INSTALLATION INSTRUCTIONS GEO-BOOSTER TM



Similar documents
Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS

Oil and Coolant Circulating Heating System. Model - OCSM

VOYAGER 570G. 744A Sprayer Control

H41 Electrical Stage Aft Air Conditioner Unit Installation

SunMaxx Solar Filling Station Operating Instructions

FILLING AND PURGING THE SYSTEM

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

Seaward Products OWNER S MANUAL WATER HEATERS. Serial Number:

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

Your safety and the safety of others are very important.

IMPORTANT: BEFORE INSTALLING ANY HEATING TERMINAL UNIT TO A DOMESTIC WATER HEATER, CONSULT THE LOCAL PLUMBING CODES.

INSTALL INSTRUCTIONS KK-C-HVAC-1 HVAC UNIT CHEVROLET/GMC VANS FOR

Geyser-R Heat pump water heater Installation manual

OWNER S MANUAL FORCE 10 MARINE COMPANY HAMILTON ROAD RICHMOND, BC CANADA V6V 1C9 TEL: (604) FAX: (604)

123 Industrial Loop Road Paynesville, MN Phone: MASTER MANUFACTURING MASTER GARDNER

Air Conditioner Water Heater Model ACWH18

Quik Lining Systems Heater Owners Guide

Installation Manual DIAPHRAGM WELL TANK

Installation Manual DIAPHRAGM WELL TANK

RI-215A Operator s Manual. Part Number: RK Revision 0 Released: 10/3/05

GEET Fuel Processor Plans

Installation Instructions - For the following HEATER model numbers: 200, 300, 400, 500 Series Hydronic Heaters

Element D Services Plumbing

Refrigerant Charging Unit ICOGD. 020AH1000 Operating Manual. FR İ-COLD Rev. 00

GOLD Plus 30/40/60/80

Electric Panel Pump Control System. Operation, Maintenance and Installation Manual

MODEL G300 BRAKE BLEEDER

Installation Operation Maintenance Troubleshooting Version 2.1, Apr/09 DAYTONA

EVANS ELECTRONIC TEMPERATURE CONTROL TROUBLESHOOTING GUIDE for systems equipped with electric coolant valve and external PC board.

Installation & Operation

DANGER DANGER. General Information. Safety Is Your Responsibility. Ordering Parts. Contact Information

Mini-HYDRO TM Installation Manual

DC400 Dispensing Cutoff System

WAYNE-DRESSER HARMONY SERIES DISPENSER RETROFIT for HEALY SYSTEMS, INC. MODEL VP1000 VAPOR RECOVERY ASSIST SYSTEM OUTLINE

Stainless Steel Single and Dual Circulation Kits

HM-W536 Install Guide

Use & Care Manual. Electric Tankless Water Heaters. With Installation Instructions for the Installer AP15447 (10/10)

CDS TROUBLESHOOTING SECTION I. VACUUM Weak vacuum at wand. Gauge reads normal (10hg to 14hg)

INSTANT HOT WATER RECIRCULATING SYSTEM

INSTALLATION, OPERATING AND SERVICE INSTRUCTIONS

Installation and Troubleshooting Instructions for Electric Tankless Residential Water Heaters.

Cooling system components, removing and installing

AIR LINE VALVES AND GAUGES

7.1. Part Lists. Hardware Insertion Machine. Instructions. Instructions

MACBlower Model Number: MAC40R MAC60R MAC80R MAC100R. MAC120R MAC150R MAC 200R Serial #

ROUGHNECK II Pumpless Drain

INSTALLATION INSTRUCTIONS & HOME OWNERS MANUAL ECO 18 ECO 24 ECO 27 IMPORTANT SAFETY INFORMATION

USE &CARE GUIDE. Remote Faucet Pump System. See Important Safeguards on page 2

Replacement parts. WM97+ gas-fired water boiler Boiler Manual. OBTAIN PARTS ONLY THROUGH WEIL-McLAIN THE BOILER CONTAINS CERAMIC FIBER MATERIALS

Installation, Operation, Repair and Parts Manual

Parker Hannifin Corporation Porter Instrument Division 245 Township Line Road Hatfield, PA USA. REF Rev. L

AHE S SERVICE MANUAL

Standard Hydraulic Piping Flushing Procedure

Installation Instructions

AUTOMATIC CHANGEOVER MANIFOLD Series 915

Watts Pure Water Systems

Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS

VANGUARD A OPERATOR S MANUAL PORTER. FM-952 Rev. E 7/07

INSTALLATION INSTRUCTIONS & HOME OWNERS MANUAL EEMAX ELECTRIC TANKLESS WATER HEATERS IMPORTANT SAFETY INFORMATION

Lawn Sprinkler Systems Reserve Irrigation Inc. O & M. Version Roseland Drive Macedonia, Ohio

Air Vantage 500 Kubota

OPL BASIC. Dosing System for Professional Laundry machines. Contents

Submersion/Insertion Toroidal Sensor

Installation and Commissioning Manual Solar Stations FlowCon Max Evolution II

DTM04 TANK MONITOR DTM08 TANK MONITOR Dtm12 TANK MONITOR. Installation and Operation Manual

Backflow Bulletin #1

ALTRA 400 Operator Manual. Planographs and Wiring Diagrams

OASIS SERVICE & TROUBLESHOOTING MANUAL (WITH DM10 OR DM12)

TRAINING AND EQUIPMENT MANUAL HOSE PRACTICES EFFECTIVE: OCTOBER 2007

FAQ and Device/Usage Chart. What Is a Cross-Connection? What Is Backflow Prevention? What Is Backflow?

Installation Manual. Solar Pool Heating System. Read the complete manual before beginning the installation

I N S T ALLATION INSTRUCTIONS & HOME OWNERS MANUAL IMPORTANT SAFETY INFORMATION

123 Industrial Loop Road Paynesville, MN Phone:

SERVICE MANUAL 12VDC WALL THERMOSTAT AIR CONDITIONING SYSTEMS ROOFTOP UNITS ONLY

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

Operating instructions

Cooling system components, removing and installing

Installation & Operation Manual Models: SIT030 - SIT119

GL-235 Solar Pool Controller

Hose Clamps & Fittings

Service Guide 12/27/03 TESTING, SERVICE & REPAIR GUIDE (For SH Space Heating Models & RA Water Heating Models)

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve

SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE

Utility Distribution Systems

Dehumidifier Users manual. For Models: DH45S DH65S

Injector Max Machine

LIEBERT VNSA Installation Sheet

SPECIFICATION DIVISION 22 SECTION DESCRIPTION DIVISION 22 PLUMBING SECTION THERMOMETERS, PRESSURE GAUGES, AND ACCESSORIES

SERVICE & OPERATING MANUAL ELECTRONIC LEAK DETECTOR WARNING VDC

Cleaning Instructions for Burner, Pilot Assembly, and Emitter Screen. Series: LP Gas

Copper Meter Resetters

Repair Parts Defender 3PT Sprayer LGS-50 Sprayer Utility Skid Sprayer Repair Parts

Pre-Fab Easy Installation For Models: 006-CT-USK, 008-CT-USK Installation and Operating Instructions for Existing Homes with Standard Piping

Sanitary Type Electronic Flow Switches

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling

Universal Installation and Maintenance Instructions Double Wall Spill Containment Bucket (5 and 15 gal)

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

Installation and instruction manual for Laing DDC pumps

OWNERS MANUAL. Model No GALLON "PRO" TOW SPRAYER

Agri-Fab OWNERS MANUAL. Model No GALLON "PRO" TOW SPRAYER

Transcription:

Table of Contents General Description 1 Parts list 1 Installation 2 New Ground Loop 2 Retrofit 4 Temporary 6 Troubleshooting 8 INSTALLATION INSTRUCTIONS GEO-BOOSTER TM General Description The Geo-Booster is an active loop pressurization system that eliminates issues with low loop pressures in closed-loop geothermal ground loop or hydronic systems. The Geo-Booster will maintain a minimum loop pressure of 35 psig on the loop system. The Geo-Booster includes a pump with a built-in pressure switch factory set at 35 psig, and a check valve to prevent back-flow into the one-gallon tank. The sealing cap ensures a closed system, prevents loop fluid evaporation, and provides vacuum relief allowing the fluid to be pumped from the tank. Parts List (1) Geo-Booster system with tank, cap, pump, and power supply (assembled) (9 ) Flexible braided hose (2) ¼ x 2-½ Lag screws (2) Hose clamps (2) ¼ Brass Nipples (1) ¼ Brass Tee (1) ¼ Brass Ball Valve

NOTE: This guide provides the installer with instructions specific to the Geo-Booster. Please refer to IGSHPA guidelines and/or the geothermal heat pump manufacturer for flushing, purging, and other general information. This equipment should be installed and serviced by qualified personnel only. Please review the entire Installation Instructions document before proceeding with installation. Installation The Geo-Booster can be mounted in any available indoor location in or around the mechanical room. The Geo-Booster includes over nine feet of hose which allows flexibility in mounting the system. If the unit needs to be located further than nine feet from the plumbing access point additional hose can be added or alternative pumping methods can be employed provided that the materials are compatible with the antifreeze used in the loop. The Geo-Booster can be plumbed into any point of the loop but is preferably located at the lowest pressure point in the system which is normally the return pipe from the ground loop just before the circulator pump(s). Procedure-New Ground Loop This procedure assumes the Geo-Booster is being installed in a new ground loop installation that will be flushed and purged after the Geo-Booster installation. 1. Mount the Geo-Booster to a well supported structure such as a framed or concrete/masonry wall using appropriate mounting hardware (Figure 1). Mounting Holes Hose barb Figure 1. Geo-Booster with cover removed. 2. Insert one end of the flexible braded hose through the rubber grommet in the right side of the cabinet. Attach the hose to the hose barb fitting using a hose clamp (Figure 1). Ensure the hose will reach the intended plumbing point. 2

3. Plumb the other end of the hose into the ground loop piping system on the return pipe before the flow center or circulator. The included ball valve should be installed at the desired plumbing point to allow isolation of the Geo-Booster. See Figure 2 for one plumbing method. From Loop To Loop ½ X ¼ Bushing 1 PE Socket X ½ FPT ¼ Ball Valve ¼ Nipple 1 PE Pipe Hose Hose Clamp To Heat Pump From Heat Pump 3/8 Hose Barb X ¼ MPT PE Tee, 1-¼ X 1-¼ X 1 Figure 2. Geo-Booster installation with plumbing point above flow center. WARNING: OPEN THE MAIN POWER SUPPY DISCONNECT SWITCH AND SECURE IT IN AN OPEN POSITION PRIOR TO PERFORMING ELECTRICAL WORK. VERIFY THAT POWER HAS BEEN DISCONNECTED PRIOR TO WIRING THE GEO-BOOSTER. FAILING TO SECURE THE ELECTRICAL SUPPLY COULD RESULT IN SERIOUS INJURY OR DEATH. 4. Wire the power supply using 120VAC or 230VAC single phase power following all applicable local codes. The power supply can be wired in series with a power disconnect switch located adjacent to the unit if desired. Another option is to wire the power supply using the same contacts in the heat pump used for the circulator pumps. This method ensures that the Geo-Booster will only operate when the heat pump runs. The installer must verify that the heat pump s circuit breaker can handle the load. 5. Fill the tank with loop fluid. WARNING: ONLY USE PREMIXED ANTIFREEZE IN A NON FLAMMABLE STATE. FAILURE TO OBSERVE SAFETY PRECAUTIONS MAY RESULT IN FIRE, INJURY, OR DEATH. 3

6. Power on the pump. Allow the pump to run until all air has been purged from the hose. Close the ball valve and the pump will automatically shut off when the pressure reaches 35 psig. 7. Flush the ground loop system using a quality flush cart and acceptable procedures. 8. Open the ball valve on the Geo-Booster. 9. Top-off the tank with loop fluid and replace the cap. Optional: Remove the handle on the ball valve to prevent tampering. Procedure-Retrofit Installation This procedure assumes the Geo-Booster is being installed in an existing geothermal heat pump system between the flow center and the heat pump in a situation where the installer does not wish to flush the entire ground loop with a flush cart after the Geo- Booster installation. This procedure will require flushing the heat pump unit side of the system which is typically accomplished without a flush cart by using a garden hose, adapter fittings, and the domestic water source. 1. Mount the Geo-Booster to a well supported structure such as a framed or concrete/masonry wall using appropriate mounting hardware. Insert one end of the flexible braded hose through the rubber grommet in the right side of the cabinet. Attach the hose to the hose barb fitting inside the cabinet using a hose clamp (Figure 1). Ensure the hose will reach the PT plug installed in the elbow at the heat pump. 2. Isolate the ground loop from the heat pump using the flow center s 3-way valves. This step is necessary to prevent the entire loop system from being re-flushed. 3. Remove PT plug from elbow on the lowest pressure side of the heat pump. This is generally the water out side. Finalize plumbing connections using the supplied fittings (Figure 3). From Flow Center/Ground Loop To Flow Center/Ground Loop Existing Elbow with ¼ FPT port Water-In ¼ Nipple ¼ Ball Valve Hose clamp Water-Out ¼ Tee Existing ¼ PT Plug (not included) ¼ Nipple ¼ MPT X 3/8 hose barb 3/8 Hose Figure 3. Geo-Booster installation between flow center and geothermal heat pump. 4

WARNING: OPEN THE MAIN POWER SUPPY DISCONNECT SWITCH AND SECURE IT IN AN OPEN POSITION PRIOR TO PERFORMING ELECTRICAL WORK. VERIFY THAT POWER HAS BEEN DISCONNECTED PRIOR TO WIRING THE GEO-BOOSTER. FAILING TO SECURE THE ELECTRICAL SUPPLY COULD RESULT IN SERIOUS INJURY OR DEATH. 4. Wire the power supply using 120VAC or 230VAC single phase power following all applicable local codes. The power supply can be wired in series with a power disconnect switch located adjacent to the unit if desired. Another option is to wire the power supply using the same contacts in the heat pump used for the circulator pumps. This method ensures that the Geo-Booster will only operate when the heat pump runs. The installer must verify that the heat pump s circuit breaker can handle the load. 5. Fill the tank with loop fluid. WARNING: Only use premixed antifreeze in a non-flammable state. Failure to observe safety precautions may result in fire, injury, or death. 6. Power on the Booster s pump. Allow the pump to run until all air has been purged from the hose and then close the ball valve. The pump will continue to run until it reaches 35 psig. 7. Flush the heat pump side of the system. This is accomplished with a garden hose, adapter fittings, and the domestic water source. When flushing is complete return the flow center s valve to the operating position. 8. Open the Geo-Booster s ball valve. The Booster s pump will run until the system pressure reaches 35 psig. 9. Top-off the tank with loop fluid and replace the cap. Optional: Remove the handle on the ball valve to prevent tampering. 5

Procedure-Temporary Installation This procedure assumes the Geo-Booster is being installed in an existing geothermal heat pump system between the flow center and the heat pump in a situation where the installer does not wish to flush any portion of the system. This method requires the least installation time but due to the potential of a leak at the PT plug it should be considered temporary. The installation should be made permanent when other service work such as replacing a circulator is performed. 1. Mount Geo-Booster to a well supported structure such as a framed or concrete/masonry wall using appropriate mounting hardware (Figure 1). 2. Insert one end of the flexible braded hose through the rubber grommet in the right side of the cabinet. Attach the hose to the hose barb fitting using a hose clamp (Figure 1). Ensure the hose will reach the PT plug in the elbow on the heat pump. 3. Plumb the other end of the hose as shown in Figure 4. PT Needle (not included) ¼ Nipple ¼ Ball Valve ¼ MPT X 3/8 Hose Barb Hose Clamp Flexible Hose Figure 4. Assembly required for temporary installation of the Geo-Booster into an existing PT port. WARNING: OPEN THE MAIN POWER SUPPY DISCONNECT SWITCH AND SECURE IT IN AN OPEN POSITION PRIOR TO PERFORMING ELECTRICAL WORK. VERIFY THAT POWER HAS BEEN DISCONNECTED PRIOR TO WIRING THE GEO-BOOSTER. FAILING TO SECURE THE ELECTRICAL SUPPLY COULD RESULT IN SERIOUS INJURY OR DEATH. 6

4. Wire the power supply using 120VAC or 230VAC single phase power following all applicable local codes. The power supply can be wired in series with a power disconnect switch located adjacent to the unit if desired. Another option is to wire the power supply using the same contacts in the heat pump used for the circulator pumps. This method ensures that the Geo-Booster will only operate when the heat pump runs. The installer must verify that the heat pump s circuit breaker can handle the load. 5. Fill the tank with loop fluid. WARNING: ONLY USE PREMIXED ANTIFREEZE IN A NON FLAMMABLE STATE. FAILURE TO OBSERVE SAFETY PRECAUTIONS MAY RESULT IN FIRE, INJURY, OR DEATH. 6. Power on the Booster s pump while directing the hose into the top of the Geo- Booster s tank. Allow the pump to run until all air has been purged from the hose and then close the ball valve. The pump will continue to run until it reaches 35 psig. 7. Remove the cap from the PT Plug in the elbow on the lowest pressure side of the heat pump. This is generally the water out side. 8. Insert the PT needle into the plug and open the ball valve. The Booster s pump will run until the system pressure reaches 35 psig. 9. Top-off the tank with loop fluid and replace the cap. Optional: Remove the handle on the ball valve to prevent tampering. Note: Due to the potential of a leak at the PT plug this installation should be considered temporary. The installation should be made permanent when other service work such as replacing a circulator is performed. 7

Troubleshooting The following table relates to issues with the Geo-Booster only. Please consult your manufacturer s flow center and heat pump installation manual for additional troubleshooting information. Problem Possible Cause Solution Pump runs continuously Tank empty Isolate Booster by closing ¼ valve; Add fluid to tank; Disconnect and purge air from hose; Open valve Major leak in loop Locate and repair loop system Pump does not run No input power Check input power (AC) and/or breaker/switch in series with Booster. Replace defective component Power supply defective Isolation ball valve closed Check output (DC) of Booster power supply. Replace power supply if necessary Open valve Pressure gauge reads < 35 psig Tank requires filling very often System pressure 35 psig Defective gauge Pump not running Leak in loop system No problem Replace gauge See Pump does not run Locate and repair loop 8