FILING REQUIREMENTS EXCERPTS FROM THE ZONING ORDINANCE SOLAR ENERGY SYSTEMS



Similar documents
County of San Diego, Planning & Development Services SECOND DWELLING UNIT

SOLAR ENERGY FACILITIES ZONING AMENDMENTS

VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT

December Purpose

d. Building permits may only be approved if consistent with the approved development plan and land division for all units with common walls.

Answers to Commonly Asked Questions

CHAPTER 23 Wireless Communication Facilities

9. Does the County of San Diego keep home plans on file for existing homes?

Edgecombe County Solar Energy Development Ordinance

Residential Accessory Buildings

INTRODUCTION TO ZONING DISTRICT REGULATIONS

TOWN OF MONSON CERTIFICATIONS-SPECIAL TOWN MEETING MAY 11, 2015

DATE STAMP RECEIVED BY OFFICE OF PLANNING

BOROUGH OF OAKLAND COUNTY OF BERGEN STATE OF NEW JERSEY ORDINANCE 13-CODE-685

PLANNED DEVELOPMENT PERMIT

How To Amend A Stormwater Ordinance

Division Yard, Lot, and Space Regulations.

Definition of Tower from the Bradley County Zoning Resolution

BLOCK 400 PLANNED COMMUNITY DISTRICT

HIGHLIGHTS: Heights in Residential Zoning Districts

BOARD OF ADJUSTMENT STAFF REPORT. BOA File No West Avenue- Multifamily Building

DELAWARE TOWNSHIP ORDINANCE # LU

HARDWICK TOWNSHIP WARREN COUNTY, NEW JERSEY

City Code of ANN ARBOR, MICHIGAN Chapter 55 Zoning

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Planning and Zoning Commission Johnston, Iowa June 29, 2015

Sec Home occupation.

Chapter 7 ZONING PLAN

3.1.8 Utilities and Service Systems

Michael & Christina Harland (PLN020078)

2 February 12, 2014 Public Hearing

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Article 20. Nonconformities

DALLAS COUNTY, IOWA CHAPTER 48 SMALL WIND ENERGY CONVERSION SYSTEMS ORDINANCE FOR THE UNINCOPORATED AREA OF DALLAS COUNTY, IOWA

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

CHAPTER 5 - "R1" SINGLE-FAMILY RESIDENTIAL DISTRICT

ARTICLE 22. AKB ARTHUR K. BOLTON PARKWAY OVERLAY ZONE

Application No.: Steve Rush, representing Rocky Mountain Power Rocky Mountain Power Project Location: approximately 1600 N E.

ORDINANCE NO

Submit a copy of your license issued by the Department of Social and Health Services.

Assisted Living & Memory Care

Rezoning case no. RZ15-08: Adam Development Properties, LP

B. Improve the appearance and character of areas surrounding new development.

PRELIMINARY PROJECT REVIEW PROCESS

Building Permits Permit Counter

LAND USE CODE CHAPTER GENERAL REGULATIONS

D3 April 8, 2015 Public Hearing

Cellular Antenna Towers for Cellular Telecommunications Service or Personal Communications Services

City of Mandeville. Guidelines for Construction and Development

SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA

TREE PERMIT APPLICATION Private Property- Section MBMC COMMUNITY DEVELOPMENT DEPARTMENT

Kirkland Zoning Code

A. Permitted uses. The following uses are permitted by right in the C-2 zone, subject to the limitations specified:

PLANNING COMMISSION COUNTY OF MONTEREY, STATE OF CALIFORNIA

Solar Siting in New Jersey

New Home Construction Packet

EXHIBIT B. Color-Keyed Legend for Tracking Categories of Proposed Ordinance Amendments

SPECIAL USE PERMIT JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing

REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES

City of Douglas Commercial Building Permit Site Application

Neighborhood Planning Guide To Zoning

TOWN BOARD OF THE TOWN OF NORTH SALEM WESTCHESTER COUNTY, NEW YORK LOCAL LAW # OF THE YEAR 2012

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

CHECKLIST FOR TELECOMMUNICATION TOWER CO-LOCATION APPLICATIONS. Conditional Use Permit Approved by Board of Supervisors Date of approval:

5. Environmental Analysis

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations?

Division S-37. PD Subdistrict 37.

The Metropolitan Planning Commission. DATE: May 19, 2015

Stormwater Design Guidelines Frequently Asked Questions:

COASTAL DEVELOPMENT PERMIT

PLANNING DIVISION STAFF REPORT February 23, Summary. Background Information PREPARED FOR THE PLAN COMMISSION. Legistar File ID # 36810

Fernbrook Home Owners Association [HOA] Policy Memorandum No. 3

The Board of Zoning Appeals shall have the duty and power to:

FILE NO.: Z LOCATION: Located on the Northeast and Southeast corners of West 12 th Street and Dennison Street

COUNTY OF EL DORADO DEVELOPMENT SERVICES ZONING ADMINISTRATOR STAFF REPORT SPECIAL USE PERMIT

Floodplain Development Land Use Review

Chapter 8.24

Single Family Residential Building Permit Questions & Answers

NON-RESIDENTIAL BUILDING PERMIT PROCEDURES

TENT AND STAGE CUSTOMER ASSISTANCE GUIDE

CITY OF BELOIT REPORT TO THE BELOIT LANDMARKS COMMISSION

CHAPTER 3 MANUFACTURED AND MOBILE HOMES

CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL

sdci Seattle Permits Tip Tree Protection Regulations in Seattle CATEGORIES OF TREES AFFECTED IDENTIFYING TREE TYPES ON YOUR PROPERTY

Mission Canyon Residential Design Guidelines Workshop. Table Focus: Environmental Issues and Concerns

Commercial Construction Permit Application

5 March 12, 2014 Public Hearing

GUIDELINES FOR PLAN CHECK AND PERMIT REQUIREMENTS FOR SOLAR ENERGY SYSTEMS

Transcription:

County of San Diego, Planning & Development Services APPLICANT S GUIDE FOR A SOLAR ENERGY SYSTEM ZONING DIVISION These guidelines provide information on how to apply for a Solar Energy System. Review the attached Zoning Ordinance excerpts to determine where and under what restrictions this use is allowed. Please be sure to read ALL of the information in this Guide and application package forms. OPTIONAL: Contact Planning & Development Services (PDS) to set-up a pre-application meeting to determine the processing requirements and to discuss project specifics with various departments prior to formally submitting an application. To schedule a pre-application meeting, contact PDS Zoning at (858) 565-5981. Note: There is a fee for a pre-application meeting. FILING REQUIREMENTS Photovoltaic Solar Energy Systems for Onsite Use: Allowed as an accessory use in all zones upon approval of a building permit unless the property is subject to a Special Area Designator or is governed by a Discretionary Permit. (Please refer to Page 5) Photovoltaic Solar Energy Systems for Offsite Use (project area less than 10 acres): Allowed in all zones upon approval of an Administrative Permit Photovoltaic Solar Energy Systems for Offsite Use (project area 10 acres or more): Allowed in all zones upon approval of a Major Use Permit Solar Energy Systems for Offsite Use: Allowed in all zones as Major Impact Service and Utility upon approval of a Major Use Permit. Please refer to the Administrative Permit or Major Use Permit cover sheets for information on the application filing requirements for a Solar Energy System. Please follow link: /zoning/zoningpermits.html Section 1110: DEFINITIONS EXCERPTS FROM THE ZONING ORDINANCE SOLAR ENERGY SYSTEMS Photovoltaic Solar Energy System: A type of solar energy system that converts solar energy into a usable form of electricity using Photovoltaic Solar Cells. Solar Energy System, Onsite Use: A solar energy conversion system consistent with the requirements of section 6954 for onsite energy use. The energy generated is predominately used onsite. Solar Energy System, Offsite Use: A solar energy conversion system consistent with the requirements of section 6954 for offsite energy use. The energy generated is predominately used offsite. Section 6954(a): SOLAR ENERGY SYSTEMS, ONSITE USE 1. A photovoltaic solar energy system for onsite use shall be allowed as an accessory use to all Agricultural, Civic, Commercial, Industrial and Residential use types in all zones in accordance with the following requirements: PDS-316 (Rev. 11/2014) PAGE 1 of 5

i. Setback. A System shall meet all of the main building setback requirements of the zone or comply with Section 4835.f. (See Page 4 for Height and Setback Requirements) ii. iii. iv. Height. A System shall meet the height limit of the height designator of the zone, except when allowed to extend not more than 5 feet above the highest point of the roof, in accordance with Section 4620.i. Solar Panel Description. The panel manufacturer and model shall be specified as part of the building permit. Special Area Regulations: Photovoltaic solar energy systems for onsite use subject to a Special Area Designator must comply with the applicable Special Area Regulations provisions of Sections 5000 through 5999. Section 6954(b)(1): PHOTOVOLTAIC SOLAR ENERGY SYSTEMS, OFFSITE USE ADMINISTRATIVE PERMIT PROCESS AND REQUIRED FINDINGS 1. A photovoltaic solar energy system for offsite use with a project area of less than 10 acres shall be allowed with an Administrative Permit in all zones in accordance with the Administrative Permit Procedure commencing at Section 7050. The following findings must be made prior to approval of an Administrative Permit: (a.) That the location, size, design, and operating characteristics of the proposed use will be compatible with adjacent uses, residents, buildings, or structures, with consideration given to: i. Harmony in scale, bulk, coverage and density; ii. The availability of public facilities, services and utilities; iii. The harmful effect, if any, upon desirable neighborhood character; iv. The generation of traffic and the capacity and physical character of surrounding streets; v. The suitability of the site for the type and intensity of use or development which is proposed; and to vi. Any other relevant impact of the proposed use; and (b.) (c.) (d.) That the impacts, as described in paragraph "b.1.(a.)" of this section, and the location of the proposed use will be consistent with the San Diego County General Plan; and That the requirements of the California Environmental Quality Act have been complied with; and That the applicant has provided the County with an owner consent letter demonstrating to the satisfaction of the Director that the operator of the Solar Energy System is authorized to use the property for a Solar Energy System, unless the operator owns the land upon which the Solar Energy System will be located. Section 6954(b)(2): PHOTOVOLTAIC SOLAR ENERGY SYSTEMS, OFFSITE USE MAJOR USE PERMIT PROCESS AND REQUIRED FINDINGS 2. A photovoltaic solar energy system for offsite use with a project area of 10 acres or more, or a combination of parcels with a combined area of 10 acres or more is a Major Impact Service and PDS-316 (Rev. 11/2014) PAGE 2 of 5

Utility in all zones and shall require a Major Use Permit permitted in accordance with the use permit procedure commencing at section 7350. Section 6954(b)(3): SOLAR ENERGY SYSTEMS, OFFSITE USE MAJOR USE PERMIT PROCESS AND REQUIRED FINDINGS 3. All other types of a solar energy systems or solar power plants including concentrating solar power plants, parabolic troughs, concentrating linear fresnel reflectors, stirling solar dish, or a solar power tower are a Major Impact Service and Utility in all zones and shall require approval of a Major Use Permit in accordance with section 7350 and the following requirements on any parcel of land: (a.) (b.) (c.) Setback. A system or plant shall meet all of the setback requirements of the zone. (See Page 4 for Height and Setback Requirements) Height. A system or plant of more than 200 feet in height is required to comply with Federal Aviation Administration safety height requirements. Visual. The following measures shall be followed in order to minimize the visual impact of the project: i. Removal of existing vegetation shall be minimized. ii. iii. iv. Internal roads shall be graded for minimal size and disruption. Any accessory buildings shall be painted or otherwise visually treated to blend with the surroundings. A structure shall be non-reflective in all areas possible to blend with the surroundings. (d.) Security. The operator shall provide a security in the form and amount determined by the Director to ensure removal of the Solar Energy System. The security shall be provided to PDS prior to building permit issuance. Once the Solar Energy System has been removed from the property pursuant to a demolition permit to the satisfaction of the Director, the security may be released to the operator of the Solar Energy System. HEIGHT AND SETBACK REQUIREMENTS Front Yard Setback: Interior Side Exterior Side Permitted but shall not exceed 30 inches above grade and must maintain 3 foot setback from property line. Permitted but shall not exceed 12 feet in height and must maintain 3 foot setback from property line. Permitted but shall not exceed 30 inches above grade and must maintain 3 foot setback from property line. Rear Permitted but shall not exceed 12 feet in height and must maintain 3 foot setback from property line. Solar Panels shall not cover more than 50 percent of the required yard in combination with all structures in the rear yard setback. PDS-316 (Rev. 11/2014) PAGE 3 of 5

Main Building Envelope: Roof Mounted Panels on Main Building: Roof Mounted Panels within Interior Side/ Rear Permitted but shall not exceed the allowed maximum height by the height designator. Permitted but shall not extend more than 5 feet above the highest point of the roof. (Section 4620.i) Permitted but shall not exceed 12 feet in total height (accessory building including solar panels). (Section 4835.f) MISC. INFORMATION Building Permit: Building Permits will be required to ensure that all solar energy systems meet current Uniform Building Code. Applicants should contact PDS Building at (858) 565-5920 or toll-free at (888) 336-7553 for Code standards and requirements. Department of Environmental Health If a proposed solar energy system is proposed to be sited near a septic system or is proposed to use a well for water, please contact the Department of Environmental Health (DEH) to identify DEH requirements. Special Area Designator If the project site contains a Special Area Designator (J, B, D, or S) and has no approved Site Plan or Use Permit, a waiver of the Site Plan review requirements may be required prior to the issuance of a building permit for a solar energy system or a Site Plan would be required. FOR PROJECTS REQUIRING A DISCRETIONARY PERMIT: Environmental Review: The deposit collected for the environmental review portion of the application covers review of an Application for an Environmental Initial Study (AEIS) for compliance with the California Environmental Quality Act (CEQA). If any environmental issues are identified or an additional study is needed after the initial review by PDS staff, the applicant may need to submit additional forms/studies and an additional deposit. Service Availability Letters To show that there are adequate public facilities to serve the Solar Energy System, the applicant must include Service Availability Letter from the fire district (PDS-399F), water district (PDS-399W), and sewer district (PDS-399S) if the project will be served by a public sewer district. The applicant completes the top of the form and then has the service agency complete the bottom portion. Once the forms are completed by the service agency, they should be submitted with the remainder of the application. Please PDS-316 (Rev. 11/2014) PAGE 4 of 5

be aware that service agencies may have requirements and improvements that need to be met and completed before the Solar Energy System can open for business. Stormwater Regulations Applicants for Solar Energy Systems do have to prepare a Stormwater Management Plan as part of the Administrative and Major Use Permit process, and please be aware that operation of a solar energy system must comply with all applicable stormwater regulations at all times. In addition, building permit plans must demonstrate how stormwater regulations will be met. The activities at a solar energy system are subject to enforcement under permits from the San Diego Regional Water Quality Control Board (RWQCB) and the County of San Diego Watershed Protection, Stormwater Management, and Discharge Control Ordinance (Ordinance No. 9926) and all other applicable ordinances and standards. This includes requirements for Low Impact Development (LID) /docs/lid- Handbook.pdf materials and wastes control, erosion control, and sediment control on the project site. Projects that involve areas greater than one acre require that the property owner keep additional and updated information on-site concerning stormwater runoff. Previously Approved Discretionary Projects If the subject parcel has an approved discretionary permit, then any proposed solar energy system shall be in compliance with that particular discretionary permit. A County of San Diego Planner shall verify that the proposed project is consistent with the approved plot plan and that all pre-building permit conditions of the approved discretionary permit have been satisfied. PDS-316 (Rev. 11/2014) PAGE 5 of 5