Results Based Testing
|
|
- Cori Warner
- 8 years ago
- Views:
Transcription
1 Using Gain-Sharing Pricing Model for Testing Ayal Zylberman Summary Results Based Testing (RBT) is a new software testing pricing model that sets forth the expected value to be delivered by the Testing Teams. Imagine your testing provider making a commitment to find 97% of the defects in the system. Can that be measured? What would that be worth? What would be the impact on the customer-provider relationships and accountability? How can you bind that commitment? This white paper will attempt to answer those questions. Introduction Very often the question what budget should I allocate for testing is asked. The answer to this question is somewhere between zero and infinity. There are many elements that define the budget for testing, such as complexity of the system under test, amount of iterations of testing and of software releases, quality of development and of unit testing, efforts spent by development on present release and past releases and more. However, an important factor for defining the testing budget is the level of risk the organization is willing to take. No risk means we need to produce a bug-free system (and therefore the testing budget will be close to infinity). You may spend one day to test a system and if you re a good tester, you will probably find lots of bugs or you could spend 3 months with a group of 50 testers to test the same system. The difference would be with the amount of defects you find and more important the amount of defects you DON T find When to use Results Based Testing? Results Based Testing usually involves three elements: 1. A Scope of work 2. A contractual SLA 3. A pricing mechanism RBT is normally utilized when part or all of the software testing process is outsourced to a third party and a core contractual SLA together with a pricing mechanism sets the exact payment made at each SLA level. The pricing mechanism may be a flexible rate for each SLA level or a Penalty/Reward mechanism, all with the goal of creating an incentive for the Testing Supplier to meet the business targets (results) set forth. However, RBT may (and should) also be used for internal testing teams even though in such cases a penalty/reward mechanism is harder to implement. Another good use of RBT is for establishing the necessary framework for measured continuous improvement in which results from previous periods can serve as a baseline for following period s targets. What results should we measure? When evaluating the level of testing, several Key Process Indicators (KPIs) should be measured. However, in order to keep things simple, the main focus should be on two main questions: 1. What percentage of the defects should be found by testing? P a g e 1
2 2. What is the cost spent in order to achieve the above goal? Although it is clearly important to be able to answer the above questions, most organizations fail to measure these two KPIs and thus, are unable to provide accurate visibility into the quality and efficiency of testing. Below we will present a simple method for measuring test coverage which will enable us to answer the first question and a method for setting a budget for achieving these results, thus answering the second question. There are many other indicators such as staff level expertise, attrition level, reporting to stakeholders, communication with development teams, delays in the process and more. However, all other aspects feed directly into the two main questions above. For example, if the level of staff is not sufficiently high, the percentage of defects found will decrease and/or the cost of testing will increase. How to measure Test Coverage KPI? In order to measure the percentage of defects found by testing (a type of test Coverage KPI vs. the escaped defects KPI) the organization should utilize the following process: 1. Reporting of defects each defect reported by the testing team should be documented in a central defect management system. 2. All issues or support tickets raised by customers/users of the system should be documented in a centralized system. Usually the support or help-desk team has this information. 3. Each ticket should be evaluated by the testing team (sometimes the support team filters the tickets and provides only the tickets that result from a defect). 4. Each ticket related to a defect should have one of the following statuses: Not a defect Known defect Cannot be found by testing/un-reproducible New Defect Only defects in the last status (New Defect) are counted for this metric. The process above, although not being used by most organizations, is extremely important in case the organization is looking to start implementing RBT and to continually improve the efficiency and effectiveness of the testing process. Measuring the test coverage is done by dividing the amount of defects found by the testing provider with the amount of defects found by the users of the system. Since critical defects carry a different importance to the organization versus less severe defects, each defect is multiplied by its severity. For example, assuming a scale of 1-5 is used, a critical defect (severity = 5) will be counted in the same way as 5 minor defects (severity = 1). Only defects found in a certain period after release of the system shall be counted (normally this is defined as 3-6 months). Once the data is available the following formula is used to calculate the KPI value: P a g e 2
3 Testing Budget Calculator The Testing Budget Calculator is a formula used to define the testing budget required for testing a system or a version of a system. There is no one generic formula for calculating the testing budget for all types of systems since the total effort required depends on the organization and the system specific characteristics. First we need to identify the parameters that affect a testing budget. These factors might include: Overall development budget Development effort in man days Type of project which can be either a development project from the ground up or an Implementation of off the shelf business software) Estimated number of product versions to be released Scope of testing (Acceptance Test, Testing automation development, establishing a test Environment etc.) Efforts spent in previous versions Number of interfaces or integrated systems Functional Complexity Duration of testing Existing level of test automation infrastructure out of overall test coverage. When selecting the relevant parameters, the organization should verify it has access to the values of each parameter as any change in the value has implications on the testing effort required. It s nice to have sophisticated parameters like lines of code, but there s no use in using such parameters if there s no access to the actual values added in each version or in case the amount of lines does not change the total effort required for testing. The next step is creating a formula using all relevant parameters. It s important that the formula is as simple as possible allowing for certain assumptions based on past experience. An example of a simple calculator might be a set percentage of the development budget. Please see engagement examples in the examples section below. Results-Based Pricing Model for Testing In traditional software testing outsourcing engagements, the testing provider provides the service and the customer pays for the services, either at a fixed price, on a time-and-materials basis or a cost-plus model. Results Based testing is the only gain-sharing approach in which long term interests are perfectly aligned. This model encourages collaboration and creative problem-solving as both parties work toward common business goals. It also provides the supplier a greater freedom to determine how to better achieve the results. The pricing model The basic pricing model is Managed Testing Services based on a pre-defined rate card with only a certain amount paid (usually 70% of the total amount) while the final calculation of the cost is made once actual results are calculated. Budget Adjustments Example According to the difference between the actual hours multiplied by the rates and the expected budget that had been calculated in the Testing Budget Calculator, the following adjustments can be made: P a g e 3
4 1. If the actual cost of testing in a certain project is BELOW the budget as estimated in the Testing Calculator, the testing provider receives 25% from the difference between the actual cost and the estimated budget 2. If the actual cost of testing in a certain project is ABOVE the budget as estimated in the Testing Calculator, the provider pays a 25% penalty from the difference between the actual cost and the estimated budget Coverage Adjustment Example The following adjustments are made based on the actual test coverage KPI: - If the actual coverage meets the expected results a reward of up to 10% of the total actual cost is given to the provider - If the actual coverage is below the expected results a penalty of up to 30% of the total actual cost is given to the provider For example: assuming the coverage KPI target for all defects is 95%, the adjustment mechanism will be as following: Actual Coverage Penalty/Reward 0%-80% 30% penalty 80%-86% 20% penalty 86%-92% 10% penalty 92%-98% No penalty/reward 98%+ 10% reward Additional Adjustment can be defined based on other agreed and measured KPIs P a g e 4
5 Real Life Engagement Examples Large Bank Tier 1 Defense Contractor Telecom Equipment Manufacturer Size of testing team 120 testers 160 testers 140 testers Coverage 96% Coverage - all defects 97% Coverage 85% Main SLA Average delays in schedule 5% Coverage - critical defects 99% Average time to recruit new staff 21 days System up time 99% Satisfaction surveys 3.8/5 Attrition of key employees 5% Location QualiTest Test Factory QualiTest Test Factory QualiTest Test Factory # of parallel testing projects Average duration of each testing project Testing Budget Calculator Pricing model days 1-2 years 3-4 months Set % of development budget Fixed Prices based on the testing calculator Formula with 6 factors: Development man days, # of iterations, efforts in previous versions, ATP required and more T&M. If the actual cost is above Testing Budget, a 30% discounted rates applies If the actual cost is below budget 20% reward % of development man days T&M. If the actual cost is above Testing Budget, a 30% discounted rates applies Conclusion Results Based Testing enables organizations to: - Provide the testing provider with financial incentives to meet customer s business goals - Provide the testing provider with financial incentives to innovate and improve the process in line with customer s business goals and spreads the financial risk between both parties - Provides a framework for continuous improvement - Measures Test Provider s performance. - Provides the customer flexibility to scale the testing up or down in line with its business needs. P a g e 5
Embedding Innovation into Outsourcing Contracts Steven Barker, National Archives.
Embedding Innovation into Outsourcing Contracts Steven Barker, National Archives. Innovation is often an imprecise nice to have aspiration in many contracts and a future dispute point when unstated expectations
More informationIAOP: Creating Sustainable value in Outsourcing Klaus Koefoed
IAOP: Creating Sustainable value in Outsourcing Klaus Koefoed April 28 th 2010 Copyright 2009 Accenture All Rights Reserved. Accenture, its logo, and High Performance Delivered are trademarks of Accenture.
More informationManaging Service Provider SLA s. Phil Smith Vice President Global Solutions Marketing
Managing Service Provider SLA s Phil Smith Vice President Global Solutions Marketing Interop Las Vegas May 12, 2004 Agenda Review of Service Level Agreements Developing and Managing Your SLAs Trends for
More informationITSM Process Description
ITSM Process Description Office of Information Technology Incident Management 1 Table of Contents Table of Contents 1. Introduction 2. Incident Management Goals, Objectives, CSFs and KPIs 3. Incident Management
More informationTelecom Outsourcing Delivery Not Discovery. Insights from EnterprisePM
Telecom Outsourcing Not Discovery Insights from EnterprisePM John Hogan January 2014 WWW.ENTERPRISEPM.COM.SG 2014 by EnterprisePM. All rights reserved not Discovery Transition & Transformation (T&T) Programs.
More informationBudgeting For the Emerging Company How to Develop Operational Plans that Improve Financial Performance
Budgeting For the Emerging Company How to Develop Operational Plans that Improve Financial Performance EXECUTIVE SUMMARY Budgeting is a difficult task for operators of emerging businesses. Many don't do
More informationIntroduction. Table of Contents
Introduction To stay competitive, you know how important it is to find new ways to streamline and save on your company s operations. Learning how leading companies handle commercial payments can give you
More informationMeasurement Information Model
mcgarry02.qxd 9/7/01 1:27 PM Page 13 2 Information Model This chapter describes one of the fundamental measurement concepts of Practical Software, the Information Model. The Information Model provides
More informationLifecycle Performance Management (dynatrace) Description
Lifecycle Performance Management (dynatrace) Description Compuware dynatrace is the new generation of application performance management. Its patented PurePath Technology provides the world s most accurate
More informationWe released this document in response to a Freedom of Information request. Over time it may become out of date. Department for Work and Pensions
We released this document in response to a Freedom of Information request. Over time it may become out of date. Department for Work and Pensions SCHEDULE 4 KEY PERFORMANCE INDICATORS, SERVICE LEVELS AND
More informationS 2 ERC Project: A Review of Return on Investment for Cybersecurity. Author: Joe Stuntz, MBA EP 14, McDonough School of Business.
S 2 ERC Project: A Review of Return on Investment for Cybersecurity Author: Joe Stuntz, MBA EP 14, McDonough School of Business Date: 06 May 2014 Abstract Many organizations are looking at investing in
More informationBusiness Challenges. Customer retention and new customer acquisition (customer relationship management)
Align and Optimize Workflows with Lean Dan Marino Marino Associates, LLC Strategic and tactical planning Information systems integration Customer retention and new customer acquisition (customer relationship
More informationL'Oréal. An Innovative Approach to Indirect Procurement
L'Oréal An Innovative Approach to Indirect Procurement L'Oréal addressed procurement of indirect categories through a co-sourcing arrangement, a unique blend of outsourcing and consultancy. The project,
More informationALM120 Application Lifecycle Management 11.5 Essentials
ALM120 Application Lifecycle Management 11.5 Essentials Instructor-Led Workshop OVERVIEW This course provides the tools you need to implement and use Quality Center 11.50. Students learn how to manage
More informationW hitepapers. Delighting Vodafone Turkey s Customers via Agile Transformation
October 2014 W hitepapers Delighting Vodafone Turkey s Customers via Agile Transformation Mehmet Yitmen, Erhan Köseoğlu, İbrahim Güneş, Gülnur Bayhan, Seda Erboral Introduction Vodafone is one of the world's
More informationTLS013. Supply Chain Key Performance Indicators (KPIs) and Performance Measurement Ehap Sabri, PhD, CFPIM
TLS013 Supply Chain Key Performance Indicators (KPIs) and Performance Measurement Ehap Sabri, PhD, CFPIM Agenda What is KPI? Performance Measurement Challenges Performance Measurement Framework Best practices
More informationThe ITIL Foundation Examination
The ITIL Foundation Examination Sample Paper B, version 4.0 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. All answers are to be marked on the answer grid provided. 3. You have
More informationTo comment on these KPIs: email abeers@aicpa.org
GARTNER/EBRC KPI INITIATIVE This initiative will identify and develop industry standard measures that are predictive of corporate performance. There is a difference between identifying such measures and
More informationA Performance-Driven Approach to Application Services Management
A Performance-Driven Approach to Application Services Management Breaking the Mold to Accelerate Business Transformation Table of contents 1.0 The keep up versus step up challenge...1 2.0 Taking a different
More informationThe ITIL Foundation Examination
The ITIL Foundation Examination Sample Paper B, version 5.0 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. All answers are to be marked on the answer grid provided. 3. You have
More informationKapsch TrafficCom Performance Measures & KPI s in Tolling Schemes
Performance Measures & KPI s in Tolling Schemes Josef A. Czako Vice President, International Business Development Orlando, 11. September 2012 Agenda 1. Overview and categorization of KPI s in Tolling 2.
More informationMANAGING RISK IN OUTSOURCED MANUFACTURING. An E2open White Paper. Contents. White Paper
White Paper MANAGING RISK IN OUTSOURCED MANUFACTURING An E2open White Paper 2 2 3 5 Contents Executive Overview Issues and Challenges of Managing Outsourced Manufacturing Resolution Plan for Key Issues
More informationThe Task. First things first what is a Service Level Agreement?
The Task If you are reading this, then you ve probably decided to or been asked to implement an SLA. Questions are starting to run through your head like what s all the fuss about? How is this going to
More information6 Tips to Help You Improve Incident Management
6 Tips to Help You Improve Incident Management by Stuart Rance Incident management is often the first IT service management (ITSM) process that an IT organization adopts, and many of my clients have a
More informationIndustry Metrics for Outsourcing and Vendor Management
Industry Metrics for Outsourcing and Vendor Management Scott Goldfarb Q/P Management Group, 10 Bow Street Stoneham, Massachusetts 02180 sgoldfarb@qpmg.com Tel: (781) 438-2692 FAX (781) 438-5549 www.qpmg.com
More informationPROCUREMENT OUTSOURCING: The 10 Things Companies Really Want to Know
PROCUREMENT OUTSOURCING: The 10 Things Companies Really Want to Know By Jason Gilroy Vice President of Outsourcing ICG Commerce As featured in: Over the past year, ICG Commerce has seen an unprecedented
More informationTEST METRICS AND KPI S
WHITE PAPER TEST METRICS AND KPI S Abstract This document serves as a guideline for understanding metrics and the Key performance indicators for a testing project. Metrics are parameters or measures of
More informationATS Delivery Strategy for Manufacturing Execution Systems
MES Excellence Centres Delivery Strategy for Manufacturing Execution Systems A modular working program designed from experience and best practices The result is a process where facts rather than opinions
More informationThe ITIL v.3 Foundation Examination
The ITIL v.3 Foundation Examination ITIL v. 3 Foundation Examination: Sample Paper B, version 3.1 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. There are no trick questions.
More informationTHE PROJECT MANAGEMENT KNOWLEDGE AREAS
THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human
More informationSoftware Test Costs and Return on
Software Test Costs and Return on Investment (ROI) Issues Bob Hunt, Galorath Tony Abolfotouh, John Carpenter; Robbins Gioia March 2014 1 Introduction The recent Affordable Health Care Web Site issues have
More informationIT Operations Managed Services A Perspective
IT Operations Managed Services A Perspective 1 Introduction This paper examines the concept of Managed Services for IT Operations, the real business drivers, the key factors to be considered, the types
More informationContract Profit Rate. Guidance on adjustments to the Baseline Profit Rate 27.03.15
Contract Profit Rate Guidance on adjustments to the Baseline Profit Rate 27.03.15 Guidance on adjustments to the Baseline Profit Rate 1 Contents Introduction 2 1. About this Guidance 2 2. Application
More informationThe Quality Assurance Centre of Excellence
The Quality Assurance Centre of Excellence A X I S T E C H N I C A L G R O U P A N A H E I M H E A D Q U A R T E R S, 300 S. H A R B O R, B L V D. S U I T E 904, A N A H E I M, CA 92805 PHONE :( 714) 491-2636
More informationSupplier Relationship Management. ISM Philadelphia, Inc. September 12, 2013
Supplier Relationship ISM Philadelphia, Inc. September 12, 2013 Why does Supplier matter Increased outsourcing of strategic services More complex relationships Consolidation of suppliers to leverage spend
More informationService Level Agreement Between Jolly Technologies Inc. And [Customer Name] For [Level of Service Gold/Silver/Bronze Coverage] Technical Support Plan
Service Level Agreement Between Jolly Technologies Inc. And [Customer Name] For [Level of Service Gold/Silver/Bronze Coverage] Technical Support Plan Submitted to: Submitted by: [Customer Name] [Customer
More informationTHE NEXT GENERATION OF HR SHARED SERVICES SUBHEADLINE RUNS HERE AND HERE AND HERE AND HERE
THE NEXT GENERATION OF HR SHARED SERVICES SUBHEADLINE RUNS HERE AND HERE AND HERE AND HERE SAP Executive Insight It s no secret that implementing HR shared services can help organizations generate significant
More informationHow to Maximise ROI and drive IT Governance with Visual Studio Team System
How to Maximise ROI and drive IT Governance with Visual Studio Team System The Power of an Integrated ALM Solution Julio Fernández-Gayoso Sales manager for Development Tools Western European Microsoft
More informationHuman Capital Management: Leveraging Your Human Assets
Human Capital Management: Leveraging Your Human Assets Executive Summary Managers have always intuitively believed that their employees generate value for the organization but today, intuition is no longer
More informationHigher Focus on Quality. Pressure on Testing Budgets. ? Short Release Cycles. Your key to Effortless Automation. OpKey TM
Pressure on Testing Budgets Higher Focus on Quality Short Release Cycles Your key to Effortless Automation OpKey TM Most of the CTOs face a common challenge i.e. the need to go to Market in shortest possible
More informationManaged Services - Driving Business Value in Banking
White Paper Managed services for credit solutions: Driving business value in banking Business solutions through information technology Entire contents 2005 by CGI Group Inc. All rights reserved. Reproduction
More informationMANDATORY CRITERIA. 1. Does the tool facilitate the creation, modification, fulfillment and closure of Service Request records?
MANDATORY CRITERIA 1. Does the tool facilitate the creation, modification, fulfillment and closure of Service Request records? 2. Does the tool provide a pre-defined list of services which can be requested
More informationThe Contract Scorecard
ARCHITECT ENGAGE OPERATE REGENERATE The Contract Scorecard Module 8 of the outsourcingtoolset outsourcingtoolset.com Contents 1 ABOUT THE OUTSOURCING TOOLSET AND THIS MODULE...1 1.1 THE OUTSOURCING TOOLSET...1
More informationWE ANSWER QUESTIONS THAT NO ONE ELSE CAN. 68 T.W. Alexander Dr. P.O. Box 13628 Research Triangle Park, NC 27709 www.cuttingedgeinfo.
MEDICAL INFORMATION AND CALL CENTER PERFORMANCE BUILDING NEW PRACTICES TO MEET THE EVOLVING NEEDS OF HCPS AND PATIENTS FULL TABLE OF CONTENTS & CHARTS AND GRAPHICS 68 T.W. Alexander Dr. P.O. Box 13628
More informationSupplier Performance Management. Eliot Madow CPSM VP Client Services - Hiperos Director - PMAB
Supplier Performance Management Eliot Madow CPSM VP Client Services - Hiperos Director - PMAB Agenda Different Approaches Service Level Agreement (SLA) Approach Balanced Scorecard Approach Best-in-Class
More informationAnatomy of an IT Outsourcing Deal. Bruce Laco Deloitte John Pickett IT World Canada Barry Sookman McCarthy Tetrault
Anatomy of an IT Outsourcing Deal Bruce Laco Deloitte John Pickett IT World Canada Barry Sookman McCarthy Tetrault 3656867 Agenda Key Considerations for IT Outsourcing Decision Anatomy of an Outsourcing
More informationGoing Seamless with SIAM. Why you need a platform-based approach for Service Integration and Management WWW.WIPRO.COM
WWW.WIPRO.COM Going Seamless with SIAM Why you need a platform-based approach for Service Integration and Management Ramesh Dorairaj, Principal Consultant, Application Support and Maintenance Table of
More informationCall for Tender for Application Development and Maintenance Services
ADM Partners Reference #: 100001200 Call for Tender for Application Development and Maintenance Services Annex 2 - Agile Application Development and Maintenance Appendix A - OECD s Agile Practices and
More informationP2P Maturity Model. A best practice framework for building your partner channel. Joint Business Planning. Leads and Pipeline Assessment.
P2P Maturity Model A best practice framework for building your partner channel v1.1 More than ever, partnerships are essential to building total solutions, business growth, and winning against the competition.
More informationSoftware Project Management
Software Project Management Software Project Planning Vivek Bhatnagar Assoc Professor Who needs software? Most software is built in organizations for people with specific needs. A stakeholder is a anyone
More informationMagic Numbers. An In-Depth Guide to the 5 Key Performance Indicators for Web Application Security. Rafal Los HP Web Application Security Evangelist
Magic Numbers An In-Depth Guide to the 5 Key Performance Indicators for Web Application Security Rafal Los HP Web Application Security Evangelist Version 3.2 2010 Hewlett-Packard Development Company, L.P.
More informationHow To Select Differently From The Standard
Want to Change the Game with Contact Center Vendors? Select Them Differently. The Accenture Vendor Management Framework In today s marketplace, companies in a wide range of industries rely on outsourcing
More informationCase Study. ElegantJ BI Business Intelligence
ISO 9001:2008 www.elegantjbi.com Get competitive with ElegantJ BI,today.. To learn more about leveraging ElegantJ BI Solutions for your business, please visit our website. Client Client is one of the reputed
More informationHow to Implement a Strategic Meeting Program For Your Business
how to smmp. THE A-Z of strategic meeting management programs 1 01 how to smmp? 01 02 what is smmp? 04 03 STEP 1: why 03 04 STEP 2: analysis 05 05 STEP 3: make a plan 09 06 STEP 4: process design 10 07
More informationPerformance Management. Constanze Nuesperling VP, Partnerships & Performance Management
Performance Management Constanze Nuesperling VP, Partnerships & Performance Management Agenda 2 ן Introduction to UCB ן What does good performance management mean, and how can it help to avoid conflict?
More informationNICE BACK OFFICE SOLUTIONS. Improve the Efficiency and Effectiveness of Your Back Office Operations. www.nice.com. Insight from Interactions
NICE BACK OFFICE SOLUTIONS Improve the Efficiency and Effectiveness of Your Back Office Operations Insight from Interactions www.nice.com INTRODUCTION In today s competitive marketplace, your company has
More informationWhite Paper February 2009. IBM Cognos Supply Chain Analytics
White Paper February 2009 IBM Cognos Supply Chain Analytics 2 Contents 5 Business problems Perform cross-functional analysis of key supply chain processes 5 Business drivers Supplier Relationship Management
More informationGoing ITIL with Countersoft Gemini
Going ITIL with Countersoft Gemini countersoft.com Countersoft May 2014 1 Gemini & ITIL GEMINI & Gemini s ITIL Template provides a best practice, instant starting point for project teams who are working
More informationIndustry Metrics for Outsourcing and Vendor Management
Industry Metrics for Outsourcing and Vendor Management Scott Goldfarb Q/P Management Group, Inc. 10 Bow Street Stoneham, Massachusetts 02180 sgoldfarb@qpmg.com Tel: (781) 438-2692 FAX (781) 438-5549 www.qpmg.com
More informationFireScope + ServiceNow: CMDB Integration Use Cases
FireScope + ServiceNow: CMDB Integration Use Cases While virtualization, cloud technologies and automation have slashed the time it takes to plan and implement new IT services, enterprises are still struggling
More informationWindows 7 Upgrade Risk Mitigation Planning: Ensuring Windows 7 Upgrade Success
November 2010 Windows 7 Upgrade Risk Mitigation Planning: Ensuring Windows 7 Upgrade Success By: Robert Schaper, Laplink Software Enterprise Solutions Contents Introduction 2 Risk and Cost 2 Upgrade Strategies
More informationProviding the staffing solutions you need with the flexibility you want
International IT Staffing, Business Change & Project Solutions Experts Providing the staffing solutions you need with the flexibility you want WWW.GIBBS-S3.COM GIBBS S3 Providing the staffing solutions
More informationThe Future of Project Management: Preparing The Next Generation Project Manager
1 The Future of Project Management: Preparing The Next Generation Project Manager By Harold Kerzner, Ph.D. 10/9/2010 2010 International Institute for Learning, Inc. 1 Best Practices in Project Management
More informationOverview of Future Purchasing s fundamental and advanced training workshops...
Performance Learning Presented by: Anna Del Mar - Director, Performance Learning Future Purchasing Overview of Future Purchasing s fundamental and advanced training workshops... Tailored excellence.. Our
More information2012 National BDPA Technology Conference. Defining Project and PMO Metrics
2012 National BDPA Technology Conference Defining Project and PMO Metrics Betty Hutchins, MBA, PMP August 1 4, 2012 Baltimore, MD Presentation Objectives Project Performance Determine the Process Defining
More informationAsset management guidelines
Asset management guidelines 1 IT asset management (ITAM) overview Objective Provide a single, integrated view of agency assets in order to allow agencies to identify the asset location and assess the potential
More informationBusiness Performance Delivered. 10 Steps to Achieving Success with Salesforce.com SHIFTING FROM CRM ADOPTION TO CRM ADDICTION
Business Performance Delivered 10 Steps to Achieving Success with Salesforce.com SHIFTING FROM CRM ADOPTION TO CRM ADDICTION Revenue 10 Steps to Achieving Success with Salesforce.com Shifting from CRM
More informationISTQB - Certified Tester Advanced Level - Test Manager
CTALTM - Version: 3 30 June 2016 ISTQB - Certified Tester Advanced Level - Test Manager ISTQB - Certified Tester Advanced Level - Test Manager CTALTM - Version: 3 5 days Course Description: Being a technical
More informationOutsourcing Risk - What should every client of outsourced software know about mitigating the risk of project failure? April 2014
Outsourcing Risk - What should every client of outsourced software know about mitigating the risk of project failure? April 2014 Scope of this Report IT Governance is about defining what decisions need
More informationMaking a Bid for Profit
Making a Bid for Profit Your quick-start guide to becoming a profit-driven marketer A Practical Guide thinkwithgoogle.com 1 Introduction Recently, a number of marketers have started a new trend known as
More information0 to 10 Relationship Management. Principles and Practices for High Performance B2B Relationships Facilitated by Gary Ryan
0 to 10 Relationship Management Principles and Practices for High Performance B2B Relationships Facilitated by Gary Ryan www.0to10rm.com Our plan To explain the 11 business relationship types and performance
More informationAchieving Competitive Advantage Through Supply Chain Excellence. Jim Webb, Senior Vice President of Operations, Provista
Achieving Competitive Advantage Through Supply Chain Excellence Jim Webb, Senior Vice President of Operations, Provista Presentation objectives Competitive Forces Sources of Competitive Advantage Focus
More informationImplementing differentiated customer-centric strategies
Implementing differentiated customer-centric strategies Retail-banker-friendly strategy development that resonates with your customers and shareholders An Experian white paper Table of contents Introduction...2
More informationDaryl Fullerton. Oil & Gas Industry Principal
Daryl Fullerton Oil & Gas Industry Principal How increased visibility into e-invoicing & other P2P KPI Metrics speeds up Invoice Payment while also improving Operator / Supplier Relations PIDX EU Conference
More informationINVESTMENT BANKING OPERATIONS MI PLATFORM
INVESTMENT BANKING OPERATIONS MI PLATFORM Investment Banking Operations MI Platform 2 Dependable Management Information (MI) is critical for timely and strategic decision making in investment banking operations.
More informationImproving. Summary. gathered from. research, and. Burnout of. Whitepaper
Whitepaper Improving Productivity and Uptime with a Tier 1 NOC Summary This paper s in depth analysis of IT support activities shows the value of segmenting and delegatingg activities based on skill level
More informationColorado Department of Health Care Policy and Financing
Colorado Department of Health Care Policy and Financing Solicitation #: HCPFRFPCW14BIDM Business Intelligence and Data Management Services (BIDM) Appendix B BIDM Project Phases Tables The guidelines for
More informationHow To Establish A. Cash Incentive Plan. 8575 164th Avenue NE, Suite 100 Redmond, WA 98052 800-627-3697 www.erieri.com
How To Establish A Cash Incentive Plan 8575 164th Avenue NE, Suite 100 Redmond, WA 98052 800-627-3697 www.erieri.com Use this learning aid as a resource for employees to effectively develop, introduce,
More informationClient Onboarding Process Reengineering: Performance Management of Client Onboarding Programs
KNOWLEDGENT INSIGHTS volume 1 no. 4 September 13, 2011 Client Onboarding Process Reengineering: Performance Management of Client Onboarding Programs In the midst of the worst economic environment since
More informationResource Manager Service for provision of ICT contractors CPO 798-11
Resource Manager Service for provision of ICT contractors CPO 798-11 Whole-of-government procurement arrangement Briefing for suppliers QGCPO Department of Housing and Public Works Key messages Consultation
More informationCommercial Software Licensing
Commercial Software Licensing CHAPTER 11: Software Prepared by DoD ESI January 2013 Chapter Overview The government uses three primary agreement types for services: Fixed Price (FP). T&M (Time and Materials).
More informationEVOLVE Customer Relationship Management
EVOLVE Customer Relationship Management With EVOLVE CRM, optimize your sales resources, reduce administrative costs and achieve constistent customer-oriented busieness process Organization and deliver
More informationGlobal Support Center
Global Support Center Next Generation IT Shared Support Services for Enterprise Applications Ramgopal Natarajan My Enterprise Application Landscape has lots of modules but does not need dedicated FTEs
More informationService Value is the End Game Advanced Facilities Performance Management (Part 2 of 2)
Service Value is the End Game Advanced Facilities Performance Management (Part 2 of 2) Alan Green is a Performance Manager within Property at one of the UK leading financial institutions Graeme Chalmers,
More informationBusiness Performance & Data Quality Metrics. David Loshin Knowledge Integrity, Inc. loshin@knowledge-integrity.com (301) 754-6350
Business Performance & Data Quality Metrics David Loshin Knowledge Integrity, Inc. loshin@knowledge-integrity.com (301) 754-6350 1 Does Data Integrity Imply Business Value? Assumption: improved data quality,
More informationHow Silk Central brings flexibility to agile development
How Silk Central brings flexibility to agile development The name agile development is perhaps slightly misleading as it is by its very nature, a carefully structured environment of rigorous procedures.
More informationHow Do You Measure Up? A Case Study in Determining What Metrics Matter Most
How Do You Measure Up? A Case Study in Determining What Metrics Matter Most Wayne Turnbow IT Services Department Manager TID Water & Power Sacramento HDI Agenda Who we are IT Service Management ITIL Measurement
More informationChapter 8 Service Management
Microsoft SQL Server 2000 Chapter 8 Service Management SQL Server 2000 Operations Guide Abstract This chapter briefly presents the issues facing the database administrator (DBA) in creating a service level
More informationAn approach to Return on Investment (ROI) for Independent Verification and Validation (IV&V) at NASA
An approach to Return on Investment (ROI) for Independent Verification and Validation (IV&V) at NASA Bob Hunt September 2012 1 NASA IV&V The NASA IV&V Program was established in 1993 as part of an Agency-wide
More informationLecture 17: Requirements Specifications
Lecture 17: Requirements Specifications Why we need to write specifications Purpose and audience Choosing an appropriate size and formality Desiderata for Specifications Properties of good specifications
More informationDigital Dashboards In Terminal Operations Management
Digital Dashboards In Terminal Operations Management AAPA Marine Terminal Management Training Sept. 12, 2013- Long Beach CA Frank J. Mazzella, APL Ltd. Page 2 What are Dashboards? Real-Time Visualization
More informationEnterprise RIM: Building the Business Case. Steve Gens. Bethesda Maryland: February 25, 2014. Managing Partner Gens and Associates, Inc.
Enterprise RIM: Building the Business Case Bethesda Maryland: February 25, 2014 Steve Gens Managing Partner Gens and Associates, Inc. Disclaimer The views and opinions expressed in the following PowerPoint
More informationInfor Equipment and Rental Fleet Operations - Understanding the Relationship
Technical paper Understand the return on investment before you jump in Dealers, service, and rental providers of heavy equipment face many of the same challenges, and must weigh the same factors as they
More information>>> SOCIAL MEDIA MARKETING ROI CHEATSHEET 40 WAYS TO MEASURE YOUR SOCIAL MEDIA ROI. we inspire people to take action
>>> SOCIAL MEDIA MARKETING ROI CHEATSHEET 40 WAYS TO MEASURE YOUR SOCIAL MEDIA ROI we inspire people to take action OBJECTIVE KPI METRIC + REVENUE SALES LEADS CUSTOMERS WEBSITE CONVERSIONS - COSTS STAFF
More informationUniversity of Colorado Health Performance Incentive Compensation Plan Plan Summary Fiscal Year 2014 Staff/Managers/Directors
University of Colorado Health Performance Incentive Compensation Plan Plan Summary Fiscal Year 2014 Staff/Managers/Directors Plan Purpose The University of Colorado Health provides outstanding patient
More informationFoundations of contract management
The foundations of contract management are laid during the Request for Proposals (RFP) process, when key decisions are made about the service that is required, how its performance will be managed and the
More informationNetwork Operations Visibility Real Time Dashboard that Connects the Field and Business Management
www.sl-j.co.jp APNOMS 2005 Special Session 2-4 Network Operations Visibility Real Time Dashboard that Connects the Field and Business Management Yoshie Hashima President & Representative Director SL Japan
More informationGlobal Account Management for Sales Organization in Multinational Companies *
Global Account Management for Sales Organization in Multinational Companies * Tino Canegrati ** Abstract A Global Company is not just a Multinational Company, but on top it has developed an organizational
More informationTake Your Program to the Next Level: Build a Plan for Continuous Improvement. Webinar Q&A Updated: May 17, 2012
Take Your Program to the Next Level: Build a Plan for Continuous Improvement Webinar Q&A Updated: May 17, 2012 Q: Our company has a highly successful MSP/VMS program in terms of performance, visibility
More information