PLM Integration. Summary Technical Specification



Similar documents
Summary of Technical specification Implementation and Support of PDM/PLM Solutions

Business Intelligence Experts for SmartPlant integration. Technical Specifications

Call for Nomination. Project Management services for IO Project Controls Office. Technical Summary

Aerospace Supply Chain Engineering Enablement

Global Sourcing. Conquer the Supply Chain with PLM and Global Sourcing Solutions. Visibility Planning Collaboration Control

FWK Contract - Support for safety and accident analyses

Evaluation of fuelling requirements and transient density behaviour in ITER reference operational scenarios

ENOVIA V6 Architecture Performance Capability Scalability

F4E-QA QUALITY CLASSIFICATION

Contractor Safety Management Procedure

MCADD COURSE STRUCTURE

Methodology for Plant System I&C specifications

Product Synthesis. CATIA - Product Engineering Optimizer 2 (PEO) CATIA V5R18

SECTION C EMPLOYER S REQUIREMENTS/SPECIFICATION

Integrating CAD, PLM and LCA: a new architecture & integration proposal

SMARTPLANT ENTERPRISE

Section 1: Definitions...1. Section 2: Certified Instructor Program Benefits...2. Section 3: How to Become a Certified Instructor...

An introduction to TecSurge

Reducing Risk in Large-scale Process Automation Projects

Complex engineering objects construction using Multi-D innovative technology

CAD/CAE systems and cost engineering

Technical Specification F4E-QA Requirements Management & Verification (RMV) Requirements for F4E Suppliers

THE FEDERATION

Engineering Document Release Management

Powering up your ENERGY business processes

Frequently Asked Questions (FAQ)

SMARTEAM FUNDAMENTALS V5 R19

SPI LTUF MEETING OSI SPI TRAINING SERVICES

PLANT DESIGN AT YOUR FINGERTIP

Lifecycle Services for Syncade Logistics

Smart Operations Management Suite

5. Product Lifecycle Management. Database Technologies for Integrating Engineering Data

SmartPlant License Manager Installation and User s Guide

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

Engineering g Procurement. 02-Feb-2015

Master Diploma in Product Design and Analysis Course Code Software Used Duration MCADD MD100 AutoCAD 2D + Creo + SolidWorks + ANSYS + PPM Concepts +

Fact Sheet Intellectual Property rules within the Fusion for Energy contractual framework

ISO Lifecycle Data for Process Plant

Validation, Transformation & Loading Solution (VTL)

AUSTRALIAN FORESTRY STANDARD LIMITED

SUPPORT SERVICE POLICIES FOR LICENSED PROGRAMS For indirect channel through VAR

ENOVIA Live Collaboration

ENOVIA 3DLive. Revolutionizing PLM

Engineering Data Lifecycle Management Overview

Program Lifecycle Methodology Version 1.7

A CIMdata Program Review

SPLM General Topics FAQ

Q-PLM DX / PLM Integration

ENOVIA Aerospace and Defense Accelerator for Program Management

Automation. Main Automation Contractor (MAC) solutions Helping the process industries to reduce risks and project delays

Asset and Lifecycle Management

ORACLE FUSION ERP CLOUD SERVICES START-UP PACKS

V6 PLM Express. Bringing PLM 2.0 Values to the Mid Market

ORACLE SERVICES PROCUREMENT

SMARTPLANT ENTERPRISE

AFNeT STEP AP242 Benchmark

Provide Outsourcing services In the areas of Engineering Design & Project Management Consultancy Services

Demonstrate and apply knowledge of project management in

ANSYS EKM Overview. What is EKM?

PLM implementation roadmap for Divertor Test Platform of ITER fusion energy program. Simo-Pekka Leino, Harri Mäkinen

Delivering true enterprise mobility for business

Powerful information management services and software for the oil, gas, and chemical industries

CRM Initial Implementation PROJECT DOCUMENTATION PROJECT INITIATION DOCUMENT PID. Document Description. Version Number 0.1 Release Date Author

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note April 2000

IndustrialIT System 800xA Engineering

On-Track Plant Operations Scheme (POS) Implementation by Contractor Organisations Frequently Asked Questions (FAQs)

FUNCTIONAL POLICY MANDATORY PROCUREMENT POLICY REQUIREMENTS FOR THE APPROVED CONTRACTOR INSURANCE PROGRAM INITIATIVE. Contracting Policy and Practice

FIPS 201 Evaluation Program Development - Configuration Management Plan

PRODUCT BROCHURE SPATIAL ANALYZER. Powerful, traceable and easy-to-use metrology and analysis software

Aerni consulting services

Outline Guide to ITER PON Archiving

QUEST The Systems Integration, Process Flow Design and Visualization Solution

Department of Finance and Deregulation 2011/004 Portfolio Panels for IT Services ATTACHMENT A

Wellness screening for your machine Remote Condition Monitoring

Concurrent Engineering Applied to Space Mission Assessment and Design

Ministry of Information and Communication Technology EXPRESSION OF INTEREST

Validity 1. Installation 2 SIMATIC. WinCC flexible Tag simulator Update 1. Readme

CATIA V5R21 - FACT SHEET

ELECTROTECHNIQUE IEC INTERNATIONALE INTERNATIONAL ELECTROTECHNICAL

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)

PLM Center of Excellence PLM for Embedded Product Development - Challenges, Experiences and Solution. M a y

Australian Industry Participation (AIP) Plan for Midal Cables Aluminium Rod and Conductor Facility Tomago NSW

EARSC Views on the. Procurement of the Copernicus Services

SmartPlant Foundation Intergraph Australia September 2008

Linexcom Sdn Bhd. ict Group of Companies ver1.2

Non-Stop Manufacturing Excellence. Automotive. Answers for industry.

CPIx on Line. Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Supporting the HMG Construction Strategy.

ORACLE PROJECT MANAGEMENT

Citrix XenApp-7.6 Administration Training. Course

CAPABILITY STATEMENT

Transcription:

IDM UID RSL3C3 VERSION CREATED ON / VERSION / STATUS 23 Jul 2015 / 1.2 / Signed EXTERNAL REFERENCE / VERSION Call for Nomination Documents PLM Integration. Summary Technical Specification Summary technical specification for the call for nomination of a framework contract to provide service for the PLM implementation Approval Process Name Action Affiliation Author Baylard C. 23 Jul 2015:signed IO/DG/COO/CIO/CMD Co-Authors Reviewers Brown A. 23 Jul 2015:recommended IO/DG/RCO/FPD/PCD/IPS Approver Chiocchio S. IO/DG/COO/CIO/CMD Document Security: Internal Use RO: Baylard Christophe Read Access LG: CCD staff and EXT, AD: ITER, AD: IO_Director-General, AD: OBS - Configuration Management Section Division (CMD), AD: EMAB, AD: Auditors, AD: ITER Management Assessor, project administrator, RO PDF generated on 23 Jul 2015 DISCLAIMER : UNCONTROLLED WHEN PRINTED PLEASE CHECK THE STATUS OF THE DOCUMENT IN IDM

Change Log PLM Integration. Summary Technical Specification (RSL3C3) Version Latest Status Issue Date Description of Change v1.0 Signed 23 Jul 2015 v1.1 Signed 23 Jul 2015 Minor corrections (only one framework contract, etc.) according to Mr. Brown's comments v1.2 Signed 23 Jul 2015 Minor spelling and grammar corrections PDF generated on 23 Jul 2015 DISCLAIMER : UNCONTROLLED WHEN PRINTED PLEASE CHECK THE STATUS OF THE DOCUMENT IN IDM

Framework Contract PLM Integration Summary Technical Specification Abstract. This specification covers the supply of information technology, engineering and technical services to the ITER Organization for the implementation of a PLM project. Page 1 of 5

1. BACKGROUND AND OBJECTIVE The Configuration Management Division (CMD) of the ITER Organization Central Team (IO-CT) is responsible for the implementation in IO (both CT and DA) of a PLM project, aiming at (a) defining and enforcing standardized systems engineering and configuration management processes, procedures, and (b) unifying corresponding supporting IT systems into a single platform. IO decided to use the platform 3D Experience (also called Enovia v6) from the company Dassault Systems. The objective of this Call for Tender is to select qualified companies with extensive experience in the required fields of work, and proven track records in the implementation, exploitation and maintenance of a PLM project based on Enovia v6 as well as the software platforms used by the ITER Organization, and to conclude the framework contract that will supply services in the implementation, exploitation and maintenance of the PLM project. 2. REQUIRED EXPERIENCE The candidate companies shall have demonstrated capabilities in implementation, exploitation and maintenance of a PLM project with the Dassault System solution, for large and complex facilities, preferably in an international environment and in a complex contractual and organization setup (comparable to the ITER project). IOs cost containment objectives also favour companies with a proven track record of delivering projects on time and within budget. The specific experience and qualities sought by IO include: Expertise in customization of the Dassault System Solution Enovia v6 Expertise in the integration of the Dassault System Solution Enovia v6 into complex IT landscape (see below) Implementation of PLM project in large, multi-disciplinary projects and in an international environment; Integration of the PLM to support design and systems integration; Experience of implementation and use of a PLM during design & engineering as well as during construction phase; Capability to mobilise and manage centralised, site-based resources, and also to establish and manage satellite facilities for remote working; Proven track record of delivering projects on schedule and within budget; Ability to respond rapidly to changing resource requirements, to accommodate peak demands, and to provide specific expertise. The current configuration management information system as well as design and engineering capability of the ITER Project, comprising IO and the Domestic Agencies, has been developed around specific software applications. The engineering analysis and integration services to be provided under the framework contract shall be executed in this environment, and accordingly, the candidate contractors shall have demonstrated knowledge of the listed software and proven experience of integration of a PLM solution compatible with the landscape described in the next section. 3. CONFIGURATION MANAGEMENT INFORMATION SYSTEM AND IT LANDSCAPE Current information management system: a distributed system consisting of For CAD: Enovia v5 For Requirement: Rational Dynamic Object Oriented Requirements System (DOORS) For 2D: SMDD Page 2 of 5

management: home solution (EBD) For integration 2D/3D and product breakdown Several part catalogs (SPMat, CADENAS, etc.) Computer Aided Design CAD & catalogues: CATIA V5 (Mechanical + E&S modules) CAD mechanical catalogues: CADENAS Plant design: PDMS, CATIA V5 CAD data-base: ENOVIA LCA (Life-Cycle Activities) VPM V5 3D-Live: ENOVIA LCA Viewer Assembly & maintenance simulation: DELMIA 3D Illustration: 3D-VIA-COMPOSER Dedicated process description software (IGE-XAO Visio based, to produce in particular PFD, P&ID ) and associated data-base: See-System- Design (SSD); See-Electrical-Expert and See-Cabling-Manager (or equivalent) CAD quality checking: Q-CHECKER Isometrics: ISOGEN For remote work, the CAD activities must be performed in data sharing mode. The connection to the IO data-bases shall be made via: o Teradici or VPN for ENOVIA. If the distance with IO exceeds 1000-1500 km, the Company will connect to the closest DA (DA approval being a pre-requisite) o CITRIX for SSD o Web for 3D-Live, IDM, EDB Structural Analysis ANSYS Classic ANSYS Workbench Hyper-mesh Other analysis software For specific analyses / functions, the following software packages have been successfully utilised by ITER, and experience with these packages would be considered an asset. However, experience in the TYPES of analysis listed is a requirement. PIPE-STRESS and CAESAR II, for piping analysis FLOW-MASTER, for hydraulic analysis 3DCS, for 3-d tolerance analysis OPTICS, for diagnostics optical analysis Construction Intergraph SmartPlant Materials SPMat Intergraph Smartplant For Operator 4. SCOPE OF WORK Under the proposed framework contract the contractor will provide services to the ITER Organization on the Cadarache Site, and at remote locations as required by the Organization, to reinforce capability in the fields for implementing a PLM project. The four main areas of work will be: Page 3 of 5

Area 1): Service to IO in the process definition and in the conception/choice of the technical implementation (based on capabilities of tools, known working data models, etc.), Area 2): Administration & Customizing of the Enovia v6 platform Area 3): Specific programming (if required) of missing functionalities of the Enovia v6 platform Area 4): Integration and interface of the platform with ITER information system. 5. QUALITY ASSURANCE REQUIREMENTS For the entire duration of the framework contract, Contractors shall hold, and maintain, a valid and relevant ISO 9001 and 14001 certification or comparable. The missions and tasks executed under this framework contract shall be carried out in compliance with the ITER CAD Manual, and the IO Quality Requirements. 6. CONTRACT BASIS AND EXECUTION The PLM integration of the ITER project will be procured via framework contract. Task Orders will be issued by work area on deliverable basis. The ITER Organization will award the framework contract and first batch of Task Orders in October 2015. The initial award will be for a 2 year period, with an option of 2 further years. The implementation plan of the PLM over the potential 4 years timespan preclude the accurate prediction of resource requirements. However the indicative levels of resources required to cover all areas of work are: Enovia v6 specialists: tentatively between 1-3 PPY per year PLM specialists: tentatively 0-2 PPY per year ITER may require the contractor to perform the work either on the ITER site, at a close support locations to be established and maintained by the contractors within easy reach of the ITER site, and at remote locations such as the contractor s usual place of business. In the case of off-site CAD work, the contractor will be required to implement connection schemes to be defined, to utilise data sharing mode. The working language of ITER is English, and a fluent professional level is required (spoken and written). 7. PREQUALIFICATION REQUIREMENTS The pre-selection criteria for this Call for Tender shall include, but shall not necessarily be limited to the following requirements, supported by appropriate references: Established company with a minimum of 10 years demonstrated experience in providing similar services to large (more than 300 Million Euro), complex international projects, and preferably covering the design, construction and commissioning phases. Proven track record of delivering projects on time and within budget. Experience in remote collaboration techniques, and implementation of database sharing schemes based on the software packages listed in section 3. Demonstrated experience in the successful implementation of Enovia v6 based PLM Ability to supply the indicative number of experienced specialists for the various areas, enabling a high level of flexibility in service providing, depending on changing IO needs, Company QA system and engineering processes acceptable to ITER (see section 5 above). Page 4 of 5

Significant customer base in relevant fields, and satisfactory list of references. Page 5 of 5