Building Information Packet



Similar documents
CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

BUILDING PERMIT SPECIFICATIONS

Does Wall Township require an inspection by the building department on resale of a home?

Residential Building Permits

Single Family Residential Building Permit Questions & Answers

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

BUILDING SAFETY UNIT

Applications for building permits will not be reviewed until all of the required information has been submitted.

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

City of St. Charles Basement Finish or Remodel

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Uncovered Decks & Porches

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Basic Requirements for Residential Plan Review _

Residential Plan Routing Information

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

Residential Deck Safety, Construction, and Repair

Sample Drawing Package for One and Two Family Dwelling Applications

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION

How To Build A Basement House

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

Single Family Residential Basement Finish

INFORMATION BULLETIN NO.

PARK COUNTY BUILDING PERMIT GUIDE PO Box 517 Fairplay, CO Fax: Inspections:

VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY (518) /

APPLICATION FOR NEW CONSTRUCTION

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

Residential Building Permit Process

C I T Y O F P E A R S A L L

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

STANDARD OPEN PATIO COVER

POST AND FRAME STRUCTURES (Pole Barns)

PDmB, Inc. Definitions

Residential Decks. Planning and Development Services Department

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

An Applicant s Guide to Residential Building Permits

City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA ,

Patio Covers / Carports

Development Services City of Lawrence, KS

City of Fort Smith Building Permit Process Frequently Asked Questions

Additions and Alterations

Building Condition Assessment Report

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Certification: Building Plans Examiner. Exam ID: B3

Development Services Department Building Permit & Inspection Services Shed and Garage Construction Guide for Detached and Semi-Detached Dwellings

Bureau Veritas Contact Information

RESIDENTIAL WINDOW REPLACEMENT

How To Make A House Safe

Botetourt County, Virginia. Residential Information Handout

Uniform Construction Code (UCC) Building Permit Application Package

Preparation for 2015 Residential Code Changes Discussion with Local Builders and Designers

INFORMATION BULLETIN NO.

Owner: Phone # Mailing Address: Contractor: Phone # Fax #

Inspection Report. Dream Home Inspections Second Ave. Frisco CO (970)

Residential Adjustments. Overview 4.1

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

HATFIELD TOWNSHIP DEMOLITION PERMIT APPLICATION PROCEDURES

City of Elk River BASEMENT Office Use Only

COMMONLY USED RESIDENTIAL BUILDING CODES

Building Code Clarifications - 7. Fire Resistance

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

PLAN SUBMITTAL INFORMATION

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

Chapter 3 Pre-Installation, Foundations and Piers

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Mark Cramer Inspection Services, Inc.

Pre-Drywall Inspection Report

Self-Home Inspection Checklist

Elevating Your House. Introduction CHAPTER 5

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

HOMEOWNER S PERMIT GUIDE

October 5, 2015 Dear Client,

ADMINISTRATIVE CODE CHAPTER 1

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015

2. What building projects are exempted? (permit not required)

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

NAVAJO COUNTY ADDENDA & ADDITIONS TO THE INTERNATIONAL BUILDING CODES. Public Works/Planning & Zoning Building & Safety AMENDED ( )

Basement Development Construction requirements for the development of basements in residential dwellings.

A Homeowner s Guide to Building Permits

Commercial Construction Information Packet

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

Arapahoe County Residential Water Heater Installation and Inspection Guide

RRIO Checklist. Use of checklist: Definitions: Limitations

Mobile Home Pre-Inspection Checklist

COUNTY OF DUPLIN BUILDING INSPECTIONS DEPARTMENT PO BOX 950 KENANSVILLE, NC PHONE: (910) FAX: (910)

CHAPTER 67.2 RESIDENTIAL BUILDING CODE

Building Code Inspections and Fees

Adult Family Home (AFH) LOCAL BUILDING INSPECTION CHECKLIST Code References: 2012 IRC Section R325 (WAC 51-51) APPLICATION NUMBER:

Botetourt County, Virginia. Frequently Asked Questions

SINGLE-FAMILY EARTHQUAKE (SEISMIC) RETROFITS

NON-RESIDENTIAL BUILDING PERMIT PROCEDURES

CHARLOTTE COUNTY Community Development Department

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

The replacement or modification of existing windows shall comply with the following requirements:

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

Village of Airmont APPLICATION FOR BUILDING PERMIT INSTRUCTIONS

A Homeowners Guide To Code Enforcement

Transcription:

Code Enforcement Department 882-9225 Building Information Packet The following information has been compiled to help you as a homeowner or contractor with the various steps and requirements for a building permit. THE INTERNATIONAL BULDING CODE, INTERNATIONAL RESIDENTIAL CODE, INTERNATIONAL MECHANICAL CODE, INTERNATIONAL FIRE CODE, WASHINGTON STATE ENERGY CODE AND 2003 UNIFORM PLUMBING CODE REGULATE CONSTRUCTION WITHIN THE CITY LIMITS OF GRANDVIEW. I. REQUIREMENTS TO OBTAIN A BUILDING PERMIT A. Complete the Application for Permit, which is included in this informational packet. Copies are also available online at: www.grandview.wa.us. B. Paid sewer and water hook-up fees to the City of Grandview. C. Address of property. D. TWO COMPLETE SETS OF PLANS, DRAWN TO SCALE. One set will remain with the City and the other will be returned to you. (THREE SETS ARE REQUIRED FOR ALL COMMERCIAL PERMITS) E. Two plot plans are required. Please indicate the distances (in feet) from the new building(s) to the property lines and other structures. F. Truss specifications from the manufacturer MUST be submitted before the FRAMING inspection will be approved. ** A DOUBLE PERMIT FEE WILL BE CHARGED IF CONSTRUCTION IS STARTED WITHOUT A PERMIT! II. PLUMBING & MECHANICAL PERMITS A. Both permits are required and are usually obtained (if applicable) at the same time as the building permit. B. Specifications of heating and cooling units are required. III. ELECTRICAL PERMITS & INSPECTIONS

A. To obtain an electrical permit or inspection you must contact the Department of Labor & Industries at 1-800-442-7516. Permit applications can be obtained at your local utility office. IV. INSPECTIONS A. Inspections are required. You must contact our office when you are ready to schedule an inspection. We require 24 hours notice for all inspections. Please supply the owner s name, permit number, type of inspection needed, and the address of the building site. B. Form Inspection When ALL required steel is in place and tied BEFORE pouring concrete. (Pole buildings require hole inspections). C Floor joist / under slab plumbing must be approved BEFORE covering joists or pouring concrete. D. Plumbing Inspection Rough-in plumbing. A test is required at the time of rough-in inspection. Final Plumbing will be inspected when all plumbing fixtures are in operation and secured in permanent position. E. Mechanical Inspection All ductwork must be inspected BEFORE covering. F. Framing Inspection At this time all plumbing / mechanical must be approved or under test. Framing will NOT be approved unless electrical has been approved for cover. G. Insulation Inspection Make certain you are in compliance with the Washington State Energy Code. H. Drywall Inspection I. Final Inspection Must be performed PRIOR TO OCCUPANCY. IF THE WORK IS NOT READY FOR INSPECTION UPON ARRIVAL OF THE INSPECTOR A $47.00 RE-INSPECTION FEE WILL APPLY. V. MOBILE HOMES/MANUFACTURED HOMES A. A placement & installation permit is required. A separate informational packet and application is available. B. ** A DOUBLE PERMIT FEE will be charged if construction is started without a permit or if a mobile home is placed without a permit. C. **APPROVED PLANS, attached drawings/information and permits must be posted at the site during construction. D. **DEVIATIONS from corrected plans must be approved prior to construction.

APPROVED PLANS WILL NOT BE HELD FOR MORE THAN 90 DAYS FROM NOTIFICATION THAT THEY ARE READY TO BE PICKED UP. All commercial occupancies that have a fire alarm system, fire suppression system, or adjoining walls with another occupancy, will be required to install a Knox Box and provide all necessary keys. All other commercial occupancies will be evaluated on a case by case basis. Design requirements: SNOW LOAD 30 lbs. PER SQUARE FOOT WIND LOAD 85 mph. EXPOSURE B SIESMIC DESIGN CATAGORY C FROST LINE 24 INCHES BELOW FINISHED GRADE SETBACKS: IF YOU ARE NOT SURE OF YOUR ZONING DISTRICT PLEASE CALL THE OFFICE @ 509-882-9225 (R-1) Single-Family Residential District 20 front, 5 rear and side unless corner is less than 20. (side & rear setbacks are measured from the drip line) (R-2) Two-family Residential District 20 front, 5 rear and side unless corner is less than 20. (R-3) Multi-Family Residential District 20 front, side and rear 5 except when abutting an R-1 or R-2, then 10 is required. Corner will be 25. (C-1) Local Commercial District 5 from curb in front, none required on side unless more restrictive zone abutting. If corner, 10. None for rear (except if abutting a residential district, then 20 ). (C-2) General Commercial District Front and side zone none, unless adjoining another district more restrictive. None in rear unless abutting a residential district, then 20. (C-1A) Professional Service District 10 front, 5 side (10 corner), 5 rear (20 if abutting a residential district). (AF-1) Agricultural Forest District 20 front, 20 minimum side yard width along street or highway side of corner lot. (M-1) Light Industrial District No setbacks for front, rear or side, unless abutting a residential district. Then it must conform to those setbacks (except corner, then 10 on each side.

(M-2) Heavy Industrial District No setbacks for front, rear or side, unless abutting a residential district. Then it must conform to those setbacks (except corner, then 10 on each side. ANSWERS TO COMMONLY ASKED QUESTIONS 1. Contractor s and sub-contractors must verify all dimensions for accuracy. 2. All work must meet the current international and local codes. 3. All windows and glass areas are to be insulated glass. 4. All patio doors and windows within 18 of finished floor, or windows within 24 of doorjamb, are to be tempered glass. 5. Concrete to meet minimum slab on grade and concrete not exposed to weather 2500 psi. Garage floors and all concrete exposed to weather 3500 psi. Foundation walls and other vertical concrete 3000 psi. 6. Engineered truss designs for the floor and roof are to be submitted to building department with the building permit application. 7. All exterior, garage and house doors are to be solid core. 8. All glass bath & shower doors are required to have tempered glass with a hinged door that opens outward unless a slider door is installed. 9. Crawl space ventilation minimum is 1 square foot for each 150 square foot under floor area with 6 mil moisture barrier on ground. Openings shall be placed as close to corners as possible and provide cross ventilation. These openings shall be covered with corrosion resistant wire mesh not less than ¼ in any dimension. (R408.2) 10. Clothes dryers shall be vented to the outside, per IRC 1501.1. Kitchen range hood, laundry and bath exhaust fans are to be vented to the outside per IRC 1502. 11. In every sleeping room you must provide an egress window with a minimum height of 24 inches and a width of 20 with not less the 5.7 square feet openable area and not more than 44 from floor to sill. 12. Minimum soil bearing value is 1500 lbs. Foundation footings shall be placed upon firm natural soil. Footings placed on fill shall be subject to R401. 13. Foundations: One story structure 6 wall; min 6 x 12 footings Two story structure 8 wall; min 7 x 15 footings 14. Mudsills pressure treated (R319) anchor bolts ½ x 10, 6 O.C.; min of 2 bolts per piece with one bolt located within 12 of each end of each piece. (R403.1.6)

INSPECTION REQUESTS (24-HR PRIOR NOTICE REQUIRED): Call the Code Enforcement Department at 882-9225, Monday through Friday, 8:00 a.m. to 5:00 p.m. (except holidays) with the following information: 1. Name of person calling and phone number 2. Owner and applicant s name on permit 3. Permit number 4. Address of job site 5. Type of inspection requested 6. Date and time desired BE SURE TO HAVE THE PERMIT POSTED IN A CONSPICUOUS PLACE AND AN APPROVED SET OF PLANS AT THE JOB SITE. CALLS FOR INSPECTIONS REQUIRE AT LEAST 24 HOURS (ONE WORKING DAY) FOR SCHEDULING. IT IS THE RESPONSIBILITY OF THE OWNER AND/OR CONTRACTOR TO VERIFY THAT A FINAL INSPECTION HAS BEEN COMPLETED. JURISDICTIONS WHICH MAY NEED TO BE CONTACTED City of Grandview City of Grandview Code Enforcement Department Public Works Department 603 N. Willoughby (Physical Address) 603 N. Willoughby (Physical Address) 207 W. 2 nd St. (Mailing Address) 207 W. 2 nd St. (Mailing Address) Grandview, WA 98930 Grandview, WA 98930 Phone (509) 882-9225 Phone (509) 882-9211 Washington State Department of Labor and Industries Electrical Permit Inspections Phone 1-800-442-7516 (Yakima Office) Pacific Power Cascade Natural Gas Customer Service 1-888-221-7070 512 Decatur Avenue Sunnyside, WA 98944 Phone (509) 837-2041 Call Before You Dig Free underground locates Grandview Fire Dept. 110 Ave A 1-800-424-5555 509-882-9224 or 509-882-9280

MINIMUM REQUIREMENTS FOR CONSTRUCTION DRAWINGS Plans which do not contain the following minimum information WILL NOT be accepted for plan check. Plans shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show that it will conform to the provisions of the adopted International Codes and Ordinances. Plan sheets must be 18 x 24, 24 x 36, or 30 x 42 and all sheets must be of the same size. Plan sheets that are cut and pasted, taped, or altered by any means (pen, pencil, marking pen, etc.) will not be accepted for plan check.

Minimum Requirements for Construction Drawings A. SITE PLAN Scale and north arrow. Maximum scale 1 =40. (Preferred scale 1 = 20 or 1 = 40 ) Basic data (type of structure, square footage, location). Show dimensions of lot, distance to property lines, street name, location, use, and vicinity map. Existing and proposed structures labeled with dimensions. Show with dashed lines any existing structures to be removed or demolished. B. FOUNDATIOIN PLAN Scale and north arrow. Outline of perimeter foundation, concrete slabs, patios, etc., with dimensions. Location and size of exterior and interior bearing footings/foundations. Interior pier locations and sizes with dimensions. Location and size of required reinforcing steel. Location, size, embedment and spacing of anchor bolts, hold downs (if required) and post to footing connections. Location and sizes of foundation vents and crawl space access. Construction Details of any unusual construction practice. Stamped engineering calculations are required for foundation/retaining walls over 4 feet.

C. FLOOR PLAN Use and size. Window and door locations and sizes. Header sizes over openings. Beam locations, materials, spacing and sizes. Floor joist sizes, directions of run, spans, and spacing, (in lieu of separate framing plans). Ceiling joists, floor joists, trusses and roof rafter sizes, directions of run, spans and spacing (in lieu of separate framing plans). Location of plumbing. Heating fixtures and equipment. D. FRAMING PLANS Information asked for here is required whether or not separate framing plans are submitted. Size, lumber species, grade, spacing and spans of all framing members. Specify panel identification index for sheathing. Clearly show bearing/shear walls and specify nailing schedule. Show materials and method of connection of all posts to beams. Draw out any special connection method in detail and clearly show how the building is held together. Designs out of the scope of the conventional framing provisions of the International Building Code shall be designated and stamped by a Washington State Registered Professional Engineer. Engineer s calculations must accompany the design. E. ELEVATIONS Elevations are required for all proposed structures with a roof or partial cover. Show height from finish grade to: 1) finished floor; 3) highest point of structure. 2) top plate/ceiling; Specify all finished materials to be utilized in construction. Show all doors and windows (distinguish between openable and fixed; single glazed and dual glazed). Specify roof pitch and material. Chimney in relation to roof. Show shear walls and/or diagonal bracing.

F. BUILDING CROSS SECTIONS Show sections of structure that clarify in detail the typical conditions and describe otherwise hidden conditions. Complete detailed cross sections of footing/foundations. Mud sill and anchorage material (pressure treated) Post to beam connections Floor construction show required clearances of earth to wood or specify treated lumber. Wall construction including exterior and interior wall covering and insulation. Ceiling construction (size and spacing of joists or pre-manufactured truss spacing) and insulation. Components of roof covering. Show compliance with ventilation requirements for attic space. Full height section through stairways including dimensions of riser and tread framing materials; riser height, tread width; handrail height above tread nosing; and clearance to ceiling above the stairs measured from a line drawn down at and parallel to tread nosing. G. ENERGY/VENTILATION Indicate compliance with energy code. Specify selected design approach: a) Component Performance; b) Systems Analysis; c) Prescriptive H. GENERAL Provide documentation verifying compliance. Submittal for Energy Code compliance must include the model numbers, frame type and prescriptive compliance or as part of a window schedule included in the plans for Component Performance of System Analysis compliance. Show compliance with light and ventilation requirements. Smoke alarms shall be installed in the following locations: 1. In each sleeping room. 2. Outside each separate sleeping area in the immediate vicinity of the bedrooms. 3. On each additional story of the dwelling. Alarms shall be interconnected in such a manner that the activation of one alarm will activate all the alarms.

One call (Revised 6/2008) can protect you and the ones you love 1-800-424-5555 Underground systems which carry essential services such as natural gas, electricity, and water are vulnerable to damage if struck by something as innocent as A SHOVEL! And serious damage can occur when using an auger (fence posts drilling) or heavy equipment (trenching). Why put you, your family and your neighbors at risk? A FREE SERVICE will clearly mark the location of all your underground utilities. You simply need to make the phone call two business days before you dig. Call 2 business days before digging! This important safety message is from the Pipeline Safety Program of the Washington Utilities and Transportation Commission. 1-800-424-5555 Call two business days in advance to make sure you know what is underground and to make you sure you stay above the law!

State law REQUIRES that when digging on your own property you MUST CALL for the free utility location service if you dig 12 inches or deeper. Dig without calling 2 days in advance - Pay $1,000 fine Dig without calling and damage a utility - Pay $10,000 fine and triple the repair costs. Dig within 35 feet of a large pipeline without calling - Pay $1,000 fine and/or 30 days in jail Dig without calling and damage a large pipeline -Pay $10,000 fine, triple repair costs and spend 30 days in jail.

Building Department 207 W. 2 nd St., Grandview, WA 98930 Ph. (509) 882-9225 Fax (509) 882-9232 PLEASE READ THE FOLLOWING LIST CAREFULLY AND PROVIDE ALL REQUIRED MATERIAL WITH YOUR APPLICATION. TWO (2) FULL SETS OF PLANS, TWO (2) SITE PLANS THAT INCLUDE CURB TO PROPERTY LINE DISTANCES. THREE (3) SETS OF PLANS ARE REQUIRED FOR NON-RESIDENTIAL PERMITS. Project Address: Parcel No. Type of Work: Owner/Builder Name Contractor Name Street Address Street Address City, State, Zip Code City, State, Zip Code Owner s Phone No. Contractor s Phone No. Bid for Project/Calculated Valuation Contractor s License No. Building Use Expiration Date

Building Dimensions: Main Floor: Upper Floor: Garage Basement: Decks: Other: Type of Heat to be installed: Natural Gas Electric Propane Other Please explain BTU Tonnage/KW R Values of Insulation to be Installed: U-Values of Doors and Windows: Plumbing Fixtures to be Installed: (Indicate total number of each fixture that will be installed under this permit) Toilet Bath Tub Shower Kitchen Sink Dishwasher Clothes Washer Floor Drain Laundry Tray Water Heater Wash Basin Hose Bibs Other Please Specify Mechanical Fixtures to be Installed: (Indicate total number of each fixture that will be installed under this permit) Heater/ Furnace A/C Unit Ventilation Fan/ System Clothes Dryer Range Hood Gas Piping Other Please Specify

I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION TO KNOW THE SAME TO BE TRUE A ND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. SIGNATURE OF OWNER/AUTHORIZED AGENT DATE