

PLAN SUBMITTAL INFORMATION

Building Permit Application

BUILDING SAFETY UNIT

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

How To Make A House Safe

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

Appendix B Florida Building Code Building Section Public Shelter Design Criteria

Applications for building permits will not be reviewed until all of the required information has been submitted.

Does Wall Township require an inspection by the building department on resale of a home?

Mobile Home Pre-Inspection Checklist

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

2. What building projects are exempted? (permit not required)

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

MECHANICAL PLAN REVIEW REQUIREMENTS

Commercial Building Permit Application & Submittal Guidelines

Building Code Clarifications - 7. Fire Resistance

PDmB, Inc. Definitions

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

2014 FLORIDA BUILDING CODE

Report for. Dick and Jane Homeowner Lovers Lane, Houston, Texas 77000

BUILDING PERMIT SPECIFICATIONS

Georgia Association of Home Inspectors

Current as of 11/10/08 1 of 1

Name Of Occupancy Date. Yes No Describe

Basement Development Construction requirements for the development of basements in residential dwellings.

Design Development Quality Management Phase Checklist Project Phase Checklist Series

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

Arapahoe County Residential Water Heater Installation and Inspection Guide

Residential Building Permit Process

Building Condition Assessment Report

The City of Basehor, Kansas

Element D Services Plumbing

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

Pre-Drywall Inspection Report

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

UCC PLAN REVIEW CHECKLIST

HERNANDO COUNTY FIRE ALARM GUIDELINES

Scope of Work Class I Contractor s Licenses. Putnam County Ordinance Section 17. Types of Authorized Contractor Licenses.

General Fire Code Requirements Within Commercial Tenant Spaces

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

Excerpts from the Canadian National Building Code (NBC)

STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE:

2010 Residential Water Heater Replacement Check List

Home Inspection Report

city of edmonds development information

COMPREHENSIVE PROPERTY INSPECTIONS

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

October 5, 2015 Dear Client,

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems

Estimating Database Checklist

Building Department John Fiedler Construction Official Ext SAMPLE GUIDE FOR 1&2 FAMILY DWELLING BASEMENTS Rev

Substantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information

Inspection Item COMMENTS

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY (518) /

Solar Panel Installations

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

PLEASE RETURN DENIAL COMMENTS WHEN RESUBMITTING PLANS*

A TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS

Building Code Inspections and Fees

Uniform Construction Code (UCC) Building Permit Application Package

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

Structure Survey Findings:

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

TENANT DESIGN MANUAL UPDATED JULY 2015

SECTION THREE CONSTRUCTION CODES

Single Family Residential Basement Finish

Total Home Inspection Checklist

VOLUSIA COUNTY GROWTH & RESOURCE MANAGEMENT BUILDING ACTIVITY

City of Elk River BASEMENT Office Use Only

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS

Educational. Educational-Existing 1/28/2014. OCCUPANT LOADS [no change] Application. Application

Overview of Hotel Fire Safety Requirements

APPLICATION FOR NEW CONSTRUCTION

The purpose of this document is to provide standards for persons requesting or subject to County building inspections.

I NI NP R Inspected Items

Basic Requirements for Residential Plan Review _

Building Codes Update: The 2009 International Fire Code and the Apartment Industry

Schedule B to By-law

Required Certification Documentation. Contractor's installation certification for range hood fire suppression systems.

Uncovered Decks & Porches

Transcription:

City of Oviedo Commercial Shell Building Permit Application Guidelines All permit application packages must be complete prior to acceptance. A complete application package shall include the following: Building Permit Application completed, signed and notarized. Application must include correct address and complete parcel I.D. number. Copy of the contractor s license issued by the State of Florida (if contractor is applicant). Site specific notarized power of attorney if the person submitting the application is not the license holder. Certificate of insurance indicating worker s compensation insurance coverage and naming the City of Oviedo as certificate holder or a copy of a worker s compensation exemption issued by the State of Florida (must be submitted with each application if contractor is the applicant). Completed, signed, and notarized Owner Builder Statement Affidavit (if owner is applicant). Approval letter from sanitary sewer provider (if other than the City of Oviedo). Copy of the onsite sewage disposal system construction permit issued by Seminole County Health Department for new or existing septic systems, grease interceptors, etc. (if applicable). Seminole County Impact Fee Statement. Four (4) sets signed and sealed building construction plans. Two (2) sets signed and sealed site development plans approved by City of Oviedo Development Services. Two (2) sets signed and sealed floor and roof truss engineering. Completed and signed Statewide Product Approval Specification Form. Two (2) copies of the manufacturer s installation instructions for the following products: windows, doors, roofing materials, engineered lumber products, glass blocks, soffit materials and siding. Three (3) sets of completed and signed energy calculations (signed/sealed if required by Florida Statute or code). State of Florida Notification on Gas Tanks (if applicable). Because the main building will be built as a shell only, it will receive a Certificate of Completion. A tenant finish permit is required for each tenant space. The Building Official or his/her designee will classify the type of shell building at the time of plan review as defined below. In accordance with Florida Building Code sections 105 and 110, the Building Official can not issue the Certificate of Occupancy without a permit and inspections for each tenant space. Without a Certificate of Occupancy for each tenant space they can not be legally occupied. A State Certified Contractor is required by law to obtain these permits and pass all required inspections to obtain the Certificate of Occupancy for each tenant space. *Basic Shell Building: A building complete on the exterior. The interior slab/floor may or may not be placed. The fire suppression and fire alarm systems (if required) must be complete. Plumbing may or may not be stubbed in. The electrical service for the main building must be complete; however the house panel which feeds only the circuits for the main building, fire alarm control panel, required exit signs, emergency lighting and the site electrical will be allowed to be energized with this permit. The building does not have any interior walls unless they are required, by code, a fire resistant corridor, stair or elevator shaft walls. This type of building will require a Certificate of Completion prior to issuance of any tenant build out permits for each tenant space. A Certificate of Completion may be issued prior to completion of site improvements. November 2008 1

*Complete Shell Building: A building designed to accommodate one (1) or more tenants and is complete on the interior and exterior. It must include all required fire suppression and fire alarm systems, all required plumbing drain, waste, vent and potable water piping and fixtures, all required exhaust, heating, ventilation and air conditioning systems and all electrical requirements. The electrical service for the main building must be complete; however the house panel which feeds only the circuits for the main building, required exit signs, emergency lighting and the site electrical will be allowed to be energized with this permit. All site improvements must be complete. This permit requires Final Inspections to be completed by the Building Services Division, Development Review Division, Fire Department, and Finance Department prior to the issuance of any additional tenant build-out permits. THE CONSTRUCTION DOCUMENTS MUST INCLUDE, AT A MINIMUM, THE FOLLOWING: SITE PLAN All parking and accessible routes Accessible parking space(s) and signage details Accessible entrances Accessible ramps, handrails, guardrails, curb cuts and details All required building exits accessible (not less than ½ if all are not required exits) Areas of rescue assistance Accessible signage Fire access Vehicle loading Driving/turning radius Fire hydrant/water supply/post indicator valve (PIV) Location of septic systems (if applicable) Setbacks/fire separation (assumed property lines) Utility lines (water, sewer, irrigation Meters and backflow devices BUILDING PLAN Page size minimum 11 x 17 Plans to minimum 1/8 scale All pages numbered and labeled Plans signed/sealed and dated by a Florida Design Professional Designer information: name, address, registration # on all pages Reference the Currently Adopted Codes Threshold Inspection Plan (for threshold buildings) All areas dimensioned and use noted Corridors Shafts and elevator hoistways Stair location/guardrails/handrails Partition denotations and schedule Door locations, sizes, door and hardware schedule Window locations, sizes and schedule Tempered glass locations Attic ventilation and access Air barrier requirements Interior finish ratings and schedule November 2008 2

Light and ventilation Sanitation Elevators Escalators Lifts Roof coverings Construction type design criteria: Type of construction denoted (per table 503) Occupancy group classification denoted for building and rooms/areas Gross square footage Net square footage calculations Building height Percentage of exterior openings calculations Classification of hazard of contents (if applicable) Structural Design Criteria: Basic wind speed (City of Oviedo is designated as 120 MPH three second gust) Exposure category Opening classification Internal pressure coefficient Importance factor Components and cladding loads Floor loads psf Stair loads psf Roof loads psf Balcony loads psf Corridor loads psf Storage loads psf Materials to be reviewed shall at a minimum include the following: Wood / grade species Steel / type - grade Aluminum Concrete Plastic Glass Masonry Gypsum board and plaster Insulating (mechanical) Roofing Insulation Alternate materials Structural: Signed and sealed soil report with a positive conclusion required Compaction requirements Foundation locations, dimensions and depth specified Foundation denotations, schedules and details Reinforcing steel, amount, size, grade, spacing, and lap specified Footing dowel locations November 2008 3

Maximum filled cell spacing Embedment s Slab thickness and reinforcement Vapor barrier Termite protection Relieving arch steel details at pipe penetrations Brick ledge detail including flashing and weep hole size and spacing Building materials used Lintel denotations and schedule Exterior and interior structural wall sections Columns Tie beams Structural steel size, type, connections Framing details and fastening Load path connectors Floor deck and fastening Wall sheathing and fastening Roof deck and fastening Stair construction Window and door details, including design pressure of openings Fastening details for windows and doors, (type, length, and quantity) Exterior mounted mechanical units fastening methods to meet wind load Roof and floor framing, truss layout, connector schedule Fire Protection Requirements: Fire separation requirements for corridors, elevators, stairways, floors & shafts Occupancy separation requirements Tenant separation requirements Fire resistant protection details for type of construction Rated requirements for walls, floor-ceiling and roof-ceiling assemblies Design numbers and details for all rated assemblies Design numbers and details for all rated penetrations Rated door and hardware schedules Fire blocking and draft stopping Calculated fire resistance Interior finishes (flame spread/smoke development) Life Safety: Occupant load calculations and egress capacities Special occupancy requirements Egress plan Number of exits Capacity of exits Arrangement of exits Travel distance to exits/common path of travel Stairs construction/geometry and protection Horizontal exits/exit passageways Illumination of exits Exit signs Emergency lighting November 2008 4

Enclosures Handrails Guardrails Ramps Early warning systems schematic Smoke control systems schematic Stair pressurization systems schematic Extinguishing requirements Areas of rescue assistance Accessibility Building: Door sizes, hardware schedule Vertical accessibility Accessible route dimensions Maneuvering clearances Hi-Lo drinking fountain Equipment clear floor space/reach ranges Areas of rescue assistance Signage ATM machines Accessibility Restrooms/Bathrooms: Turning radius Required floor space for fixtures Fixture and equipment mounting dimensions Adaptability Accessible requirements for special occupancies in addition to general requirements will also be reviewed. PLUMBING PLAN Plumbing plans submitted Piping materials Piping supports Determine minimum plumbing fixtures required based on occupant load calculated per FBC 1004 Water distribution diagram Water hammer arrestors Plumbing drain, waste and vent riser diagram Grease trap detail Grease trap Health Dept. report on existing Interceptors Roof drains/calculations for flat roofs Backflow prevention Medical gas Oxygen systems Environmental requirements Water Heaters: T & P drain Air gap November 2008 5

Pan drain Thermal expansion device Heat traps Mounting platform GAS PLAN Type of gas Gas pressure Appliances schedule and BTU s Chimneys and Vents Combustion air LP tank size and location (above or below grade) Protection requirements Gas Riser Diagram: Pipe type Pipe sizing Total developed length Segment lengths Appliance locations Shut-offs valves MECHANICAL PLAN Mechanical plans submitted Energy calculations Duct systems and sizing Duct supports Means for balancing HVAC system Diffusers (size and direction) CFM requirements Ventilation Combustion air Outdoor air calculations Balanced return air Make-up air Equipment location Condensate piping and disposal Required platforms and catwalks Roof mounted equipment (including equipment and curb anchorage) Details and specifications Equipment sizing calculations Equipment specifications Joint sealing methods and product specification Air balance table Rated penetrations - fire damper details and manufacturer s installation instructions Means for automatic fan shutdown Kitchen hood, duct plans, fire suppression and specifications Bathroom exhaust systems Special exhaust systems Chimneys, fireplaces and vents November 2008 6

Other appliances Boilers Refrigeration Bathroom ventilation Laboratory ELECTRICAL PLAN Maximum available fault current at service AIC rating of equipment Voltage and phase of electrical system Load calculation Electrical service riser diagram indicating overcurrent protection sizes, conductor and conduit types and sizes, number of service disconnecting means, grounding electrode system: bonded to the foundation steel, structural steel, metal piping, size and type, separately derived system or not? (solid neutral or switching) Transformer sizes and types if used Panel schedules and ratings Power plan Lighting plan Device legend Wiring methods and materials Feeders and branch circuits, conduit sizes and types Grounding conductors Exit lights Emergency lighting Egress lighting Signage and disconnecting means location Generator type: emergency or standby Remote annunciation Load shed (if necessary) Required receptacle outlets GFCI s Equipment Special occupancies Emergency systems Communication systems Low voltage FIRE PROTECTION/FIRE SUPPRESSION PLAN Early warning smoke evacuation and control Sprinkler design criterion (separate permit required) Fire alarm design criterion (separate permit required) Pre-engineered systems Riser diagram Standpipes These guidelines were compiled to assist the applicant in preparing a commercial shell building permit application and may not be complete. The applicant is required to meet all City of Oviedo, state, and federal code requirements. November 2008 7