ARC FLASH CALCULATIONS & LABELING REQUIREMENTS

PALM BEACH STATE COLLEGE PERSONAL PROTECTIVE EQUIPMENT (PPE) JOB HAZARD ASSESSMENT

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

OPTIONAL INFORMATION ELECTRICAL SAFETY WORK PRACTICES SELF INSPECTION CHECKLIST

What s up with Arc Flash?

Company Name Company Address Company Phone Number Company Fax Number

Union County Public Schools. Facilities Department. Electrical. Safe Work Practices

Vilter motor starter solutions The NEW industry standard in motor starter packages

3053 Electrical Safety Training Program Course Outline

Arc Flash Hazards. Electrical Hazards. Dan Neeser Field Application Engineer Electrical Hazards 2/18/2015. Shock.

NFPA 70E 2012 Rolls Out New Electrical Safety Requirements Affecting Data Centers

Installation Instructions for Alarm Module Kit A043F059

Analyzing Electrical Hazards in the Workplace

Understanding Arc Flash

Electrical Wiring Methods, Components and Equipment for General Use. Approved for Public Release; Further Dissemination Unlimited

Required Courses. Total Hours 39

2008 Eaton Corporation. All rights reserved.

Electrical Safety Program

Dining Services OSHA Safety Training Program TRAINING RECORD

Arc Flash Mitigation. Remote Racking and Switching for Arc Flash danger mitigation in distribution class switchgear.

Arc Flash Avoidance and its Application to Overhead Traveling Cranes

Occupational Health Program Safety Training Series. Lockout/Tagout Safety Awareness Training

Temporary Worker Safety Checklist

Business & Legal Reports (BLR) Training. Workplace Safety Online Courses. Accident Investigations. Aerial Lift Safety

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE SAFETY BULLETIN #23

misconceptions about arc-flash hazard assessments

2012 NFPA 70E. Ten Most Important Changes. John A. DeDad

Welcome to the Hairdressing Module

Job Safety Analysis. The Experienced Workers Compensation. Specialist RM144GOLF 1 WHAT IS JOB SAFETY ANALYSIS? 2. Break the Job Down

Hazard Management Tool

CONTROL OF HAZARDOUS ENERGY (Lockout Tagout)

Roadmap to Compliance with NFPA 70E Arc Flash Requirements

OSHA Training Institute Education Centers Course Descriptions

Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.)

HAZARD IDENTIFICATION AND RISK ASSESSMENT PROCEDURES FOR DEEP SOUTH CRANE & RIGGING

INTRODUCTION ARC FLASH PROTECTION AND SAFETY MEASURES. September 2010

Integrating SPDs in Switchgear & Switchboards Causes More Problems than it Solves

Written Program ELECTRICAL SAFETY. Based on OSHA Subpart S and NFPA 70E Standards

Machine/Woodworking Shop The Basic Rules

Understanding Emergency Power Off (EPO)

Why Construction Workers are Getting Electrocuted

OSHA and NFPA 70 Understanding NFPA 70 and its Implications in Electrical Inspections 2010

100% Rule Alternate Method Arc Blast Arc Flash Approved Approved Equipment Authority Having Jurisdiction (AHJ) Authorized Work Bare Hand Work

Conducting a Job Hazard Assessment. Environmental, Health and Safety

RMM 306 Lockout/Tagout (LOTO) Program for the Control of Hazardous Energy Page 2 June 2016

Confined Spaces. Notes

Lockout-Tagout Training for Albany Employees Control of Hazardous Energy OSHA standard

SAFE ELECTRICAL WORK PRACTICES & 2015 NFPA 70E

IOSH Working Safely MODULE 2: DEFINING HAZARD AND RISK. (Material correct Autumn 2013)

LOCK-OUT/TAG-OUT PROGRAM I. Purpose

Massachusetts FACE Occupational Fatality Report

Tech Shop Safety Level 2 - FN Tech Shop / Tool Safety Operations. (Fermilab machines not covered in course FN000258)

3088 Lockout-Tagout Training Program Course Outline

Slip, Trip & Fall Prevention Handbook

How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work. Section 2 Types of Methods of Measurements page 4

This program is listed as a mandatory inspection item on the MnOSHA Investigation Checklist, Item 7D.

OSHA Compliance Checklist ASC

HAZARDS, INCLUDING SHOCK, ARC FLASH AND FIRE

Additional information: -OSHA Instruction CPL 2.103, Field Inspection Reference Manual, Chapter IV, Section A -29 CFR 1910, Subpart I, Appendix B

Slips, Trips and Falls. Awareness Month. February Slips, Trips and Falls

GEORGIA INSTITUTE OF TECHNOLOGY ENVIRONMENTAL HEALTH AND SAFETY PERSONAL PROTECTIVE EQUIPMENT

Part 1 System Modeling & Studies for Existing Systems

ELECTRICAL SAFETY. The standard unit for measuring electrical current.

Control of Hazardous Energy LOCKOUT/TAGOUT 29 CFR

LOCKOUT GUIDELINE. To ensure that a piece of equipment cannot be turned on, pressurized or switched on accidently while an employee is working on it.

THIS CHECKLIST SHOULD BE CARRIED OUT BY EACH CLUB ON A MONTHLY BASIS.

ISSUE: LOCK OUT BLOCK OUT

COMPENDIUM OF TYPICAL HAZARDS ASSOCIATED WITH CNC MILLING AND THEIR CONTROL MEASURES IN THE CONSTRUCTION INDUSTRY CNC MILLING

working surface can be a potential fall hazard.

Lockout Tagout Program. Table of Contents

Choosing the Best Solution for Reducing Arc Energy

Lockout - Tagout Program

Risk Management Department Safety & Worker s Compensation Training Classes

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR THE CONTROL OF HAZARDOUS ENERGY (LOCKOUT / TAGOUT) SECTION: 2400

Energy Control Lockout/Tagout

You ve. life. ahead. you... So, safe. the of. job!

PERSONAL PROTECTIVE EQUIPMENT FOR CALIFORNIA STATE UNIVERSITY, LOS ANGELES

MD 52 WASTE MANAGEMENT AUTHORITY CORPORATE HEALTH AND SAFETY PROGRAM

BWC Division of Safety and Hygiene

Safety in Offices and other General Areas

Control of Hazardous Energy Equipment-Specific Lockout/Tagout Procedure (ELP) Template Instructions

Personal Protective Equipment Policy & Procedure Date: August, 2001 Approved by:

WHS Induction Series. 36 Toolbox Talks. Contents

Oil and Coolant Circulating Heating System. Model - OCSM

MANCON Human Resources Workers Compensation or ext 312 or

Safety Training Needs Assessment

LOCKOUT/TAGOUT (LOTO) SAFETY PROGRAM

How to reduce exposure to arc flash hazards

OSHA Training Guidelines (An Unofficial Summary)

The following components are common to most cubicles; this example is an ABB HK cubicle.

Safe Operating Procedure

Rutherford County Workplace Injuries and Safety

Managing Workers Compensation Costs and Loss Control in the Workplace

Transcription:

Electrical Safety in the Workplace NFPA 70 E Presented by Sabine Mueller

What Made Sabine Choose Such a DRY Topic?

Ulterior Motive Metso Mueller Engineering has been visiting many scrap yards two or more times per year for >30 years. We work on medium/high voltage drive motors. When we are working at your plant Metso has a legal obligation to provide a safe workplace for our technicians. As the host company YOU are also legally obligated to provide a safe workplace.

NFPA NEC What is NFPA 70E and what does it have to do with OSHA & the National Electric Code?

OSHA 1970 Congress passed the OSH Act, which created the Occupational Safety and Health Administration, OSHA is part of the Labor Department.

OSHA GENERAL DUTY CLAUSE

The mission of the international nonprofit NFPA, established in 1896, is to reduce the worldwide burden of fire and other hazards on the quality of life by providing and advocating consensus codes and standards, research, training and education. The NEC is developed by an NFPA committee, which is then approved by the American National Standards Institute, ANSI. The NEC s is created primarily for those who design, install and inspect electrical installations. The National Electric Codes does not necessarily apply to workplace or employee safety.

In 1975 NFPA recommended to OSHA that a document be prepared applicable to electrical safety. The document was created by extracting pertinent information from the NEC and other sources. The first edition of the NFPA 70 E was published in 1979

NFPA 70 E WHO DOES IT APPLY TO? WHAT VOLTAGE LEVEL DOES IT APPLY TO?

NFPA 70 E DETAILS FOUR PROTECTIVE STRATEGIES TO REDUCE THE RISK OF INJURY WHEN WORKING ON EQUIPMENT WHICH CONTAINS ELECTRICAL ENERGY Create an Electrically safe work condition If that is not possible Train employees about the hazards Plan the work in a way that minimizes risk Protect the employee with the appropriate PPE

ESTABLISHING AN ELECTRICALLY SAFE CONDITION Six Steps 1) Planning, review up to date electrical diagrams and locate all sources of electrical energy to the specific equipment and their isolation means. 2) Open the disconnect for each source 3) Visually Verify that all phases are open 4) Apply lock and tag according to written policies 5) Test 6) Ground

ESTABLISHING AN ELECTRICALLY SAFE CONDITION In the process of creating an electrically safe work condition the worker is exposed to hazards and must be qualified, trained, wearing the appropriate PPE.

There is always some risk. Minimize the risk by making sure there is NO LOAD on the switch Stand away from the door Wear the appropriate PPE (Table 130.7)

Verify that all Phases are Open Are You Wearing your PPE?

Lock Out Tag Out Written Policy Specific to your Facility and each piece of equipment.

Lock Out Tag Out Policies Complexity Varies with the Device and the Facility

MEDIUM VOLTAGE TESTING

LOW VOLTAGE TESTING Date Author Title INTERNAL 21

GROUNDING The load side of the circuit is grounded so that accidental closure will not energize the equipment we are working on.

INTERNAL Date Author Title IN MY 24 YEARS OF WORKING IN THE SCRAP INDUSTRY NFPA 70E HAS ONLY BECOME A PRACTICE SINCE 2005. Capital City Metals in 2003 SIMS Metal Management in 2009 23

INTERNAL Date Author Title Subcontractors you hire to create an Electrically Safe Work Condition for Metso need to follow these Rules Right now that is happening less than 50% of the time. Six Steps 1) Planning, 2) Isolate Source 3) Visually Verify 4) LOTO 5) Test 6) Ground 24

When Metso Mueller Arrives to Maintain and Inspect Your Drive METSO-MUELLER - JSA WORKSHEET System We Complete Job Safety Analysis the following JSA A hazard is the potential for harm. In practical terms, a hazard often is associated with a condition or activity that, if left uncontrolled, can result in an injury or illness. Completed by: Date: You are called to site XXX to: (perform what task) In order to do this work, the following individual tasks must be performed: 1Enter the work area 2Survey work area 3LOTO Motor 4LOTO Liquid Rheostat 5LOTO Switchgear & Capacitors 6LOTO Controls 7 8 9 # Exit the work area Taking each task listed above, think about what general hazards (listed to right) you may be exposed to while performing that task. List the hazards you may be exposed to next to the task. Possible Hazards Associated with Task a Impact with falling or flying objects b Pentration of sharp objects 1Enter the work area a,b,c,d c Slips, trips or falls 2Survey work area L d Caught in or between a stationary/moving object 3LOTO Motor j e Fall from an elevated work platform, ladder or stairs f Excessive lifting, twisting, pushing, pulling, reaching or bending 4LOTO Liquid Rheostat 5LOTO Switchgear & Capacitors j j g Exposure to vibrating tools or equipment 6LOTO Controls j h Exposure to excessive noise 7 0 i Exposure to excessive heat or cold 8 0 j Electrical hazards 9 0 k Explosion hazard # Exit the work area L other:

Procedures for Creating Electrically Safe Condition 1Enter the work area a,b,c,d a Ensure that a hard hat and safety glasses are worn b Ensure that steel toed boots are worn. c Do not walk on or across metal or oily areas - clean up or take alternative route. Ensure that manager has made workers in the area aware of your presence, when working d around moving equipment, maintain eye contact with operator. 2Survey work area L L Hazards unknown inspect work area 3LOTO Motor j j Bring any hazards found to the immediate attention of the site supervisor. Review Diagrams and determine if they are up to date. Locate isolation means. Have customer/electrician open the isolations means. Visually verify all phases are open. Test for voltage. Ground the load side. 4LOTO Liquid Rheostat j j Review Diagrams and locate all sources of energy, typically 480VAC for pump/servo as well as 120VAC. De-energize and test. 5LOTO Switchgear & Capacitors j j Review Diagrams. Should have been made electrically safe when motor was LOTO. Verify that all energy sources were de-energized. Outside control power sources may exist. Identify the circuits and de-energize. Test to verify. 6LOTO Controls j j Review diagrams. Locate control power sources. De-energize for maintenance. If it is necessary to energize the controls for testing, wear appropriate PPE and plan work to minimize risk. 7 0 0 8 0 0 9 0 0 10Exit the work area 0

27 INTERNAL Date Author Title

PPE S INTERNAL Date Author Title 28

PPE S INTERNAL Date Author Title 29

INTERNAL Date Author Title 30

INTERNAL Date Author Title 31

INTERNAL Date Author Title 32

INTERNAL Date Author Title 33

INTERNAL Date Author Title 34

INTERNAL Date Author Title 35

INTERNAL Date Author Title 36

INTERNAL Date Author Title 37

INTERNAL Date Author Title DESIGNING FOR SAFETY Provide Arc Rated Switchgear and Distribution Panels Windows for Verifying switch position MCC s External programming and testing points Use 24VDC control power 38