Selector Description Unit Act Unit Price ACT Remove wet ceiling tile & drywall and bag for disposal SF - 0.95 ACT3 Remove wet ceiling tile & drywall and bag - Cat 3 SF - 1.37 ACT3A Remove wet ceiling tile & drywall and bag - Cat 3 aft hrs SF - 1.99 ACTA Remove wet ceiling tile & drywall, bag for disp. after hrs SF - 1.37 ACTAS Remove wet ceiling tile w/staples - bag for disposal SF - 0.73 ACTAS3 Remove wet ceiling tile w/staples - bag Cat 3 SF - 1.07 ACTAS3A Remove wet ceiling tile w/staples - bag Cat 3 - aft hrs SF - 1.57 ACTASA Remove wet ceiling tile w/staples, bag for disp. - aft hrs SF - 1.07 ACTS Remove wet suspended ceiling tile and bag for disposal SF - 0.33 ACTSA Remove wet susp. ceiling tile, bag for disp. - after hrs SF - 0.48 ACTSS Remove wet suspended ceiling tile and bag - Cat 3 SF - 0.48 ACTSSA Remove wet suspended ceiling tile and bag - Cat 3 aft hrs SF - 0.7 BAG Plastic bag - used for disposal of contaminated items EA + 2.89 BARR Containment Barrier/Airlock/Decon. Chamber SF + 0.76 BARRA Containment Barrier/Airlock/Decon. Chamber - after hours SF + 1.13 BARRP Containment Barrier - tension post - per day DA + 3.3 BARRZ Peel & seal zipper EA + 10.28 BARRZ+ Peel & seal zipper - heavy duty EA + 12.62 BARRZA Peel & seal zipper - after hours EA + 12.52 BARRZA+ Peel & seal zipper - heavy duty - after hours EA + 14.11 BASE Tear out baseboard LF - 0.44 BASEA Tear out baseboard - after business hours LF - 0.69 BASEB Tear out baseboard and bag for disposal - up to Cat 3 LF - 0.82 BASEBA Tear out baseboard and bag for disp. - up to Cat 3 aft hrs LF - 1.11 BASED Baseboard - Detach LF + 1.03 BASEDA Baseboard - Detach - after hours LF + 1.54 BASERS Baseboard - Detach and reset LF + 1.73 BIDITM Water Extraction & Remediation (Bid Item) EA + 0 BLK Block and pad furniture in room EA + 46.87 BLK< Block and pad furniture in room - Small amount EA + 36.02 BLK> Block and pad furniture in room - Large amount EA + 59.22 BLKA Block and pad furniture in room - after hours EA + 70.42 BLKA< Block and pad furniture in room - Small amount - after hrs EA + 54.15 BLKA> Block and pad furniture in room - Large amount - after hrs EA + 88.9 BLKHR Block and pad furniture - hourly charge HR + 60.23 BLKHRA Block and pad furniture - hourly charge - after hours HR + 83.54 CABFHD Cabinet - full height unit - Detach LF + 18.05 CABFHDA Cabinet - full height unit - Detach - after hours LF + 25.33 CABLWD Cabinet - lower (base) unit - Detach LF + 18.2 CABLWDA Cabinet - lower (base) unit - Detach - after hours LF + 25.43 CABUPD Cabinet - upper (wall) unit - Detach LF + 15.57 CABUPDA Cabinet - upper (wall) unit - Detach - after hours LF + 21.75 CABVND Cabinet - vanity unit - Detach LF + 15.44 CABVNDA Cabinet - vanity unit - Detach - after hours LF + 21.75 CALC Calcium Chloride moisture test - per sample EA + 83.14 CTFBSD Backsplash - flat laid/solid surface - Detach LF + 1.1 CTFBSDA Backsplash - flat laid/solid surface - Detach- after hours LF + 1.65
CTFLD Countertop - flat laid plastic laminate - Detach LF + 5.47 CTFLDA Countertop - flat laid plastic lam. - Detach - after hours LF + 8.2 CTPFD Countertop - post formed plastic laminate - Detach LF + 5.22 CTPFDA Countertop - post formed plastic lam. - Detach - after hrs LF + 7.84 CTSSD Countertop - solid surface/granite - Detach SF + 7.76 CTSSDA Countertop - solid surface/granite - Detach - after hours SF + 10.92 DHM Dehumidifier (per 24 hour period) - No monitoring EA + 60.82 DHM> Dehumidifier (per 24 hour period) - Large - No monitoring EA + 82 DHM>> Dehumidifier (per 24 hour period) - XLarge - No monitoring EA + 105 DHM>>> Dehumidifier (per 24 hour period) - XXLarge- No monitoring EA + 133 DHMAC Dehumidifier w/environmental control - per 24 hrs EA + 123.25 DHMB Dehumidifier booster (per 24 hour period) - No monitoring EA + 30 DHMD Dehumidifier (per 24 hour period) - Desiccant - No monit. EA + 230 DHMD< Dehumidifier (per 24 hr period) -Small-Desiccant-No monit. EA + 112.45 DHMD> Dehumidifier (per 24 hr period) -Large-Desiccant-No monit. EA + 501.6 DHMDT2K Trailer-mount dehumidifier - 2000 CFM- per 24 hr EA + 965 DHMDT3K Dehumidifier - Desiccant -3000-4000 CFM No monit.-per 24hr EA + 1250 DHMDT5K Dehumidifier - Desiccant -4500-7500 CFM No monit.-per 24hr EA + 1560 DHMDT9K Dehumidifier - Desiccant-8500-15000 CFM No monit.-per 24hrEA + 2574.04 DORSLD Interior door slab only - Detach EA + 5.52 DORSLDA Interior door slab only - Detach - after hours EA + 8.28 DRY Air mover (per 24 hour period) - No monitoring EA + 27.58 DRY+ Air mover axial fan (per 24 hour period) - No monitoring EA + 29.58 DRY++ Axial fan air mover - 1 HP (per 24 hr period)-no monit. EA + 34.95 DRY1 Structural drying per sf of floor area- Class 1 (Bid Item) SF + 0 DRY2 Structural drying per sf of floor area- Class 2 (Bid Item) SF + 0 DRY3 Structural drying per sf of floor area- Class 3 (Bid Item) SF + 0 DRY4 Structural drying per sf of floor area- Class 4 (Bid Item) SF + 0 DRYMA Multi-port air mover adapter (per 24 hr period)- No monit. EA + 25 DRYSA Air mover snout adapter 48" (per 24 hr period) - No monit. EA + 10 DRYW Tear out wet drywall, cleanup, bag for disposal SF - 0.86 DRYW4 Tear out wet drywall, cleanup, bag, per LF - up to 4' tall LF - 4.73 DRYW4A Tear out wet drywall, cleanup, bag, per LF - 4' aft hrs LF - 5.94 DRYW4S Tear out wet drywall, cleanup, bag, per LF - to 4' - Cat 3 LF - 5.94 DRYW4SA Tear out wet drywall, cleanup, bag, LF - 4' Cat 3 aft hrs LF - 8.19 DRYWA Tear out wet drywall, cleanup, bag - after business hours SF - 1.21 DRYWG Add-on cost for tearing out glued-on drywall SF - 0.34 DRYWGA Add-on cost for tearing out glued-on drywall - after hours SF - 0.51 DRYWLF Tear out wet drywall, cleanup, bag, per LF - up to 2' tall LF - 3.13 DRYWLFA Tear out wet drywall, cleanup, bag, per LF - 2' aft hrs LF - 4.71 DRYWLS Tear out wet drywall, cleanup, bag, per LF - to 2' - Cat 3 LF - 4.72 DRYWLSA Tear out wet drywall, cleanup, bag, LF - 2' Cat 3 aft hrs LF - 6.65 DRYWS Tear out wet drywall, cleanup, bag - Cat 3 SF - 1.21 DRYWSA Tear out wet drywall, cleanup, bag - Cat 3 - after hours SF - 1.6 DUCTLF Ducting - lay-flat LF + 0.29 DUCTLF> Ducting - lay-flat - Large LF + 0.5 EQ Equipment setup, take down, and monitoring (hourly charge) HR + 54.3 EQA Equip. setup, take down & monitoring - after hrs HR + 81.53
EQD Equipment decontamination charge - per piece of equipment EA + 34.5 EQDH Equipment decontamination charge - HVY, per piece of equip EA + 50.94 ESRV Emergency service call - after business hours EA + 228.08 ESRVD Emergency service call - during business hours EA + 152.05 EXT Water extraction from floor SF + 0.61 EXT+ Water extraction from floor - Heavy SF + 0.73 EXTA Water extraction from floor - after business hours SF + 0.87 EXTA+ Water extraction from floor - Heavy - after business hours SF + 0.96 EXTDMP Contaminated water dump fee - (Bid item) EA + 0 EXTG Water extraction from floor - Category 2 water SF + 0.91 EXTG+ Water extraction from floor - Category 2 water - Heavy SF + 1.04 EXTGA Water extract from floor - Cat 2 water - aft business hrs SF + 1.29 EXTGA+ Water extract from floor - Cat 2 water -Heavy -aft bus hrs SF + 1.53 EXTH Water extraction from hard surface floor SF + 0.27 EXTHA Water extraction from hard surface floor - after bus. hrs SF + 0.38 EXTHG Water extraction from hard surface floor - Cat 2 water SF + 0.46 EXTHGA Water extract from hrd surf flr - Cat 2 wtr - aft bus hrs SF + 0.74 EXTHS Water extraction from hard surface floor - Cat 3 water SF + 0.9 EXTHSA Water extract from hard surf flr - Cat 3 wtr - aft bus hrs SF + 1.31 EXTS Water extraction from floor - Category 3 water SF + 1.41 EXTS+ Water extraction from floor - Category 3 water - Heavy SF + 1.7 EXTSA Water extract from floor - Cat 3 water - aft business hrs SF + 1.97 EXTSA+ Water extract from floor - Cat 3 water -Heavy -aft bus hrs SF + 2.35 EXTW Water extraction from floor - Weight-assisted SF + 1.06 EXTWA Water extraction floor - Weight-assisted - after bus. hrs. SF + 1.78 EXTWP Pumping & hauling of standing Category 3 water GL + 0.77 EXTWPA Pumping & hauling of standing Cat 3 water - after bus. hrs GL + 1.16 EXTWPC 2" Submersible pump with hose (per hour) HR + 58.68 EXTWPT 2" Submersible trash pump with hose (per hour) HR + 60.52 EXTWPTM Pumping of standing water - truck mounted (per hour) HR + 209.3 FCC Tear out wet non-salvageable carpet, cut & bag for disp. SF - 0.51 FCCA Tear out wet non-salvage cpt, cut/bag - after business hrs SF - 0.69 FCCGD Tear out wet non-salvageable glue down carpet, cut/bag SF - 0.81 FCCGDA Tear out wet non-salv. gluedn. cpt, cut/bag- aft. bus. hrs SF - 1.19 FCCGDN Tear out wet non-salvageable glue down carpet, no bagging SF - 0.62 FCCGDNA Tear out wet non-salv. gluedn. cpt, no bag - aft. bus. hrs SF - 0.93 FCCGDS Tear out wet non-salv. gluedn. cpt, cut/bag - Cat 3 water SF - 1.19 FCCGDSA Tear out wet non-salv.gluedn.cpt,cut/bg-cat 3 wtr-aft. hrs SF - 1.75 FCCGSN Tear out wet non-salv. glue down cpt, no bag - Cat 3 water SF - 0.93 FCCGSNA Tear out wet non-salv.gluedn.cpt,no bag-cat 3 wtr-aft. hrs SF - 1.4 FCCN Tear out wet non-salvageable carpet, no bagging SF - 0.27 FCCNA Tear out wet non-salvage carpet, no bag-after business hrs SF - 0.39 FCCS Tear out wet non-salvageable carpet, cut/bag - Cat 3 water SF - 0.68 FCCSA Tear out wet non-salv. cpt, cut/bag-cat 3 wtr-aft bus. hrs SF - 0.99 FCCSN Tear out wet non-salvageable carpet, no bag - Cat 3 water SF - 0.39 FCCSNA Tear out wet non-salv. cpt, no bag -Cat 3 wtr-aft bus. hrs SF - 0.59 FCV Tear out non-salvageable vinyl, cut & bag for disposal SF - 1.21 FCVA Tear out non-salvageable vinyl, cut & bag - after hrs SF - 1.64
FCVL Tear out non-salv vinyl, cut & bag - additional layer SF - 0.42 FCVLA Tear out non-salv vinyl, cut & bag - add'l layer after hrs SF - 0.57 FCVS Tear out non-salv vinyl, cut & bag - Category 3 water SF - 1.64 FCVSA Tear out non-salv vinyl, cut & bag - Cat 3 water-after hrs SF - 2.53 FCVSL Tear out non-salv vinyl, cut & bag - Cat 3 wtr - add'l lyr SF - 0.57 FCVSLA Tear out non-salv vinyl, cut & bag - Cat 3 add'l lyr a/hrs SF - 0.87 FCVT Tear out non-salvageable vinyl tile, cut & bag for disp. SF - 1.29 FCVTA Tear out non-salv. vinyl tile, cut & bag for disp. Aft hrs SF - 1.93 FCVUV Tear out non-salv. vinyl & underlay, cut & bag for disp. SF - 1.55 FCVUVA Tear out vinyl & underlay, bag for disp. - after hours SF - 2.27 FCVUVS Tear out vinyl & underlay, bag for disp. - Cat 3 water SF - 2.27 FCVUVSA Tear out vinyl & underlay & bag. - Cat 3 water - after hrs SF - 3.35 FCW Tear out non-salv solid/eng. wood flr & bag for disposal SF - 3.1 FCWA Tear out non-salv solid/eng. wood flr & bag - after hrs SF - 4.18 FCWL Tear out non-salv floating floor & bag for disposal SF - 1.47 FCWLA Tear out non-salv floating floor & bag - after hrs SF - 2.15 FCWLS Tear out non-salv floating floor & bag - Category 3 water SF - 2.15 FCWLSA Tear out non-salv floating floor & bag- Cat 3 wtr-aft hrs SF - 3.21 FCWS Tear out non-salv wood floor & bag - Category 3 water SF - 4.18 FCWSA Tear out non-salv wood floor & bag - Cat 3 water - aft hrs SF - 6.5 FCWSC Screen wood floor SF + 0.54 FHEPA Add for HEPA filter (for negative air exhaust fan) EA + 185.7 FHEPA< Add for HEPA filter (for canister/backpack vacuums) EA + 50.7 FHEPA<< Add for HEPA filter (for upright vacuums) EA + 26.38 FHEPA> Add for HEPA filter (for neg. air machine/vacuum - Large) EA + 240.7 FLVAP Carbon vapor filter (for air scrubber) - 16" x 16" EA + 63.71 FLVAP> Carbon vapor filter (for air scrubber) - 24" x 24" EA + 100.7 FURN Drying furnace - ind. fired heater w/ducting - 85 kbtuh DA + 160 FURN10 Drying furnace - ind. fired heater w/ducting - 100 kbtuh DA + 225 FURN17 Drying furnace - ind. fired heater w/ducting - 170 kbtuh DA + 460 FURN25 Drying furnace - ind. fired heater w/ducting - 250 kbtuh DA + 575 FURN40 Drying furnace - ind. fired heater w/ducting - 400 kbtuh DA + 830 GRM Apply anti-microbial agent SF + 0.22 GRMA Apply anti-microbial agent - after hours SF + 0.33 GRMB Apply plant-based anti-microbial agent SF + 0.25 GRMBA Apply plant-based anti-microbial agent - after hours SF + 0.36 HBAG Plastic bag - for hazardous material cleanup - Medium EA + 1.94 HBAG< Plastic bag - for hazardous material cleanup - Small EA + 1.2 HBAG> Plastic bag - for hazardous material cleanup - Large EA + 3.54 HBOX Box and liner - for hazardous material cleanup - Medium EA + 4.02 HBOX< Box and liner - for hazardous material cleanup - Small EA + 2.99 HBOX> Box and liner - for hazardous material cleanup - Large EA + 7.63 HC14 Plastic container - hazardous material cleanup - 14 gl EA + 44.08 HC30 Plastic container - hazardous material cleanup - 30 gl EA + 58.65 HC60 Plastic container - hazardous material cleanup - 60 gl EA + 125.12 HCON Plastic container - hazardous material cleanup - Medium EA + 8.55 HCON< Plastic container - hazardous material cleanup - Small EA + 5.75 HCON> Plastic container - hazardous material cleanup - Large EA + 13.4
HDRY Hang dry carpet in plant SF + 0.5 HDRY+ Hang dry custom oriental rug in plant SF + 0.77 HEAT Heat drying - hydronic boiler/power unit - 200 kbtu DA + 600 HEAT> Heat drying - hydronic boiler/power unit - 250 kbtu DA + 900 HEAT>> Heat drying - hydronic boiler/power unit - 300 kbtu DA + 1100 HEATA Heat drying - ducted air - 200 kbtu - 2300+ cfm DA + 1375 HEATA> Heat drying - ducted air - 400 kbtu - 5200+ cfm DA + 2200 HEATX Heat drying - thermal exchanger with air mover - 50 kbtu DA + 206.08 HEATX> Heat drying - thermal exchanger with air mover - 80 kbtu DA + 300 HEPAVAC HEPA Vacuuming - hourly charge HR + 57.43 HEPAVAL HEPA Vacuuming - Light - (PER SF) SF + 0.43 HEPAVAS HEPA Vacuuming - Detailed - (PER SF) SF + 0.6 HTAM Heat drying - thermal air mover - Electric DA + 200 HTAM> Heat drying - thermal air mover - Electric - Large DA + 325 INS Tear out and bag wet insulation SF - 0.69 INSA Tear out and bag wet insulation - after hours SF - 1.05 INSC Tear out and bag wet insulation in crawl space SF - 1.23 INSCA Tear out and bag wet insulation in crawl space - after hrs SF - 1.81 INSCS Tear out and bag wet insulation in crawl space - Cat 3 SF - 1.81 INSCSA Tear out and bag wet insul. crawl space - Cat 3 - aft hrs SF - 2.68 INSS Tear out and bag wet insulation - Category 3 water SF - 1.05 INSSA Tear out and bag wet insulation - Category 3 - after hours SF - 1.37 LAB Water Extraction & Remediation Technician - per hour HR + 54.3 LABA Water Extraction & Remediation Technician - after hours HR + 81.53 LABC Cleaning Technician - per hour HR + 32.5 LABCA Cleaning Technician - after hours HR + 53.99 LABS Cleaning & Remediation - Supervisory - per hr HR + 57.02 LABSA Cleaning & Remediation - Supervisory - after hrs. HR + 85.62 LIFT Lift carpet for drying SF + 0.38 LIFTA Lift carpet for drying - after hours SF + 0.56 MASKFL Floor protection - self-adhesive plastic film SF + 0.4 MASKFLA Floor protection - self-adhesive plastic film - after hrs SF + 0.55 MASKFLP Floor protection - cloth - skid resistant leak proof SF + 0.79 MASKFP+ Floor prot. - cloth - skid resist, leak proof, cleanable SF + 0.81 MASKFPB Floor protection - cloth - skid resistant, breathable SF + 0.94 MN Water Extraction & Remediation - Labor Minimum EA + 135.75 MR Per job charge for 3rd party monitoring/review (Bid item) EA + 0 NAFAN Negative air fan/air scrubber (24 hr period) - No monit. DA + 70 NAFAN> Neg. air fan/air scrub.-large (per 24 hr period)-no monit. DA + 120 NAFAN>> Neg. air fan/air scrub.-xlrg (per 24 hr period)-no monit. DA + 140 PAD Tear out wet carpet pad and bag for disposal SF - 0.48 PADA Tear out wet carpet pad, cut/bag - after business hours SF - 0.71 PADN Tear out wet carpet pad, no bagging SF - 0.13 PADNA Tear out wet carpet pad, no bagging - after business hours SF - 0.19 PADS Tear out wet carpet pad, cut/bag - Category 3 water SF - 0.71 PADSA Tear out wet carpet pad, cut/bag - Cat 3 wtr - aft.bus.hrs SF - 0.93 PADSN Tear out wet carpet pad, no bagging - Category 3 water SF - 0.19 PADSNA Tear out wet carpet pad, no bag - Cat 3 wtr - aft.bus.hrs SF - 0.28
PLYTK Tear out toe kick and bag for disposal LF - 2.77 PLYTKA Tear out toe kick and bag for disposal - after bus. hours LF - 4 PNL Tear out wet paneling, bag for disposal SF - 0.5 PNLA Tear out wet paneling, bag for disposal - after hours SF - 0.71 PNLS Tear out wet paneling, bag for disposal - Cat 3 SF - 0.71 PNLSA Tear out wet paneling, bag for disp. - Cat 3 - after hours SF - 1.01 POWD Power distribution box DA + 36.67 PPE Add for personal protective equipment (hazardous cleanup) EA + 7.34 PPE+ Add for personal protective equipment - Heavy duty EA + 17.8 PPEB Boots - waterproof latex - Disposable (per pair) EA + 6.54 PPEE Eye protection - plastic goggles - Disposable EA + 5.61 PPEG6 Personal protective gloves - Disposable (per pair) EA + 0.32 PPEGHD Personal protective gloves - Heavy duty (per pair) EA + 3.98 PPER Disposable rain suit EA + 10.28 PPERC Respirator cartridge - HEPA only (per pair) EA + 9.96 PPERCM Respirator cartridge - HEPA & vapor & gas (per pair) EA + 21.35 PPERCP PAPR cartridge - HEPA only (single cartridge) EA + 17.78 PPERCPM PAPR cartridge - HEPA & vapor & gas (single cartridge) EA + 32.46 PPERCPV PAPR cartridge - vapor only (single cartridge) EA + 22.48 PPERCV Respirator cartridge - organic vapor & acid gas (per pair) EA + 13.13 PPERF Respirator - Full face - multi-purpose resp. (per day) DA + 7.61 PPERH Respirator - Half face - multi-purpose resp. (per day) DA + 1.67 PPPAPR Powered Air-Purifying Respirator (PAPR) - per day DA + 73.25 PPSAR Supply Air Respirator (SAR) - per day DA + 61.25 PROT Protect - Cover with plastic SF + 0.28 PROTA Protect - Cover with plastic - after hours SF + 0.35 RM Remote monitoring sys. w/up to 10 sensors (per 24 hr prd) DA + 55 RMG Remote monitoring - additional gateway (per 24 hr period) DA + 30 RMS Remote monitoring - each additional sensor (per 24 hr prd) DA + 3 SANDF Sand exposed framing - Floor SF + 1.77 SANDW Sand exposed framing - Walls SF + 0.96 SFSL Tear out subfloor, sleepers & bag for disposal SF - 1.67 SFSLA Tear out subfloor, sleepers & bag for disposal - after hrs SF - 2.47 SFSLS Tear out subflr, sleepers & bag for disposal - Category 3 SF - 2.47 SFSLSA Tear out subflr, sleepers & bag for disp - Cat 3 - aft hrs SF - 3.66 SNKD Sink - single bowl - Detach EA + 25.45 SNKDA Sink - single bowl - Detach - after hours EA + 38.18 SNKDD Sink - double bowl - Detach EA + 27.2 SNKDDA Sink - double bowl - Detach - after hours EA + 40.77 SNKPD Pedestal sink - Detach EA + 48.24 SNKPDA Pedestal sink - Detach - after hours EA + 72.33 TACK Tear out tackless strip and bag for disposal LF - 0.84 TACKA Tear out tackless strip and bag for disposal - after hours LF - 1.27 TACKG Tackless strip guard LF + 0.46 TACKGA Tackless strip guard - after hours LF + 0.62 TEST Contamination - air or surface testing & lab analysis EA + 123.21 TEST+ Contamination - pre & post test - full service (Bid item) EA + 0 TESTATP Contamination - on-site ATP testing EA + 25.76
THERM Thermal imaging - (Bid item) EA + 0 TLTD Toilet - Detach EA + 42.17 TLTDA Toilet - Detach - after hours EA + 63.23 TRAN Transport carpet for drying SF + 0.32 TRI Tear out trim LF - 0.44 TRIA Tear out trim - after business hours LF - 0.69 TRIM Tear out trim and bag for disposal - up to Cat 3 LF - 0.82 TRIMA Tear out trim and bag for disposal - up to Cat 3 - aft hrs LF - 1.11 TRIMT Add-on for tearing out trim/base from tile/grout LF - 0.56 TRIMTA Add-on for tear out trim/base from tile/grout - after hrs LF - 0.78 ULAY Tear out non-salv underlayment & bag for disposal SF - 1.25 ULAYA Tear out non-salv underlayment & bag - after business hrs SF - 1.85 ULAYS Tear out non-salv underlayment & bag - Category 3 water SF - 1.85 ULAYSA Tear out non-salv underlayment & bag - Cat 3 wtr - aft.hrs SF - 2.74 WALL Wall cavity drying-inj. type (per 24 hr period) No monit. DA + 140 WALLD Wall cavity drying-dctd type (per 24 hr period) No monit. DA + 80 WALLF Fill holes created by wall cavity drying EA + 1.19 WALLH Drill holes for wall cavity drying EA + 0.51 WALLHA Drill holes for wall cavity drying - after hrs EA + 0.67 WFD Wood flr drying - sub floor air flow (per 24 hr) No monit DA + 95 WFDAD Wood floor drying add-on kit (per 24 hr period) No monit. DA + 50 WFI Wood floor drying extraction mat (per 24 hr prd) No monit. DA + 180.49