Minimizing Disputes in Energy Project Development

Similar documents
ELECTRIC UTILITY CONTRACTS FOR NON-LAWYERS

Hacking and Hardware: Understanding the Threats, Compliance Obligations, and Cybersecurity Solutions for Utilities

Midstream Oil & Gas. September 15-16, 2014 Hotel ICON Houston, TX. EUCI is authorized by IACET to offer 1.0 CEUs for the course.

INLINE INSPECTION OF PIPELINES CRITICAL FACTORS IN STRUCTURAL DESIGN, TESTING AND MANUFACTURING

DERIVATIVES ACCOUNTING FOR POWER AND ENERGY COMPANIES:

FUNDAMENTALS OF CYBER SECURITY FOR NUCLEAR PLANTS

MANAGING CONSTRUCTION RISKS WITH INSURANCE AND CONSTRUCTION SURETY BONDS

AN INTRODUCTION TO ELECTRIC UTILITY SYSTEMS FOR NON-ENGINEERS

Strengthening Utility Critical

September 22-23, 2014 JW Marriott Houston Houston, TX

ACCIDENT & INCIDENT INVESTIGATION FOR UPSTREAM OIL & GAS

PROJECT PORTFOLIO MANAGEMENT

CONTROL ROOM MANAGEMENT: GUIDANCE FOR AND LESSONS LEARNED FROM DEVELOPING AND IMPLEMENTING A WORKABLE PROGRAM

COurse. Midstream Oil & Gas. April 28-29, 2014 The Westin Denver Downtown Denver, CO. EUCI is authorized by IACET to offer 1.0 CEUs for the course.

Oil & Gas Cybersecurity

Project Prioritization and Utility Project Portfolio Management

NATURAL GAS UTILITY BASICS

POWER GENERATION AND INDUSTRIAL PLANT CABLES - CONSTRUCTION, APPLICATION, INSTALLATION AND TESTING

INLINE INSPECTION OF PIPELINES CRITICAL FACTORS IN STRUCTURAL DESIGN, TESTING AND MANUFACTURING

Learn About the Billing and Collection Process Through an Onlineinar

Midstream Oil & Gas. September 15-16, 2014 Hotel ICON Houston, TX. EUCI is authorized by IACET to offer 1.0 CEUs for the course.

Fundamentals of Oil and Gas Taxation

Estimation and Cost Control Fundamentals for Oil & Gas

in Ontario and Key Canadian

Improving Utility Call Centers

Lessons Learned from Utilities that are in the Cloud

How To Learn Workforce Analytics

(IN)CONDUIT HYDRO-ELECTRIC GENERATION

FERC Natural Gas 101. October 2-3, 2014 Renaissance Denver Downtown Denver, CO. EUCI is authorized by IACET to offer 1.0 CEUs for the course.

Improving Utility Call Centers

Power Facilities Physical Security Threats Physical Security, Personnel Security and Preventative Measures

IN-SERVICE REPAIRS TO LEAKING ABOVE GROUND STORAGE TANK ROOFS

Data Centers and Utilities: Planning, Incentives, Audits & Trends

ADVANCED DISTRIBUTION MANAGEMENT SYSTEMS (ADMS) HOW TO SUCCESSFULLY ASSESS, PROCURE, IMPLEMENT, AND UPGRADE AN OMS, DMS OR A COMPLETE ADMS

SOUTHEAST CLEAN POWER SUMMIT

5 TH ANNUAL STORM, PLANNING AND PREPARATION CONFERENCE:

LEADERSHIP CONFERENCE FOR WOMEN IN ENERGY

Construction Liens in Ontario

AN IN-DEPTH INTRODUCTION TO MASTER LIMITED PARTNERSHIPS

mitigating construction risk from the ground up

SOLAR PROJECT DUE DILIGENCE: FINANCIAL, LEGAL & TECHNICAL REQUIREMENTS

WRITING RIGHT FOR THE WEB WORKSHOP: IMPROVING YOUR INSTITUTION S WEB CONTENT. May 24-25, 2012 Atlanta, GA

IAN J. HOUSTON. T F Toronto; IJHouston@blg.com EXECUTIVE SUMMARY

PLANNING & GROWING ONLINE LEARNING INITIATIVES. October 25 26, 2010 Atlanta, GA

LEX HELIUS: THE LAW OF SOLAR ENERGY Solar Energy System Design, Engineering, Construction, and Installation Agreements

TEXAS ASSOCIATION OF REALTORS INDEPENDENT CONTRACTOR AGREEMENT FOR SALES ASSOCIATE. Robyn Jones Homes, LLC

CYBERSECURITY FOR UTILITIES

CALIFORNIA CONSTRUCTION CONTRACTS, DEFECTS, AND LITIGATION (1st Edition) November 2015 TABLE OF CONTENTS

WEB SELF-SERVICE, MOBILE APPS, AND SOCIAL MEDIA FOR UTILITIES

Tricks, Traps and Ploys Used in Construction Scheduling in Virginia

BIM Unit 1: An Introduction to Building Inf ormation Modeling

How To Get Construction Procurement Services

LEGAL UPDATE FOR OIL & GAS ENTITIES:

CREDIT AND COLLECTIONS: IMPROVING FINANCIAL PERFORMANCE FOR UTILITIES

Measured development Construction and Engineering Training Supplement Guide

Understanding the Current CGL Policy in Illinois

Christopher Noble, Negotiating Owner-Architect Agreements: Theory and Practice (revised February 2011)

CONTRACT MANAGEMENT POLICY

Vendor Performance Evaluation Requirements

How To Get A Job As A Construction Attorney In California

Online Course Design. August 2 4, 2010 Denver, CO

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES PINE TRAIL ELEMENTARY HVAC, CEILING & LIGHTING PROJECT NO

RETAINER AGREEMENT. Dibble & Miller, P.C.

PROCUREMENT GUIDE: SELECTING A CONTRACTOR/PROJECT DEVELOPER

Subscription Renewal. Renewal Pricing. Gift Memberships.

3RD ANNUAL CANADIAN CONSTRUCTION INSURANCE LAW: NEW WAYS TO MANAGE RISK AND AVOID LIABILITY

The Importance of Cyber Security and Risk Management

Green Design & Construction: How to Manage the Risks

CHAPTER Committee Substitute for Committee Substitute for Senate Bill No. 708

Amendment and Consent No. 2 (Morris County Renewable Energy Program, Series 2011)

Project Finance in the Oil and Gas Industry

CONTRACT POLICES & PROCEDURES MANUAL CONTRACT POLICIES AND PROCEDURES MANUAL

Checklist 26: How Owners Can Avoid Litigation on Construction Projects

MANAGEMENT AGREEMENT

InstructIonal strategies for Blended & online. December 9 11, 2009 Scottsdale, AZ

ARTWORK COMMISSION AGREEMENT

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES PIERSON ELEMENTARY REPLACEMENT SCHOOL PROJECT NO

We look forward to your participation and partnership in our 2016 conference. Please let us hear from you no later than Monday, November 30.

1. First MI Last Preferred First MI Last Preferred First MI Last Preferred First MI Last Preferred

Key Accounts Certificate Program

NOTICE OF REGULATION REPEAL. September 11, 2013

IP Considerations in Outsourcing Agreements

Vendor Management Program

UNIVERSAL DESIGN FOR LEARNING AND ONLINE EDUCATION

Construction Management Contract This agreement is made by (Contractor) and (Owner) on the date written beside our signatures.

Manage Deliverables - Construction Step 6. July 12, 2012

2015 ARIZONA LEGISLATIVE AMENDMENTS AFFECTING REAL ESTATE LENDING (May 12, 2015 ACMLA meeting)

HOW AMI IS IMPACTING THE CUSTOMER EXPERIENCE

IMPLEMENTING GUIDELINES FOR THE GUARANTY PROGRAM FOR ABANDONED/UNFINISHED BUILDINGS

Creating a Restorative Justice Model on your Campus June 2 & 4, 2010

CONTRACT ADMINISTRATION AND MANAGEMENT GUIDE

Kiwi Energy NY LLC 144 North 7 th Street #417 Brooklyn, NY

Service Managers Training Program

Draft Model Social Infrastructure PPP Bill

Make sure your builder is registered.

Key Accounts Certificate Program. October 5-9, 2015 n Fall Education Institute n Savannah, Georgia

Procurement Capability Standards

L.A. Tax Service, LLP 8350 MELROSE AVE. 2 ND Fl. #202 LOS ANGELES, CA TEL: (323) FAX: (323) Client Name: Dear Client,

Appendix 18 NEC3 Options

Credit Union Liability with Third-Party Processors

Transcription:

COurse Minimizing Disputes in Energy Project Development Hilton Charlotte University is authorized by IACET to offer 1.0 CEUs for the course. 1

Overview Energy development projects are fraught with potential pitfalls at every stage. But precautions taken in the early stages can significantly reduce the risk of problems and increase the likelihood of a successful project. One of the most important ways to avoid problems is by properly and carefully drafting energy industry project development and construction contracts. Contracts that clearly define and allocate the parties rights and responsibilities can greatly assist in clarifying the parties roles and in preventing misunderstandings. On the other hand, unclear or inadequate project contracts can result in misunderstandings, major project setbacks, and unforeseen costs that impact project viability and may erupt into litigation. Poorly drafted contracts may even result in an unfinanceable project. Another important aspect of dispute avoidance is pre-construction planning. The pre-construction stage is a critical point in development, and it deserves a commensurate amount of attention and planning. This seminar will address activities in the pre-construction stage that will minimize disputes throughout the remainder of a project. Key topics include: 1. Key project and contract risks 2. Project risks and rewards and their allocation among project participants 3. Delineating responsibility to accomplish important tasks 4. Contractual rights and remedies in the event of breach and default 5. Negotiating power and transmission prices and related financial terms 6. Practical issues related to project contracts 7. Required terms for long-term financing arrangements 8. Ensuring coordinated and coherent project agreements to avoid unfulfilled downstream obligations 9. Relationship of insurance coverage to contract terms and conditions 10. Selecting the project development team 11. Assessing project risks and developing budgets and schedules 12. The importance of construction management in energy project development This course will address common pitfalls in the contract drafting and negotiation process among project developers, project consultants, and off-take entities. It will examine specific contract measures and terms that can help reduce risk exposure and future potential conflicts, thus increasing the odds of overall project success. Most importantly, the course content will draw from specific cases and agreements that illustrate the concepts under examination. The discussion will apply to the following contracts: Standard power industry and renewable energy contracts Project development agreements, including letters of intent Power purchase agreements (PPA) and interconnection agreements Vendor and supply agreements Construction and EPC contracts Performance guaranties Performance bonds and security agreements Leases and real estate contracts RFPs O & M contracts REGISTER 4601 TODAY! DTC Blvd., CALL Suite 800 303-770-8800 P: 303-770-8800 OR VISIT 2

Who Should Attend Energy project owners, developers, and operators Energy-focused construction and engineering firms Power purchasers, utilities and other off-take parties, including their procurement professionals Energy facility engineers Attorneys for all of the above Industrial operations seeking to generate and sell power Fuel commodity suppliers Industry consultants and service providers Manufacturers and equipment suppliers Learning Outcomes Identify key areas of potential disputes in energy project development Discuss the importance of typical contracts required for energy project development Classify key terms of these contracts Examine how properly drafted terms can minimize the project risks Address practical and pricing issues in power and transmission agreements Illustrate typical contractual remedies upon default Identify critical precautions in the pre-construction stage Discuss how risk assessment, budgeting, and scheduling efforts can minimize disputes Examine the role of construction management as a risk-mitigation method REGISTER 4601 TODAY! DTC Blvd., CALL Suite 800 303-770-8800 P: 303-770-8800 OR VISIT 3

course timing June 24, 2013 8:00 8:30 a.m. registration and Continental Breakfast 8:30 a.m. 5:00 p.m. Course Timing June 25, 2013 8:00 8:30 a.m. continental Breakfast 8:30 a.m. 12:00 p.m. Course Timing 12:00 1:00 p.m. Group Luncheon course agenda Framework of Typical Projects Typical project participants and their roles and importance Project stages and milestones Typical project agreements Key project risks Minimizing Disputes through Project Agreements Presenters will discuss the following typical project agreements: Letters of intent Development agreements Financing-related agreements Power purchase agreements Transmission-related agreements Vendor and supply agreements Construction contracts, including engineering, procurement, and construction (EPC) contracts Performance guarantees Performance bonds and security agreements Manufacturer agreements The necessity of written, executed agreements The ubiquitous problem of ambiguity Problem clauses Pitfalls in negotiation and drafting Specific contract provisions reduce the risk of ambiguity, misunderstandings, and potential conflicts Minimizing Disputes through Pre-Construction Planning Importance of the development team Requisite skills, roles, and responsibilities for each member Construction delivery, supervision, and management Level of control over design/engineering Need for control of suppliers/materials/equipment procurement Policies, procedures, and systems to manage sudden increase or acceleration in work, additional subcontracts, and associated changes 4601 DTC Blvd., Suite 800 P: 303-770-8800 4

Agenda Minimizing Disputes through Pre-Construction Planning (continued) Managing changes to scope, engineering, and cost Permitting and regulatory issues Project risk assessment Assigning and delegating risk Trade-off of delegation Budget Definition and importance Establishing a realistic budget Use of and adherence to the budget Schedule Feasibility, engineering, procurement, construction, and startup Required milestone dates Impact of governmental, regulatory, tax/monetary, budgetary, or other factors Effect on existing facilities or operations Sequencing multiple scopes of work and primes Construction management The need for a developer s representative Compare and contrast to EPCM Additional delivery methodologies Clearly define scope and responsibilities Bonuses and penalties based adherence to budget, schedule, or other measurements Reporting requirements Scope of reports Regulatory reporting Project stakeholder reporting 4601 DTC Blvd., Suite 800 P: 303-770-8800 5

INSTRUCTORs Charles T. Autry / Attorney / Autry, Horton & Cole, LLP Mr. Autry is an attorney in Autry, Horton & Cole, LLP s energy and cooperative practice. Since 1979, his practice has focused primarily on the representation of electric cooperatives and related entities in corporate and power supply related matters. Mr. Autry has extensive experience in the negotiation and drafting of complex power supply, natural gas and construction contracts, and in corporate and financial matters involving cooperative electric and telecommunication companies. His clients include Green Power EMC, a renewable energy cooperative in Georgia that purchases clean energy on behalf of its thirty-nine members. David R. Cook Jr. / Attorney / Autry, Horton & Cole, LLP Mr. Cook is an attorney in Atlanta at the energy and construction law firm of Autry, Horton & Cole, LLP. In his energy law practice, he assists energy developers and utilities with various power-related matters, such as power construction contracts, power purchase agreements, and securing governmental incentives and qualifying for tax credits and grants. Mr. Cook s prior experience as a Certified Public Accountant for utilities provides him added expertise to guide his clients through the complex regulatory terrain of the power industry. In his construction law practice, he advises public and private owners and developers on their construction, procurement, and energy efficiency initiatives, and claims avoidance, litigation, and resolution. Neil Gaudion / Senior Managing Director / FTI Consulting Mr. Gaudion is a senior managing director with FTI s Construction and Government Contracts practice and is a member of the practice s global operating committee. He leads the Atlanta practice, which is concentrated on assisting owners, contractors and other professionals on implementing effective project controls and in the development, analysis, and resolution of major construction and public contract disputes. Over his career, Mr. Gaudion has consulted with clients on virtually every type of major construction project worldwide. Mr. Gaudion has also provided advice on how to avoid disputes to both owners and contractors on several large mega-projects. Should disputes arise, Mr. Gaudion has many years of experience in performing delay analysis and quantifying the effects of delay, disruption and interference and has testified in arbitration (both ICC and AAA forums), dispute review board proceedings, deposition, and mediation. Jonathan Haag / Director / FTI Consulting Mr. Haag is a director with FTI s Construction Solutions and Government Contracts practice. He works with owners, contractors, and other project stakeholders to implement and maintain successful project controls practices as well as contract and change management, and preventing disputes. Should the need arise, Mr. Haag also provides assistance in resolving claims and disputes and providing schedule and delay analysis. His industry experience includes mining, power generation and transmission, pipeline, government, airport, condominium, educational, and general industrial projects. REGISTER 4601 TODAY! DTC Blvd., CALL Suite 800 303-770-8800 P: 303-770-8800 OR VISIT 6

INSTRUCTORs Roland F. Hall / Attorney / Autry, Horton & Cole, LLP Mr. Hall is an attorney with Autry, Horton & Cole, LLP. His practice includes representing electric cooperatives and related entities in corporate, finance and regulatory matters, as well as providing advice to developers on all aspects of renewable energy projects, including regulatory requirements, power purchase agreements, and financing. Mr. Hall is licensed to practice in the states of Georgia and Florida. He has presented seminars and written numerous articles on issues related to electric cooperatives, smart grid applications and renewable energy projects. Mark V. Hanrahan / Attorney / Autry, Horton & Cole, LLP Mr. Hanrahan s entire law practice focuses on representing construction industry clients. He represents owners and contractors throughout the life cycle of a project, from pre-construction planning through project close-out. He has extensive experience drafting and negotiating construction contracts, including tailoring AIA, DBIA and other industry form contracts to meet the needs of specific clients and projects. Mr. Hanrahan also represents owners and contractors in mediation, arbitration and litigation. He has handled a wide range of construction disputes, including those involving defaults and terminations, change order and extra work claims, payment bond claims, mechanics lien claims, schedule accelerations, impacts and delays, construction defects, utility relocations, site access, and differing site conditions. Thomas W. Siegrist / Vice President / EnerVision Mr. Siegrist is a vice president of EnerVision, an independent management and technical consulting firm that provides a full range of business services to electric utilities. Mr. Siegrist leads EnerVision s transmission and system operations practices areas. Mr. Siegrist has over 35 years of diverse electric utility experience including electric system operations, system protection and control, engineering design, system planning, power contracts, and strategic planning. Before the formation of EnerVision, Mr. Siegrist served in several senior positions with Oglethorpe Power Company and also worked with Florida Power & Light Company. Mr. Siegrist is a registered Professional Engineer in the state of Georgia. REGISTER 4601 TODAY! DTC Blvd., CALL Suite 800 303-770-8800 P: 303-770-8800 OR VISIT 7

Instructional Methods Case studies and PowerPoint presentations will be used in the program. Requirements for Successful Completion of Program Participants must sign in/out each day, be in attendance for the entirety of the course, and complete the assessment with a score of 70% or higher to be eligible for continuing education credit. iacet Credits EVENT LOCATION has been approved as an Authorized Provider by the International Association for Continuing Education and Training (IACET), 1760 Old Meadow Road, Suite 500, McLean, VA 22102. In obtaining this approval, has demonstrated that it complies with the ANSI/IACET Standards, which are widely recognized as standards of good practice internationally. As a result of its Authorized Provider membership status, is authorized to offer IACET CEUs for its programs that qualify under the ANSI/IACET Standards. is authorized by IACET to offer 1.0 CEUs for the course. A room block has been reserved at the Hilton Charlotte University, 8629 JM Keynes Dr., Charlotte NC, 28262, for the nights of June 23 24, 2013. Room rates are $149.95, plus applicable tax. Call 704-547-7444 for reservations and mention the course to get the group rate. The cutoff date to receive the group rate is June 2, 2013, but as there are a limited number of rooms available at this rate, the room block may close sooner. Please make your reservations early. PROCEEDINGS The proceedings of the course will be published, and one copy will be distributed to each registrant at the course. REGISTER 4601 TODAY! DTC Blvd., CALL Suite 800 303-770-8800 P: 303-770-8800 OR VISIT 8

REGISTRATION INFORMATION Mail Directly To: Electric Utility Consultants, Inc. () 4601 DTC Blvd., Ste. 800 P: 303-770-8800 please register the following Minimizing Disputes in Energy Project Development : US $1395 Early bird on or before June 14, 2013: US $1195 EVENT LOCATION A room block has been reserved at the Hilton Charlotte University, 8629 JM Keynes Dr., Charlotte NC, 28262, for the nights of June 23 24, 2013. Room rates are $149.95, plus applicable tax. Call 704-547-7444 for reservations and mention the course to get the group rate. The cutoff date to receive the group rate is June 2, 2013, but as there are a limited number of rooms available at this rate, the room block may close sooner. Please make your reservations early. ENERG ZE WEEKLY s Energize Weekly e-mail newsletter compiles and reports on the latest news and trends in the energy industry. Newsletter recipients also receive a different, complimentary conference presentation every week on a relevant industry topic. The presentations are selected from a massive library of more than 1,000 current presentations that has gathered during its 26 years organizing conferences. Sign me up for Energize Weekly. How did you hear about this event? (direct e-mail, colleague, speaker(s), etc.) Print Name Job Title Company What name do you prefer on your name badge? Address City State/Province Zip/Postal Code Country Telephone Email List any dietary or accessibility needs here CREDIT CARD Name on Card Account Number Billing Address Billing City Billing State Billing Zip Code/Postal Code exp. Date Security Code (last 3 digits on the back of Visa and MC or 4 digits on front of AmEx) OR Enclosed is a check for $ to cover registrations. All cancellations received on or before May 24, 2013, will be subject to a US $195 processing fee. Written cancellations received after this date will create a credit of the tuition (less processing fee) good toward any other event or publication. This credit will be good for six months. In case of event cancellation, s liability is limited to refund of the event registration fee only. For more information regarding administrative policies, such as complaints and refunds, please contact our offices at 303-770-8800. reserves the right to alter this program without prior notice. 4601 DTC Blvd., Suite 800 P: 303-770-8800 9