Quick fix for frost heave:



Similar documents
Transmission Foundations Case History : Helical piles Hydro One Networks Inc.

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued November 1, Legacy report on the 1997 Uniform Building Code

System. Stability. Security. Integrity. 150 Helical Anchor

Cold Weather Concrete Practices

Designed and Engineered to Perform

Transmission Foundations. helical piles and guy anchors for transmission structures.

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

ATLAS RESISTANCE Pier Foundation Systems

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

Chapter 3 Pre-Installation, Foundations and Piers

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

symptoms of a faulty foundation

The Stabilizer TM. Benefits. Supplemental support system for sagging beams and floor joists within a crawl space

High Capacity Helical Piles Limited Access Projects

Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford

A Solid Foundation Solution for Homeowners. from. Our products are made with 90% Recycled Material Down. Right. Solid. GREEN.

High Strain Dynamic Load Testing of Drilled Shafts

SECTION 1 GENERAL REQUIREMENTS

Stability. Security. Integrity.

Helical Pier Foundations

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

ITEM # OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

International Greenhouse Company

Baton Rouge Foundation Repair

The minimum reinforcement for the stem wall is the placement of:

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool

Soils, Foundations & Moisture Control

Hyperlinks are Inactive

Assembly Instructions for the InteliTrack 3000 Rail Tracking System

ALIGNMENT. Pump and Driver Alignment

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

POST AND FRAME STRUCTURES (Pole Barns)

Residential Foundations and Basements

Homeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS

For a Coastal Site. A Pier-and-Beam Foundation. Our company specializes in oceanfront

Section SEWER PIPE INSTALLATION AND TESTING

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST

EAST LYME HIGH SCHOOL

Industry Track Inspection

Proposed Action: Morrow Flat Substation Construction and Related Improvements Near Boardman, Oregon

Building Pluto Subwoofers with Large PVC Pipe

PC-Concrete Injectable Concrete Anchoring and Repair System

Uniform Construction Code (UCC) Manufactured Homes. Modular Homes. Building Permit Application Package

Table 4.9 Storm Drain Inlet Protetion Applicable for

Standards Committee T echnical Technical Conference

ROTATING MACHINES. Alignment & Positioning of. Fast, easy and accurate alignment of rotating machines, pumps, drives, foundations, etc.

Embedded Parts Introduction - Anchors

5/1/2013. Topics. The challenge is to better maintain native characteristics of soils during and after construction

Safe & Sound Bridge Terminology

LIFE SCIENCE. Hoop House Construction for New Mexico: 12-ft. x 40-ft. Hoop House BRINGING TO YOUR HOME ECONOMICS COLLEGE OF AGRICULTURE AND

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

Metropolitan Builders Association Masonry & Concrete Standard

Section 2100-Trenching and Tunneling

Structural Foundation System

Instruction Manual 19/9/01. Flat Roof Carport

Page B-1 Hubbell Power Systems, Inc. All Rights Reserved Copyright 2014 LOAD TESTS

Whitepaper. Modular Substation Cable Termination Design. Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada

How to Design Helical Piles per the 2009 International Building Code

Elevating Your House. Introduction CHAPTER 5

Preventing water damage in the basement

The Ultimate Guide To Protecting Your House From Water In The Basement

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Comprehensive Design Example 2: Foundations for Bulk Storage Facility

PUSD High Frequency Word List

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: HUBBELL POWER SYSTEMS, INC.

DESIGNING STRUCTURES IN EXPANSIVE CLAY

Wood Projects Outdoors. Post Hole Specifications. Deck Span Tables. Eakes.com

AXIS system used to install gravity flow sewer Laser-guided boring technology capable of pinpoint, on-grade accuracy

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Chapter 2. My Early Days Trading Forex

METHOD OF STATEMENT FOR STATIC LOADING TEST

The quadrature signals and the index pulse are accessed through five inch square pins located on 0.1 inch centers.

IH-635 MANAGED LANES PROJECT, SEG. 3.2

by Greg DiBernardo Working With Helical Piers Steel piles are an affordable foundation option for small jobs and tricky sites

MHI. Overview of Manufactured Home Installation MANUFACTURED HOUSING INSTITUTE. This guide contains an overview. of the HUD-Code manufactured home

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

How To Retaining Wall Guide

LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR

Twist Drill Grinding Attachment By Steven Skiprat Jackson June 2009

DTU Animal Cart Programme

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

DIRT DWELLING. and your. Pin Foundations Inc., 2008

MAINTENANCE OF WHEELMOVE IRRIGATION SYSTEMS

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

Report on. Wind Resistance of Signs supported by. Glass Fiber Reinforced Concrete (GFRC) Pillars

6 RETROFITTING POST & PIER HOUSES

Overhang Bracket Loading. Deck Issues: Design Perspective

Transcription:

Quick fix for frost heave: HELICAL PILES Megan Milbradt Civil Engineer Basin Electric Power Shane Vasbinder Civil Engineer Basin Electric Power Concrete piers were 6 inches to 2 feet out of the ground. Notice the frost heave particularly evident on the pier at right. Frost heave created major problems at Basin Electric Cooperative s Logan substation. The busses were at an angle. The light posts were leaning and you could pull some of the fence posts out of the ground by hand. Frost heave was a serious issue at Logan Substation, on the Basin Electric Power Cooperative (Bismarck, North Dakota) system. To compound the problem, the only outages the engineers could get were short and in the spring and fall, when the ground would be thawing or freezing. 2 www.hubbellpowersystems.com

Logan Substation is located on a windswept plain, about 100 miles north of Bismarck, ND, where temperatures vary from -40 F in the winter to 100 F in the summer. The frost line is about five or 6 feet down and the soil is mainly clay. The site was wet to begin with and when the substation was built, in 1979, grading (to level the site) created a bit of a depression that was topped with gravel. Drainage has been a serious issue from the start and frost heave has been an ongoing challenge. Frost heave is a problem throughout the substation; basically everything is moving. Some of the small piers, supporting lights posts, had come up almost 2 feet. It was crazy to see the piers heaved that high out of the ground, says Shane Vasbinder, Civil Engineer, Basin Electric Co-op. The biggest problem was the piers that were supporting the bus-rack structures. The 9-foot concrete piers weren t rising uniformly and the equipment on the racks was at an angle. A Need for Speed In 2010, the situation had gotten to the point that something had to be done, but Basin Electric s engineers were not sure what to do. They did not want to move the structures or expend the time or effort needed to remove and replace the existing 9-foot concrete piers. One approach the engineers considered was to remove the structures, grind down the existing piers, pour two concrete piers (one on each side) and then install a beam across the two. The structures could then be re-erected in the same spot. While it would work in theory, it was not a practical solution. They would not be able to get the necessary outages needed to pour concrete and let it harden. Getting an outage was going to be a challenge. Basin Electric is a GT co-op that provides power to 135 member co-ops. Its total territory covers 540,000 square miles and stretches from Canada to Mexico. Member companies provide power to 2.8 million consumers in nine states. Logan is a 230kV and 115kV transmission substation, providing power to native load and member co-ops. Logan Substation feeds a number of critical regions. As the lines go west, they feed all the new oil development areas. We just can t take extended outages, says Vasbinder. Besides, the only time dispatchers could arrange an outage was during low-load times (the soonest was in October) late enough in the year that freezing temperatures and snow storms were a real possibility. Basin Electric needed another solution. A light post at the station sticking about 18 out of the ground. As the superstructures move, conductors connected to them are stretched, including those connected to the substation ground grid. We had used the A.B. Chance (Hubbell Power Systems, HPS) Helical Piles before to fix transmission structures in the middle of winter and that looked like our best option. We couldn t take a long, extended outage to go in and pour concrete, says Vasbinder. If we used Helical Piles, we could drill the anchors down and, later that day or the next day, put the structures back up. We could get a whole area done in a week, at most. That was about as long of an outage we could get. Further, we could work in October and not worry about heating enclosures for concrete, so we went with the Helical Piles. Helical Piles: Fast and Winter Friendly To begin, Basin Electric contacted Lee Goen, Senior Chance Anchoring Application Engineer, for help. The co-op was able to provide all the necessary load information, including vertical 3

(or axial) overloads and turning moments. The axial loads were minimal, but, due to strong winds at the site, the moment loads were significant. And, Basin Electric provided bore logs from the site that let me determine the strength of the soil, so I could pick out the right pile, says Goen. It was possible to replace each foundation with a single Helical Pile, but Basin Electric s engineers decided to install two, on either side of the original foundation, perpendicular to the frame. They installed a grade beam across the two and re-erected the structures in the original locations. First, spotting the precise location for a Helical Pile s lead section, then the drive tools engage the box coupler at its top. The Helical Piles used at Logan Substation are 14-feet long, consisting of two 7-foot sections, so they could be installed while nearby bus-work was still in place. (That area of the substation was, obviously, de-energized.) An Aggressive Schedule After taking off the top 2 feet of the existing concrete foundation, the contractor installed two Helical Piles one on either side. Working with the dispatchers, Basin Electric was able to schedule a few outages. The engineers broke the work into phases and hired High Mark (Piedmont, SD) to install the Helical Piles. The concrete foundations had not heaved at the same rate. Some of them were up more than others. In some less serious cases, we just adjusted the cross members, so that they and the equipment on them were level, again. In more serious cases, we had to replace the concrete piers with Helical Piles and re-install level structures, says Megan Milbradt, Civil Engineer, Basin Electric Coop. When the lead section is torqued into the ground, the Helical Pile s baseplate section is added by bolting together their box couplers. Then the proper drive tool is attached and the entire Helical Pile is torqued to grade. We decided to focus on the worst foundations, first. We looked at our survey and picked a number of foundations that had heaved significantly and were in groups. We had one area with eight foundations that were in really bad shape and decided to fix those during the first outage to see how it went, explains Milbradt. We got the first outage in October 2010. It was cold at that time, but the ground wasn t completely frozen, says Milbradt. 4 www.hubbellpowersystems.com

After the Helical Piles were installed, a welded grade beam was bolted across the pair. To align the beam s middle plate so the bus structure could be re-installed where it originally was, a magnetic-base drill was used to locate appropriate bolt holes in the pier bases. Vertical alignment is maintained by using a carpenter s level periodically during the process. Hubbell Power Systems sent a representative, Jason Herron, out to the field to help us get started and oversee the contractor... just in case we ran into any problems, which we didn t. We have a really good working relationship with Hubbell Power Systems, says Milbradt. It is not unusual for AB Chance (HPS) to send a representative to a job site, says Jason Herron, Chance Anchoring Application Engineer. I went out the day before they installed the piles. On the first day, the workers took down the bus work and began demolition of the concrete piers. On the second day, High Mark workers started installing the Helical Piles. I was there to answer any questions and help with the installation, because this particular contractor had 5

never installed our Helical Piles before. So, I directed them on how to put the tooling together and how to attach it to their drill rig. It isn t hard to get a new contractor up to speed. The biggest thing is working with their equipment. Most people think that whenever you install a Helical Pile, you need a large drill rig or something similar. This contractor came out with this large drill rig and that is not typically what an installer needs. The contractors that install a lot of Helical Piles usually install a torque motor on a skid steer loader, or for these larger diameter piles, they will generally put a higher capacity torque motor on an excavator, says Herron. Helical Piles have to be installed at a certain rate typically eight to 20 revolutions per minute. For every revolution the anchor will embed itself 3 inches into the ground. If you drill too fast, it will have the effect of auguring the hole out. You are actually disturbing the soil and you don t get the bearing pressure you need. If you go too slowly, you are just wasting your time. At Logan Substation, the equipment (designed to drill holes) was turning a bit too fast. So, we had to work with the operator to get it slowed down. Typically, this is achieved by adjusting the flow rate on the machine or slowing the RPM or the machine. They made the adjustments and averaged about 14 revolutions per minute, says Herron. During the first outage, work began on Tuesday and finished on Saturday. In that time, the co-op finished eight foundations and that included removing the structures, jack-hammering out a couple feet of the existing foundations and clearing the site, drilling in the Helical Piles and putting the structures back up. During a second outage in October, Basin Electric Co-op completed work on ten more foundations. Then, winter arrived in earnest and a third outage, scheduled for December, had to be cancelled. The rest of the work will be completed in the spring. Overall, using the Helical Piles was a good solution for us. Most importantly, we didn t need long outages. The expense was most likely less than pouring concrete and we didn t have to pour concrete in cold weather. We got the results we needed, says Milbradt. For more information, consult your Hubbell Power Systems terrritory manager or visit http://www.hubbellpowersystems.com/literature/anchoring/ 6 www.hubbellpowersystems.com