Quality Assurance Plan



Similar documents
Warehouse Management MICROSOFT BUSINESS SOLUTIONS AXAPTA

Hella KGaA Hueck & Co. Concept for returnable load carrier in IAM. Status:

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES

GOVERNMENT OF INDIA MINISTRY OF RAILWAYS TI/STR/028. (Revision 1)

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

CEG/GP/1534/257/RFQ27016/ [01] Technical specification for NB 350 CB pipe :

STORAGE & DISTRIBUTION SERVICE PROPOSAL. Prepared for Jade Lambert

Drain & Sewer. Cleaning. Drain and Sewer cleaning Fluid transfer solutions TRELLEBORG FLUID HANDLING SOLUTIONS

Certification process ECOCERT Ecological & Recycled Textile Standard

ENGINEERING SPECIFICATION PULTRUDED DYNAFORM FIBERGLASS STRUCTURAL SHAPES. July 1, 2008 Revision 2

ORDER PROCESSING/SHIPPING

SPECIFICATION Aluminum Module Frames. Allowed anodization before fabrication for clear frames.

Understanding BS EN 771-3: Aggregate concrete masonry units

Naue GmbH&Co.KG. Quality Control and. Quality Assurance. Manual. For Geomembranes

WHAT IS PCL3 DIGITAL?

Quality Control requirements fortechnical REQUIREMENT

COMMISSION INTERNATIONALE DE KARTING - FIA

cc quality management

How To Make An Oriented Strand Board

Authorised and notified according to Article 10 of the Council Directive 89/106/EEC of 21 December 1988 on the

A comprehensive range

Profiles in stock Standard catalogue. Discover the possibilities with aluminium profiles from Sapa

COMPARISON BETWEEN GLASS AND FLAX NON-CRIMP STITCHED FABRICS

A Member of the Constructor Group STORAGE SOLUTIONS. Clever Thinking Inside the Box

Pharmaceutical Wholesaler Site Inspection Checklist

3.7 Logistics Execution

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

Belt and Roller Conveyor for boxes and containers

Cold drawn seamless steel tubes for mechanical applications

REFERENTIEL- SODERN. Autre référence / Other reference :

TRANSLATION OF THE ORIGINAL MANUAL

For Components PIERBURG S.A.

Fax Server. Fax Server PRI. Blue Line. Fax Server for ISDN30 line bundles

European technical approval

The certification process

ZKL Bearings for Railway Rolling Stock

YFS Automotive Systems, Inc. Supplier Packaging Guidelines

The Carriage of Dangerous Goods and Use of Transportable Pressure Equipment Regulations 2009 (as amended) Authorisation No. 284 Rev.

STENCA PIPE. High quality pipe insulation.

Merchant Order Management System Key Features

Delivery specification Labelling of components and products

Barcoding in pharmaceutical inventory management Botswana experience

UNCONTROLLED COPY FOR REFERENCE ONLY

Glass Fibers Reinforced Composits (GFRP) for TUNNELLING

TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES

Metals Industry White Paper

Development of Application Software for Stock Material Selection for Manufacturing of Shafts

High Capacity Hot Air Dryer

Rollers. from the UK s largest roller manufacturer. Quality Performance Reliability

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality

Inventory management within a food factory

02. OX SPREADER BEAMS CATALOGUE. Van der Blij B.V. Vechtstraat KH Oss Netherlands tel fax

PRODUCTBLADEN GT ROCKPANEL STRUCTURE

1.1.2 Polypropylene The polypropylene must be a white opaque film, 1 2 mil thick. Biaxial orientation is preferred.

DC/DC CONVERTER Environmental Test Report

This attractive cover system has been designed to complement the Pipe Cover and Skirting Cover product ranges.

DIE SETS - MACHINED PLATES ACCORDING TO DRAWING CONTENTS

INTERNATIONAL HOCKEY FEDERATION PERFORMANCE REQUIREMENTS AND TEST PROCEDURES FOR HOCKEY BALLS. Published: April 1999

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS

TruLaser Tube: Optimal tube. and. profile cutting. Machine Tools / Power Tools Laser Technology / Electronics Medical Technology

European Technical Approval ETA 13/0526

THE MINISTRY OF ENVIRONMENTAL PROTECTION, PHYSICAL PLANNING AND CONSTRUCTION

ADVANTAGES OF RFID FOR WARRANTY MANAGEMENT AND/OR MAINTENANCE

Working Drawing and Assemblies. Chapter 10

Analytics for Tally.ERP 9

Home Product Testing

Défumair XR. ventilation and cmv. fire grade - label CE. smoke-extraction fan extraction casing for kitchen at F advantages.

Module 7. Plumber: Sink Installation

CONVEYING TECHNOLOGY LOADING TECHNOLOGY PALLETIZING TECHNOLOGY PACKAGING TECHNOLOGY SORTATION AND DISTRIBUTION SYSTEMS.

LKL Staal BV Specialized in customer specific metallurgical components

Quality Manual PA

PRELIMINARY BROCHURE. Uddeholm Corrax

EX-TECH SAS CP/PB 150 EXPLOSIONPROOF MANUAL CALL POINT/ PUSH BOTTON TECHNICAL MANUAL

QUALITY MANUAL. Version 2.6/August Printed copies are not subject to revision service.

Transmission of delivery note and transport data in format VDA 4913

GENERAL TERMS OF PURCHASE of Globe Chemicals GmbH valid for contracts with merchants effective May 1 st, 2005

UNLIMITED VARIETY OF CREATIVE SHEET MATERIAL.

Quality Systems Manual

Accounts Receivable. I. Overview Definitions and Abbreviations. Equipment and Supplies Required

Quality Assurance Manual. QAM-2013-Rev2

DFX - DFM for Flexible PCBs Jeremy Rygate

Packaging Validation according to ISO 11607

ENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING. January 24,

TY-FLO Needle Valves

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

STENCA HT PIPE. Quality Insulation made of calcium silicate.

ICS: Strengthening retrofitting of reinforced concrete structures by gluing of fibre reinforced polymeric fabrics (FRP fabrics)

ROLLING STOCK CABLES

Engineering Plastics Technical Presentation

Table of Contents MODULE 1: QUALITY MANAGEMENT SYSTEM Introduction:... 3 What is a QMS (Quality Management System)?... 3

PC INTERFACE MODULES FOR TOLL-PLAZA CLASSIFICATION SENSORS


EUROPASS DIPLOMA SUPPLEMENT

B&R guidelines for delivery of goods Version 02

SEMAE3221 Machining aircraft components using CNC milling machines

tutor2u Stock Control The Importance of Managing Stocks AS & A2 Business Studies PowerPoint Presentations 2005

Flexible Circuits and Interconnection Solutions

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

Transcription:

Quality Assurance Plan AGEPOL Reference Manual Provisions specific to the business Ratchaburi Phase 2 ID_7391 Walkways & Ladders Ratchaburi Phase 2 : QAP

1.1 Production of GRP sections : Extract from the internal control procedures a. Procurement - An order is placed with listed suppliers quoting both AGEPOL's and the supplier's reference, with a reminder of the particulars of our standards if necessary. - Presentation of the " Receiving report " (cf. example) - Upon receipt, the goods are inspected in accordance with the " Receiving report " (a non-compliance results in non-acceptance of the goods). - The materials received are labelled and set aside to be put into stock. b. Preparing for production. - The machine must be cleaned in accordance with the manufacturer's procedure, or an internal procedure. - The necessary tools must be prepared and the dimensions set. - The formulation, baths, mats, rovings and any necessary additives are prepared (in accordance with the internal formulation sheet). - The machine (mould) is pre-heated. - Pre-production is launched, in order to set the cutting speed and temperature (which must be adjusted in accordance with both the machine settings information sheet, depending on the sections, and the dimensional and visual characteristics of the product to be obtained). - Setting of cutting lengths. - Prepare for packaging of the products. c. Start of production - Tests are carried out during production by random sampling. Dimensional testing (5 % of production) and destructive testing are carried out in order to validate the product's physical and mechanical properties. Any product marked with a material non-compliance is discarded. - The products are palletized and labelled (product type, quantities, lengths, customer order reference). - Quantities are checked against the " Production Report " before dispatch. Ratchaburi Phase 2 : QAP

1.2 Production of Finished / Semi-finished products Extract from the internal control procedures d. The sections manufactured are inspected - A general dimensional check is carried out in accordance with the list of products for manufacture. - The products are visually inspected. Parts declared noncompliant are discarded. - A check is made of the quantities necessary for the current production run (in accordance with the Parts List and " Internal Tracking of Production and Dispatch " form. e. Preparing for production. - The machines are cleaned in accordance with the manufacturer's procedure and/or an internal procedure. - Inspection and laying out of tools - Adjusting of tools and/or machining jigs. f. Start of production - Production output is checked against the " Parts List " or " Internal Tracking of Production and Dispatch " form. - Systematic check of the first and last cut, as well as of quantities. Noncompliant parts are put into stock and any missing parts are cut. - The parts are marked in accordance with the list and this is recorded in the production report of the parts made. - Sorting of output per machining station. - Machining is done in accordance with the " AGP_FAB " manufacturing plan or the customer's plans. - The products made are inspected and non-compliant parts are discarded. - At the end of the production run, the quantities are checked and recorded in the " Internal Tracking of Production and Dispatch " form. g. Assembly - The manufactured parts are collected for assembly in accordance with the manufacturing plans. - The assembly jigs are installed and adjusted. - The parts are assembled and the dimensions checked, including the general geometry of the part (squareness, parallelism, straightness). - The product markings are checked and the products palletized in accordance with the " Packing List ". - The quantities are checked and indicated in the " Internal Tracking of Production and Dispatch ". Ratchaburi Phase 2 : QAP

1.3 Dispatch Extract from the internal control procedures h. Palletization - Returning to the pallets: the quantities produced are checked against the " Internal Tracking of Production and Dispatch " form. - This is then confirmed in the " Internal Tracking of Production and Dispatch " form. - Strapping the checked pallets and attaching the packing list. - The relevant " Packing List " is attached to the pallets. - The pallets are positioned to await collection. i. Dispatch - The " Internal Tracking of Production and Dispatch " form is returned to the Dispatch department - it must be confirmed on the document that all of the stations have been validated in terms of " Production " as well as Dispatch. - Preparation of the " Delivery Note " (cf. Annexes). - The " Packing List " is sent to the customer, including details of the pallets, their weight and the total quantities. In return, the customer confirms delivery (place and date). - Upon collection, the " Delivery Note " is attached to the pallets, and the number of parcels and related " Packing Lists " is checked. - The pallets are loaded. - The transportation documents are signed when all of the stages have been validated by the Dispatch department. N.B. : As indicated in our sales terms and conditions : - " Our goods are always transported at the addressee's risk, even when the prices are agreed carriage-paid or the carrier has been chosen by us. " - " Our delivery times are provided for information purposes only remain within the scope of what is humanly possible. A delay in delivery, even if considerable, cannot constitute just cause for refusal to accept the delivery, nor for damages or interest charges of any kind. " - " Complaints will only be accepted within a period of 8 days following receipt of the goods. No goods may be returned without our prior authorization. - " At the time of delivery, in the event of missing or damaged parcels, specific concerns must be noted on the carrier's delivery note and these must be confirmed by registered letter to the delivering carrier within 2 working days. " - " Special insurance is automatically arranged for goods of a value exceeding a threshold set by us. " j. Updating the file - The dispatch documentation is added to the file, which is then forwarded to the Accounts department. - Upon payment, archive the file. Ratchaburi Phase 2 : QAP

Annexes Standard documents Provisions specific to the business Ratchaburi Phase 2 ID_7391 Walkways & Ladders Ratchaburi Phase 2 : QAP

Fiche Technique Matière Polyester Renforcé fibre de Verre (P.R.V.) Propriétés Physiques Propriété Unité Valeur Spécifique Densité Kg/dm 3 1.7 2.0 Dureté Barcol Barcol 50 Absorption d eau % Néant Tension de claquage KV/mm 2 10 K passage chaleur 10-6 / K 6 10 Température C - 80 / +120 Propriétés Mécanique Propriété Limite à rupture (Mpa) Limite d utilisation (Mpa) Flexion (L - T) 240 100 135 50 Traction (L - T) 240 50 135 25 Compression (L - T) 240-70 135 50 Cisaillement 25 17 Propriété MPa - Module d Young (L - T) 23 000-8500 Module de Coulomb 3 000 Coefficient de Poisson (LT - TL) 0.23 0.09 Propriétés Physiques Environnement Concentration Polyester Isophtalique Epoxy Vinylester % 20 C 60 C 20 C 60 C Eau (toutes) 100 R R R R Huiles Minérales 100 R R R R Acide Nitrique 5 R NR R R Acide Sulfurique 10 R NR R R R : Recommandé NR : Non Recommandée Confidentiel Fiche Technique AGEPOL

AGEPOL 2 rue du 7 septembre 57300 Mondelange - France Tel : 03.87.71.59.60 Fax : 03.87.71.63.63 Mail : agepol@wanadoo.fr Client N Affaire N Commande Chargé d'affaire Date N Document Hamon Thermal Europe HAMONCOCK030506 BC52607001 Jacques Pouret 01/02/2007 AGP_LDP_30506_002 Liste des Documents de Production N Document C.007391.309.01 C.007391.309.02 Désignation Plan d'ensemble Plan de Détail Ind. Date D 23/06/2006 C 23/06/2006 Remarques AGP_FD_30506_002 Fiche de Débitage A 01/02/2007 AGP_SIFE_30506_002 Suivi Interne de Fabrication & d'expédition A 01/02/2007 AGP_PL_30506_002 Packing List Général A 01/02/2007 AGP_FNC_30506_001 AGP_FNC_30506_002 AGP_FNC_30506_003 Fiche de non-conformité n 1 Fiche de non-conformité n 2 Fiche de non-conformité n 3 xx/xx/xx En cours Levée xx/xx/xx En cours Levée xx/xx/xx En cours Levée

AGEPOL 2 rue du 7 septembre 57300 Mondelange - France Tel : 03.87.71.59.60 Fax : 03.87.71.63.63 Mail : agepol@wanadoo.fr Client N Affaire N Commande Chargé d'affaire Date N Document Hamon Thermal Europe HAMONCOCK030506 BC2704023 Jacques Pouret 12/04/2007 AGP_LDP_30506_003 Liste des Documents de Production N Document C.007391.309.01 C.007391.309.02 Désignation Plan d'ensemble Plan de Détail Ind. Date D 23/06/2006 C 23/06/2006 Remarques AGP_FD_30506_003 Fiche de Débitage A 12/04/2007 AGP_SIFE_30506_003 Suivi Interne de Fabrication & d'expédition A 12/04/2007 AGP_PL_30506_003 Packing List Général A 16/04/2007 AGP_FNC_30506_001 AGP_FNC_30506_002 AGP_FNC_30506_003 Fiche de non-conformité n 1 Fiche de non-conformité n 2 Fiche de non-conformité n 3 xx/xx/xx En cours Levée xx/xx/xx En cours Levée xx/xx/xx En cours Levée

AGEPOL S.A.S NF L 00-015C - 03017 AGEPOL S.A.S 1/3 Hamon Thermal Europe HTEB HAMONCOCK030506 BL2703050 27.03.2007 Ladder type 1 : lg = 4350 mm Ladder type 2 : lg = 2563 mm AGECH_4350 AGECH_2563 AGint03017-1 12 type 1 12 type 2 Plan Nb : C.007803.309.01 Plan Nb : C.007803.309.02 Matuszczak Technical Department 27.03.07

AGEPOL S.A.S NF L 00-015C - 03027 AGEPOL S.A.S 2/3 Hamon Thermal Europe HTEB HAMONCOCK030506 BL2703050 27.03.2007 Mark 01 : Grating 735 (sp) x 1295mm Mark 02 : Grating 735 (sp) x 485mm Mark 03 : Grating 735 (sp) x 840mm Mark 04 : Grating 735 (sp) x 1185mm Mark 22 : Grating Fixation Set AGCP_30*6_30*56 AGCPFix_M30 AGint03017-2 Mark 01 : 36 Mark 02 : 12 Mark 03 : 12 Mark 04 : 12 Mark 22 : 504 Plan Nb : C.007803.309.01 Plan Nb : C.007803.309.02 Matuszczak Technical Department 27.03.07

AGEPOL S.A.S NF L 00-015C - 03037 AGEPOL S.A.S 3/3 Hamon Thermal Europe HTEB HAMONCOCK030506 BL2703050 27.03.2007 Profils Items : 05, 06, 09, 10, 11, 25 U 150 x 45 x 8mm, SQ 75 x 75 x 6mm, Angle 50 x 50 x 5mm, Flat 30 x 6mm AGProfil_U150 AGProfil_SQ75 AGProfil_Ang50 AGProfil_F30 AGint03017-3 Mark 05 : 24 Mark 06 : 72 Mark 09 : 12 Mark 10 : 168 Mark 11 : 24 Mark 25 : 48 Plan Nb : C.007803.309.01 Plan Nb : C.007803.309.02 Matuszczak Technical Department 27.03.07

AGEPOL S.A.S NF L 00-015C - 16047 AGEPOL S.A.S 1/1 Hamon Thermal Europe HTEB HAMONCOCK030506 BL2704015 12.04.2007 Mark 01 : Grating 735 (sp) x 1295mm AGCP_30*6_30*56 AGint12047-1 Mark 01 : 24 Plan Nb : C.007803.309.01 Ind. F Plan Nb : C.007803.309.02 Ind. D Matuszczak Technical Department 16.04.07