Implementation Challenges of Incorporating Greenhouse Gas Compliance Costs

Similar documents
TECHNICAL BULLETIN. Natural Gas Price Calculation. February 21, Outcropping Way, Folsom, CA

California ISO. Report on natural gas price volatility at western trading hubs. May 14, Department of Market Monitoring

Business Requirements Specification

External Business Requirements Specification

Comments of Pacific Gas & Electric Company pertaining to ISO s Straw Proposal on Bid Cost Recovery Enhancements

Technical Bulletin Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues. Market Issue

Natural Gas Pipeline Penalty Recovery Issue Paper

The remainder of this memo provides a summary of market performance and trends in 2014 through November.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. California Independent System ) Docket No. ER Operator Corporation )

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market

151 FERC 61,108 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING PROPOSED TARIFF REVISIONS. (Issued May 11, 2015)

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

ALSTON&BIRD LLP. The Atlantic Building 950 F Street, N. W. Washington, DC Fax: July 11, 2007

California s Cap-and-Trade Voluntary Renewable Electricity Program

FERC Workshop on Price Formation: Scarcity and Shortage Pricing, Offer Mitigation, and Offer Caps in RTO and ISO Markets (Docket. No.

Issue Paper & Initial Straw Proposal. Settlement Timeline Bridge

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

DISPATCH AGREEMENT RECITALS

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Electric Creditworthiness Standards ) Docket No.

California Greenhouse Gas Cap and Generation Variable Costs

Nodal Exchange Contract Specifications

Overview of Reliability Demand Response Resource

154 FERC 61,020 FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC January 19, 2016

How To Trade In California S Carbon Market

Aliso Canyon Gas-Electric Coordination. Issue Paper

PREPARED DIRECT TESTIMONY OF YVONNE M. LE MIEUX ON BEHALF OF SAN DIEGO GAS & ELECTRIC COMPANY

On November 18, 2014, ICE Clear Credit LLC ( ICC ) filed with the Securities and

Cap-and-Trade. Adaptive Management. Board Update November 19, 2015

Energy in the Wholesale Market December 5, :30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England

Memo INTRODUCTION UNDER-SCHEDULING

San Diego Gas & Electric Company ) Docket No. ER MOTION TO INTERVENE AND PROTEST OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION

Business Requirements Specification

June 28, Secretary. Street, N.E. 888 First. pursuant. examine the. screen to. addition to. Sincerely, Nancy Saracino

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Energy Imbalance Market

NEW YORK INDEPENDENT SYSTEM OPERATOR, INC. WORKING CAPITAL POLICY AND PROCEDURE

Market Tracking System

Core Fittings C-Core and CD-Core Fittings

Monitoring Competitive Markets

REPORT ON THE SECONDARY MARKET FOR RGGI CO2 ALLOWANCES: THIRD QUARTER 2014

Chapter 9 Settlements and Billing

Automation of ROS DAM

From: Steve Berberich, Vice President of Technology and Corporate Services and Chief Financial Officer

CUSTOMER CHARTER. Small Customer Charter

Opportunities for Biogas Digesters

Customer Services and the Changing Needs of the CA Electricity Grid. Stanford University May 5, 2015

ANCILLARY SERVICES. A Paper for PPC. Establishment Organisation and Pilot Operation of the HTSO. 21 September 2000

APPENDIX 7 TO LGIP INTERIM INTERCONNECTION SYSTEM IMPACT STUDY AGREEMENT

An Overview of California s Cap and Trade Program

RATE SCHEDULE FCS FACILITIES CONNECTION SERVICE

Market Solutions to Loop Flow

Comments on ISO s Third Revised Straw Proposal for Settlement of Interties in Real-Time

Network Upgrades andSIAs Under California Tariff Clarifications

Day-Ahead Commitment Process Implementation Overview - Settlement. January 12, 2006 Edward Arlitt, DACP Project Team

ELECTRIC SCHEDULE A-1 Sheet 1 SMALL GENERAL SERVICE

Compliance, Tools & Synchronization: A Guide to Climate Action Planning Resources in California

September 29, Docket No. ER Amendment to CAISO FERC Electric Tariff to Eliminate Annual External Operations Review

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) )

Business Requirements Specification

Workshop B. 11:15 a.m. to 12:30 p.m.

Aliso Canyon Gas-Electric Coordination. Straw Proposal

First Deliverer Approach to Regulating gelectricity Imports in Cap and Trade Programs. RGGI Learning Session October 11, 2011 New York, NY

Wind Power and Electricity Markets

Office of. City Attorney. City of San Diego MEMORANDUM MS 59 (619) QUESTION PRESENTED

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

NV Energy ISO Energy Imbalance Market Economic Assessment

THE COMED RESIDENTIAL REAL-TIME PRICING PROGRAM GUIDE TO REAL-TIME PRICING

No SUPPLEMENTARY GAZETTE THE SOUTH AUSTRALIAN GOVERNMENT GAZETTE. PUBLISHED BY AUTHORITY

California Independent System Operator Corporation - A Case Study

152 FERC 61,218 DEPARTMENT OF ENERGY FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 35. [Docket No. RM ]

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Measurement and Mitigation of Market Power in Wholesale Electricity Markets

Informational Report of the California Independent System Operator Corporation

August 11, Advice No (U 904 G) Public Utilities Commission of the State of California

Release User Group Agenda

Customer Service Business Unit Tariff Programs & Services. Leading the Way in Electricity TM

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO)

California ISO Straw Proposal. Ancillary Services Procurement in HASP and Dispatch Logic

Linking Offsets From Mexico into California s Greenhouse Gas Cap and Trade Program

Scarcity Pricing. Draft Compliance Filing Language. CAISO Fourth Replacement Tariff. November 10, 2009

SASABE PIPELINE OPEN SEASON BID SHEET. The In-Service Date for the Sasabe Pipeline. MDQ (Quantity in Dth) MDQ (Quantity in Dth)

Proposal to Modify Bad Debt Loss Allocations and Working Capital Rebalancing Methodologies. Mary K. McGarvey Management Committee November 29, 2006

California ISO. Third Revised Straw Proposal. Renewable Integration: Market and Product Review Phase 1

Comments on the California ISO MRTU LMP Market Design

How To Settle Day Ahead Energy, Loss, And Loss For A Day Ahead Market

Accounting and Billing Manual

Industrial & Commercial Energy Snapshot Methodology

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

APPENDIX VIII FORMULA FOR CALCULATING ANNUAL BASE TRANSMISSION REVENUE REQUIREMENTS UNDER SDG&E S TRANSMISSION OWNER TARIFF

ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices. Version 10.0 April 17, 2013

The ISO s Working Capital Fund shall be maintained according to the provisions of this

Affidavit Of Charles A. Smart

Carbon Market Development and Oversight. June 26, 2009 De Ana Dow, Managing Director, CME Group

ELECTRIC SCHEDULE E-6 Sheet 1 RESIDENTIAL TIME-OF-USE SERVICE

SMALL BUSINESS IMPACT STATEMENT FOR PROPOSED REGULATION AMENDMENTS APC Regulations No. 47

* Revised March 2013 *

ACER. oj L 211, , p J L 211, , p RECOMMENDATION Of THE AGENCY FOR THE COOPERATION OF ENERGY REGULATORS No 02/2014

At the time of notification, the QF or OSGF shall provide the Company with the following information:

Transcription:

www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400

Revision History Date Version Description Author 2013-07-12 1.0 Xu, Lin Note: Consistent with Attachment G to the Business Practice Manual for Market Operations, the purpose of this technical bulletin is to provide the ISO s market participants with information concerning implementation issues the ISO experienced when implementing the greenhouse gas cost adder effective as of January 1, 2013 www.caiso.com Revision History

Contents EXECUTIVE SUMMARY...4 BACKGROUND...4 IMPLEMENTATION ISSUES ENCOUNTERED...5 MARKET IMPACT ASSESSMENT FOR JANUARY 1, 2013 TRADING DAY...6 MITIGATION...7 www.caiso.com Page 3 of 8

Executive Summary The ISO encountered two implementation issues in connection with its implementation of the greenhouse gas (GHG) adder as of January 1, 2013. First, the greenhouse gas (GHG) adder was not included in the day-ahead market for the January 1, 2013 trading day due to a data availability issue. The total bid cost for the January 1, 2013 trading day was approximately $200,000 lower without the GHG adder than what it would have been with the GHG adder. In addition, the total energy payment from load was about $25,000 lower than what it would have been had the GHG adder been incorporated in to the market. The ISO did not issue price corrections. The ISO will include the adder in bid cost recovery for the January 1, 2013 trading day thereby substantially mitigating the impact to the generating resources that were in the market. Second, from January 1, 2013 to January 8, 2013, one of the gas price indices used to calculate the GHG allowance adder was from an alternative publication rather than from the publications identified in the business practice manual. The cost differences were minor and the market impact was negligible. The ISO is not proposing any mitigation. Background The state of California started the GHG emission cap-and-trade program in 2012 with one element GHG compliance costs to be enforced beginning January 1, 2013. GHG compliance costs may affect the relevant resources costs including energy bids, minimum load cost, start-up costs and variable cost-based default energy bids. Market participants can choose to use cost-based or registered cost for their minimum load start-up costs as set forth in ISO tariff section 30.4. Cost based minimum load and start-up costs are calculated on a daily basis using the most recent available natural gas prices and, as of the January 1, 2013 trading day, the most recent available greenhouse gas emissions costs as well. Scheduling coordinators electing the registered cost option submit minimum load and start-up cost values subject to a cap of 200% of the projected cost-based calculations. Accordingly, the natural gas costs and GHG costs affect both the daily cost-based calculations as well as the registered cost cap. Pursuant to the ISO tariff, the ISO started to incorporate GHG compliance costs into generated bids, minimum load and start-up costs as well default energy bids as of the January 1, 2013 trading day for resources with GHG compliance obligations. An independent entity, Potomac Economics, calculates the GHG cost adder and provides www.caiso.com Page 4 of 8

the information to the ISO on a daily basis. Potomac Economics also calculates and streams the default energy bids to the ISO. Implementation Issues Encountered The ISO encountered two implementation issues. First, the GHG cost adder was received too late on December 31, 2012 to be available for the day-ahead market run for the January 1, 2013 trading day. The data were made available for the real-time market for the January 1, 2013 trading day, so the real-time market was not affected. No price corrections were made for the day-ahead market results for the January 1, 2013 trading day. The market impact analysis for the January 1, 2013 trading day and the ISO s proposed mitigation are set forth in the next section. The second issue was related to the gas price indices used to calculate the GHG allowance price index. As with the natural gas price index, the ISO uses at least two of three daily prices to calculate the GHG adder. In its tariff amendment filing the ISO had proposed to identify the names of the publications in the business practice manual rather than the tariff to allow greater flexibility to address changes in the publication industry. 1 The business practice manual required gas price indices from at least two of the following publications to be used: Intercontinental Exchange (ICE), Platt s Daily, and ARGUS Air Daily. However, the following publications were actually used in the first 8 days beginning with the January 1, 2013 trading day: Intercontinental Exchange (ICE), CME Group, and ARGUS Air Daily. Starting on January 8, 2013 (for the January 9 day-ahead market and January 8 real-time market), the publications identified in the business practice manual were utilized. In Table 1 below, the ISO identifies the GHG adder that was used in the ISO markets and the GHG value calculated based on the values in the publications identified in the business practice manual. Because the difference is negligible, the ISO has concluded that no further market impact assessment is warranted and no mitigation is necessary. 2 1 FERC subsequently required the ISO to identify the names of the publications in the ISO tariff and the publications are identified in ISO tariff section 39.7.1.1.1. 2 Platt s is not yet publishing a GHG price. www.caiso.com Page 5 of 8

Table 1 Trade date ICE CME Argus GHG_INDEX GHG_INDEX without CME Difference 1/1/2013 14.75 15.10 14.65 14.83 14.7 (0.13) 1/2/2013 16.20 16.10 15.75 16.02 15.98 (0.04) 1/3/2013 15.85 15.65 15.75 15.75 15.80 0.05 1/4/2013 15.95 15.90 15.95 15.93 15.95 0.02 1/5/2013 Saturday Saturday Saturday 15.93 15.95 0.02 1/6/2013 Sunday Sunday Sunday 15.93 15.95 0.02 1/7/2013 16.25 16.35 16.35 16.32 16.30 (0.02) *No GHG data are available on Saturdays and Sundays. The last available GHG data are used for the weekend GHG index calculation. Market Impact Assessment for January 1, 2013 Trading Day The ISO assessed the market impact of not including the GHG adder in the day-ahead market for the January 1 trading day by rerunning the market optimization with corrected start-up, minimum load and default energy bid values. With the GHG cost adder included in the rerun case, the total bid cost for the 24 hours increased by approximately $200,000. The rerun of the day-ahead market for the January 1, 2013 trading day also showed system wide energy component price fluctuations as illustrated in Figure 1. The hourly price change ranges from $2.30 (lower price in rerun case) to $5.16 (higher price in rerun case). The price fluctuations are largely due to the unit commitment changes as a result of GHG cost being considered. Some resources become uneconomic with GHG adder, and thus were decommitted in the rerun case; other resources were committed to make up for the uneconomic generation decommitments. The rerun case shows that total load energy payment (load*lmp) would have increased by about $25,000 if the GHG adder had been included in the dayahead market for the January 1, 2013 trading day. www.caiso.com Page 6 of 8

Figure 1: Trade day 1/1/2013 IFM system energy price changes after rerun Mitigation The ISO did not issue any price corrections and does not believe the price impact is significant enough to warrant an application to FERC to correct the prices outside of the five day price correction window. Furthermore, since the actual commitment would not have changed, performing a price correction would have created an inconsistency between the corrected prices and the actual resource commitment and dispatchresults, which would not be overcome by the slim benefit of price correction. The ISO will include the GHG adder in bid cost recovery for the January 1, 2013 trading day for resources with GHG compliance obligations. This will ensure that resources with a GHG compliance obligation that actually operated consistently with the the day ahead market results recover their GHG costs. The settlement adjustment will be issued in Recalculation Settlement Statement T+9M for the trade date of January 1, 2013 that is scheduled to publish on October 7, 2013. As discussed above, the ISO does not www.caiso.com Page 7 of 8

propose any mitigation for the January 1-January 8, 2013 period associated with how the GHG adder was calculated. www.caiso.com Page 8 of 8