Activity Summary: Flood Protection and Control Works

Similar documents
Revenue and Financing Policy

DRAFT Revenue and Financing Policy

Flood Protection & control works

Rivers Group. Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers. Flooding & Drainage Perspectives

Councillor Norm Bruning. Councillors Lyall Thurston and Jane Nees. Steve Everitt (Waterline Engineering)

STATEMENT OF PROPOSAL - REVENUE AND FINANCING POLICY

REVENUE AND FINANCING POLICY

Revenue and Financing Policy

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

HAWKE S BAY REGIONAL COUNCIL Job Description

Revenue and financing policy March 2015

REVENUE AND FINANCING POLICY

Defence Land has the same meaning as in Section 22 of the Local Government Rating Act 2002 (LGRA).

London Borough of Bromley LEAD LOCAL FLOOD AUTHORITY UPDATE AND GRANT DRAW-DOWN

STATEMENT OF COMPLIANCE AND BASIS OF MEASUREMENT

Revenue and Financing Policy

London Borough of Merton Local Flood Risk Management Strategy

Melbourne Water Flood Risk Assessment: How flood impacts are assessed in the Port Phillip and Westernport region

Revenue and Financing Policy 401

9.1 Draft Revenue and financing policy

Revenue and Financing Policy

Appendix C Asset Risk Model Data

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

Stormwater harvesting

LONG TERM FINANCIAL PLAN 2011/ /2021

Highway Asset Management Strategy

Waikato Regional Council Technical Report 2014/13 Managing land use change and Council s administered drainage areas

Proposed Revenue and Financing Policy 2015 And New Rates Remissions Policies Consultation Document. Have your say by 17 April 2015

8.7 DRAINAGE MAINTENANCE SERVICES CONTRACT AMENITY JAMES LENIHAN, DRAINAGE MAINTENANCE ENGINEER

REVENUE AND FINANCING POLICY

10.0 ASSET MANAGEMENT PRACTICES. Table of Contents

Summary: Introduction

Water Rate Study & O.Reg.453/07 Water Financial Plan No A

Waterway Technote Drains

Visual Integration of Compound Events. A presentation to the Climate Compact of Southeast Florida

FLOOD INFORMATION SERVICE EXPLANATORY NOTES

10.0 ASSET MANAGEMENT PRACTICES

Melbourne Water s Submission. Draft Victorian Floodplain Management Strategy

Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region

Climate Local Hampshire County Council Our progress on November 2013

Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts

10.0 ASSET MANAGEMENT PRACTICES

Long-Term Asset Management Plan

Capital Financing and Debt Management Policy

INFRASTRUCTURAL ASSET MANAGEMENT PLAN. Policies and Procedures common to all Scheme assets managed by Horizons Regional Council

Integrated Local Flood Management and Drainage Strategy OVERVIEW

Financial and Asset Management. Glossary of Terms and Abbreviations

Implementing a Coastal Settlement Boundary

ANSWERS TO COMMONLY ASKED QUESTIONS ABOUT AGRICULTURAL LAND VALUE IN KANSAS

SUBDIVISION AND DEVELOPMENT REGULATION

Objective 4: Enhanced community education, flood awareness and preparedness

EXPLANATORY NOTES. 1. Summary of accounting policies

Salary Sacrifice (Novated Vehicles) Guideline

LONDON BOROUGH OF HAVERING

Newbiggin House Farm,

PLANNING APPLICATION: 12/00056/APP

FLOOD PLAIN DESIGNATION AND PROTECTION

Comcare, the Safety, Rehabilitation and Compensation Commission, and the Seafarers Safety, Rehabilitation and Compensation Authority

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE

Quest 2014 Gplus 9 Financial Management and Performance Outcomes

STAFF REPORT TO COMMITTEE OF THE WHOLE

Essex County Council Flood Investigation Report

Homes and Environment Scrutiny Committee. (Environment & Transport)

OURIMBAH FLOOD RESPONSE PLAN

Revenue and Financing Policy

The Town of Fort Frances

East Riding of Yorkshire Council

EXPENDITURES SUMMARY INCREASE BUDGET BUDGET (DECREASE) (Restated) Over 2014

CHAPTER WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

Transcription:

Activity Summary: Flood Protection and Control Works Activity name Activity description Flood Protection and Control Works The Annual Plan 2014/2015 states that Flood Protection and Control Works covers works related to: Flood control schemes River alignment control Land drainage. The Annual Plan 2014/2015 further specifies that land drainage work is undertaken in 28 drainage districts of various sizes, the largest of which is the Raupo Drainage District, and that Council provides administrative and technical support in respect of this activity. Kaihu River Control is administered by the Northland Regional Council (NRC). Activities undertaken to maintain the current capacity of the land drainage network include: Weed spraying Drain clearance Floodgate and outlet maintenance in all districts Floodgate and stopbank maintenance in the Raupo Drainage District. Other stopbank maintenance for remaining districts is discretionary. Flood protection is carried out through various drainage system stopbanks and floodgates. Rivers are also monitored for tidal levels and stormwater levels during weather events and to provide warning of potential flooding. Council also maintains floodgates and monitors floodbank settlement rates. Level of Service Drains have the capacity to enable flood water to recede within three (3) tidal cycles. Stopbanks are 2.6 metres above Mean High Sea Level leaving 0.5 metre above extreme high tide for Raupo area. Raupo Drainage Committee (a formal committee of Council) is in place to perform delegated functions. Page 1 of 9

Activity name Flood Protection and Control Works All flood protection activities outside of the Raupo district are, in general, administered by informal community committees supported to a greater or lesser extent by Council s Land Drainage Co-ordinator according to each committee s request for assistance. Maintenance on privately owned stopbanks is undertaken by the landowner. The Northland Regional Council (NRC) is responsible for catchment management. Research is underway to establish and document current service levels in other areas. Contribution to Community Outcomes Council wants to work with the people in Kaipara to make it a place where it s easy to live. When it s easy, it will be easy to do business here, easy to join in and easy to enjoy nature. Protecting productive land from flood damage is critical to making it easy to do business. Activity delivery model The Council provides a co-ordination role through the Land Drainage Co-ordinator and sets the targeted rates to cover works within each land drainage location which are understood by landowners in each of the land drainage areas. Service level issues: It is currently unclear as to whether current levels of service meet the minimum standard. Any climate change impacts will need to be reflected in levels of service in the future. There is some overlap and confusion as to the respective roles of Kaipara District Council and the Northland Regional Council for land drainage. Risks Climate change. Objections from targeted ratepayers who feel they are not gaining benefits. Landowners making it difficult to access public drains on private land. Funding source and rationale Funding: Targeted rates. Rationale: The main funding source is targeted rates. Flood Protection and Control Works affect certain landowners and they pay for the services provided through targeted rates. Page 2 of 9

Activity name Key policy and statutory related cost drivers Flood Protection and Control Works Land Drainage Act 1908 Soil Conservation and Rivers Control Act 1941 Local Government Act 1974 Local Government Act 2002 Resource Management Act 2002 Local Government (Rating) Act 2002 Cost drivers are levels of service requested by stakeholders. Asset profile: Northern Area Land Drainage Assets by Asset Type as at 30 June 2013 Asset Type Replacement Cost Depreciated Accumulated Annual Replacement Depreciation Depreciation Cost Drains 3,959,291 3,959,291 0 0 Floodgates 1,647,571 739,225 908,346 29,168 Total 2013 $5,606,862 $4,698,516 $908,346 $29,168 Page 3 of 9

Raupo Land Drainage Assets by Asset Type as at 30 June 2013 Community Replacement Cost Depreciated Accumulated Annual Replacement Depreciation Depreciation Cost Land Drainage reserves 131,027 131,027 0 0 Wharf Road buildings 224,751 85,439 139,312 2,248 Jellicoe Depot 12,102 9,578 2,524 35 Drains 3,983,467 3,983,467 0 0 Stopbanks 2,354,758 2,354,758 0 0 Rip-rap 480,000 67,200 412,800 4,800 Floodgates 2,957,387 796,154 2,161,234 58,281 Wallace Road Pump station 320,170 106,967 213,203 5,076 Boundary Gates 32,117 7,708 24,409 642 Total 2013 $10,495,779 $7,542,298 $2,953,482 $71,082 Page 4 of 9

Measuring performance: Flood Protection and Control Works - Measure 1 is a statutory requirement Performance indicator/service level LTP Year 1 Target 2015/2016 LTP Year 3 Target 2016/2017 LTP Year 3 Target 2017/2018 LTP Years 4-10 Target 2018/2025 1 Reliability Monitor drainage of rivers and streams. Ensure minimal flood risk and coastal erosion to the community. Measured by The number of schemes maintained to their full service potential. 100% of schemes 100% of schemes 100% of schemes 100% of schemes maintained to ensure maintained to ensure maintained to ensure maintained to ensure that they provide that they provide that they provide that they provide protection to the protection to the protection to the protection to the agreed standard and agreed standard and agreed standard and agreed standard and the scheme assets the scheme assets the scheme assets the scheme assets are maintained as are maintained as are maintained as are maintained as established in the established in the established in the established in the adopted Asset adopted Asset adopted Asset adopted Asset Management Plans. Management Plans. Management Plans. Management Plans. Non-performance of drainage network due to poor monitoring or < 5 service requests < 5 service requests < 5 service requests < 5 service requests maintenance causing an inability to contain a 1 in 5 year flood as per year per year per year per year measured by public feedback i.e. Service requests that result in additional cleaning to drains needed. Council inspection of drainage network to ensure that a 1 in 5 Twice yearly Twice yearly Twice yearly year flood is contained by the network. inspections inspections inspections Page 5 of 9

Performance indicator/service level LTP Year 1 Target 2015/2016 LTP Year 3 Target 2016/2017 LTP Year 3 Target 2017/2018 LTP Years 4-10 Target 2018/2025 Targeted maintenance of the stopbank system in the Raupo Minimum yearly Minimum yearly Minimum yearly Minimum yearly Drainage District to prevent tidal flows from inundating private inspections and inspections and inspections and inspections and property during high tide and/or when the river is in flood. targeted maintenance targeted maintenance targeted maintenance targeted maintenance completed completed completed completed Improvement Programme 2015/2025 Flood Protection and Control Works Year 1 Planned improvement/change 2015/2016 The table below sets out tasks over a three-year period as an Improvement Plan for issues identified in the Flood Protection and Control Works Activity Plan. Replace 2 floodgates in Raupo Drainage District. Work commences on implementing the agreed recommendations of the Drainage District Governance Review Project. Land Drainage Asset Register is completed to a maintenance standard. Commence work with Northland Regional Council to understand the implications of water storage and irrigation options. Year 2 Planned improvement/change 2016/2017 Development of an Asset Management Plan for the remaining 27 Land Drainage Areas. An Asset Management Plan with well understood design standards, setting out the condition of assets and a programmed approach of work within the remaining 27 Land Drainage Areas. Election for Raupo Drainage Committee members plus any other districts that are appropriate. Commission engineering report into potential climate change effects on the Land Drainage network. Page 6 of 9

Improvement Programme 2015/2025 Flood Protection and Control Works Year 3 Planned improvement/change 2017/2018 Review of Bylaw - Part 17 Land Drainage. An understanding of whether changes need to be made to the Bylaw. Review outcomes of engineering report on potential climate change effects. Programme of consultation for next Long Term Plan with regards to findings from water storage and irrigation report and engineering report into potential climate change effects. Years 4-10 Planned improvement/change 2018/2025 Replace floodgate in Aratapu Village Drainage District. Replace floodgate in Koremoa Drainage District. Replace 2 floodgates in Raupo Drainage District. Continuing programme of elections for Drainage District Committees. Human Resources Activity Profile Sub Profile 30/06/2014 FTE 2014/2015 FTE 2015/2016 FTE 2016/2017 FTE 2017/2018 FTE 2019 + FTE Water Services Flood Protection 1 1 1 1 1 1 Page 7 of 9

Financial Information Flood Protection and Control Works Funding Impact Statement - Operating For the period commencing: Annual Plan Forecast Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget 1 July 2014-2015 2014-2015 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 Operating funding Sources of operating funding General rates, uniform annual general charges, rate penalties 7 7 9 9 9 10 10 10 11 11 12 12 Targeted rates (other than a targeted rate for water supply) 595 595 549 576 597 615 634 655 677 702 728 757 Subsidies and grants for operating purposes 0 0 0 0 0 0 0 0 0 0 0 0 Fees, charges and targeted rates for water supply 8 8 8 8 8 9 9 9 9 10 10 10 Internal charges and overheads recovered 11 11 4 4 4 5 5 5 5 5 5 5 Local authorities fuel tax, fines, infringement fees and other receipts 0 0 0 0 0 0 0 0 0 0 0 0 Application of operating funding Total operating funding 621 621 570 597 618 639 658 679 702 728 755 784 Payments to staff and suppliers 452 452 405 426 442 455 469 485 502 520 540 561 Finance Costs 0 0 0 0 0 0 0 0 0 0 0 0 Internal charges and overheads applied 100 100 65 66 68 70 72 74 76 78 81 84 Other operating funding applications 0 0 0 0 0 0 0 0 0 0 0 0 Total applications of operating funding 552 552 470 492 510 525 541 559 578 598 621 645 Surplus (deficit) of operating funding 69 69 100 105 108 114 117 120 124 130 134 139 Page 8 of 9

Funding Impact Statement Capital For the period commencing: Annual Plan Forecast Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget 1 July 2014-2015 2014-2015 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 Capital funding Sources of capital funding Subsidies and grants for capital expenditure 0 0 0 0 0 0 0 0 0 0 0 0 Development and financial contributions 0 0 0 0 0 0 0 0 0 0 0 0 Increase (decrease) in debt -69-69 1 1 2-1 0 1 1-1 0 1 Gross proceeds from sale of assets 0 0 0 0 0 0 0 0 0 0 0 0 Lump Sum Contributions 0 0 0 0 0 0 0 0 0 0 0 0 Total sources of capital funding -69-69 1 1 2-1 0 1 1-1 0 1 Applications of capital funding Capital Expenditure - to meet additional demand 0 0 0 0 0 0 0 0 0 0 0 0 Capital Expenditure - to improve the level of service 0 0 0 0 0 0 0 0 0 0 0 0 Capital Expenditure - to replace existing assets 0 0 0 0 0 0 0 0 0 0 0 0 Increase (decrease) in reserves 0 0 101 106 110 113 117 121 125 129 134 140 Increase (decrease) of investments 0 0 0 0 0 0 0 0 0 0 0 0 Total applications of capital funding 0 0 101 106 110 113 117 121 125 129 134 140 Surplus (deficit) of capital funding -69-69 -100-105 -108-114 -117-120 -124-130 -134-139 Funding Balance 0 0 0 0 0 0 0 0 0 0 0 0 Page 9 of 9