Greater New Orleans Hurricane and Storm Damage Risk Reduction System



Similar documents
New Orleans Hurricane and Storm Damage Risk Reduction System Managing Risk

New Orleans Hurricane and Storm Damage Risk Reduction System

New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012

GAO HURRICANE KATRINA. Strategic Planning Needed to Guide Future Enhancements Beyond Interim Levee Repairs. Report to Congressional Committees

Greater New Orleans Hurricane & Storm Damage Risk Reduction System

PART 2 NEW ORLEANS DRAINAGE CANALS

U.S. Army Corps of Engineers

FINAL Environmental Impact Statement (EIS) for the

London Avenue Canal I-Wall Load Test

Comprehensive Recommendations Supporting the Use of the Multiple Lines of Defense Strategy to Sustain Coastal Louisiana 2008 Report (Version I)

Swannanoa River Flood Risk Management Study

Emergency Management THERE WHEN YOU NEED US

Created by Neevia docuprinter Pro trial version Created by Neevia docuprinter Pro trial version

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005

Storm tide is the water level rise during a storm due to the combination of storm surge and the astronomical tide.

Offshore Alabama Prepared by the University of South Alabama MBA Consulting Group in December 2010

How the Chicago District, US Army Corps of Engineers Conducts Project Management 20 November 2013

Performance Evaluation of New Orleans and Southeast Louisiana Hurricane Protection System. Report 1 Performance Evaluation Plan and Interim Status

Storm tide is the water level rise during a storm due to the combination of storm surge and the astronomical tide.

A Systems Engineering Based Assessment of The Greater New Orleans Hurricane Surge Defense System Using the Multiple Lines-of-Defense Framework

TFMA 2015 Spring Conference Dallas, TX. John E. Bourdeau Jr: FEMA Region 6, Risk Analysis Branch

Flood Risk Management

Flood Risk Management

Hurricanes Katrina & Rita Using Mitigation to Rebuild a Safer Gulf Coast

Hurricane Preparedness in Pinellas County

Water Resource Issues in the 110 th Congress

8 Sub-Basins acres. 5 Outflow Locations 29 billion gallon/day capacity. Drainage Basin 1. 17th st. canal. pump st. 12. pump st. 19. pump st.

The success of the hurricane protection around Chevron s refinery at Pascagoula, MS, during Katrina

Tokyo, Japan. William L. Carwile, III FEMA Associate Administrator Response and Recovery. Most catastrophic natural disaster in United States in the

SARASOTA COUNTY Dedicated to Quality Service

EXPERT REVIEW PANEL ON GREATER NEW ORLEANS HURRICANE AND STORM DAMAGE RISK REDUCTION SYSTEM DESIGN GUIDELINES: Final Report

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

Knox Andress, RN, FAEN Designated Regional Coordinator Louisiana Region 7 Hospital Preparedness LSU Health Shreveport Louisiana Poison Center

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.

A Coastal Barrier Protecting the Houston/Galveston Region from Hurricane Storm Surge

COMMUNITY CERTIFICATIONS

Jefferson Parish Department of Water Emergency Plan

Restore Americas Estuaries 5 th National Conference

Applying Best Practices To Galveston Bay November Applying Best Practices From The Delta Works And New Orleans To Galveston Bay

EPA s Climate Resilience Evaluation and Awareness Tool (CREAT): A Case Study

Hurricanes and Storm Surge

The Army Corps of Engineers and the Flood Risk Challenge

In the United States Court of Federal Claims

A tiered reconnaissance approach toward flood monitoring utilising multi-source radar and optical data

CRS Report for Congress

Hurricane Rita September 20 24, 2005 Situation Paper

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

U.S. Naval Academy. Flood Damage Reduction Project Using Structural and Non-Structural Measures

CRS Report for Congress

FINAL TECHNICAL MEMORANDUM AWD FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012

Use of Watermarks for Discerning Hurricane-Induced Flood Levels. Erik L. Nelson, Ph.D., P.E., M. ASCE 1

2011 Operations, Maintenance, Monitoring and Rehabilitation Plan

Release of EC USACE Process for the National Flood Insurance Program (NFIP) Levee System Evaluation. Frequently Asked Questions

The Cost of Coastal Storm Surge Damage Reduction

The. year. floods are

How to Become a Navy Engineer For $78,000 in USD

Duty and Responsibility of Civil Engineers Following Natural Disasters. ASCE Ohio Valley Student Conference: Technical Paper.

Tropical Storm Allison 2001

Fund for the Improvement of Postsecondary Education (FIPSE) FY 2007 Hurricane Education Recovery Awards (HERA) by Award Number

Flood Damage Related to Army Corps of Engineers Projects: Selected Legal Issues

Mouth of the Columbia River Jetties Major Rehabilitation Study

USACE Civil Works Infrastructure Investment Trends: Glide-Path to Benign Neglect?

Wind vs. Water and Unique Monroe County Mitigating Factors for Wind Damage

Pine Creek Culvert Upgrade $ 560,000. Located at exiting hump dike, just south of Fire Training Center

Standard Operating Procedures for Flood Preparation and Response

Texas Universities Recover from Hurricane Ike University of Texas Medical Branch Galveston and Texas A&M University Galveston

Federal Triangle Stormwater Working Group Federal Triangle Floodproofing Seminar BUILDING STRONG SM

Inhoud. Katrina Vergelijking met Nederland Nederlanders in New Orleans Andere opgaven in de VS. Doet u mee? California Florida

Flood Insurance Guide THE INSURANCE AGENT S ROLE IN PROTECTING HOMEOWNERS

Storm Surge: A Rising Danger by Andrew M. Dzambo

Coastal Restoration Spending in Louisiana Economic Impact Analysis

4 th International Symposium on Flood Defence: Managing Flood Risk, Reliability and Vulnerability Toronto, Ontario, Canada, May 6-8, 2008

Gulf Intracoastal Waterway

Evaluating the Condition of Seawalls/Bulkheads

Presentation for SAME Industry Day

Senate Bills 1765 & 1766 Would Hurt, Not Help, Hurricane Katrina Victims

The Mississippi River & Tributaries Project

Levees in Texas A Historical Perspective

Long Term Recovery Loan Program ($100 million)

REVIEW PLAN. US Army Corps of Engineers, New Orleans District. September 22, 2010 MSC Approval Date: Pending Last Revision Date: None

How To Understand The Financial Impact Of Hurricane Ireke

CRS Report for Congress

Aligning Natural and Built Infrastructure for

ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT

A New Coastal Engineering Graduate Program

3/6/2014. Regional Planning Commission s Brownfield Redevelopment Program. Geographic Coverage for RPC Parishes. Brownfield Definition

Louisiana-Mississippi Gulf Coast Ecosystem Restoration Working Group. Roadmap for Restoring Ecosystem Resiliency and Sustainability March 2010

The Mississippi River & Tributaries Project

AERIAL PHOTOGRAPHY AND MAPPING LESSON PLAN Images of Katrina

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

Storm Protection. Storm Protection

RISKS THE HERBERT HOOVER DIKE LLOYD S EMERGING RISKS TEAM REPORT

All of the communities along the Mississippi Gulf Coast visited by the MAT participate in the

1. GENERAL ADVISORY BASE FLOOD ELEVATION (ABFE) QUESTIONS

Honolulu District Personnel Supply Experience, Manpower to Hurricane Relief Efforts

Oakwood Beach Storm Damage Prevention Project NJDEP-Bureau of Coastal Engineering Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs

FEMA s Risk Mapping, Assessment, and Planning (Risk MAP) Fiscal Year 2011 Report to Congress March 15, Federal Emergency Management Agency

Impacts of Global Warming on Hurricane-related Flooding in Corpus Christi,Texas

HURRICANE ISAAC. National Disaster Recovery Framework (NDRF) Long Term Recovery Group (LTRG) Citizens Advisory Committee (CAC)

HB2 (Act 24) of the 2013 R.S. (Jefferson)

Transcription:

Greater New Orleans Hurricane and Storm Damage Risk Reduction System Mike Park Chief Task Force Hope Mississippi Valley Division U.S. Army Corps of Engineers March 15, 2011 US Army Corps of Engineers BUILDING STRONG

New Orleans Area Hurricane and Storm Damage Risk Reduction System 5 Parishes 350 Miles of Levee/Floodwall 78 Pumping Stations (Fed & Non-Fed) 4 Gated Outlets Legend Federal Federal Non-COE Non-Federal BUILDING STRONG

1878 3 BUILDING STRONG

City of New Orleans Ground Elevations A LAKE PONCHARTRAIN B NEW ORLEANS A From Canal St. at Mississippi River to the Lakefront at U.N.O. 30 30 20 20 PROJECT DESIGN FLOWLINE (18 FEET) LONDON AVENUE CANAL FLOODWALL 10 10 HURRICANE LEVEE / FLOODWALL (14.0 FEET) 0 0-10 4 BUILDING STRONG CANAL ST AT RIVER ST LOUIS CATHEDRAL ESPLANADE AT ST. CLAUDE DERBIGNY AT I-10-10 -20 GENTILLY BLVD AT ALLEN DILLARD UNIV CAMPUS ST ANTHONY AT FILMORE AVE WAINRIGHT DR AT L. C. SIMON UNO SIDE OF WAINWRIGHT DR ELEVATIONS IN FEET NGVD New Orleans Topography FLOODWALL ALONG MISSISSIPPI RIVER 23 FT B -20

Hurricane Katrina Aug 29, 2005 Hurricane Rita Sep 24, 2005 One of America s largest natural disasters Cat 5 less than 12 hrs before landfall 127 MPH wind at Louisiana landfall Maximum surge of 28 to 30 feet along Mississippi coast 80 percent of the city of New Orleans flooded Cat 4 less than 12 hrs before landfall 175 MPH max sustained winds in Gulf of Mexico 120 MPH max sustained winds at landfall Cat 3 strength at landfall 5 BUILDING STRONG

New Orleans Maximum Flooding Depth 10 to 13 feet 8 to 15 feet 12 to 15 feet High: 15 Ft. Low: 0 Ft. 9 to 11 feet Design Failure Breach Locations

HSDRRS: Our Mission and Commitment Repair the damages, making what was there before whole again. By 1 June 2011, strengthen and improve the system and provide 100-year level of risk reduction capable of withstanding the effects of a storm having a 1% chance of occurring each year. Current funding level $14.4 B (fully funded). Study and recommend solutions to provide higher levels of protection; restore and protect coastal wetlands (LACPR). 7 BUILDING STRONG

HSDRRS Construction Status Total expected construction contracts: ~390 Overall Program Estimate: ~$14.6B Total Obligations to date: ~$9.5B Total Obligations to Small Businesses: ~$2.5B Awarded: 313 construction contracts worth $7.5B 100-yr Contracts: 103 of 109 construction contracts awarded Ongoing: 116 construction contracts worth $5.8B Complete: 197 construction contracts worth $1.6B Remaining: 74 construction contracts worth $2.3B 2011 Plan to award 36 contracts at a value of $1.1B Outfall Canal Closures and Pumps Levees and Floodwalls Pump Station Storm Proofing SELA interior drainage 8 BUILDING STRONG

Deliver the Greater New Orleans HSDRRS Mission Challenges Mandate to deliver $14.6B construction program on schedule Intense scrutiny New governances Form design criteria, program cost estimate, acquire funding NEPA compliance Deliver a comprehensive system Enablers Administration / Congressional commitment Fully funded program National/Regional Corps capabilities Local partners and stakeholders capabilities NEPA Alternate Arrangements Full host of acquisition strategies Favorable bidding climate 9

Integrated Systems Approach Navigation Flood Damage Risk Reduction Ecosystem Restoration 10

The Big Picture New Orleans IHNC MRGO Closure 11

Acquisition Strategy Best Practices: System Program Management Design Build / Cost Plus Contracts Best Value Source Selection Early Contractor Involvement (ECI) Program Management Support Contract Construction Materials Government Furnished Borrow Supply Contracts for Sheet Piles and Borrow Improved Techniques Value Engineering systems study complete Pile Load Tests in advance of contract award Press Pile, Spiral welded piles Deep soil mixing, sand blanket and wick drains Earned Value Management System (EVMS) Leverage National & Regional Resources 12

HSDRRS Funding Breakdown TOTAL APPROPRIATED FUNDS: $14.48 B Other COMPONENT $ (M) SELA (Interior Drainage) $1,253 WBV 100-year Level of Protection $1,605 Floodwalls SELA LPV 100-year Level of Protection $1,997 Repair Existing System $1,491 Armoring Non-fed WBV 100-yr Restore to Design Height $1,116 Complete Authorized System $1,619 Permanent Pump Stations $804 IHNC LPV 100-yr IHNC $1,743 Selective Armoring $89 PCCP Complete Restore Repair 13 Storm-proof Existing Pump Stations Incorporate non-fed Levees in Plaquemines Parish $340 $671 Reinforce or Replace Floodwalls $1,626 Other $130

Contractual Obligations Total HSDRRS Obligations = $9.5B $978,725,304 $2,471,098,711 E&D, S&A, Real Estate, Work by Other Corps, etc Total Large Business Contracts Total Small Business Contracts $5,862,333,984 30% of all contractual dollars have been awarded to small businesses 14 BUILDING STRONG

Industry Interaction Industry Days and Small Business Days: Upcoming projects, concepts and innovations Innovative Workshops: Forums to discuss and gather information from industry to determine the best engineering solution 15 BUILDING STRONG

1 June 2011 Status: A perimeter system capable of defending against a 100-year storm surge where: 97% of the system perimeter will be constructed to 100-year design criteria 2 % of the system will have Engineered Interim Structures in place 1% of the system will have Engineered Construction Closures on site to close gaps should a hurricane threaten the area 16 BUILDING STRONG

17 BUILDING STRONG

Lake Borgne Surge Barrier 18

Lake Borgne Surge Barrier Gates GIWW Barge Gate GIWW Sector Gate 19

Lake Borgne Surge Barrier 20

Lake Borgne Surge Barrier 21

Lake Borgne Surge Barrier Sector Gate Fabrication 22

Lake Borgne Surge Barrier Sector Gate Fabrication IHNC Lake Borgne Sector Gate 23

Lake Borgne Surge Barrier Barge Gate 24

Bayou Bienvenue Gate Fabrication 25

St. Bernard Floodwall 26

St. Bernard Floodwall Construction 27 Southern Reach