1 Minutes of the Third Meeting of the Research Outcomes Harmonisation Project 28 th April 2014, Polaris House, Swindon Attendees: Ian Lyne Bob Innes Ian Viney Isobel Climas Chris Moulsley Mari Williams Simon Kerridge Heather Sayers AHRC, Associate Director (Chair and Senior Responsible Owner) Research Funding Programme Manager MRC, Director of Strategic Evaluation and Impact STFC, Head of Performance Evaluation PSU, Joint Head of Information Services BBSRC, Deputy Director, Corporate Policy & Strategy Group University of Kent, Chair of ARMA Project Manager 1. Introductory Remarks 1.1 Ian L welcomed everyone to the third meeting of the project board. He confirmed that no changes had been requested to the minutes of the last meeting, and the actions listed have been completed, other than the request to publish board minutes, which will be discussed at the upcoming Programme Board. 2. Project Update Procurement and contract negotiations 2.1 Contract negotiations with ResearchFish as the preferred supplier are progressing, and all the initial queries have been resolved. However, the requirements for the provision of an SQL database by ResearchFish need to be finalised (see below). Once a revised contract has been received, Heather will circulate to Councils and UK SBS for final checking. 2.2 It is hoped that the contract will be agreed as soon as possible, working to the deadline requested by ResearchFish of 30th April, but the end of the week (2/5) may be a more realistic timeframe. Ian L sought and received authority to push the contract sign off along if any final issues raised are not substantive. 1

2 Common Data Model (CDM) 2.3 Heather advised that the CDM is nearing completion, there are 7 outstanding issues of which 5 are expected to be resolved at the ResearchFish Funders Group Meeting on Friday and the remaining 2 progressed subsequently. 2.4 Ian V confirmed that currently ResearchFish have an exclusive licence to use the question set developed by MRC, and he was in discussion with them regarding future licencing arrangements. A non-exclusive licence will be needed in future, to allow for wider commercial and non-commercial use of the CDM. 2.5 Councils would, as a one off exercise, be asked to formally assign their IP in the new CDM to MRCT to manage on behalf of the Councils. 2.6 It was agreed that advice should be sought from the chair of the cross-council Research Outputs Network (RON) (which oversees the RCUK Open Access policy) regarding the licensing arrangements for the CDM. Data Migration 2.7 The data migration strategy has been approved by all seven Councils. The access database built by EPSRC for the migration and checking of ROS data is ready and will enable progress statistics to be available. Heather advised that guidance will be issued to ensure consistency in the data cleaning process, and a sample validation process will be put in place by the project to check quality. 3. Review of Project impact on other systems Bulk Upload, interoperability and HEI Interface 3.1 It was agreed that a workshop should be arranged for Sept/Oct involving HEI reps, ResearchFish, and suppliers of university systems to discuss bulk upload functionality, interoperability and issues around wider data standards. 3.2 It was also agreed that Councils would provide Research Organisations with a single complete copy of data submitted by their grant holders each year, for them to use as they wish. It was noted that ResearchFish has a freely available institutional dashboard which allows oversight of information submitted by staff, but a fee of 2

3 1K fee p.a. is required to access a wider range of reporting tools covering all the funders using the system. Gateway to Research (GtR) 3.3 Ian L has flagged the impact on GtR of changes to the outcomes collection process to Louise Grant who is looking after the closure of the GtR project as it moves into business as usual. 3.4 GtR has its own management board, and while the project should maintain a link and keep the board informed, changes to the GtR system were the responsibility of its Management Board, and were not included in the project plan. 3.5 Chris reported that with the transition into his team of ongoing support of the GtR system alongside existing priorities over the next few months, there is a risk of a delay with the development work needed on the GtR database to align it to the new CDM. It was felt by the group that given the checking of submitted information undertaken by Councils prior to its release in GtR, a short delay in revising GtR was not a problem. SQL databases and VPN 3.6 Heather informed the group that Councils had agreed that ResearchFish should provide a single SQL database for all Council data, and therefore it was necessary to agree in which Council s contract this should be included (and costed). In addition, it had been agreed that a complete back-up copy of the data be held in a separate RChosted SQL database. Offers to host and manage this had been received from NERC and the AHRC/EPSRC/ESRC Professional Services Unit (PSU); Heather will liaise with both to finalise. 3.7 The charge for ResearchFish to provide the single SQL database will be added to the contract of the Council managing the additional SQL back-up copy, and a cross charge could then be made as necessary. 4. Project Plan 4.1 The project plan and timetable will be baselined once the supplier has been appointed. 3

4 4.2 The project will aim to finish in September, following the launch of the new system and the transition to BAU. The group agreed that progressing the issues around interoperability were included in the project (e.g. the plans for a workshop), even if future activity falls outside of the project period. In addition, it was agreed that the Project scope should be extended to include the implementation of the SQL database. 4.3 The project is responsible for facilitating and defining the BAU processes, but review and monitoring of benefits realisation is the responsibility of the Programme Board. 5. Target Operating Model Governance 5.1 The target operating model will be a product of the project and ensure clear governance of the area of outputs collection. It was agreed that a future Outputs Collection Management Board would oversee the operation of outputs collection across the Councils and the contract with the supplier. 5.2 While in due course there may be value in moving to a joint board with GtR, at this stage a separate Management Board was likely to be preferable, with a clear link to the GtR Board, and reporting to the cross-council Performance Evaluation Network (PEN), which in turn would report to the RCUK Impact Group as having overarching responsibility for this area of activity. 5.3 Heather advised the group that the project is documenting the end to end business process at a high level and proposes that each step will have detailed guidance notes on the expectations and ownership of different parts of the process. The workshops to produce the next level of detail are being held weekly and may take between 1 and 2 months to complete. 5.4 The Outcomes Collection Management Board would have responsibility for oversight of service delivery under the contract with the supplier. It was recognised by the project board that satisfaction with the new harmonised system on the part of users will depend heavily on how well they are supported by the supplier when raising problems or queries, and this would be an area for the Management Board to monitor. 4

5 First Submission Period 5.5 When the system goes live in September, Research Organisations and PIs will be able to submit information straightaway, but ResearchFish also has a submission period when users have to confirm what outputs they are formally submitting to their funders. Heather suggested that for the first data collection period all Councils align with the MRC submission dates which are 16th Oct - 13th Nov. No issues were raised with the proposal and Heather will now ask the PEN to formally approve these dates. Sanctions Policy 5.6 The group noted that only MRC currently applies a sanctions policy for non-return of outputs information. It was agreed that while this was an area in which the Councils should harmonise, no new sanctions policies would be introduced by Councils at this stage, and any future changes will need to be communicated clearly, and with adequate warning, to Research Organisations. 6. Communications 6.1 Communications will be issued to announce the Supplier as soon as contract negotiations are completed. It was agreed that members of the Board would be asked to provide input into the wording of the announcement. 6.2 Heather and Ian L will be attending the ARMA conference in Blackpool on behalf of the board, to provide information on the project. 6.3 A user focus group will help to inform guidance and FAQs for previous ROS users. 7. Risks and Issues 7.1 All ROS councils have indicated the resource they have available to support the data migration phase of the project. AHRC, BBSRC and ESRC have currently flagged the data cleaning activity as red partly because of the unknown levels of work to be completed. Chris will see if the ROS help-desk is able to provide assistance once the timetable for the work is known. 5

6 8. AOB 8.1 Subject to finalising the contracts, a representative of ResearchFish will be asked to attend the next Board meeting. Actions Who Ref Description /01 Research Funding Programme Board to be asked BI to confirm that Project Board minutes can be published externally /02 Facilitate approval of ResearchFish contract HS /03 Seek advise from RON regarding licensing IL arrangements for the CDM /04 Facilitate decision on whether NERC or the PSU HS should host the SQL database /05 Seek PEN approval for the first data submission HS period to be 16 th October 13 th November /06 Organise workshops for bulk upload discussion HS/AK /07 Re arrange June board meeting HS/AK /08 Confirm availability of ROS helpdesk staff to support data migration activities HS/CM 6

Data Management Planning

Data Management Planning DIY Research Data Management Training Kit for Librarians Data Management Planning Kerry Miller Digital Curation Centre University of Edinburgh Kerry.miller@ed.ac.uk Running Order I. What is Research Data

More information

isupplier The amount/quantity on the invoice exceeds the amount/quantity on the purchase order and/or receipt.

isupplier The amount/quantity on the invoice exceeds the amount/quantity on the purchase order and/or receipt. 1 Purchase Orders 1.1 Viewing Receipts UK SBS use a 3-way match process. This means that before any invoices are paid the amount/quantity on the invoice must match the amount/quantity on both the purchase

More information

Creating a Data Management Plan for your Research

Creating a Data Management Plan for your Research Creating a Data Management Plan for your Research EPFL Workshop Lausaunne, 28 Oct 2014 Robin Rice, Laine Ruus EDINA and Data Library Course content What is a Data Management Plan? Benefits and drivers

More information

1 Managing Invoices. 1.1 Create an Invoice. 1. Click the RCUK isupplier Portal Supplier User link. 2. Click the tab.

1 Managing Invoices. 1.1 Create an Invoice. 1. Click the RCUK isupplier Portal Supplier User link. 2. Click the tab. 1 Managing Invoices The isupplier Portal will allow you to track your invoices and payments. For multiple invoice upload there is a spreadsheet document available on the UK SBS website UK SBS isupplier.

More information

Research Councils and Their Role in Project Development

Research Councils and Their Role in Project Development Directors of Finance at Universities and other Research Organisations David Harman Chair, Research Administration Convergence Group Polaris House North Star Avenue Swindon, SN2 1UH e-mail: david.harman@epsrc.ac.uk

More information

Benefits of managing and sharing your data

Benefits of managing and sharing your data Benefits of managing and sharing your data Research Data Management Support Services UK Data Service University of Essex April 2014 Overview Introduction to the UK Data Archive What is data management?

More information

MRC & NC3Rs transfer to Joint Electronic Submission (Je-S)

MRC & NC3Rs transfer to Joint Electronic Submission (Je-S) MRC & NC3Rs transfer to Joint Electronic Submission (Je-S) Carol Catley Simon Mather V1.1 Welcome Aims of this session To understand What is Je-S Why transfer from EAA to Je-S? Timeline for MRC and NC3Rs

More information

RCUK Policy on Open Access and Supporting Guidance

RCUK Policy on Open Access and Supporting Guidance RCUK Policy on Open Access and Supporting Guidance 1. Introduction (i) Free and open access to the outputs of publicly funded research offers significant social and economic benefits as well as aiding

More information

Future Research Leaders call 2015/16 Guidance notes for non-academic reviewers

Future Research Leaders call 2015/16 Guidance notes for non-academic reviewers Future Research Leaders call 2015/16 Guidance notes for non-academic reviewers Introduction... 1 Aims and objectives... 1 Procedure... 3 Peer Review form on Je-S... 3 The decision-making process... 3 Assessment

More information

RCUK Action Plan for Equality, Diversity and Inclusion

RCUK Action Plan for Equality, Diversity and Inclusion RCUK Action Plan for Equality, Diversity and Inclusion Our ambition is for RCUK to be recognised as a leader in equality and diversity in the research community, working with partners throughout the sector.

More information

ESRC Big Data Network Phase 2: Business and Local Government Data Research Centres Welcome, Context, and Call Objectives

ESRC Big Data Network Phase 2: Business and Local Government Data Research Centres Welcome, Context, and Call Objectives ESRC Big Data Network Phase 2: Business and Local Government Data Research Centres Welcome, Context, and Call Objectives Dr Fiona Armstrong, Professor Peter Elias, Dr Paul Meller Today s event This event

More information

A joint plan to foster a healthy and vibrant Healthcare IT market. Intellect & DH Informatics Directorate. Initial Issue

A joint plan to foster a healthy and vibrant Healthcare IT market. Intellect & DH Informatics Directorate. Initial Issue A joint plan to foster a healthy and vibrant Healthcare IT market Intellect & DH Informatics Directorate Initial Issue Crown Copyright 2012 Page 1 of 8 Amendment History: Version Date Amendment History

More information

Open Science and Property Knowledge:

Open Science and Property Knowledge: Open Science and Property Knowledge: From Policy into Practice Mark Thorley Natural Environment Research Council mrt@nerc.ac.uk Overview The UK research councils. What do we mean by open? Access to research

More information

Project Assessment Framework Establish service capability

Project Assessment Framework Establish service capability Project Assessment Framework Establish service capability July 2015 Component of the Project Assessment Framework (PAF) This document forms part of the Project Assessment Framework, as outlined below.

More information

Gateway review guidebook. for project owners and review teams

Gateway review guidebook. for project owners and review teams Gateway review guidebook for project owners and review teams The State of Queensland (Queensland Treasury and Trade) 2013. First published by the Queensland Government, Department of Infrastructure and

More information

How To Manage A County Council Contract Management

How To Manage A County Council Contract Management Contract Management Status RAAC 2 December 2013 Background Concern had been raised that for several reasons poor/ insufficient contract monitoring was a theme for some contracts. The committee requested

More information

A Framework of Quality Assurance for Responsible Officers and Revalidation

A Framework of Quality Assurance for Responsible Officers and Revalidation A Framework of Quality Assurance for Responsible Officers and Revalidation Supporting responsible officers and designated bodies in providing assurance that they are discharging their statutory responsibilities.

More information

Institutional Repositories: Staff and Skills Set

Institutional Repositories: Staff and Skills Set SHERPA Document Institutional Repositories: Staff and Skills Set University of Nottingham 25 th August 2009 Circulation PUBLIC Mary Robinson University of Nottingham Introduction This document began in

More information

Network Rail Infrastructure Projects Joint Relationship Management Plan

Network Rail Infrastructure Projects Joint Relationship Management Plan Network Rail Infrastructure Projects Joint Relationship Management Plan Project Title Project Number [ ] [ ] Revision: Date: Description: Author [ ] Approved on behalf of Network Rail Approved on behalf

More information

SUBMITTED TO: NORFOLK AND SUFFOLK COLLABORATION PANEL - 3 SEPTEMBER 2014 ERP (ENTERPRISE RESOURCE PLANNING) PROJECT UPDATE

SUBMITTED TO: NORFOLK AND SUFFOLK COLLABORATION PANEL - 3 SEPTEMBER 2014 ERP (ENTERPRISE RESOURCE PLANNING) PROJECT UPDATE ORIGINATOR: CHIEF CONSTABLE PAPER NO: NS14/18 SUBMITTED TO: NORFOLK AND SUFFOLK COLLABORATION PANEL - 3 SEPTEMBER 2014 SUBJECT: ERP (ENTERPRISE RESOURCE PLANNING) PROJECT UPDATE SUMMARY: 1. The Collaboration

More information

(1) To approve the proposals set out in paragraphs 3.1-2 to ensure greater transparency of partnership board activity; and

(1) To approve the proposals set out in paragraphs 3.1-2 to ensure greater transparency of partnership board activity; and Agenda Item No. 7 Governance Committee 23 November 2015 Partnership Governance for Contract Management Report by Director of Law Assurance and Strategy Executive Summary This report sets out some areas

More information

etrading Programme Procserve Holdings Limited 2015

etrading Programme Procserve Holdings Limited 2015 etrading Programme Procserve Holdings Limited 2015 2 Agenda 1. About etrading and its Vision 2. The System 3. The Support 4. Customer Responsibilities 5. MoU 6. Next Steps About etrading and Its Vision

More information

Upgrade of Exchange Environment Request for Proposal

Upgrade of Exchange Environment Request for Proposal Upgrade of Exchange Environment Request for Proposal August 2014 Contents 1. Introduction... 4 1.1. Purpose of document... 4 1.2. Why this document is being issued... 4 1.3. Overview... 4 1.4. Introduction

More information

INFRASTRUCTURE PROGRAMME

INFRASTRUCTURE PROGRAMME INFRASTRUCTURE PROGRAMME programme remit Infrastructure s remit is to provide researchers in the Engineering and Physical sciences with access to the world class facilities necessary to enable internationally

More information

The Data Sharing Policies of the UK Research Councils: Principles and Practices Mark Thorley Natural Environment Research Council mrt@nerc.ac.

The Data Sharing Policies of the UK Research Councils: Principles and Practices Mark Thorley Natural Environment Research Council mrt@nerc.ac. The Data Sharing Policies of the UK Research Councils: Principles and Practices Mark Thorley Natural Environment Research Council mrt@nerc.ac.uk Overview The UK research councils. Generic drivers for data

More information

EVALUATION OF THE CORPORATE PERFORMANCE MANAGEMENT FRAMEWORK

EVALUATION OF THE CORPORATE PERFORMANCE MANAGEMENT FRAMEWORK Appendix A EVALUATION OF THE CORPORATE PERFORMANCE MANAGEMENT FRAMEWORK 1. Introduction and Background 1.1 The County Council introduced a new corporate performance management framework in September 2002.

More information

1) Is it appropriate for institutions to develop research data management services and e infrastructure using research funding streams?

1) Is it appropriate for institutions to develop research data management services and e infrastructure using research funding streams? RCUK Responses to questions raised at the DCC/RDMF Special Event on funding for Research Data Management held at Aston University on 25 th April 2013. (NB only the questions in bold font below were discussed

More information

The STFC Project Management Framework

The STFC Project Management Framework The STFC Project Management Framework Version 4 April 2016 For further information contact: Tony Medland, Programmes Directorate (tony.medland@stfc.ac.uk) Matt Fletcher, National Laboratories Directorate

More information

Report of Cabinet Member for Finance and Strategy. Cabinet 21 January 2016 THE MOVE TO AN IN-HOUSE MANAGED ICT SERVICE

Report of Cabinet Member for Finance and Strategy. Cabinet 21 January 2016 THE MOVE TO AN IN-HOUSE MANAGED ICT SERVICE Report of Cabinet Member for Finance and Strategy Cabinet 21 January 2016 THE MOVE TO AN IN-HOUSE MANAGED ICT SERVICE Purpose: Policy Framework: Reason for Decision: Consultation: Report Author: Finance

More information

Guidance for Annual Monitoring 2014-15

Guidance for Annual Monitoring 2014-15 Guidance for Annual Monitoring 2014-15 Author Academic Quality Services Date created July 2015 Due for review July 2016 Approval route Quality Assurance and Enhancement Committee 1 P a g e Annual Monitoring

More information

Collaborative Computational Projects: Networking and Core Support

Collaborative Computational Projects: Networking and Core Support Collaborative Computational Projects: Networking and Core Support Call type: Invitation for proposals Closing date: 16:00 07 October 2014 Related themes: Engineering, ICT, Mathematical sciences, Physical

More information

CHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY AND POLICY

CHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY AND POLICY Zurich Management Services Limited Registered in England: No 2741053 Registered Office The Zurich Centre, 3000 Parkway Whiteley, Fareham Hampshire, PO15 7JZ CHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY

More information

EMR Capacity Market Implementation Coordination Workshop

EMR Capacity Market Implementation Coordination Workshop EMR Capacity Market Implementation Coordination Workshop Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight

More information

Managing ICT contracts in central government. An update

Managing ICT contracts in central government. An update Managing ICT contracts in central government An update Prepared by Audit Scotland June 2015 Auditor General for Scotland The Auditor General s role is to: appoint auditors to Scotland s central government

More information

Consultancy spending approval process: Initial guidance to NHS foundation trusts

Consultancy spending approval process: Initial guidance to NHS foundation trusts Annex One Consultancy spending approval process: Initial guidance to NHS foundation trusts Summary 1. Monitor, the NHS Trust Development Authority (TDA) and NHS England are jointly implementing an approval

More information

Programme Manager Relationship Management System

Programme Manager Relationship Management System Programme Manager Relationship Management System Russam Ref 4573 Job Profile This document is a generic description for the role. Any specific requirements in the published advert should also be taken

More information

Project Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee

Project Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee Page 1 2 Contents 1. Introduction... 3 1.1 Definition of a... 3 1.2 Why have

More information

Writing Research Grant Proposals

Writing Research Grant Proposals Writing Research Grant Proposals University of Strathclyde March 15th 2011 Dr Rob Daley Researcher Development Coordinator Academic Enhancement Heriot-Watt University E-mail: r.a.daley@hw.ac.uk Acknowledgements

More information

Lessons learned from creating a change management framework

Lessons learned from creating a change management framework Lessons learned from creating a change management framework Author Melanie Franklin Director Agile Change Management Limited Contents Introduction 3 What is a Change Management Framework? 3 Why is it called

More information

The data landscape lessons from UK

The data landscape lessons from UK The data landscape lessons from UK Veerle Van den Eynden UK Data Archive University of Essex Faculty of Psychology and Educational Sciences University of Ghent, Belgium 23 October 2014 UK data landscape

More information

Central Hosting. Case Study

Central Hosting. Case Study Central Hosting Case Study October, 2014 Central Hosting Case Study Background An Chéim was originally set up to procure, distribute and implement key MIS systems (hardware and software) for the Institutes

More information

Graduate School of Biological Sciences Quality Assurance Model for Postgraduate Research Programmes November 2012

Graduate School of Biological Sciences Quality Assurance Model for Postgraduate Research Programmes November 2012 Graduate School of Biological Sciences Quality Assurance Model for Postgraduate Research Programmes November 2012 1. ACADEMIC MANAGEMENT STRUCTURE The Graduate School is responsible for ensuring that quality

More information

Item 15 Appendix 2. CORPORATE PERFORMANCE MANAGEMENT - May. NHS Hambleton, Richmondshire and Whitby CCG

Item 15 Appendix 2. CORPORATE PERFORMANCE MANAGEMENT - May. NHS Hambleton, Richmondshire and Whitby CCG Item 15 Appendix 2 CORPORATE PERFORMANCE MANAGEMENT - May NHS Hambleton, Richmondshire and Whitby CCG Introductory comments North Yorkshire & Humber CSU Performance Management We are committed to delivering

More information

Web Development Brief

Web Development Brief Web Development Brief 1. Summary Turning Point South West: Strengthening the Visual Art Sector Turning Point South West is part of the Turning Point National Network initiated by the Arts Council of England.

More information

National Institute for Health Research Coordinated System for gaining NHS Permission (NIHR CSP)

National Institute for Health Research Coordinated System for gaining NHS Permission (NIHR CSP) National Institute for Health Research Coordinated System for gaining NHS Permission (NIHR CSP) Operating Manual Please check the CRN Website for the latest version. Version: 6.0 Status: Consultation in

More information

Creative Skillset supports skills and training for people and businesses to ensure the UK Creative Industries maintain their world-class position.

Creative Skillset supports skills and training for people and businesses to ensure the UK Creative Industries maintain their world-class position. Job Description Job title: Reports to: Location: Databases Technical Specialist Senior Operations Manager King s Cross, London Job context: Creative Skillset supports skills and training for people and

More information

Performance Detailed Report. May 2008. Review of Performance Management. Norwich City Council. Audit 2007/08

Performance Detailed Report. May 2008. Review of Performance Management. Norwich City Council. Audit 2007/08 Performance Detailed Report May 2008 Review of Performance Management Audit 2007/08 External audit is an essential element in the process of accountability for public money and makes an important contribution

More information

UoD IT Job Description

UoD IT Job Description UoD IT Job Description Role: Projects Portfolio Manager HERA Grade: 8 Responsible to: Director of IT Accountable for: Day to day leadership of team members and assigned workload Key Relationships: Management

More information

High Speed Two (HS2) Ltd Board Meeting held on 16 October 2014. Minutes. HS2 Ltd Board room, One Canada Square, London E14 5AB

High Speed Two (HS2) Ltd Board Meeting held on 16 October 2014. Minutes. HS2 Ltd Board room, One Canada Square, London E14 5AB High Speed Two (HS2) Ltd Board Meeting held on 16 October 2014 Minutes HS2 Ltd Board room, One Canada Square, London E14 5AB Present: David Higgins, Chair Simon Kirby, Chief Executive Richard Brown Christine

More information

Institutional Repositories: Staff and Skills requirements

Institutional Repositories: Staff and Skills requirements SHERPA Document Institutional Repositories: Staff and Skills requirements 8th August 2007 Circulation PUBLIC Mary Robinson Introduction This document began in response to requests received by the core

More information

The minutes of the previous meetings held on the 18th December 2013 were reviewed and approved.

The minutes of the previous meetings held on the 18th December 2013 were reviewed and approved. Minutes Title: Executive Team Meeting Date of Meeting: 17 January 2014 Location: Blue Room Attendees: Clem Brohier (CB - Chair) Patrick Mallett (PJM) Carol Tullo (CT) Amanda Spencer (AS) Mary Gledhill

More information

Governance of the Business Transformation Partnership Responsible Officer: Executive Director (Business Development)

Governance of the Business Transformation Partnership Responsible Officer: Executive Director (Business Development) Meeting: Cabinet Date: 6 October 2005 Subject: Governance of the Business Transformation Partnership Responsible Officer: Executive Director (Business Development) Contact Officer: Portfolio Holder: Key

More information

THE ALLOCATION OF SCIENCE AND RESEARCH FUNDING 2015/16 INVESTING IN WORLD-CLASS SCIENCE AND RESEARCH

THE ALLOCATION OF SCIENCE AND RESEARCH FUNDING 2015/16 INVESTING IN WORLD-CLASS SCIENCE AND RESEARCH THE ALLOCATION OF SCIENCE AND RESEARCH FUNDING 2015/16 INVESTING IN WORLD-CLASS SCIENCE AND RESEARCH MAY 2014 Contents Foreword:... 4 Part 1. Investing in World-Class Science & Research... 5 Introduction...

More information

Business Continuity Management Policy and Framework

Business Continuity Management Policy and Framework Management Policy and Framework Version: Produced by: Date Produced: Approved by: Updated: 7 University Manager with the assistance of the Operational Group 11 th March 2010 Steering Group (14 December

More information

Probationary procedures for University/Senior/Academic Research Fellowships

Probationary procedures for University/Senior/Academic Research Fellowships Human Resources Probationary procedures for University/Senior/Academic Research Fellowships Contents 1. Introduction... 1 2. Procedures for initial probationary review... 2 3. Outcome... 3 4. Action...

More information

Network Security Innovation Platform

Network Security Innovation Platform Technology Strategy Innovation Platform Andrew Tyrer Innovation Platform Manager Office of Science and Innovation DTI Innovation Platform Technology Programme ICT opportunities Andrew Tyrer Innovation

More information

Specialist Cloud Services Lot 4 Cloud Printing and Imaging Consultancy Services

Specialist Cloud Services Lot 4 Cloud Printing and Imaging Consultancy Services Specialist Cloud Services Lot 4 Cloud Printing and Imaging Consultancy Services Page 1 1 Contents 1 Contents... 2 2 Transcend360 Introduction... 3 3 Service overview... 4 3.1 Service introduction... 4

More information

Specialist Cloud Services Lot 4 Cloud EDRM Consultancy Services

Specialist Cloud Services Lot 4 Cloud EDRM Consultancy Services Specialist Cloud Services Lot 4 Cloud EDRM Consultancy Services Page 1 1 Contents 1 Contents... 2 2 Transcend360 Introduction... 3 3 Service overview... 4 3.1 Service introduction... 4 3.2 Service description...

More information

Project Plan DATA MANAGEMENT PLANNING FOR ESRC RESEARCH DATA-RICH INVESTMENTS

Project Plan DATA MANAGEMENT PLANNING FOR ESRC RESEARCH DATA-RICH INVESTMENTS Date: 2010-01-28 Project Plan DATA MANAGEMENT PLANNING FOR ESRC RESEARCH DATA-RICH INVESTMENTS Overview of Project 1. Background Research data is essential for good quality research, especially when data

More information

Client and Cost Management System (CCMS) PILOT PROVIDER Go Live pack - new cases

Client and Cost Management System (CCMS) PILOT PROVIDER Go Live pack - new cases Client and Cost Management System (CCMS) PILOT PROVIDER Go Live pack - new cases Content 1. Introduction 2. Timeline 3. Latest news 4. Preparation for Go-Live 5. How to access the System 6. Managing your

More information

Announcement of Opportunity. Part B: Applying for ESPA 2016 Grants

Announcement of Opportunity. Part B: Applying for ESPA 2016 Grants Announcement of Opportunity Part B: Applying for ESPA 2016 Grants Critical Deadlines: Full proposals to be submitted via Je-S by 16:00 (4pm) UK Local Time (GMT+1/UCT+1), 17 May 2016 Information about your

More information

ACADEMIC POLICY FRAMEWORK

ACADEMIC POLICY FRAMEWORK ACADEMIC POLICY FRAMEWORK Principles, Procedures and Guidance for the Development & Review of Academic Policies [V.1] Page 2 of 11 TABLE OF CONTENTS 1. FRAMEWORK OVERVIEW... 3 2. PRINCIPLES... 4 3. PROCESS...

More information

Service Management and ICT Monitoring and Reporting Advisory and Implementation Services

Service Management and ICT Monitoring and Reporting Advisory and Implementation Services Service Management and ICT Monitoring and Reporting Advisory and Implementation Services G-Cloud Service 1 1. An overview of the G-Cloud Service Arcus can assist you with a review and advice on the effectiveness

More information

STANS CAFE - EXECUTIVE PRODUCER JOB DESCRIPTION Reports to: Chair of Board

STANS CAFE - EXECUTIVE PRODUCER JOB DESCRIPTION Reports to: Chair of Board 1 STANS CAFE - EXECUTIVE PRODUCER JOB DESCRIPTION Reports to: Chair of Board (Salary 32K PA) Line manages: Administrator Other key relationships: Artistic Director, Associate Director and Creative Learning

More information

The overall aim for this project is To improve the way that the University currently manages its research publications data

The overall aim for this project is To improve the way that the University currently manages its research publications data Project Plan Overview of Project 1. Background The I-WIRE project will develop a workflow and toolset, integrated into a portal environment, for the submission, indexing, and re-purposing of research outputs

More information

CENTRAL MANCHESTER UNIVERSITY HOSPITALS NHS FOUNDATION TRUST

CENTRAL MANCHESTER UNIVERSITY HOSPITALS NHS FOUNDATION TRUST CENTRAL MANCHESTER UNIVERSITY HOSPITALS NHS FOUNDATION TRUST Report of: Paper prepared by: Adrian Roberts, Executive Director of Finance Simon Walsh, Head of Procurement and E-Commerce Date of paper: August

More information

Careers in Research Online Survey (CROS) 2011 Newcastle University CROS 2011 Summary Report

Careers in Research Online Survey (CROS) 2011 Newcastle University CROS 2011 Summary Report Careers in Research Online Survey (CROS) 2011 Newcastle University CROS 2011 Summary Report Introduction CROS has been important in capturing the anonymous views and experiences of Newcastle research staff

More information

Appendix D Programme Stream 6 CRM Procurement. Programme Stream 6 Remodelling of Customer Services Programme CRM Procurement

Appendix D Programme Stream 6 CRM Procurement. Programme Stream 6 Remodelling of Customer Services Programme CRM Procurement Programme Stream 6 Remodelling of Customer Services Programme CRM Procurement Recommendations That the Executive note CRM procurement will be put out to tender in 2010/11 and note the proposed phasing

More information

New Current Account Frequently Asked Questions

New Current Account Frequently Asked Questions Q1 What changes are happening? Following a review of our current accounts, we have introduced a new and simplified account structure. As part of the new account range, a new Service Tariff has been introduced.

More information

STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF. Terms of Reference July 20 2005

STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF. Terms of Reference July 20 2005 1. Background STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF Terms of Reference July 20 2005 UNICEF has decided to undertake a Strategic Review of its approach to and performance in Human Resource

More information

JOB TITLE: JIG TECHNICAL MANAGER JOB PURPOSE:

JOB TITLE: JIG TECHNICAL MANAGER JOB PURPOSE: 1 JOB TITLE: JIG TECHNICAL MANAGER REPORTS TO: General Manager, JIG JOB PURPOSE: The Technical Manager role supports all the technical elements of JIG Committee work. Additionally, the Technical Manager

More information

Commonwealth Secretariat Response. to the DFID Multilateral Aid Review Update

Commonwealth Secretariat Response. to the DFID Multilateral Aid Review Update Commonwealth Secretariat Response to the DFID Multilateral Aid Review Update Summary The Commonwealth Secretariat recognises that the United Kingdom contribution to the Commonwealth Fund for Technical

More information

IAPT Data Standard. Frequently Asked Questions

IAPT Data Standard. Frequently Asked Questions IAPT Data Standard Frequently Asked Questions Version 1.0 March 2012 IAPT FAQs 1.0-1 - Contents Section 1: About the IAPT Data Standard.. 3 Section 2: Who is responsible for doing what?. 5 Section 3: How

More information

SUSTAINABLE PROCUREMENT CENTRE OF EXCELLENCE FOR HIGHER EDUCATION. London Universities Environmental Group 8 th November 2011

SUSTAINABLE PROCUREMENT CENTRE OF EXCELLENCE FOR HIGHER EDUCATION. London Universities Environmental Group 8 th November 2011 SUSTAINABLE PROCUREMENT CENTRE OF EXCELLENCE FOR HIGHER EDUCATION London Universities Environmental Group 8 th November 2011 AGENDA Role of the SPCE Benefits Realisation SPCE Website Capacity Building

More information

Business Relationship Manager IT Project and Programme Managers Hospice Managers Nursing Staff 3 rd Party Suppliers CIO Head of IT Infrastructure

Business Relationship Manager IT Project and Programme Managers Hospice Managers Nursing Staff 3 rd Party Suppliers CIO Head of IT Infrastructure Job Title: Informatics Business Analyst Department: IT Service Management, TDA Location: 89 Albert Embankment, London Responsible to: Head of IT Service Management Role Summary: This role will support

More information

Pre-application service for Nationally Significant Infrastructure Projects

Pre-application service for Nationally Significant Infrastructure Projects Pre-application service for Nationally Significant Infrastructure Projects Prospectus for Applicants Version 1 (May 2014) In this prospectus... This is a clickable PDF Executive summary 3 1 2 3 Purpose

More information

DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA

DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA Appendix 2c DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA Review of Programme and Project Management Framework- Strategic Land and Property DISTRIBUTION LIST Audit Team David

More information

Lead Provider Framework Draft Scope. NHS England / 13/12/13 Gateway Ref: 00897

Lead Provider Framework Draft Scope. NHS England / 13/12/13 Gateway Ref: 00897 Lead Provider Framework Draft Scope NHS England / 13/12/13 Gateway Ref: 00897 1 Introduction The commissioning support lead provider framework is being developed in response to requests from CCGs for a

More information

13. Performance Management

13. Performance Management 13. Performance Management Summary Delivering schemes on time and on budget Management of Capital Programme Management of Risk Gateway Reviews Resource requirements Project Management and skills development

More information

Research Data Management: The library s role

Research Data Management: The library s role CILIP Executive Briefings 2014 Research Data Management: The library s role Tuesday 20 May 2014 Organised by #CILIPRDM @CILIPEvents Engaging with students and researchers: the case of the social sciences

More information

Big Data and the social sciences a perspective from the ESRC. Peter Elias

Big Data and the social sciences a perspective from the ESRC. Peter Elias Big Data and the social sciences a perspective from the ESRC Peter Elias What do we mean by Big data Electronic data generated from research infrastructures (e.g. astronomy, particle physics, micro-biology,

More information

Following up recommendations/management actions

Following up recommendations/management actions 09 May 2016 Following up recommendations/management actions Chartered Institute of Internal Auditors At the conclusion of an audit, findings and proposed recommendations are discussed with management and

More information

Linking Social Care, Housing & Health Data Governance Group. Meeting 4 St Andrews House 18 th June 2012. Minutes

Linking Social Care, Housing & Health Data Governance Group. Meeting 4 St Andrews House 18 th June 2012. Minutes Linking Social Care, Housing & Health Data Governance Group Meeting 4 St Andrews House 18 th June 2012 Attendees: Julie Rintoul (Chair) Duncan Buchanan Kenny Oliver Ian Nicol Eleanor Cunningham Anthea

More information

Introduction to the online training materials

Introduction to the online training materials Introduction to the online training materials These materials are intended for college staff who have been designated the role of facilitator for the Summative review stage of QAA's Integrated quality

More information

Wednesday 20 May 2015, Conference Room 7, VQ, Edinburgh

Wednesday 20 May 2015, Conference Room 7, VQ, Edinburgh REVENUE SCOTLAND BOARD MEETING MINUTE Wednesday 20 May 2015, Conference Room 7, VQ, Edinburgh Present: Dr Keith Nicholson [Chair] Lynn Bradley Jane Ryder OBE Ian Tait John Whiting Attended: Eleanor Emberson,

More information

28,843 31,739 per annum depending on experience (up to 35,793 for exceptional candidates), plus benefits

28,843 31,739 per annum depending on experience (up to 35,793 for exceptional candidates), plus benefits Linking local priorities to global challenges Job title: Coordinator Job details Group Reports to Responsible for Purpose of job Main contacts Strategy and Learning Group Senior Coordinator n/a Carry out

More information

Manchester City Council Report for Information. Resources and Governance Overview and Scrutiny Committee- 15 December 2011

Manchester City Council Report for Information. Resources and Governance Overview and Scrutiny Committee- 15 December 2011 Manchester City Council Report for Information Report To: Subject: Report of: Resources and Governance Overview and Scrutiny Committee- 15 December 2011 Contract Management City Treasurer Summary This

More information

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011 BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT Notice No.... 2011 NOTICE IN TERMS OF THE COUNCIL FOR THE BUILT ENVIRONMENT ACT, 2000 (ACT NO. 43 OF 2000) The Council for the Built Environment has under

More information

Informatics: The future. An organisational summary

Informatics: The future. An organisational summary Informatics: The future An organisational summary DH INFORMATION READER BOX Policy HR/Workforce Management Planning/Performance Clinical Document Purpose Commissioner Development Provider Development Improvement

More information

Research Councils UK and UK Shared Business Services Limited

Research Councils UK and UK Shared Business Services Limited Research Councils UK and UK Shared Business Services Limited Grant Applicants' Feedback Survey Compiled October 2013 Stephanie Brewer UK SBS Performance Analysis Team Contents Foreword Snapshot of Initial

More information

Non-teaching Room Bookings: Policy, Roles and Responsibilities, and Procedures Approved December 2014 Version 1.0. Contents

Non-teaching Room Bookings: Policy, Roles and Responsibilities, and Procedures Approved December 2014 Version 1.0. Contents Non-teaching Room Bookings: Policy, Roles and Responsibilities, and Procedures Approved December 2014 Version 1.0 Contents 1. Introduction... 2 2. Policy Objectives... 2 3. Guidance on the Use of Teaching

More information

EPSRC Research Data Management Compliance Report

EPSRC Research Data Management Compliance Report EPSRC Research Data Management Compliance Report Contents Introduction... 2 Approval Process... 2 Review Schedule... 2 Acknowledgement... 2 EPSRC Expectations... 3 1. Awareness of EPSRC principles and

More information

Network System Operation

Network System Operation Improved reporting of our network system operator activities an NSO Dashboard Executive Summary Consultation: Network System Operation 02 Good network system operation matters. The way we plan and use

More information

North Nottinghamshire College Corporation Minutes of the Audit Committee Meeting held on 13 March 2008

North Nottinghamshire College Corporation Minutes of the Audit Committee Meeting held on 13 March 2008 North Nottinghamshire College Corporation Minutes of the Audit Committee Meeting held on 13 March 2008 08.01 Membership Mr M Lloyd (Chair) Mr K Green Ms D Needham Mr J R Savage Mr J Sephton In attendance

More information

University of Oxford RCUK open access compliance report 2013-14

University of Oxford RCUK open access compliance report 2013-14 Introduction University of Oxford RCUK open access compliance report 2013-14 The University of Oxford has made considerable progress in all areas of its open access (OA) programme. The University is fully

More information

Bristol CIPD event - Change Management practical aspects of business driven changes including examples of restructures, redundancies, TUPEs

Bristol CIPD event - Change Management practical aspects of business driven changes including examples of restructures, redundancies, TUPEs Bristol CIPD event - Change Management practical aspects of business driven changes including examples of restructures, redundancies, TUPEs Being brilliantly reliable at managing change by Carolyn Woolway

More information

Division. Direct Reports 2/3 digital fundraising officers

Division. Direct Reports 2/3 digital fundraising officers Job Description Job Title Assistant Digital Fundraising Manager Job Band SAME Job Reference UKO52697 Department Individual Giving Direct Marketing Division Fundraising Location UK Office, London Duration

More information

Harnessing Creativity in Civil Society and Digital Economy

Harnessing Creativity in Civil Society and Digital Economy Connected Communities Harnessing Creative Clusters to Civil Society and the Digital Economy Dr Kerrie Schaefer, Steve Thompson & Dr Tom Wakeford Background Executive Summary This project worked closely

More information

Legal and Protective - Section 1 - PI Summary

Legal and Protective - Section 1 - PI Summary Legal and Protective - Section 1 - PI Summary Objective a) The Council is more efficient and effective Traffic Light Green 9 Unknown 4 Code & Short Name SP1213LP_P_A01 Absence - Average number of days

More information

Audit and risk assurance committee handbook

Audit and risk assurance committee handbook Audit and risk assurance committee handbook March 2016 Audit and risk assurance committee handbook March 2016 Crown copyright 2016 This publication is licensed under the terms of the Open Government Licence

More information